SU1416647A1 - Power transmission line support - Google Patents

Power transmission line support Download PDF

Info

Publication number
SU1416647A1
SU1416647A1 SU864141464A SU4141464A SU1416647A1 SU 1416647 A1 SU1416647 A1 SU 1416647A1 SU 864141464 A SU864141464 A SU 864141464A SU 4141464 A SU4141464 A SU 4141464A SU 1416647 A1 SU1416647 A1 SU 1416647A1
Authority
SU
USSR - Soviet Union
Prior art keywords
support
uprights
strut
flexible
console
Prior art date
Application number
SU864141464A
Other languages
Russian (ru)
Inventor
Николай Александрович Сенькин
Михаил Данилович Косолапов
Татьяна Владимировна Кузнецова
Сергей Валентинович Тыричев
Original Assignee
Ухтинский индустриальный институт
Районное Энергетическое Управление "Комиэнерго"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ухтинский индустриальный институт, Районное Энергетическое Управление "Комиэнерго" filed Critical Ухтинский индустриальный институт
Priority to SU864141464A priority Critical patent/SU1416647A1/en
Application granted granted Critical
Publication of SU1416647A1 publication Critical patent/SU1416647A1/en

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

Изобретение относитс  к области строительства опор линий электропередачи Целью изобретени   вл етс  снижение материалоемкости и времени возведени . Опора включает Х-образно соединенные стойки 1,- установленные ка фундаменты 2 и св занные гори- . зонтальной балкой 3, и подкос 4 с консолью, шарнирно прикрепленный к балке 3 с возможностью поворота в плоскости линии. Траверса 6 выполнена гибкойо Гирл нды изол торов прикреплены к траверсе 6 и гибким св з м 9, объедин ющим верхние и нижние концы стоек по одну сторону от вертикальной оси опорЫо Гибкие св зи 1 объедин ют верхние концы стоек с основанием подкоса, гибкие св зи 12 - с консолью подкоса, гибкие св зи 13 - нижние концы стоек с консолью подкоса , дополнительные св зи 14 - основа- fi ние подкоса с его консолью через точку пересечени  стоек, 3 з,п,ф-лы, 5 Ш1о СЛThe invention relates to the field of construction of transmission line supports. The aim of the invention is to reduce the consumption of materials and the time of construction. The support includes X-shaped connected racks 1, - installed on foundations 2 and associated horizons. horizontal beam 3, and the strut 4 with the console, pivotally attached to the beam 3 can be rotated in the plane of the line. Traverse 6 is made of flexible Insulator beads attached to traverse 6 and flexible links 9, connecting the upper and lower ends of the uprights on one side of the vertical axis of the base. Flexible connections 1 unite the upper ends of the uprights with the base of the strut, flexible connections 12 - with the strut console, flexible connections 13 - the lower ends of the uprights with the strut console, additional connections 14 - the foundation of the strut with its console through the point of intersection of the uprights, 3 H1, SL

Description

Изобретение относитс  к строительству опор линий электропередачи вьг сокого напр жени  в труднодоступных районах с т желыми грунтовыми уело- The invention relates to the construction of poles for power transmission lines of high voltage in hard-to-reach areas with heavy groundwater.

ВИЯМИ.Viyami.

Целью изобретени   вл тс  снижение материалоемкости и времени возведени .The aim of the invention is to reduce material consumption and erection time.

На фиг. 1 изображена опора линии электропередачи (в аксонометрии); на фиг о 2 - то же, с жесткими консол ми и У-образными отт жками и св - з ми; на фиг. 3 - опора, вид в плоскости траверс; на фиг. 4 - то же, вид в плоскости линии; на фиг 5, - опора-пакет с подкосом, расположенным в плоскости стоек.FIG. 1 shows a power line pylon (perspective view); Fig 2 shows the same, with rigid consoles and Y-shaped delays and links; in fig. 3 - support, view in the plane of the traverse; in fig. 4 - the same view in the plane of the line; Fig 5, - support package with a strut located in the plane of the racks.

