SU1273560A1 - Method of preventing inflow of water into stoping faces - Google Patents

Method of preventing inflow of water into stoping faces Download PDF

Info

Publication number
SU1273560A1
SU1273560A1 SU853915550A SU3915550A SU1273560A1 SU 1273560 A1 SU1273560 A1 SU 1273560A1 SU 853915550 A SU853915550 A SU 853915550A SU 3915550 A SU3915550 A SU 3915550A SU 1273560 A1 SU1273560 A1 SU 1273560A1
Authority
SU
USSR - Soviet Union
Prior art keywords
water
aquifers
roof
lava
width
Prior art date
Application number
SU853915550A
Other languages
Russian (ru)
Inventor
Виктор Максимович Варакин
Виктор Иванович Костенко
Виктор Федорович Михалецкий
Сергей Федорович Рыбалко
Алексей Григорьевич Скворцов
Original Assignee
Институт горного дела им.А.А.Скочинского
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела им.А.А.Скочинского filed Critical Институт горного дела им.А.А.Скочинского
Priority to SU853915550A priority Critical patent/SU1273560A1/en
Application granted granted Critical
Publication of SU1273560A1 publication Critical patent/SU1273560A1/en

Links

Landscapes

  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

Изобретение относитс  к области горнодобывагацей промьппленности и предназначено дл  разработки пластовых месторождений твердых полезных ископаемых под водоносными породами (П). Цель - снижение затрат на предотвращение притока воды в I очистные выработки из подрабатываемых водоносных П. Способ включает поддержание пород кровли по мере отработки полезного ископаемого в лаве от разрезной выработки путем формировани  поддерживак цих целиков (ПЦ) 7 в выработанном пространстве (ВП) 4. Затем между ПЦ 7 осуществл ют обрушение П кровли. При этом ВП между ПЦ 1 формируют шириной не более величины отхода лавы от разрез ной выработки до вскрыти  подрабатываемых водоносных П обрушенными П кровли и не менее половины этой величины . При этом условии контур зоны водопровод щих трещин принимает положение, при котором водоносный горизонт не вскрываетс  трещинами . При последующем подвигании очистного забо  водопро влени  12 отмечаютс  лить в бортовой выработке 14, мину  очистной забой-13. Это предотвращает на прот жении выемочного столба вскрытие водоносных П и приток воды в ВП 4. Кроме того, не получаетс  лишней полосы ПЦ 7. 2 ил..The invention relates to the field of industrial mining and is intended for the development of stratal deposits of solid minerals under aquifers (II). The goal is to reduce the cost of preventing the flow of water into the I wastewater treatment of the earned aquifers P. The method involves maintaining the roof rocks as the minerals in the lava are mined from the split production by forming support pillars (PC) 7 in the airspace (VP) 4. Then between PCs 7, the roof roof collapses. At the same time, the airspace between PCs 1 is formed with a width not exceeding the magnitude of the waste of lava from the cut out to open the watering P-bearing aquifers and not less than half of this value. Under this condition, the contour of the zone of water-conducting cracks assumes a position at which the aquifer is not opened by cracks. With the subsequent advancement of the cleaning hole, the water supply 12 is noted to be cast in the onboard development 14, the mine of the cleaning face-13. This prevents, during the extraction column, the opening of aquifers P and the influx of water into CW 4. Furthermore, there is no excess band of PC 7. 2 or more.

Description

:% %:%:%4 %%%5%%Щ:%%:%:% 4 %%% 5 %% U

Claims (1)

