SU1469178A1 - Method of relieving rock around a working - Google Patents

Method of relieving rock around a working Download PDF

Info

Publication number
SU1469178A1
SU1469178A1 SU864105185A SU4105185A SU1469178A1 SU 1469178 A1 SU1469178 A1 SU 1469178A1 SU 864105185 A SU864105185 A SU 864105185A SU 4105185 A SU4105185 A SU 4105185A SU 1469178 A1 SU1469178 A1 SU 1469178A1
Authority
SU
USSR - Soviet Union
Prior art keywords
unloading
rocks
mining
cavity
carried out
Prior art date
Application number
SU864105185A
Other languages
Russian (ru)
Inventor
Геннадий Васильевич Бабиюк
Сергей Геннадиевич Коробкин
Александр Иванович Мележик
Original Assignee
Коммунарский горно-металлургический институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Коммунарский горно-металлургический институт filed Critical Коммунарский горно-металлургический институт
Priority to SU864105185A priority Critical patent/SU1469178A1/en
Application granted granted Critical
Publication of SU1469178A1 publication Critical patent/SU1469178A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Изобретение относитс  к горной промышленности и м.б. использовано при проведении горных выработок (ГВ) в сложных горно-геологических услови х . Цель - повьшение эффективности разгрузки и безопасности работ, снижение затрат на разгрузку, крепление Изобретение относитс  к горной промьшшенности и может быть использовано при проведении горных выработок в сложных горно-геологических услови х, в частности в выбросоопас- ных породах. Целью изобретени   вл етс  повышение эффективности разгрузки и безопасности работ, снижение затрат на разгрузку, крепление и поддержание выработки. и поддержание ГВ. Способ разгрузки пород в окрестности ГВ осуществл ют следующим образом. При проведении ГВ определ ют главные напр жени  в гор- ном массиве и зоны разрушеци  вмещающих пород. Осуществл ют бурение из ГВ скважин и шпуров. Скважины располагают под углом к груди забо . Размещают в шпурах и скважинах зар ды взрывчатого вещества и взрывают их одновременно, В результате взрыва образуетс  разгрузочна  полость (РП), заполненна  породой. При этом РП опережает забой ГВ и ее располагают перпендикул рно главным напр жени м. Мощность ненарушенных пород между контуром ГВ и РП формируют равной двойной высоте РП, Ширину РП выполн ют равной ширине ГВ. При меньшей мощности ненарушенных пород они будут разрушатьс  взрывом, а при меньшей ширине РП разгрузка пород в окрестности ТВ будет неэффективнойi 1 ил. SU (Л На чертеже показана схема проведени  горной выработки и образовани  разгрузочной полости, Способ осуществл ют следующим образом. При проведении горной выработки 1 определ ют главные напр жени  в горном массиве и возможные зоны разрушени  вмещающих пород, бур т 4:: С5 ;о СХ)The invention relates to the mining industry and m. used in mining operations (GW) in difficult mining and geological conditions. The goal is to increase the efficiency of unloading and safety of work, reducing the cost of unloading, fixing. The invention relates to mining and can be used when mine workings are carried out in difficult geological conditions, in particular in outburst-hazardous rocks. The aim of the invention is to increase the efficiency of unloading and safety of work, reducing the cost of unloading, fixing and maintaining production. and maintaining HBV. The method of unloading rocks in the vicinity of the GW is carried out as follows. When conducting HW, principal stresses in the mountain massif and zones of destruction of the host rocks are determined. Drilling from HB wells and boreholes is carried out. The wells are located at an angle to the bottom of the chest. The explosive charges are placed in bore-holes and boreholes and they are blown up simultaneously. As a result of the explosion, an unloading cavity (RP) is formed, filled with rock. In this case, the RP leads to the bottom of the HS and is located perpendicular to the main voltage. The thickness of the undisturbed rocks between the HS circuit and the RP is formed equal to twice the RP height, the RP width is equal to the width of the HS. With a smaller capacity of undisturbed rocks, they will be destroyed by an explosion, and with a smaller width of the SP, the unloading of rocks in the vicinity of TV will be ineffective 1 sludge. SU (L The drawing shows the scheme of mining and the formation of the discharge cavity, The method is carried out as follows. When mining 1, the main stresses in the mountain massif and possible destruction zones of the host rocks are determined, drill 4 :: C5; )

Description

314314

забойные шпуры 2 и скважины 3, располага  последи а веерообразно, под углом к груди забо  вьфаботки f и в шахматном пор дке, при этом скважины 3 выход т за контуры выработки 1, Затем в шпурах 2 и в скважинах 3 размещают зар ды взрывчатого вещества и в зрывают их одновременно. В результате взрыва образуетс  разгрузочна  полость 4, заполненна  породой 5. Полость 4 опережает забой выработки 1 и ее располагают перпендикул рно главным напр йсени м. Массу зар дов взрывчатого вещества в скважинах 3 и глубину их заложени  определ ют КЗ услови  обеспечени  камуф- летности взрьша, дл  чего мощность ненарушенных пород между контуром выработки 1 и разгрузочной полостью 4 принимают равной двойной высоте полости 4, а ширину разгрузочной полости - равной ширине горной выработки 1.The downhole bore-holes 2 and boreholes 3 are located after the fan-shaped, at an angle to the chest of the bottom face f and in a staggered order, with the boreholes 3 coming out of the contours of production 1, then charges of explosives are placed in the boreholes 2 and boreholes 3 in tearing them at the same time. As a result of the explosion, an unloading cavity 4 is formed, filled with rock 5. The cavity 4 is ahead of the bottom of the mine 1 and is positioned perpendicularly to the main lines. The mass of explosive charges in the wells 3 and the depth of their laying determine the short-term condition of camouflage, for which the thickness of undisturbed rocks between the contour of the excavation 1 and the unloading cavity 4 is taken equal to double the height of cavity 4, and the width of the unloading cavity equal to the width of the excavation 1.

