SU1248942A1 - Tower crane - Google Patents

Tower crane Download PDF

Info

Publication number
SU1248942A1
SU1248942A1 SU843696463A SU3696463A SU1248942A1 SU 1248942 A1 SU1248942 A1 SU 1248942A1 SU 843696463 A SU843696463 A SU 843696463A SU 3696463 A SU3696463 A SU 3696463A SU 1248942 A1 SU1248942 A1 SU 1248942A1
Authority
SU
USSR - Soviet Union
Prior art keywords
crane
portal
boom
tower
mounting
Prior art date
Application number
SU843696463A
Other languages
Russian (ru)
Inventor
Николай Яковлевич Крылов
Юрий Иванович Гудков
Анатолий Николаевич Еремин
Original Assignee
Всесоюзный конструкторско-технологический институт по механизации монтажных и специальных строительных работ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный конструкторско-технологический институт по механизации монтажных и специальных строительных работ filed Critical Всесоюзный конструкторско-технологический институт по механизации монтажных и специальных строительных работ
Priority to SU843696463A priority Critical patent/SU1248942A1/en
Application granted granted Critical
Publication of SU1248942A1 publication Critical patent/SU1248942A1/en

Links

Landscapes

  • Jib Cranes (AREA)

Description

Изобретение относитс  к под ьемио-тран- сгюртным машинам, а именно к 6aHieHHtiiM кранам на нортале.The invention relates to underworld-transomuctivating machines, namely to 6aHieHHtiiM cranes on the northal.

Цель изобретени  - улучшение удобства обслуживани  путем обеснечени  самомонтажа крана..The purpose of the invention is to improve the ease of servicing by discounting the self-assembly of a crane.

На фиг. 1 и 2 изображен башенный кран, вид сбоку неред началом подъема башни ео стрелой и монтажной стойки и неред под ьемом крана соответственно; на фиг. 3 - то же, вид в плане неред подъемом крана; на фиг. 4 - то же, вид сбоку в начале подъема; на фиг. 5 - то же, вид сбоку в конце подъе.ма; на фиг. б - крап в рабочем положении, вид сбоку; на фиг. 7 - то же, вид сзади; па фиг. 8 - установка монтажной стойки и полиспаста, вид спереди; на фиг. 9 - то же, вид сбоку; па фиг. 10 - монтажные стойки и монтажный полиспаст, вид в аксонометрии; на фиг. 11 - стойки портала в двух положени х - монтажном и рабочем , вид сбоку; на фиг. 12 - оголовок стрелы и уравновен1пваюша  площадка на колесах, вид сбоку.FIG. 1 and 2 shows a tower crane, side view is not the beginning of lifting the tower with the boom and mounting rack and not under the crane, respectively; in fig. 3 - the same, a view in the plan is not unhooked by the lifting of a crane; in fig. 4 - the same, side view at the beginning of the ascent; in fig. 5 - the same, side view at the end of the lift. in fig. b - specks in working position, side view; in fig. 7 - the same, rear view; pas figs. 8 - installation of the mounting rack and the polyspast, front view; in fig. 9 - the same, side view; pas figs. 10 - mounting racks and mounting pulley, a perspective view; in fig. 11 - gantry racks in two positions - mounting and working, side view; in fig. 12 - arrowhead and balanced platform on wheels, side view.