«5«/в.7 Изобретение относигс  к горнодобывающей промышленности и может быть использовано дл  обеспечени  эффективной и безопасной разработки пологих угольных пластов и других пластовых месторождений твердых полезных ископае1Ф х под водоносными породами . Цель изобретени  - снижение затрат на предотвращение притока воды в очистные выработки из подрабатываемых водоносных пород. На фиг. 1 показано положение в пл не контура зоны вскрыти  подрабатыв емых водоносных пород и места водопро влений с кровли выработок, вид в планер на фиг. 2 - разрез А-А на фиг, 1. Способ осуществл етс  следующим образом. В лавах с близкими значени ми вынимаемой мощности угольного пласта 1, высоты залегани  водоносных пород 2 и степени литификации и литоло ического строени  водоупорных пород 3 устанавливают минимальную ширину выработанного пространства,при которой происходит вскрытие водоносных пород, сопровождающеес  водопро влени ми в выработках. Она соответствует минимальной величине отхода LO лавы от разрезной выработки довскрыти  водоносных пород. При ширине выработанного пространства 4 лавы меньше этой величины свод зоны водопровод щих трещин 5, развивающийс  над обрушенными породами основной кровли 6, не достигает водоносных пород. Дл  предотвращени  притоков воды из подрабатываемых во доносных пород достаточно уменьшить ширину выработанного пространства с полным обрушением кровли до величины , меньшей указанной. Уменьшение ширины выработанного пространства сПОЛНЫМ обрушением кровли производ т посредством формировани  вслед за лавой любыми известными способами сплошного или прерывистого поддерживающего целика 7 (или полосы), например, из Закладочного или крепежного материала (бут, бутокостры, железобетонные тумбы и др;). Этими целиками раздел ют выработанное про странство на части щириной Ъд.Ъ. При значении ,5Ъц одна полоса целиков оказываетс  лишней, что ве0 дет К увеличению трудоемкости и повышению затрат. Поэтому ширина частей вьфаботанного пространства лав с полным обрушением кровли дл  предотвращени  притоков воды из подрабатываемых водоносных пород ограничиваетс  пределами 0, 5Ъд. Когда подошва водоносного горизонта находитс  в пределах контура 8 зоны водопровод щих трещин, подзем- „ ные воды 9 дренируютс  в выработанное пространство 4 лавы, а также перетекают от контура 10 зоны вскрыти  водоносного горизонта в направлении падени  11 пласта. При выемке пласта с отклонением в сторону падени  водопро влени  12 отмечаютс  с кровли очистного забо  13 (не показано ) и бортовой подготовительной выработки 14. При формировании поддерживающих целиков контур 8 зоны водопровод щих трещин принимает положение 15, при котором водоносный горизонт не вскрываетс  трещинами. При последук цем подвигании очистного забо  водопро влени  12 отмечаютс  лишь -в бортовой выработке 14, мину  очисти рй забой 13, в результате чего навсем прот жении выемочного столба полностью предотвращаетс  вскрытие водоносных пород и приток воды в выработанное пространство. Формула изобретени  Способ предотвращени  притока воды в очистные выработки, включающий поддержание пород кровли по мере отработки полезного ископаемого в лаве от разрезной выработки путем формировани  поддерживающих целиков в выработанном пространстве, отличающийс  тем, что, с целью снижени  затрат на предотвращение притока воды в очистные выработки из пoдpaбaтывae ыx водоносных пород, осуществл ют обрушение пород кровли между поддерживающими целика®ми , при этом вьфаботанное пространство между целиками формируют шириной не более величины отхода лавы от разрезной выработки до вскрыти  подрабатываемых водоносных пород обрушенными породами кровли и не менее половины этой величины."5" / in .7 The invention relates to the mining industry and can be used to ensure the efficient and safe development of flat coal seams and other stratum deposits of solid mineral deposits under aquifers. The purpose of the invention is to reduce the cost of preventing the inflow of water to the treatment generation of earned aquifers. FIG. Figure 1 shows the position in the open contour of the zone of opening the undermined aquifers and the place of water supply from the roof of the workings, a view to the glider in FIG. 2 is a section A-A in FIG. 1. The method is carried out as follows. In the lavas with similar values of the coal seam 1, the height of the aquifers 2 and the degree of lithification and lithologic structure of the impermeable rocks 3, the minimum width of the excavated space is established, at which the aquifers accompanied by waterways in the workings are opened. It corresponds to the minimum amount of lava LO waste from the split production of the aquifers before the opening. When the width of the open area 4 of lava is less than this value, the code of the zone of water-conducting cracks 5, which develops over the collapsed rocks of the main roof 6, does not reach the aquifers. To prevent water inflows from undermined water-bearing rocks, it is sufficient to reduce the width of the open space with a complete collapse of the roof to a value less than that indicated. Reducing the width of the excavated space in full roof collapse is done by forming a continuous or intermittent supporting pillar 7 (or strip) after the lava by any known methods, for example, from a backfill or fastening material (butyl, butostrino, reinforced concrete pedestals, etc.). By these pillars, the developed space is divided into parts by a width of b. With a value of 5 hz, one band of pillars turns out to be superfluous, which leads to an increase in labor intensity and an increase in costs. Therefore, the width of the parts of the aforesaid laval space with the complete collapse of the roof to prevent water inflows from the aquifers being worked up is limited to 0, 5BD. When the bottom of the aquifer is within the contour of zone 8 of water-conducting cracks, the groundwater 9 drains into the open space of the lava 4, and also flows from the contour 10 of the zone of the aquifer in the direction of the fall 11 of the reservoir. When the formation is excavated with a deviation in the direction of the fall of the water supply, 12 are marked from the roof of the clearing hole 13 (not shown) and the onboard preparatory exit 14. When the supporting pillars are formed, the contour 8 of the water fracture zone takes position 15, at which the aquifer is not opened by cracks. During the subsequent advancement of the clearing water intake, water supply 12 is observed only in the onboard excavation 14, the mine has been cleared by the slaughter 13, as a result of which the removal of aquifers and the inflow of water into the developed space are completely prevented during the extraction column. Claims of the Invention A method for preventing the inflow of water to the clearing generation, including maintaining the roof rocks as the mineral in the lava is mined from the split generation by forming supporting pillars in the developed space, characterized in that, in order to reduce the cost of preventing the inflow of water into the clearing generation from aquifers, the collapse of roof rocks between supporting pillars®, while forming a fabulous gap between pillars with a width not exceeding the magnitude of the waste of lava from the split production to the opening of water-bearing aquifers by the collapsed rocks of the roof and not less than half of this value. JULJul . . ,. «, vrr T :T - f scrrTT r . . , ", Vrr T: T - f scrrTT r у.:л:-...л-.;--.- :ь : тг7: ;;а ау уЧ;::w.: l: -... l -.; - .-: l: tg7: ;; ay uch; :: e . f5/ -f- Vf- -#-- - e. f5 / -f- Vf- - # - - , 3 .--,::;...x, 3 .--, ::; ... x
SU853915550A 1985-06-26 1985-06-26 Method of preventing inflow of water into stoping faces SU1273560A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853915550A SU1273560A1 (en) 1985-06-26 1985-06-26 Method of preventing inflow of water into stoping faces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853915550A SU1273560A1 (en) 1985-06-26 1985-06-26 Method of preventing inflow of water into stoping faces

