SU1328526A1 - Method of producing underground cavities through wells - Google Patents

Method of producing underground cavities through wells Download PDF

Info

Publication number
SU1328526A1
SU1328526A1 SU864043741A SU4043741A SU1328526A1 SU 1328526 A1 SU1328526 A1 SU 1328526A1 SU 864043741 A SU864043741 A SU 864043741A SU 4043741 A SU4043741 A SU 4043741A SU 1328526 A1 SU1328526 A1 SU 1328526A1
Authority
SU
USSR - Soviet Union
Prior art keywords
formation
inlets
roof
hardening material
well
Prior art date
Application number
SU864043741A
Other languages
Russian (ru)
Inventor
Эдуард Иванович Черней
Михаил Михайлович Смирнов
Виктор Сергеевич Козлов
Леонид Васильевич Ишукин
Original Assignee
Московский Геологоразведочный Институт Им.Серго Орджоникидзе
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Московский Геологоразведочный Институт Им.Серго Орджоникидзе filed Critical Московский Геологоразведочный Институт Им.Серго Орджоникидзе
Priority to SU864043741A priority Critical patent/SU1328526A1/en
Application granted granted Critical
Publication of SU1328526A1 publication Critical patent/SU1328526A1/en

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

Изобретение относитс  к области горного дела, геологии и строительства и м.б. использовано при скважинкой гидродобьгае полезных ископаемых, опробовании продуктивных горизонтов и сооружении подземных хранилищ. Цель - повьшение эффективности образовани  подземных емкостей за счет обеспечени  надежности формировани  кровли. Бур т эксплуатационную скважину до верхней,границы образовани  емкости. В скважине размещают гидромониторный . агрегат. Провод т размыв радиальных лепестковообразных заходок 3 с выводом их забойных зон за пределы емкости 5 и вьщачей пульпы на поверхность. Между заходками 3 оставл ют целики 4. Затем в заходки 3 нагнетают твердеющий материал. После набора материалом прочности осуществл ют размыв заходок 6 в вышележащем слое с расположением их над целиками 4. При размыве заходок 6 их контуры налагают на контуры заходок 3 с образованием зон наложени  7 в пределах границы извлечени , т.е. границы емкости 5. Затем ввод т твердеющий материал в верхние заходки 6. Над будущей емкос-тью 5 образуетс  перекрытие. После создани  кровли из твердеющего материала производ т разбуривание цементной пробки, заглубление скважины и размыв камеры 5 с вьщачей пульпы. 3 ил. . С оо ьо 00 ел ГС О)The invention relates to the field of mining, geology and construction, and m. used in the well hydrodiobye minerals, testing of productive horizons and the construction of underground storage facilities. The goal is to increase the efficiency of formation of underground tanks by ensuring the reliability of roof formation. Drill a production well to the top, the boundary of the formation of capacity. In the well placed jetting. unit. The erosion of the radial petal-like inlets 3 is carried out with the withdrawal of their bottomhole zones beyond the limits of the tank 5 and the thick pulp to the surface. Between the stoppers 3, the pillars 4 are left. Then hardening material is injected into the stowers 3. After the material gains strength, the erosion of the inlets 6 in the overlying layer with their location above the pillars 4 is carried out. container boundaries 5. Then hardening material is introduced into the upper stowings 6. Over the future capacitance 5, an overlap is formed. After the roof has been made of hardening material, a cement plug is drilled, the hole is dredged and the chamber 5 is washed out with thick pulp. 3 il. . With oooo 00 ate GS O)

Description

1one

Изобретение относитс  к горномуThis invention relates to mountainous

делу, геологии и строительству и может быть использовано при скважинной гидродобыче полезных ископаемых, опробовании продуктивных горизонтов, а также при сооружении подземных хранилищ .business, geology and construction and can be used in the downhole mining of minerals, testing of productive horizons, as well as in the construction of underground storage facilities.

Цель изобретени  - повышение эффективности образовани  подземных; емкостей за счет обеспечени  надежности формировани  кровли,The purpose of the invention is to increase the efficiency of formation of underground; tanks by ensuring the reliability of the formation of the roof,

На фиг. 1 представлена схема размыва нижележащих заходок; на фиг. 2 - схема размыва вьшележащих заходок; на фиг. 3 - схема наложени  контуров вьшележащих и нижележащих заходок, план.FIG. Figure 1 shows the scouring pattern of the underlying approaches; in fig. 2 - a washout pattern for overshooting; in fig. 3 - the scheme of superposition of the contours of the overlying and underlying approaches, the plan.

Способ осуществл етс  следующим образом.The method is carried out as follows.