Кран может быть доставлен на место монтажа по част м с последуюпдей укрупненной сборкой, а также в виде готового укрупненного транспортабельного блока 1, включающего раму 2 портала 3 с диагональными балками 4 и поворотную платформу 5 со стойками 6, лебедками 7 и 8 и другими механизмами, транспортируемого на подкат- ных тележках 9 т гачом и устанавливаемого вдоль оси железнодорожного подпорталь- пого пути 10. Стойки II портала 3 размещают вдоль подкрановых рельсов 12 (фиг. 1-- 3) и щарнирно подсоедин ют верхними концами 13 к диагональным балкам 4, а нижними концами 14 - к рельсовым ходовым тележкам 15 (фиг. 11). Кажда  диагональна  балка 4 имеет проушины 16 с парой горизонтальных отверстий 17 и 18 и фиксирую- щ,ие пальць 19 и 20, а на верхних концах стоек 11 имеютс  ответные 21 с отверсти .ми 22 и 23. Кажда  ходова  тележка 15 имеет проушины 24 с парой горизонтальных отверстий 25 и 26 и фиксирующие пальцы 27 и 28, а на нижних концах 14 стоек 1 имеютс  ответные проушины 29 с отверсти ми 30 и 31. При шарнирном подсоединении верхних концов 13 стоек 1 1 к диагональным балкам 4 и нижних концов стоек 1 1 к ходовым тележкам 15 вверху пальцем 20 фиксируют смещенные наружу от оси стоек 11 отверсти  18 и 23, а внизу пальцем 27 - смещенные внутрь от оси стоек 11 отверсти  25 и 30. При жестком закреплении стоек 11 на диагональных балках 4 и ходовых тележках 15 в проушинах 16 и 21 устанавливают вторые пальцы 19 и 28 соответственно в отверсти  17 и 22 вверху, 26 и 31 - внизу. На поворотной платформе 5 и башне 32 закреплен своим основанием консольный кроищтейн 33, свободный конец 34 которого распо.пожен вышеThe crane can be delivered to the installation site in parts with subsequent enlarged assembly, as well as in the form of a ready enlarged transportable unit 1, including frame 2 of portal 3 with diagonal beams 4 and a turntable 5 with racks 6, winches 7 and 8 and other mechanisms, transported on trolley carts with 9 tons of hitch and installed along an axle railway subportal track 10. Racks II of portal 3 are placed along crane rails 12 (Fig. 1-- 3) and are pivotally connected by their upper ends 13 to diagonal beams 4, and n With their ends 14 - to rail track carts 15 (Fig. 11). Each diagonal beam 4 has lugs 16 with a pair of horizontal holes 17 and 18 and a locking pin 19 and 20, and at the upper ends of the pillars 11 there are counterparts 21 with holes 22 and 23. Each travel carriage 15 has lugs 24 sec. a pair of horizontal holes 25 and 26 and locking pins 27 and 28, and at the lower ends 14 of the uprights 1 there are response lugs 29 with holes 30 and 31. When the upper ends of the 13tops of the uprights 1 1 are connected to the diagonal beams 4 and the lower ends of the uprights 1 1 to the undercarriage 15 at the top of the finger 20 is fixed displaced outward from the axis of the uprights 11 holes 18 and 23, and below the finger 27 - the holes 25 and 30 displaced inward from the axis of the pillars 11. When the pillars 11 are rigidly fixed on the diagonal beams 4 and the undercarriages 15, the second fingers 19 and 28, respectively, are installed in the holes 17 and 22 above, 26 and 31 - below. On the turntable 5 and the tower 32 is fixed by its base console krashchteyn 33, the free end 34 of which is located above.

уровн  центра т жести крапа и снабжен блоками 35 нижней обоймы 36 монтажного полиснаста 37, на которых запасовывают грузовой канат 38 1 рузовой лебедки 7 приthe level of the center of the body of the speck and is equipped with blocks 35 of the lower cage 36 of the assembly polisnast 37, on which the cargo rope 38 1 of the winch 7 is stored at

под ьеме крана на портал. Ранее, при подъеме бащни 32 в вертикальное положение, грузовой канат 38 запасован на блоках 39 и 40 монтажного полиспаста 41 подъема башни (фиг. 1). а при работе крана он запасован на грузовом полиспасте 42 (фиг. 6). В иодстреловом пространстве перед бащ- пей 32 расположена монтажна  стойка 43 с верхней обоймой 44 монтажного полиспаста 37 с блоками 45 (фиг. 1, 2, 4. 5, 8 и 9). Монтажна  стойка 43 гибкой св зью 46 соеди5 пена с башней 32 при ее подъеме и автоматически поднимаетс  вместе с ней в вертикальное положение.under the tap on the portal. Previously, when lifting the bashni 32 to a vertical position, the cargo rope 38 is stockpiled on blocks 39 and 40 of the assembly hoist 41 of the tower hoist (Fig. 1). and when the crane is operating, it is stored on a cargo polyspast 42 (Fig. 6). In the iodo space, in front of the baffles 32, there is a mounting stand 43 with an upper holder 44 of the mounting pulley 37 with blocks 45 (Fig. 1, 2, 4. 5, 8 and 9). The mounting stand 43 of the flexible coupling 46 connects foam to the tower 32 when it is raised and automatically rises together with it to a vertical position.

