- SU1188185A1 SU1188185A1 SU833652551A SU3652551A SU1188185A1 SU 1188185 A1 SU1188185 A1 SU 1188185A1 SU 833652551 A SU833652551 A SU 833652551A SU 3652551 A SU3652551 A SU 3652551A SU 1188185 A1 SU1188185 A1 SU 1188185A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- pit
- absorbing
- mineral
- absorbent
- spent drilling
- Prior art date
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
1. СПОСОБ ЛИКВИДАЦИИ ОТСТОЙНО-ПОГЛОТИТЕЛЬНОГО КОТЛОВАНА, включающий заполнение котлована отработанным буровым раствором, расслоение отработанного бурового раствора на загущенную и осветленную фазы и засыпку отстойно-поглотительного котлована минеральным грунтом, отл-и чающийс тем, что, с целью повьшени защиты окружающей среды от загр знени , загущенную фазу отверждают частично с образованием верхнего твердого сло , причем отверждение производ т после удалени осветленной фазы, а засыпку котлована минеральным грунтом производ т после нанесени непроницаемого экрана. 2. Способ по п. 1, отличающийс тем, что, с целью предупреждени подземной суффозии i и защиты подземных вод от загр знени в водопроницаемых грунтах (Л и на заболоченной местности, перед заполнением котлована отработанным буровым раствором стенки и дно отстойно-поглотительного котлована покрываютс глинистой пастой.1. METHOD OF LIQUIDATION OF SUCTION-ABSORBING PITTING, including filling the pit with spent drilling mud, stratification of the spent drilling mud into thickened and brightened phases and filling the sediment-absorbing pit with mineral soil, which is also used for the purpose of combining the absorbing and absorbing pit with mineral primer, which is used for the purpose of combining the absorbing and absorbing pit with mineral primer, which is also used to protect the absorbent and absorbent pit with mineral primer, which is used to protect the absorptive pit with mineral primer, which is used for the purpose of cleaning and absorbing the excavation pit with mineral soil, which is used to protect the absorbent and absorbent mineral with a mineral soil. knowledge, the thickened phase is cured partially with the formation of the upper solid layer, and curing takes place after removal of the clarified phase, and the foundation pit is filled with mineral primer. Dropped after applying an impermeable screen. 2. The method according to claim 1, characterized in that, in order to prevent underground suffusion i and protect groundwater from contamination in permeable soils (L and on wetland, before filling the pit with the spent drilling mud, the bottom and bottom of the settling and absorption pit are covered clay paste.
Description
1 Изобретение относитс к охране окружающей среды, в частности к ликвидации отстойно-поглотительных котлованов (ОПК) с буровыми отходами. Цель изобретени - повьшение эффективности защиты окружающей .Среды. На фиг. 1 показано разделение отработанного бурового раствора: на осветленную и загзтценную фазы после коагул ции; на фиг. 2 котлован по окончании процесса ликвидации, разрез, В отстойно-поглотительный котло ван объемом 1900 м , сооруженный в водоупорном грунте и заполненньш отработанным буровым раствором, ввод т коагул нт из расчета 1,5 кг на 1 м жидкой фазы. Указанный котлован примерно содержит 50% твердых отходов 1 и 50% жидкой фаз т.е. 950 м. Тогда потребность коа л нта - сернокислого алюмини дл расслоени буровых отходов на осветленную 1 и загущенную 11 част составл ет 1425 кг. Введение коагу л нта осуществл ют при активном смешении его с отработанным буровы растворами с помощью цементировочного агрегата. Перемешивание ведут в течение 1,5-2,0 ч. Обработанный буровой раствор отстаивают в течение 1 сут. После отсто осветленную воду 2 откачивают дл технолог ческих нужд. Подвижную часть 3 загущенного осадка с помощью гр зе вого насоса откачивают из котлована и смешивают со св зующим, напри мер цементом из расчета 0,8 т цеме та на 1 м подвижной части загущен ного осадка, объем которой замер ю с помощью тарировочных емкостей цементировочного агрегата. Получен ную смесь ввод т в котлован, равно мерно распредел ее по поверхност придонной неподвижной части 4 5 загущенного осадка. Отверждение поверхностного сло загущенного осадка заканчиваетс через 2сут.На отвержденную поверхность 3, 4 (фиг. 2) нанос т непроницаемый экран 5 из глины толщиной 0,3 мм. Оставшуюс часть котлована засыпают минеральным грунтом 6. Отстойно-поглотительный котлован объемом 1900 м сооружаетс в водопроницаемом грунте. Перед заполнением отработанным буровым раствором внутри котлована по периметру устанавливают дерев нную строительную стойку, пространство между которой и стенкой котлована заполн ют глинистой пастой, плотность которой больше плотности бурового раствора , а затем тонким слоем равномерно распредел ют глинистую пасту по дну котлована. Затем котлован заполн етс отработанным буровым раствором. Введение коагул нта в количестве 14.25 кг осуществл етс при активном смешивании его с отработанным буровым рас-твором с помощью Ьементировочного агрегата. Перемешивание ведут в течение 1,5-2,0 ч после чего отработанный буровой раствор отстаивают в течение 1 сут. После отсто осветленную воду от качивают дл технологических нуж. Подвижную часть загущенного осадка смешивают со св зывающим, например цементом из расчета 0,8 т цемента на 1 м подвижной части загущенного осадка. Полученную смесь возвращают в котлован, равномерно распредел ее по поверхности неподвижной части загущенного осадка. Отверждение поверхностного сло заканчиваетс через 2 сут. На отвержденную поверхность нанос т непроницаемый зкран из глины толщиной 0,3 мм, оставшуюс часть котлована засыпают минеральным грунтом.1 The invention relates to the protection of the environment, in particular to the elimination of sedimentation and absorption pits (OPK) with drilling waste. The purpose of the invention is to increase the effectiveness of environmental protection. FIG. Figure 1 shows the separation of the spent drilling mud: into the clarified and solvable phases