При меньшей мощности ненарушенных пород они будут разрушатьс  взрывом , а при меньшей ширине разгрузочном полости 4 разгрузка пород в окрестности выработки 1 будет неэффективной .With a smaller capacity of undisturbed rocks, they will be destroyed by an explosion, and with a smaller width of the unloading cavity 4, the unloading of rocks in the vicinity of generation 1 will be ineffective.

Claims (1)

Формула изобретени Invention Formula Способ разгрузки пород в окрестности выработки, включающий определение главных напр жений в горном массиве и зон разрушени  вмещающих пород, бурение из выработки скважин и шпуров с последующим взрыванием шпуровых зар дов в забое, образование разгрузочной полости взрыванием скважинных зар дов взрывчатого вещества , отличающийс   тем.The method of unloading rocks in the vicinity of the mine, including determining the main stresses in the mountain massif and the zones of destruction of the host rocks, drilling out of the wells and holes, followed by blasting blast-hole charges in the bottomhole, forming an unloading cavity by blasting the explosive borehole charges, differing in that. что, с целью повышени  эффективности разгрузки и безопасности работ, снижени  затрат на разгрузку, разгрузочную полость образуют в породах кровли выработки с опережением забо  выработки,скважины располагают под углом к груди .забо , взрывание скважинных зар дов взрывчатого вещества осуществл ют одновременно с взрыванием шпуровых зар дов в забое проводимой выработки, при этом полость заполн ют взорванной породой и располагают ее перпендикул рно главным напр жени м, мощность ненарушенных пород между контуром выработки и разгрузочной полостью формируют равной двойной высоте полости, а, ширину разгрузочной полости - равной ширине выработки.that, with the aim of increasing the efficiency of unloading and safety of work, reducing the cost of unloading, the unloading cavity forms roofs in the rocks of the excavation ahead of downhole production, the wells are angled to the chest, the blasting of the explosive well bore charges simultaneously with the blasting of blast hole charges In this case, the cavity is filled with blasted rock and its perpendicular main stresses are placed, the thickness of undisturbed rocks between the working and unloading contour second cavity is formed equal to twice the height of the cavity, and a width of discharge cavity - of equal width output. 77 ТT
SU864105185A 1986-05-13 1986-05-13 Method of relieving rock around a working SU1469178A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864105185A SU1469178A1 (en) 1986-05-13 1986-05-13 Method of relieving rock around a working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864105185A SU1469178A1 (en) 1986-05-13 1986-05-13 Method of relieving rock around a working

Publications (1)

Publication Number Publication Date
SU1469178A1 true SU1469178A1 (en) 1989-03-30

Family

ID=21251926

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864105185A SU1469178A1 (en) 1986-05-13 1986-05-13 Method of relieving rock around a working

Country Status (1)

Country Link
SU (1) SU1469178A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 470626, кл, Е 21 D 9/00, 1975, Авторское свидетельство СССР № 817253, кл. Е 21 С 37/00, Е 21 D 9/00, 1981. *

Similar Documents

Publication Publication Date Title
SU1469178A1 (en) Method of relieving rock around a working
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
SU1116177A1 (en) Method of driving a mine working in rock body with gas-dynamic hazard
SU1469137A1 (en) Roof control method
RU2019705C1 (en) Method for control of heaving of mine working floor
RU2012804C1 (en) Method for protection of workings from rock pressure
SU1615367A1 (en) Method of relieving mined coal seams from extra stress
SU1461930A1 (en) Method of combined mining of mineral deposits
SU1634784A1 (en) Method for sealing off mine workings
SU817253A1 (en) Method of driving a mine working
SU1469150A1 (en) Method of relieving from strain the outline of a mine working
SU1506109A1 (en) Method of protecting development workings
SU877071A1 (en) Method of degassing coal beds
RU1770571C (en) Method for making raise mine working
SU1180518A1 (en) Method of enhancing the stability of fissured rock when driving mine workings
SU1553706A1 (en) Method of constructing a mine working
SU675191A1 (en) Method of preventing rock burst shocks
SU1555502A2 (en) Method of relieving a mine working from strain
SU796426A1 (en) Method of controlling a solid roof
SU1555487A1 (en) Method of breaking an ore body
SU983273A1 (en) Method of protecting a preparatory working
SU1516603A1 (en) Method of driving horizontal workings
SU1642009A1 (en) Method of controlling stability of parent rock in stopes
SU1427076A1 (en) Method of driving a mine working
SU1546665A1 (en) Method of rock bump control in entry-driving