Кажда  стойка 11 снабжена подкосом 47, который е помощью шарнира 48 верхним концом 49 закрегкпен на диагональ0 ной балке 4, а нижним концом 50 с помощью 1парнира 51 крепитс  к стойке 11. Подкос 47 в средней части подвеп1ен к диагональной балке 4 на гибком элементе 52. который обе- г ает ролик 53 и вторы.м концом 54 закреплен на стойке 11.Each stand 11 is provided with a strut 47, which by means of a hinge 48, upper end 49 is fixed on diagonal beam 4, and the lower end 50 is fixed to stand 11 by means of 1 joint 51. The strut 47 in the middle part is attached to diagonal beam 4 on flexible element 52. which ensures the roller 53 and the second end 54 is fixed on the rack 11.

При разомкнутом нижнем шарнире 51 подкос 47 повисает на гибком эле.менте 52, который при отклонении стойки 11 от вертикали автоматически подт гивает за собой подкос 47 вверх, а при приближении стойкиWhen the lower hinge 51 is open, the strut 47 hangs on the flexible element 52, which, when the strut 11 deviates from the vertical, automatically pulls the strut 47 upwards, and when the strut approaches

0 1 1 к вертикали также автоматически опускает подкос 47 в рабочее положение, где он фиксируетс  в шарнире 51.The 0 1 1 to the vertical also automatically lowers the strut 47 into the working position, where it is fixed in the hinge 51.

На поворотной платформе 5 закреплены стойки 6 с блоками 39 (фиг. 1) и с помощью пJapниpa 55 крепитс  основание 56On the rotary platform 5, the supports 6 are fixed with blocks 39 (Fig. 1) and the base 56 is fastened with the aid of the adapter 55

5 башни 32, верхн   часть 57 которой снабжена блоками 40 и шарниром 58 дл  креплени  основани  59 стрелы 60. Оголовок 61 стрелы опирают на уравновешивающую 62 на колесах 63 (фиг. 1, 2 и 12), установленную на рельсах подпортального пути5 of the tower 32, the upper part 57 of which is provided with blocks 40 and a hinge 58 for fastening the base 59 of the boom 60. The boom head 61 is supported on the balancing 62 on the wheels 63 (Figs. 1, 2 and 12) mounted on the rails of the port side track

0 10 и загруженную противовесными блоками 64, с.мещающими центр т жести крана в сторону стрелы. Стрела 60 также соединена отт жкой 65 со стреловым полиспасто.м 66 (на. фиг. 2 показаны положени  центра т жести крана Окр по горизонтали и по вертикали до смещени  Ьп и после смещени  вперед huT и 1цтс, а также рассто ни  1ст и ь до уравновешивающих масс стрелы и площадки с противовесными блока.ми).0 10 and loaded with counterbalance blocks 64, which move the center of the crane body towards the boom. The boom 60 is also connected by tapping 65 to the boom polyspaston m 66 (Fig. 2 shows the center of gravity of the Okr crane in the horizontal and vertical directions to the displacement bp and after the displacement forward huT and 1tsts, as well as distances balancing masses of the boom and platform with counterbalance blocks.