Опора линии электропередачи включает две Х-образно соединенные стой- ки 1, шарнирно установленные на фундаменты 2 и св занные горизонтальной балкой 3, подкос 4, установленный на фундамент, шарнирно прикрепленный к балке 3 посредством шарнира 5 и поддерживающий стойки 1, гибкую траверсу 6, гирл нды изол торов 7, гиб- 1дае, снабженные нат жными приспособлени ми 8, св зи 9, объедин ющие верх ние и нижние ко 1Нцы стоек по одну сто- рону от вертикальной оси опоры, зат жки 10, объедин ющие точки опирани  стоек с подкоса, гибкие св зи 11, присоедин ющие верхние концы стоек 1 с основанием подкоса, гибкие св з 12, соедин ющие верхние концы стоек с консолью подкоса 4, гибкие св зи 13, объедин ющие консоль подкоса 3 и нижние концы стоек, дополнительные св зи 14, св зывающие точку пересечени  стоек с консолью подкоса, и консольные элементы 15, расположенные в плоскости стоек 1 и прикрепленные к их верхним концам, обеспечивающие присоединение к iffiM траверсы и гибких св зей , объедин клцих верхние и нижние концы стоек по одну сторону от вертикальной оси опоры.The power line support includes two X-shaped legs 1, pivotally mounted on foundations 2 and connected by a horizontal beam 3, a strut 4 mounted on a foundation pivotally attached to beam 3 by means of a hinge 5 and supporting pillars 1 flexible traverse 6, bends of insulators 7, bend-1 dae, equipped with tensioning devices 8, links 9, uniting the upper and lower corners 1 of the legs of racks one side from the vertical axis of the support, the hooks 10, connecting the points of the supports with strut, flexible connections 11 joining Upper ends of racks 1 with strut base, flexible connections 12, connecting the upper ends of the racks to the strut console 4, flexible connections 13 connecting the strut console 3 and the lower ends of the racks, additional links 14 connecting the intersection point of the racks to the console a strut, and cantilever elements 15, located in the plane of the uprights 1 and attached to their upper ends, allowing the crossbars and flexible links to be joined to the iffiM, joining the upper and lower ends of the uprights on one side of the vertical axis of the support.

Стойки 1, балка 3, подкос 4 и элементы 15 могут быть вьшолнены дерев нными из бревен или металлическими, имеющими многогранное полое сечение, и изготовленными из легких сплавов.The pillars 1, the beam 3, the strut 4 and the elements 15 can be made of wood from logs or metal, having a multifaceted hollow section, and made of light alloys.

Фундаменты 2 дл  опирани  на грунтовое основание со слабыми грунтами выполнены в виде поверхностных фундаментов , например, из стандартных металлических ребристых плит из легкихFoundations 2 for resting on a soil base with weak soils are made in the form of surface foundations, for example, from standard metal ribbed slabs of light

сплавов или бревенчатых плотов, или емкостей, заполненных балластом.alloys or log rafts, or tanks filled with ballast.

Гирл нды изол торов 7 выполн ютс  легкими, прочными и долговечными, например из полимерных изолирующих материалов.The sleeves of the insulators 7 are made light, strong and durable, for example, from polymeric insulating materials.

Св зи 9, 11-14 и зат жки 10 выполнены гибкими, например, из стального троса и снабжены приспособлени ми 8 типа талрепа, при помощи которых в них осуществл етс  предварительное напр жение Гибкие св зи 11-13 могут быть вьшолнены расщепленными.Links 9, 11-14 and puffs 10 are made flexible, for example, from a steel cable and are equipped with lanyard-type devices 8 with which they are prestressed. Flexible connections 11-13 can be made split.

Две пересекающиес  стойки 1, объединенные балкой 3 с шарниром 5, гибкими траверсой 6 и т гами 9 гирл ндами изол торов 7 и одной з ат жкой 10 образуют достаточно жесткую плоскую рабочую грань опоры.Two intersecting pillars 1, joined by beam 3 with hinge 5, flexible crosshead 6 and ti 9 bend insulators 7 and one pull 10, form a fairly rigid flat working face of the support.

