SU1406388A1 - Method of constructing a mine working - Google Patents

Method of constructing a mine working Download PDF

Info

Publication number
SU1406388A1
SU1406388A1 SU864084676A SU4084676A SU1406388A1 SU 1406388 A1 SU1406388 A1 SU 1406388A1 SU 864084676 A SU864084676 A SU 864084676A SU 4084676 A SU4084676 A SU 4084676A SU 1406388 A1 SU1406388 A1 SU 1406388A1
Authority
SU
USSR - Soviet Union
Prior art keywords
holes
anchors
mass
drill holes
length
Prior art date
Application number
SU864084676A
Other languages
Russian (ru)
Inventor
Владимир Иванович Штеле
Original Assignee
В. И. Штеле
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by В. И. Штеле filed Critical В. И. Штеле
Priority to SU864084676A priority Critical patent/SU1406388A1/en
Application granted granted Critical
Publication of SU1406388A1 publication Critical patent/SU1406388A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Изобретение относитс  к способам проведени  горных выработок в крепких горных породах. Цель изобретени  - снижение трудоемкости проходческих работ и и повышение устойчивости горных пород вокруг выработки. Проход т выработку сечением меньше проектного. Пробуривают шпуры за проектный контур выработки. В законтурную часть шпуров устанавливают трубчатые анкеры. Длину анкеров принимают равной длине законтурной части шпуров. Полости анкерных труб и прикон- турную часть шпуров одновременно заполн ют твердеющей расшир юш.ейс  массой. В полости труб анкеров за счет расширени  твердеюш.ей массы создаетс  радиально направленное давление и анкеры надежно расклиниваютс  в законтурной части шпуров Твердеюш,а  масса, расположенна  в при- контурной части шпуров, оказывает на горные породы разрушаюшее действие.This invention relates to methods for mining in hard rock. The purpose of the invention is to reduce the labor intensity of the tunnel works and to increase the stability of the rocks around the mine. Pass t generation section less than the project. Drilled holes for the design contour development. Tubular anchors are installed in the boring part of the drill holes. The length of the anchors is taken equal to the length of the contour part of the holes. The cavities of the anchor tubes and the near-hole portion of the drill holes are simultaneously filled with a hardening widened mass. In the cavity of the anchor pipes, due to the expansion of the hardened mass, a radially directed pressure is created and the anchors are reliably wedged in the boundary part of the drill holes Hardened, and the mass located in the boundary part of the drill holes has a destroying effect on the rocks.

Description

05 0005 00

0000

СХ)CX)

Изобретение относитс  к способам нрове- дени  горных выработок в крепких горных породах.The invention relates to methods for laying mines in hard rocks.

Целью изобретени   вл етс  снижение трудоемкости проходческих работ и повышение устойчивости горных пород вокруг выработки .The aim of the invention is to reduce the labor intensity of the tunnel works and increase the stability of the rocks around the excavation.

Технологи  способа сооружени  горной выработки заключаетс  в следующем.The technology for the construction of the mine is as follows.

Проход т выработку сечением меньше проектного. Пробуривают шпуры за проектный контур выработки. Затем в законтурную часть шпуров устанавливают трубчатые анкеры, концы которых совмещают с проектным контуром выработки. Длину анкеров принимают равной длине законтурной части шпуров. Затем полости анкерных труб и приконтурную часть шпуров одновременно заполн ют твердеющей расшир ющейс  массой, В полости труб за счет рас- ншрени  твердеющей массы создаетс  ра- диально направленное давление, и они надежно расклиниваютс  в законтурной части innypoB. Твердеюща  масса, расположенна  в приконтурной части шпуров, оказывает на горные породы разрушающее действие. После обращени  приконтурного сло  горных пород образуетс  проектный контур выработки с заанкерованными вокруг нее горными породами.Pass t generation section less than the project. Drilled holes for the design contour development. Then tubular anchors are installed in the boring part of the drill holes, the ends of which are combined with the design contour of the working. The length of the anchors is taken equal to the length of the contour part of the holes. Then the cavities of the anchor tubes and the marginal part of the drill holes are simultaneously filled with a hardening expanding mass. Radially directed pressure is created in the cavity of the tubes due to the expansion of the solidifying mass, and they are reliably wedged in the contour portion of innypoB. The hardening mass, located in the marginal part of the hole, has a destructive effect on the rocks. After turning the marginal layer of rocks, a design contour of the mine is formed with rocks anchored around it.