Монтаж и демонтаж крана осуществл етQ с  грузовой 7 и стреловой 8 лебедками крана с использованием монтажного полиспаста 41 дл  подъема , монтажного полиспаста 37 дл  подъема крана и стрелового полиспаста 66 дл  выравнивани  крана при его подъеме и дл  последующего 5 подъема стрелы 60 в рабочее положение. В качестве опорных средств используютс  несущие конструкции крана (рама 2 п орта- ла 3 с диагональными балками 4, поворотна The crane is mounted and dismounted using cargo 7 and a boom 8 crane winches using mounting pulley 41 for lifting, mounting pulley 37 for lifting the crane and boom pulley 66 for leveling the crane when lifting it and for later lifting the boom 60 to the working position. Bearing structures of the crane are used as supporting means (frame 2, half of the ortals, 3 with diagonal beams 4, turning

платформа 5 со стойками б, башн  32, стрела 60 и прочее), а также монтажна  стойка 43, консольный кронштейн 33 и уравновешивающа  плоидадка 62 на оголовке 61 стрелы 60.platform 5 with supports B, tower 32, boom 60, etc.), as well as mounting stand 43, cantilever bracket 33 and balancing pad 62 on head 61 of boom 60.

При монтаже транспортабельный блок 1 на подкатных тележках 9 устанавливаетс  вдоль оси подпортального пути 10 (фиг. 1-З) Рама 2 портала 3 с диагональными балками 4 фиксируетс  на месте будуш,ей установки крана. На поворотной платформе 5 в шарнире 55 креп т основание 56 башни 32,-к верхней части 57 которой на шарнире 58 креп т основане 59 стрелы 60. Оголовок 6 стрелы 60 опираетс  на уравновешивающую площадку 62 на колесах 63 с установленными на ней противовесными блоками 64 (фиг. 12), а среднюю часть стрелы соедин ют отт жкой 65 со стреловым полиспастом 66. Монтажную стойку 43, уложенную под башней и стрелой, соедин ют гибкой св зью 46 с башней 32. Свободный конец грузового каната 38 запасовывают на блоках 39 и 40, образу  монтажный молиспаст 41 подъема башни, с помощью которого башн  32 поднимаетс  в вертикальное положение с одновременным подъемом монтажной стойки 43, и они фиксируютс  вертикально . При этом стрела 60 занимает наклонное положение, а ее уравновешивающа  площадка 62 загружена противовесными блоками 64, что смещает центр т жести крана от оси вращени  поворотной платформы 5 в сторону монтажной стойки 43 и далее за нее вперед. СоотноЩение масс крана, стрелы и противо- весных блоков и их рассто ний от оси монтажной стойки обеспечивает это смещение центра т жести крана (фиг. 2).When mounting, the transportable unit 1 on trolleys 9 is installed along the axis of the porportale path 10 (Fig. 1-W) The frame 2 of the portal 3 with diagonal beams 4 is fixed in place by the installation of the crane. On the rotary platform 5 in the hinge 55, the base 56 of the tower 32 is secured, the upper part 57 of which is fixed on the hinge 58 to the base 59 of the boom 60. The boom head 6 of the boom 60 rests on the balancing pad 62 on the wheels 63 with the counterbalance blocks 64 installed on it ( Fig. 12), and the middle part of the boom is connected by a tie 65 with a jib pulley 66. A mounting stand 43, laid under the tower and the boom, is connected by a flexible link 46 to the tower 32. The free end of the cargo rope 38 is stockpiled on blocks 39 and 40 , to form an installation molispast 41 lifting the tower, with the help of torogo tower 32 is raised to a vertical position with the simultaneous rise of the mounting rack 43, and they are fixed vertically. In this case, the boom 60 occupies an oblique position, and its balance pad 62 is loaded with counterweight blocks 64, which shifts the center of gravity of the crane from the axis of rotation of the turntable 5 towards the mounting stand 43 and further behind it. The ratio of the masses of the crane, boom and counterweight blocks and their distances from the axis of the mounting stand ensures this displacement of the center of gravity of the crane body (Fig. 2).