Основные габаритные размеры опоры по вертикали определ ютс  требовани ми высоты подвески токоведущих элементов , а в верхней части опоры по горизонтали - услови ми защиты от перенапр жений . Размеры по горизонтали нижней части опоры определ ютс  услови ми прочности грунта и общей устойчивости опоры, откуда определ ютс  рассто ни  между фундаментами 2, размещаемыми так, чтобы давление на слабьй грунт под подошвой сжатого фувдамента и сила, отрывающа  поднимаемый фундамент, не превьшали предельные .значени . .Целесообразно, чтобы равнодействующа  всех приложенных к опоре сил находилась в вертикальной плоскости, проход щей через центр т жести опорного треугольника, образованного зат жками 10. Так же целесообразно , чтобы длина подкоса 4 не пре вьшила длины стойки 1 (исход  из условий складывани  опоры).The main dimensions of the support vertically are determined by the requirements for the suspension height of the current-carrying elements, and in the upper part of the support horizontally by the conditions of overvoltage protection. The horizontal dimensions of the lower part of the support are determined by the strength of the soil and the overall stability of the support, from where the distances between foundations 2 are located so that the pressure on the weak soil under the bottom of the compressed basement and the force tearing off the lifted foundation do not exceed the limiting values . It is advisable that the resultant of all forces applied to the support be in a vertical plane passing through the center of gravity of the supporting triangle formed by the pulls 10. It is also advisable that the length of the brace 4 does not exceed the length of the rack 1 (based on the conditions of folding) .

При эксплуатации опоры под воздействием нагрузок в стойках 1 и иодкосе 4 возникают в основном сжимающие усили , в балке 3 и консол х 15 - изгибающие моменты, а в гибких траверсе 6 гирл ндах изол торов 7, зат жках 10 и св зах 8, 11-14 - усили  раст жени . При этом целесообразно, чтобы усили  раст жени  в гибких элементах, возникающие при предварительном напр жении , были не ниже возможных уси- ЛИЙ сжати  в них о Дополнительные св зи 14 целесообразно устанавливать при больших усили х в стойках 1оDuring the operation of the support, under the influence of loads, in racks 1 and iodkose 4 there arise mainly compressive forces, in beam 3 and consoles 15 - bending moments, and in flexible traverse 6 bends of insulators 7, plugs 10 and bridges 8, 11- 14 - effort to stretch. In this case, it is advisable that the tensile forces in the flexible elements arising under the prestressing should not be lower than the possible forces of compression in them about the Additional links 14, it is advisable to install at high forces in the racks 1o

Полную сборку опоры также можно .производить на папигоне, преимущественно вместе с фундаментами 2, и траспортировать ее в рабочем виде на трассу при помощи вертолетной техникиThe complete assembly of the support can also be made on a papigon, mainly along with foundations 2, and transported in a working form onto the track using helicopter technology.

Возведение опоры, резервируемой дп  аварийно-восстановительных работ на лини х электропередачи, осуществлетс  в три этапа,The construction of a support, backup dp emergency repair works on power lines, is carried out in three stages,

Первьй этап включает сборку рабочей грани, присоединение подкоса 4 к балке 3 и месту пересечени  стоек . подготовку пакета дл  хранени  на закрытом складе или транспортировани .The first stage includes the assembly of the working face, the joining of the strut 4 to the beam 3 and the place where the racks intersect. preparing the bag for storage in a closed warehouse or transport.

Второй этап включает строповку опоры-пакета за верхнюю часть и транспортирование на трассу вертолетом.The second stage involves slinging the support package for the upper part and transportation to the route by helicopter.