В качестве трубчатых анкеров используют трубы, внешний диаметр которых равен или на 1-5 мм мefIьшe диаметра шпуров . Толщина стенок труб может состав- ;1 ть 2-4 мм. Дл  исключени  разруше- ни  горных пород в окрестности трубчатых анкеров их каналы могут заполн тьс  твердеющей массой, котора  создает давление не более 10-20 МПа.As tubular anchors, pipes are used whose outer diameter is equal to or 1-5 mm of mine diameter of drill holes. The thickness of the pipe walls can be as small as 1-4 mm. To avoid the destruction of rocks in the vicinity of tubular anchors, their channels can be filled with a solidifying mass, which creates a pressure of no more than 10–20 MPa.

10ten

Claims (1)

Формула изобретени Invention Formula Способ сооружени  горной выработки, включающий проходку выработки сечением меньше проектного, бурение шпуров за проектный контур выработки, крепление законтурного горного массива и разрущение приконтурного горного массива, отличающийс  тем, что, с целью снижени  трудоемкости проходческих работ и повыщени  устойчивости горных пород вокруг выработки , крепление законтурного горного массива осуществл ют путем установки в шпурах трубчатых анкеров, длину которых принимают равной длине законтурной части шпуров, затем одновременно заполн ютA method of constructing a mine working, which includes sinking a section less than the designed section, drilling holes for the project mining contour, fixing a ridge mountain massif and destroying an edge mountain massif, characterized in that, in order to reduce the labor intensity of tunnel works and increase the stability of the rocks around the mine, mount the boundary the rock mass is carried out by installing tubular anchors in bores, the length of which is taken to be equal to the length of the boring part of the holes, then simultaneously filling ny полости трубчатых анкеров и приконтурную часть шпуров твердеющей расщир ющейс  массой.the cavity of the tubular anchors and the marginal part of the bore-hole hardening expanding mass.
SU864084676A 1986-06-25 1986-06-25 Method of constructing a mine working SU1406388A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864084676A SU1406388A1 (en) 1986-06-25 1986-06-25 Method of constructing a mine working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864084676A SU1406388A1 (en) 1986-06-25 1986-06-25 Method of constructing a mine working

Publications (1)

Publication Number Publication Date
SU1406388A1 true SU1406388A1 (en) 1988-06-30

Family

ID=21244067

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864084676A SU1406388A1 (en) 1986-06-25 1986-06-25 Method of constructing a mine working

Country Status (1)

Country Link
SU (1) SU1406388A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Мельников Н. И. Анкерна крепь. М.: Недра, 1980, с. 47-56. Авторское свидетельство СССР № 1221373, кл. Е 21 D 20/00, 1984. *

Similar Documents

Publication Publication Date Title
CN103016027B (en) Tunnel or roadway excavating method under weak and broken complicated geological conditions
FI66051B (en) ANORDINATION WITHOUT BORROWING
SU1406388A1 (en) Method of constructing a mine working
KR20190011887A (en) Method for digging huge tunnel using tnnnel boring mechine
JP2006077402A (en) Underground timbering structure and its construction method, and tunnel construction method
RU2128773C1 (en) Method for supporting mining workings with loose roof rock by anchor support
PT1119687E (en) COVERING TUBE FOR A DRILLING AND ANCHORING DEVICE
SU1523675A1 (en) Method of supportting mine workings
RU2043501C1 (en) Method for driving tunnels in unstable water-saturated rocks
SU1002600A1 (en) Method of avoiding rock and gas outbursts when driving mine working
SU768996A1 (en) Method of protecting working in stratified rock area
SU1578407A1 (en) Method of restoring mine workings
SU1701938A1 (en) Method of prevention of rock and gas outbursts in driving openings
RU2002127100A (en) METHOD FOR DRIVING MINING DRAINAGE IN DISTURBED AND WATERWATED ARRAY
JPH0813997A (en) Tunnel construction method
SU1420175A1 (en) Method of erecting prestrained anchor-like support
JPS5894598A (en) Level drilling method and drill guide used therein
SU1684510A1 (en) Method for constructing mine working
SU1033751A1 (en) Method of hydraulic isolation of rock about mine working
JPS6124511B2 (en)
SU949193A1 (en) Method and anchor for making large cross-sectional area working
SU1460271A1 (en) Method of mining coal seams
SU1470981A1 (en) Method of procucing a partition in mine working
SU1643724A1 (en) Method for protecting development galleries
SU1751349A1 (en) Method of controlling floor heaving in mine workings