После установки консольного кронштейна 33 грузовой канат 38 перепасовывают на блоки 45 и 35 монтажного полиспаста 37 подъема крана (фиг. 8-10). Одновременно вдоль рельсов 12 подкранового пути размещают стойки 11 портала 3 и шарнирно соедин ют верхними концами 13 с диагональными балками 4, а нижними 14 - с ходовыми тележками 15 (фиг. 2, 3 и 11). При этом вверху пальцем 20 фиксируют смещенные наружу от оси стоек 11 отверсти  18After installation of the console bracket 33, the cargo rope 38 is re-pasted to the blocks 45 and 35 of the assembly hoist 37 of the crane lifting (Fig. 8-10). At the same time, along the rails 12 of the crane runway, the posts 11 of the portal 3 are placed and pivotally connected by the upper ends 13 with the diagonal beams 4, and the lower ends 14 are connected to the trolleys 15 (Figures 2, 3 and 11). At the same time at the top of the finger 20 is fixed offset outward from the axis of the uprights 11 holes 18

и 23, а внизу пальцем 27 фиксируют смещенные внутрь от оси стоек отверсти  25 и 30. Подкосы 47 закрепл ют с помощью шарнира 48 на диагональной балке 4 и сand 23, and at the bottom with a finger 27, the holes 25 and 30, which are offset inward from the axis of the uprights, are fixed. The struts 47 are fixed with a hinge 48 on the diagonal beam 4 and

помощью гибкого элемента 52, огибающего ролик 53, подвешивают к стойке И. После подт гивани  стреловым полиспастом 66 стреловой отт жки 65 кран готов к подъему. При включении грузовой лебедки 7 на подъем сокращаетс  монтажный полиспаст 37 иusing a flexible element 52, which bends around the roller 53, is suspended from the post I. After the boom pulley 66 of the boom end 65 is pushed up, the crane is ready for lifting. When you turn on the cargo winch 7 on the rise is reduced mounting pulley 37 and

0 отрывает кран от земли, освобожда  под- катные тележки 9 (фиг. 4). При дальнейшем подъеме крана дл  выравнивани  его горизонтальности включают на спуск стреловую лебедку 8. Во врем  подъема крана оголовок 61 стрелы 60 остаетс  на уравно- вещивающей площадке 62, котора  на колесах 63 частично смещаетс  в сторону крана (фиг. 4 и 5). Одновременно стойки 1 1 портала 3 с подкосами 47 выполн ют угловые смещени  под действием собственных масс и0 lifts the crane from the ground, releasing the undercarriage 9 (Fig. 4). Upon further lifting of the crane to level its horizontal position, the boom winch 8 is lowered. During the lifting of the crane, the heads 61 of the boom 60 remain on the equalizing platform 62, which at the wheels 63 is partially shifted towards the crane (Fig. 4 and 5). At the same time, the posts 1 1 of the portal 3 with the struts 47 perform angular displacements under the action of their own masses and

0 вместе с ходовыми тележками 15 занимают свои конечные положени  (фиг. 4, 5 и II), где стойки 1 жестко фиксируютс  пальцами 19 и 28 в отверсти х 26 и 31 внизу, а подкос 47 - на стойке 11 шарниром 51. При этом портал 3 прочно и устойчиво устанавливаетс  на ходовые тележки 15. Дл  приведени  крана в рабочее положение оголовок 6 стрелы 60 освобождают от уравновешивающей площадки 62, а поворотную платформу 5 загружают противовесными блоками 64 с соответствующим смещением центра т жести крана назад. Одновременно перепасовывают грузовой канат 38 с монтажного полиспаста 37 на грузовой полиспаст 42 стрелы. При включении на подъем стреловой лебедки 8 стрела 60 поднимаетс  стреловым полиспастом 66 в рабочее положение. Монтажна  стойка 43, подкатные тележки 9 и уравновешивающа  площадка 62 убираютс  из рабочей зоны крана грузовым полиспастом 42 (фиг. 6 и 7).0 together with the undercarriages 15 occupy their final positions (Figs. 4, 5 and II), where the stands 1 are rigidly fixed with fingers 19 and 28 in the holes 26 and 31 below, and the strut 47 are fixed on the stand 11 by the hinge 51. At the same time 3 is firmly and stably mounted on the undercarriage 15. To bring the crane into position, the heads 6 of the boom 60 are released from the balancing pad 62, and the turntable 5 is loaded with counterweight blocks 64 with a corresponding offset of the center of gravity of the crane to the rear. At the same time perepasovyvayut cargo rope 38 with the mounting of the polyspast 37 on the cargo polyspast 42 arrows. When enabled to lift the boom winch 8, the boom 60 is raised by the boom pulley 66 to the working position. The mounting stand 43, the trolleys 9 and the balancing pad 62 are removed from the working area of the crane by the cargo tackle 42 (Fig. 6 and 7).