Третий этап включает установку опоры-пакета нижними концами стоек 1 на заранее подготовленные фундаменты 2, прикрепление к ним и выведение опоры-пакета в горизонтальное положение , опустив ее на третий фундамент 2 о Затем производитс  открепле- ние подкоса 4 от точки пересечени  ст.оек 1 и присоединение зат жек 10 к нижним концам стоек 1, гибких св зей 11 и 12, к верхним концам стоек а гибких св зей 13 - к верхнему кон- цу подкоса 4о Далее производитс  подъем опоры вертолетом способом поворота относительно неподвижной оси, проход щей через точку опирани  стоек 1 до тех пор, пока подкос 4, скол з пщй нижним концом по поверхности земли, не встанет на свой фундамент После этого прикрепл ют зат жки 10 и отцепл ют крюк-захват вертолетаThe third stage involves installing the package support with the lower ends of the pillars 1 on the prepared bases 2, attaching to them and removing the package package in a horizontal position, lowering it onto the third base 2 o. Then, the brace 4 is detached from the intersection point of the rack 1 and attachment of the plugs 10 to the lower ends of the uprights 1, the flexible links 11 and 12, to the upper ends of the uprights, and the flexible links 13 to the upper end of the brace 4o. Next, the support of the helicopter is lifted by turning the relatively fixed axis through the point about the racks 1 until the strut 4, with its lower end on the ground, stands on its foundation. After that, the braces 10 are attached and the hook is seized

ми mi

водит к резкому сокращению трудозатрат и периода ремонтно-восстановитель ных работ, а значит и к значительному снижению народно-хоз йственного ущерба при авари х на лини х электропередачи , особенно в нефтегазодобывающих районах, районах Крайнего Севера и Сибири.leads to a sharp reduction in labor costs and the period of repair and restoration work, and hence to a significant reduction in national economic damage in the event of accidents on power lines, especially in oil and gas producing areas, areas of the Far North and Siberia.

Claims (1)