after coagulation; in fig. 2 pit at the end of the elimination process, a section, a settling and absorption boiler of 1900 m, built in waterproof soil and filled with spent drilling mud, is introduced into the coagulant at the rate of 1.5 kg per 1 m of the liquid phase. Said pit approximately contains 50% of solid waste 1 and 50% of the liquid phase i. 950 m. Then the demand for a cobalt aluminum sulphate for separation of drilling waste into a clarified 1 and a thickened 11 part is 1425 kg. The introduction of coagulum is carried out by actively mixing it with spent drilling muds using a cementing unit. Stirring is carried out for 1.5-2.0 hours. The treated drilling fluid is settled for 1 day. After settling, the clarified water 2 is pumped out for technological needs. The mobile part 3 of the thickened sludge is pumped out of the excavation using a grease pump and mixed with a binder, for example, cement at the rate of 0.8 tons of cement per 1 m of the mobile part of the thickened sludge, the volume of which is measured using the calibration tanks of the cementing unit . The resulting mixture is introduced into the excavation, uniformly distributed over the surface of the near-bottom stationary part of 4 5 thickened sediment. The curing of the surface layer of the thickened sediment ends in 2 days. An impermeable screen 5 of clay with a thickness of 0.3 mm is applied to the hardened surface 3, 4 (Fig. 2). The remainder of the pit is covered with mineral soil 6. A settling pit of 1900 m is constructed in permeable soil. Before filling the spent drilling mud inside the pit, a wooden construction stand is installed around the perimeter, the space between which and the wall of the pit is filled with clay paste, the density of which is greater than the density of drilling mud, and then a thin layer is evenly distributed across the bottom of the pit. The foundation pit is then filled with waste mud. The introduction of a coagulant in an amount of 14.25 kg is carried out with active mixing with the spent drilling mud using a cementing unit. Mixing is carried out for 1.5-2.0 hours after which the spent drilling mud is settled for 1 day. After settling, the clarified water is shaken for technological needs. The moving part of the thickened sludge is mixed with the binding, for example cement, at the rate of 0.8 tons of cement per 1 m of the moving part of the thickened sludge. The resulting mixture is returned to the pit, evenly distributed over the surface of the fixed part of the thickened sludge. The curing of the surface layer ends after 2 days. An impenetrable clay screen with a thickness of 0.3 mm is applied to the hardened surface, the rest of the excavation is covered with mineral soil.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833652551A SU1188185A1 (en) | 1983-07-18 | 1983-07-18 | Method of liquidation of settling-absorbing pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833652551A SU1188185A1 (en) | 1983-07-18 | 1983-07-18 | Method of liquidation of settling-absorbing pit |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1188185A1 true SU1188185A1 (en) | 1985-10-30 |
Family
ID=21085531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833652551A SU1188185A1 (en) | 1983-07-18 | 1983-07-18 | Method of liquidation of settling-absorbing pit |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1188185A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2723794C1 (en) * | 2019-11-05 | 2020-06-17 | Юрий Георгиевич Безродный | Method for construction of oil and gas well on land |
-
1983
- 1983-07-18 SU SU833652551A patent/SU1188185A1/en active
Non-Patent Citations (1)
Title |
---|
Заключительный о лет ВНИИКРНефть ГР 80057825. Краснодар, 1980, с. 29, 77. Авторское свидетельство СССР 9 743584, кл. С 09 К 7/02, 1979. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2723794C1 (en) * | 2019-11-05 | 2020-06-17 | Юрий Георгиевич Безродный | Method for construction of oil and gas well on land |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4375930A (en) | Permanent disposal vault for containers | |
US4952242A (en) | Composition for solidification or semi-solidification of waste materials | |
US4358221A (en) | System for pollution control | |
DK145327B (en) | PROCEDURE FOR FILLING WITH RENOVATION MATERIAL | |
US5201608A (en) | Process for sealing soil formations, especially waste dumps | |
WO2012040470A2 (en) | Installation of leakage barriers to enhance yield of mineral deposits in unlined solar pond systems | |
SU1188185A1 (en) | Method of liquidation of settling-absorbing pit | |
JPS5781530A (en) | Placement work of underwater concrete and form therefor | |
RU2291180C2 (en) | Method of construction and elimination of the earth storages-collectors | |
KR0121307B1 (en) | Waste material buried place making method | |
Holtz | Discussion of “Predicting Hydraulic Conductivity of Clay Liners” by David E. Daniel (February, 1984) | |
RU2162918C1 (en) | Method of eliminating drillings accumulation pit | |
JPH0378160B2 (en) | ||
RU2040633C1 (en) | Method for liquidating earthy pit-accumulator provided for wastes from drilling | |
KR100448475B1 (en) | Layer structure and construction method of waste reclamation land by permeative waterproof agents | |
GB2148867A (en) | Disposal of liquid wastes | |
SU1764535A1 (en) | Method for recultivation of tailings dump | |
RU1808909C (en) | Method for construction of a settler-absorber pit | |
JPH03202188A (en) | Fixation of soil in polluted area containing harmful substance | |
RU2251564C2 (en) | Method of a storage barn recultivation | |
Mykhailovska et al. | Technology placement of drilling waste storage with the use of soil cement screens | |
JPH0135032B2 (en) | ||
RU2704858C1 (en) | Method of drill cuttings disposal | |
JPS5740031A (en) | Replacement treatment of mixed mud water for underground wall construction | |
RU2123574C1 (en) | Method for liquidation of ground storage-collector of drilling waste |