При демонтаже крана и подготовке егоWhen dismantling the crane and preparing it

к перебазировке все операции осуществл ютс  с помощью тех же средств в обратной последовательности с опусканием рамы 2 портала 3 на подкатные тележки 9 или на землю в зависимости от способа дальнейшей перебазировки крана.to relocation, all operations are carried out using the same means in reverse order, lowering the frame 2 of the portal 3 to the trolleys 9 or to the ground, depending on the method of further relocating the crane.

00

6666

7J477J47

6565

n nTNn nTN

./У j f4 f./Y j f4 f

S-L--Qm.DDODDP DDDDDDDDDDODSL - Qm.DDODDP DDDDDDDDDDOD

фиг. 2FIG. 2

П ПППППPppt

4 // ;/ ffi --4frfr4 //; / ffi --4frfr

щи2.shchi2.

U LPU U Ю 5U LPU U Yu 5

nn D D 00 0 00 D 00nn D D 00 0 00 D 00

U LPU UUU Ю U LPU UUU Yu

фиг. 5FIG. five

фиг. 6FIG. 6

иand

фиг. 7 FIG. 7

4four

CPUS. 8CPUS. eight

4 454 45

фиг.Зfig.Z

3737

фиг. 10FIG. ten

53Щ22 20Л23 I 1653Schch22 20L23 I 16

Фи2.11Fi2.11

66

Составитель М. МоскалейCompiled by M. Moskal

Редактор Е. ПаппТехред И. ВересКорректор М. ДемчикEditor E. PappTechred I. VeresKorrektor M. Demchik

Заказ 4188/21Тираж 799.ПодписноеOrder 4188/21 Circulation 799.Subscription

ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee

по делам изобретений и открытийfor inventions and discoveries

113035, Москва, Ж-35, Раушска  наб., д. 4/5113035, Moscow, Zh-35, Raushsk nab. 4/5

Филиал ППП «Патент, г. Ужгород, ул. Проектна , 4Branch PPP "Patent, Uzhgorod, st. Project, 4

Claims (4)