Формула изобретени Invention Formula 1о Опора линии элект |гопередачи, включающа  Х-образно соединенные стойки , установленные на фундаменты, подкос , траверсу и гирл нды изол торов, отличающа с  тем, что, с целью снижени  материалоемкости, и времени возведени , стойки снабжены горизонтальной балкой, установленной ниже их узла пересечени , подкос закреплен к балке с образованием консоли ,а траверса выполнена гибкой, при этом опора снабжена гибкими св з ми, одни из которых объедин ют верхние концы стоек и основание подкоса, другие - верхние и нижние концы стоек , расположенные по одну сторону от вертикальной оси опоры, третьи - верхние и нижние концы стоек с консолью подкоса, дополнительными св з ми , объедин кщйми основание подкоса с консолью его через точку пересечени  стоек, и зат жками, соедин ющиточки опкрани  стоек и подкосов.1o Electro-transmission line support, including X-shaped connected racks installed on foundations, brace, traverse and wire of insulators, characterized in that, in order to reduce material consumption and erection time, the racks are equipped with a horizontal beam installed below them the intersection assembly, the strut is fixed to the beam with the formation of a cantilever, and the traverse is made flexible, while the support is provided with flexible connections, some of which combine the upper ends of the uprights and the base of the strut, others - the upper and lower ends of the uprights, located on one side of the vertical axis of the support, the third - the upper and lower ends of the uprights with the console brace additional bonds, combined kschymi base strut with the console through the intersection point of its uprights and puffs connecting yuschitochki opkrani struts and braces. 2 о Опора по По 1, отличающа с  тем, что,гирл нды изол торов прикреплены к гибким траверсам и гибким св з м, объедин нщим верх-2 o The support according to claim 1, characterized in that the wires of the insulators are attached to flexible crossbars and flexible connections connecting the upper ные по одну сторону от вертикальной оси опоры.on one side of the vertical axis of the support. Зо Опора по п. 1, отличающа с  тем, что подкос закреплен 45 к горизонтальной балке шарнирно с возможностью поворота в плоскости линии электропередачи. The support according to Claim 1, characterized in that the strut is fixed 45 to the horizontal beam pivotally with the possibility of rotation in the plane of the transmission line. Затем производ т прикрепление вис щих 40 ние и нижние стоек, расположен- концов гибких св зей 11-13оИ посредством встроенных в них нат жных при способлений 8 создают предварительное напр жение„Then, the hangings are mounted and the bottom racks are located; the flexible end joints 11–13 ° C are located at the end of which, by means of the tensioning devices built into them, at 8, they create a preliminary stress. После подвески проводов и тросов, осуществл емой также вертолетом, опора готова к работе.After the suspension of wires and cables, also carried out by helicopter, the support is ready for operation. Демонтаж опоры вьшолн етс  в обратном пор дке, также с использованием вертолетной техники.ggThe disassembly of the support is performed in reverse order, also using helicopter technology. Таким образом, значительно увеличиваетс  жесткость опоры, снижаетс  ее стоимость, сокращаютс  трудоемкость и врем  возведени  линий электропередачи на труднодоступных трассах сThus, the rigidity of the support increases significantly, its cost decreases, the labor intensity and time of the construction of transmission lines on hard-to-reach roads from 55 т жельми грунтовыми услови ми, в частности на болотах55 tons groundwater conditions, particularly in swamps Применение опоры при проведении ремонтно-восстановительных работ при4о Опора по п. 1, -о т л и ч а- ю щ а   с   тем, что гибкие св зи, объедин ющие верхние концы стоек с консолью подкоса и его основанием, выполнены расщеш1енны14И, а вершины стоек снабжены жесткими консольными элементами, к концам которых прикреплены гибка  траверса и гибкие св зи, объедин ющие верхние и нижние концы стоек, расположенные по одну сторону от вертикальной оси опоры.The use of a support when carrying out repairs and restoration work The support according to claim 1, -Tl and ch and so that the flexible connections that unite the upper ends of the uprights with the strut console and its base, are cross-linked, and the tops of the uprights are provided with rigid cantilever elements, to the ends of which are attached a flexible traverse and flexible connections that unite the upper and lower ends of the uprights located on one side of the vertical axis of the support. ные по одну сторону от вертикальной оси опоры.on one side of the vertical axis of the support. Зо Опора по п. 1, отличающа с  тем, что подкос закреплен 45 к горизонтальной балке шарнирно с возможностью поворота в плоскости линии электропередачи. The support according to Claim 1, characterized in that the strut is fixed 45 to the horizontal beam pivotally with the possibility of rotation in the plane of the transmission line. 0 ние и нижние стоек, расположен- 0 and bottom racks, located- 4о Опора по п. 1, -о т л и ч а- ю щ а   с   тем, что гибкие св зи, объедин ющие верхние концы стоек с консолью подкоса и его основанием, выполнены расщеш1енны14И, а вершины стоек снабжены жесткими консольными элементами, к концам которых прикреплены гибка  траверса и гибкие св зи, объедин ющие верхние и нижние концы стоек, расположенные по одну сторону от вертикальной оси опоры.4o The support according to claim 1, -o tl and ch and y with the fact that the flexible connections that unite the upper ends of the uprights with the strut console and its base are made crosswise, and the tops of the uprights are equipped with rigid cantilever elements, the ends of which are attached to a flexible yoke and flexible links that unite the upper and lower ends of the uprights, located on one side of the vertical axis of the support. /5/five .3.3 1Z1Z Г/G / ffl.ffl. Составитель M, Корчак Редактор Н. ГорватТехред Л.блййнык. КорректорС Шекма р.Compiled by M, Korchak Editor N. GorvatTehred L. blyik. Proofreader Shekma r. Заказ 4042/30Order 4042/30 Тир.аж 688Tir.azh 688 ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee по делам изобретений и открытий 113035, Москва, Ж-35, Раушска  наб., д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., 4/5 tffaff.Stffaff.S .Подписное.Subscription
SU864141464A 1986-10-31 1986-10-31 Power transmission line support SU1416647A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864141464A SU1416647A1 (en) 1986-10-31 1986-10-31 Power transmission line support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864141464A SU1416647A1 (en) 1986-10-31 1986-10-31 Power transmission line support

Publications (1)

Publication Number Publication Date
SU1416647A1 true SU1416647A1 (en) 1988-08-15

Family

ID=21265342

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864141464A SU1416647A1 (en) 1986-10-31 1986-10-31 Power transmission line support