Publications (1)

Publication Number Publication Date
SU1273560A1 true SU1273560A1 (en) 1986-11-30

Family

ID=21184363

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853915550A SU1273560A1 (en) 1985-06-26 1985-06-26 Method of preventing inflow of water into stoping faces

Country Status (1)

Country Link
SU (1) SU1273560A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112818504A (en) * 2019-11-16 2021-05-18 南京宝地梅山产城发展有限公司 Method for preventing and treating water inrush in mined-out subsidence area by pillarless caving method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Бурчаков А.С. и др. Процессы подземных горных работ. М.: Недра, 1976, с. 124-127. Андрейчев А.Н. Разработка калийных месторождений. М.: Недра, 1966, с. 244. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112818504A (en) * 2019-11-16 2021-05-18 南京宝地梅山产城发展有限公司 Method for preventing and treating water inrush in mined-out subsidence area by pillarless caving method

Similar Documents

Publication Publication Date Title
SU1273560A1 (en) Method of preventing inflow of water into stoping faces
CN213897164U (en) Concrete precast segment assembly spraying concrete reinforcing soil tank
RU2233373C1 (en) Method for constructing horizontal or slanting draining well in watered sand horizons, device for realization of said method, filter pipe
RU2078209C1 (en) Method of mining mineral deposits and superstructure for its embodiment
RU2085737C1 (en) Method for treating deep-lying seams of minerals
CN217872913U (en) Be applied to precipitation drainage well structure that mining area waste water was administered
SU1335645A1 (en) Method of constructing a drainage system
SU1191582A1 (en) Method of solid roof composition
SU1071003A1 (en) Method of underground leaching of useful minerals from ore bodies
SU676737A1 (en) Method of reducing inflow of water into mine workings
RU2091582C1 (en) Method of mining of mineral beds at large depths
RU2069754C1 (en) Method for development of mine field in mining mineral beds at large depths
RU2039269C1 (en) Method for reconstruction of flooded open pits
SU909178A1 (en) Method of working beds of complex structure with intervening muck
RU97101858A (en) METHOD OF GAS DISCHARGE MANAGEMENT WHEN EXPLOITING COAL FORMATIONS
SU1301970A1 (en) Method of opening up and developing gently-sloping coal seams
SU1716136A1 (en) Method of mining beds
SU1139802A1 (en) Drainage for soil area
SU1573093A1 (en) Device for diverting highly-mineralized ground water from mine working
RU2004801C1 (en) Method for mining mineral deposits
SU1680987A1 (en) Method for exposing and preparing gently sloping coal seams
SU1735583A1 (en) Method for protection of development workings used repeatedly in coal mining
SU1252492A1 (en) Method of driving an ascending mine working
SU1452992A1 (en) Method of remining of mineral deposits
SU1495435A1 (en) Method of constructing underground structure