1. БАШЕННЫЙ КРАН, содержащий стрелу и поворотную платформу с лебедками и стойками, установленную на портале, выполненном в виде рамы с диагональными балками и стойками, опирающимися на ходовые тележки, монтажную стойку с монтажным полиспастом и грузовой канат, отличающийся тем, что, с целью улучшения удобства обслуживания путем обеспечения самомонтажа, он снабжен консольным кронштейном, основание которого за креплено на поворотной платформе и башне с расположением его свободного конца выше уровня центра тяжести крана и на котором установлена нижняя обойма монтажного полиспаста, блоками для запасовки грузового каната в монтажный полиспаст, смонтированными на стойках платформы и верхней части башни, при этом каждая стойка портала шарнирно прикреплена к соответствующей диагональной балке и ходовой тележке с возможностью фиксации в рабочем положении.1. TOWER CRANE containing a boom and a swing platform with winches and racks mounted on a portal made in the form of a frame with diagonal beams and racks resting on running trolleys, an mounting rack with a mounting sheave and a cargo rope, characterized in that, for the purpose of improving serviceability by ensuring self-assembly, it is equipped with a cantilever bracket, the base of which is mounted on a turntable and a tower with the location of its free end above the center of gravity of the crane and on which it is mounted lena lower wing mounting pulley block, blocks for reeving the hoist rope in the pulley block assembly mounted on platform stands and the upper part of the tower, wherein each post of the portal is pivotally attached to a corresponding diagonal undercarriage beam and fixable in the working position. 2. Кран по π. 1, отличающийся тем, что каждая стойка портала снабжена шарнирно закрепленным нижним и верхним концами на ней и на диагональной балке подкосом, подвешенным средней частью к диагональной балке посредством гибкого элемента, соединенного вторым концом со стойкой портала.2. The crane on π. 1, characterized in that each portal gantry is equipped with pivotally fixed lower and upper ends on it and on the diagonal beam by a strut suspended by the middle part to the diagonal beam by means of a flexible element connected by the second end to the portal rack. 3. Кран по пп. 1 и 2, отличающийся тем, что он снабжен уравновешивающей площадкой на колесах с установленными на ней противовесными блоками, смонтированной на оголовке стрелы с возможностью перемещения по рельсам подпортального пути.3. The crane according to paragraphs. 1 and 2, characterized in that it is equipped with a balancing platform on wheels with counterweights installed on it, mounted on the head of the boom with the ability to move along the rails of the sub-portal track. О! с кABOUT! from to 4* ОС сс 4* К4 * OS ss 4 * K
SU843696463A 1984-01-30 1984-01-30 Tower crane SU1248942A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843696463A SU1248942A1 (en) 1984-01-30 1984-01-30 Tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843696463A SU1248942A1 (en) 1984-01-30 1984-01-30 Tower crane

Publications (1)

Publication Number Publication Date
SU1248942A1 true SU1248942A1 (en) 1986-08-07

Family

ID=21101961

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843696463A SU1248942A1 (en) 1984-01-30 1984-01-30 Tower crane

Country Status (1)

Country Link
SU (1) SU1248942A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5836463A (en) * 1996-12-09 1998-11-17 Khachaturian; Jon E. Powered lifting apparatus using multiple booms
US7066343B1 (en) 1996-12-09 2006-06-27 Khachaturian Jon E Powered lifting apparatus using multiple booms

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Кох П. И. Производство, монтаж, эксплуатаци и ремонт подъе.мно-транспортных машин. - Киев.-Донецк: Головное изд-во изд-го объединени «Вища школа, 1977, с. 176-177. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5836463A (en) * 1996-12-09 1998-11-17 Khachaturian; Jon E. Powered lifting apparatus using multiple booms
US7066343B1 (en) 1996-12-09 2006-06-27 Khachaturian Jon E Powered lifting apparatus using multiple booms

Similar Documents

Publication Publication Date Title
JP5198973B2 (en) Bridge overhang installation device and installation method
US4394911A (en) Heavy duty crane
US3777900A (en) Building crane
JPS6317757B2 (en)
US4195740A (en) Lift crane support system
CN215756065U (en) Quick hoist device of construction is contained to prefabricated box of bridge
US4483448A (en) Heavy duty crane
SU1248942A1 (en) Tower crane
JP2002507530A (en) Ring lift crane
CN218201897U (en) Sliding and hoisting construction device
CN211006327U (en) Deck railway arch bridge pier-passing bridge inspection vehicle
CN216687181U (en) Four-column type tipping winch
CN210458947U (en) Bridge concrete guardrail pouring trolley
JPH10279281A (en) Support pulling up device for telescopic tower crane
CN210505297U (en) Gantry type tipping winch
SU695954A2 (en) Crane
JPH0328066Y2 (en)
CN217377108U (en) Hand-operated wheel disc type handcart lifting vehicle
JPH0776934A (en) Stock lift-up assembling device used for building skyscraper
CN217947456U (en) Flower-frame type gantry crane with electric hoist
CN117886229B (en) Multifunctional integrated rail type lifting mechanism
JPS63189391A (en) Boom turning type crane
CN212769511U (en) LDP dolly of restricting down in two-sided
SU1544863A1 (en) Device for mounting beams of bridge framework
CN217732600U (en) Operation panel of can encorbelmenting