Country Status (1)

Country Link
SU (1) SU1416647A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2614180C1 (en) * 2015-12-24 2017-03-23 Акционерное общество энергетики и электрификации "Тюменьэнерго" Prefabricated light support for emergency and restoration works on power lines
RU183315U1 (en) * 2018-04-18 2018-09-18 Федеральное государственное бюджетное учреждение науки Институт проблем нефти и газа Сибирского отделения Российской академии наук Quick-mounted support for emergency recovery work on power lines
RU2768534C1 (en) * 2021-07-19 2022-03-24 Акционерное общество "Научно-производственное предприятие "Алтик" Method of mounting a permanent quick-erect lightweight support for emergency recovery works on power transmission lines
RU2781646C2 (en) * 2022-04-04 2022-10-17 Акционерное общество "Научно-производственное предприятие "Алтик" Prefabricated lightweight support for emergency recovery work on power lines

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Патент US № 3162719, кло Е 04 С 3/30, опублик. 1962, Авторское свидетельство СССР R 65425, кло Е 21 С 12, 1939 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2614180C1 (en) * 2015-12-24 2017-03-23 Акционерное общество энергетики и электрификации "Тюменьэнерго" Prefabricated light support for emergency and restoration works on power lines
RU183315U1 (en) * 2018-04-18 2018-09-18 Федеральное государственное бюджетное учреждение науки Институт проблем нефти и газа Сибирского отделения Российской академии наук Quick-mounted support for emergency recovery work on power lines
RU2768534C1 (en) * 2021-07-19 2022-03-24 Акционерное общество "Научно-производственное предприятие "Алтик" Method of mounting a permanent quick-erect lightweight support for emergency recovery works on power transmission lines
RU2781646C2 (en) * 2022-04-04 2022-10-17 Акционерное общество "Научно-производственное предприятие "Алтик" Prefabricated lightweight support for emergency recovery work on power lines
RU2806378C2 (en) * 2023-03-14 2023-10-31 Акционерное общество "Научно-производственное предприятие "Алтик" Prefabricated support for power lines and method of its construction
RU220429U1 (en) * 2023-08-01 2023-09-13 Публичное акционерное общество "Якутскэнерго" (ПАО "Якутскэнерго") Temporary mobile power line support

Similar Documents

Publication Publication Date Title
CN111622126A (en) Construction method of high-altitude vertical manned channel in high mountain rock area
AU2001239558B2 (en) Method of constructing structures useful as catwalks and building scaffolds on slopes, and catwalk and building scaffold constructed thereby
SU1416647A1 (en) Power transmission line support
JP2005299111A (en) Temporary strut and its erection method
CN110318344B (en) Novel steel box girder No. 0 block support and No. 0 block erection construction method
JPH02503099A (en) Cable supported bridge and construction method
JP2812885B2 (en) Construction method of steel pipe arch
US3182761A (en) Skeleton structure
JP2645758B2 (en) Construction method of suspension bridge type pipe bridge
JPH01210510A (en) Method of installation construction of structure such as bridge
JPH01322064A (en) Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe
JP2691261B2 (en) Facility method of arch form support
CN219490682U (en) Basket hanging device for prestress construction of light T-pier cantilever cap beam
CN114776035B (en) Construction method of oblique spoke type cable truss structure
JP3100574B2 (en) Suspended scaffold and its erection method
JPH11107219A (en) Wire scaffold and construction thereof
CN116607746B (en) Construction process for replacing and dismantling top support of large cantilever steel structure
CN212507521U (en) Telescopic elevator shaft protection device
CN210238299U (en) Support base for slide way beam
CN212926974U (en) External hanging rack structure
US3393480A (en) Antenna supporting tower and method of constructing same
JP2691262B2 (en) Facility method of arch form support
CN118187465A (en) Truss and upright post construction method
CN205743069U (en) A kind of high-supported formwork support dilatory for support steel beam
SU1567752A1 (en) Power transmission line support