До верхней границы образуемой емкости бур т скважину 1, в которой размещают скважинный гидромониторный агрегат 2. С помощью последнего непосредственно над указанной верхней границей производ т размыв радиальных лепестковообразных заходок 3 с выдачей пульпы на поверхность и с оставлением клинообразных целиков 4 между заходками 3, которые предотвращают обрушение слабых пород в выработанное пространство этих заходок. Размыв заходок осуществл ют с выводом их забойных зон за пределы границы 5 извлечени  пород при образовании емкости . После размыва .заходок 3 в них нагнетают твердеющий материал, например цементный раствор. При размыве заходок после твердени  материала , вокруг скважины 1 на уровне заходок 3 образуетс  зона утирани  скважины, заполненна  твердеющим материалом. Из-гза наличи  этой зоны размыв целиков 4 на уровне расположени  заходок 3 становитс  невозможным.Up to the upper boundary of the reservoir being formed, a well 1 is drilled, in which a downhole jetting unit 2 is placed. Using the latter, the radial lobe-shaped approaches 3 are washed out directly above the indicated upper boundary, leaving a pulp to the surface and leaving wedge-shaped pillars 4 between the entries 3, which prevent the collapse of weak rocks in the developed space of these stopovers. The erosion of the inlets is carried out with the withdrawal of their downhole zones beyond the boundary 5 of the extraction of rocks during the formation of the tank. After washing out the inlet 3, a hardening material is injected into them, for example, cement mortar. During the erosion of the inlets after the material hardens, around the well 1 at the level of inlets 3, a zone of well formation is formed, filled with hardening material. Due to the presence of this zone, the erosion of the pillars 4 at the level of the positions 3 becomes impossible.

Дл  создани  сплошного перекрыти  после набора прочности твердеющим материалов в заходках 3 поднимают скважинный гидромониторный агрегат 2 И производ т размыв аналогичных заходок 6 на более высоком уровне. Дан- . ные заходки смещают относительно заходок 3 и располагают над целиками 4 при этом при .размыве заходок 6 контуры последних налагают .на контуры заходок 3 с образованием зон 7 наложени  в пределах границы 5 извлечени , т.е. границы будущей емкости. Размыв заходок 6 производ т так, что обна13285262In order to create a solid block after curing with hardening materials in the bores 3, the well assembly 2 is raised and the similar bores 6 are washed out at a higher level. Dan The nodal shifts are relative to the nipples 3 and position above the pillars 4, while unwinding the nipples 6, the contours of the latter are imposed on the contours of the nipples 3 to form the nesting zones 7 within the extraction boundary 5, i.e. boundaries of future capacity. The erosion of the entries 6 is made so that the exposed

жаетс  твердеющ;;1й материал в заходках 3 на периферии, т.е. в пределах зон 7 наложе и , Это позвол ет достичь того, что после ввода тверде- ющего материала в верхние заходки 6 монолитные блоки в этих заходках опираютс  на монолитные блоки затвердевшего материала в нижних заходках 3, т.е. в результате этого образуетс  сплошное перекрытие над будущей емкостью, при этом периферийна  зона этого перекрыти  располагаетс  вне границы 5 извлечени  и при образовании емкости опираетс  на массив пород. При этом каждый монолитный лепесток вьшележащих заходок 6 опираетс  своими кра ми на два монох:итных лепестка нижележащих заходок 3.it hardens ;; the 1st material in the 3-step perimeter, i.e. within zones 7 and overlap, this allows one to achieve that after the hardening material is introduced into the upper loops 6, the monolithic blocks in these loops rely on the monolithic blocks of the hardened material in the lower loops 3, i.e. As a result, a continuous overlap is formed over the future tank, while the peripheral zone of this overlap is located outside the extraction boundary 5 and, upon the formation of the tank, rests on the rock mass. At the same time, each monolithic petal of the overlying patches 6 rests on its edges on two monochs: the natural petals of the underlying patches 3.

После создаЕи  указанной кровли из твердеющего материала производ т разбуривание цементной пробки и заглубление скважк. ны 1 в породы, подлежащие извлечении.After creating the specified roof of hardening material, the cement plug is drilled and the hole is buried. us 1 in the rocks to be extracted.

В указанной скважине размещают - гидромо ниторный агрегат и приступают к размыву пород с образованием камеры в пределах границы 5 с выдачей пульпы на поверхность под защитой : искусственной кровли.A hydromonitor assembly is placed in the indicated well and the rocks are washed out with the formation of a chamber within border 5 with the delivery of pulp to the surface under the protection of an artificial roof.

Claims (1)

Формула изобре.тени Formula invented 5five 00 5five 00 5five Способ образовани  подзе мных емкостей через скважины, включающий бурение эксплуатационной скважины до верхней границы образуемой емкости, формирование полости искусственной кровли, нагнетание в нее твердеющего материала, углубление скважинь на высоту емкости, гидравлическую отработку пород под кровлей с вьщачей пульпы на поверхность, отличающийс  тем, что, с целью повышени  эффективности образовани  подземных емкостей за счет обеспечени  надежности формировани  кровли, полость кровли формируют в нижнем слое неустойчивйгх пород в виде радиальных лепестковообразных заходок с выводом их забойных ,зон за пределы емкости, затем нагнетают в указанные заходки твердеющий материал и после набора прочности этим материалом осуществл ют размыв заходок в вьшележащем слое с расположением их над целиками между нижележащими заходками с частичным обнажением последних и с наложеходок на контуры нижележащих .в пределах границ емкости, после чего нагнеРедактор И. НиколайчукA method for the formation of underground tanks through wells, including drilling a production well to the upper boundary of the reservoir being formed, forming an artificial roof cavity, forcing hardening material into it, deepening the wells to the height of the reservoir, hydraulic mining the rocks under the roof with thick pulp onto the surface characterized by , in order to increase the efficiency of formation of underground tanks by ensuring the reliability of the formation of the roof, the roof cavity is formed in the lower layer of unstable rocks in the form of radial petal-like inlets with the withdrawal of their downhole zones outside the tank, then hardening material is injected into the inlets and after curing with this material, the erosion is performed in the overlying layer with their location above the rear sections between the underlying inlets and partially stripped of the latter and with superpositions on the contours of the underlying. within the confines of the container, then the editor I. Nikolaichuk Составитель Н. Чертова Техред И. Вер ееCompiled by N. Chertova Tehred I. Ver her Заказ 3464/36Тираж 454ПодписноеOrder 3464/36 Circulation 454 Subscription ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee по делам изобретений и открытий 113035, Москва, Ж-35, Раушска  наб., д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., 4/5 Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна , 4Production and printing company, Uzhgorod, st. Project, 4 верхнего сло , а после его затвердевани  заглубл ют скважину.the upper layer, and after it is solidified, the well is sunk. (Риг.1(Rig.1 К TO // гg Риг.2Rig.2 Корректор А.ЗимокосовProofreader A.Zimokosov
SU864043741A 1986-03-26 1986-03-26 Method of producing underground cavities through wells SU1328526A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864043741A SU1328526A1 (en) 1986-03-26 1986-03-26 Method of producing underground cavities through wells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864043741A SU1328526A1 (en) 1986-03-26 1986-03-26 Method of producing underground cavities through wells

Publications (1)

Publication Number Publication Date
SU1328526A1 true SU1328526A1 (en) 1987-08-07

Family

ID=21228890

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864043741A SU1328526A1 (en) 1986-03-26 1986-03-26 Method of producing underground cavities through wells

Country Status (1)

Country Link
SU (1) SU1328526A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2574084C2 (en) * 2014-12-22 2016-02-10 Владимир Иванович Лунев Development of productive depths in urbanised territory and subsurface facilities to this end
RU2763162C1 (en) * 2021-04-09 2021-12-27 Сергей Николаевич Кошколда Method for underground hydro mining of minerals and the device for its implementation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2574084C2 (en) * 2014-12-22 2016-02-10 Владимир Иванович Лунев Development of productive depths in urbanised territory and subsurface facilities to this end
RU2763162C1 (en) * 2021-04-09 2021-12-27 Сергей Николаевич Кошколда Method for underground hydro mining of minerals and the device for its implementation
RU2804018C1 (en) * 2023-04-18 2023-09-26 Сергей Николаевич Кошколда Method for underground mining of mineral deposits

Similar Documents

Publication Publication Date Title
US2970645A (en) Producing multiple fractures in a well
CA1123726A (en) Explosive fracturing of deep rock
SU1328526A1 (en) Method of producing underground cavities through wells
SU1444465A1 (en) Method of erecting counter-seepage screen of hydraulic structure
SU1346798A1 (en) Method of hydraulic excavation of materials from underground formations
US4071087A (en) Well construction
RU2010953C1 (en) Method of determination of cracks spreading height in basic zone of working
SU1317133A1 (en) Method of hydraulic winning of minerals through wells from horizontal and gently-sloping production levels
SU1594272A1 (en) Method of forming underground cavities
SU1448056A1 (en) Method of hydraulic excavation of minerals from thick producing levels
RU2141442C1 (en) Method of erection of underground reservoir in soil
SU1521874A1 (en) Method of winning minerals through hydraulic wells
SU1514938A1 (en) Method of testing thick producing strata
RU2517728C1 (en) Hydraulic borehole mining of hard minerals
RU2771966C1 (en) Method for creating an underground gas storage in an aquifer geological structure
SU1633125A1 (en) Method of protecting underground workings from water ingress
SU1448054A1 (en) Method of hydraulic recovery of minerals from producing formations
SU711292A1 (en) Method of working thick gently sloping coal beds
SU1518522A1 (en) Method of excavating noncohesive saturated rock from producing levels
SU1019060A1 (en) Method of erecting an underground structure
SU1446312A1 (en) Method of excavating rock mass from thick underground formations
SU1442595A1 (en) Method of producing canals or trenches
SU1305349A1 (en) Method of excavating materials from underground formations
SU1293346A1 (en) Method of hydraulic breaking of rock to be recovered from underground formations
SU1453007A1 (en) Method of preparing water-saturated producing level to mining through wells