SU1162894A1 - Method of erecting a composition dam - Google Patents

Method of erecting a composition dam Download PDF

Info

Publication number
SU1162894A1
SU1162894A1 SU843687160A SU3687160A SU1162894A1 SU 1162894 A1 SU1162894 A1 SU 1162894A1 SU 843687160 A SU843687160 A SU 843687160A SU 3687160 A SU3687160 A SU 3687160A SU 1162894 A1 SU1162894 A1 SU 1162894A1
Authority
SU
USSR - Soviet Union
Prior art keywords
dam
buttresses
prism
screen
columnar arrays
Prior art date
Application number
SU843687160A
Other languages
Russian (ru)
Inventor
Анатолий Васильевич Швецов
Анатолий Васильевич Караваев
Игорь Борисович Соколов
Юрий Петрович Бондаревский
Original Assignee
Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Гидротехники Им.Б.Е.Веденеева
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Гидротехники Им.Б.Е.Веденеева filed Critical Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Гидротехники Им.Б.Е.Веденеева
Priority to SU843687160A priority Critical patent/SU1162894A1/en
Application granted granted Critical
Publication of SU1162894A1 publication Critical patent/SU1162894A1/en

Links

Landscapes

  • Revetment (AREA)

Abstract

способ ВОЗВЕДЕНИЯ ПЛОТИНЫ СМЕШАННОГО ТИПА, включающий бетонированне контрфорсов и плит экрана, а тайже отсыпку крупнообломочного грунта в упорную призму с созданием в нижней части плотин столбчатых массивов из омоноличенной каменной наброски, примыкающих вплотную к контрфорсам и экрану, надстроенных в верхней части плотины бетонным массивным гребнем, отличающийс  тем, что, с целью упрощени  производства работ и ускорени  ввода гидроузла на промежуточном напоре, упорную призму и столбчатые массивы возвод т раздельно с опережающим ростом последних, одновременно подпира  их с низовой стороны при отсыпке камн  и в процессе работ (Л по омоноличиванию наброски временными поддерживающими конструкци ми.method the dam mixed type comprising concreting buttresses and screen plates and Taizhou dumping coarse-ground in a persistent prism with the creation of the bottom of the dam columnar arrays of omonolichennoy riprap abutting against the buttresses and the screen, the suspended at the top of the dam concrete massive ridge characterized in that, in order to simplify the work and accelerate the input of the hydrosystem at the intermediate head, the stop prism and columnar arrays are erected separately with the advance he growth of the past, at the same time backing them with grassroots party at dumping stones and during operation (L for grouting outline temporary support constructs.

Description

Из.рбретение относитс  к гидротехническому строительству, в частности к способам возведени  высоких плотин смешанного типа. Известен способ возведени  камен нонабросных плотин с экраном, включающий отсыпку камн  в упорную приз му, устройство подэкрановой кладки или подготовки, укладку экрана (l. Недостатком способа  вл етс  вынужденное отставание каждой последующей операции от предыдущей, что сдерживает темпы подготовки напор- кого фронта плотины. Известен также способ возведени  плотин смешанного типа, включающий бетонирование контрфорсов и плит экрана, а также отсыпку крупнообломочного грунта в упорную призму с созданием в нижней части плотины столбчатых массивов из омоноличенной каменной наброски, примыкающих вплотную к контрфорсам и экрану, надстроенных в верхней части плотины бетонным массивным гребнем 2 Недостатком способа  вл етс  вьшужденное отставание каждой последующей операции от предыдущей, ввиду необходимости совместного возведени  упорной призмы и столбчатых массивов, раздел емых переходной зоной из песчано-гравелистового грунта. Цель изобретени  - упрощение про изводства работ и ускорение ввода гидроузла на промежуточном напоре. Цель достигаетс  тем, что соглас но способу упорную призму и столбчатые массивы возводит раздельно с опережающим ростом последних, одн временно подпира , их с низовой стор ны при отсыпке камн  и в процессе работ по омоноличиванию наброски временными поддерживающими конструк ци ми.Эти конструкции могут быть как съемными, многократно используемыми так и несъемными, оставл емыми в теле плотины. В первом случае они могут выполн тьс  в виде щитовых ..элементов, изготавливаемых из дерев или металла, и крепитьс  после уста новки на место посредством заанкери ровани  в нижележащую омоноличенную часть столбчатого массива. Во второ случае эти конструкции целесообразно выполн ть из железобетонных сбор ных арочных элементов, опирающихс  на контрфорсы. Применение указанных конструкций, воспринимающих давление каменной наброски и инъекционного раствора во врем  ее омоноличивани , упрощает производство работ, а автономное возведение столбчатых массивов позвол ет существенно ускорить подготовку напорного фронта при наполнении водохранилища и сократить срок ввода гидроузла в эксплуатацию на промежуточных напорах при минимальных объемах работ пускового комплекса. В частности, произведенные расчеты показывают, что при наклоне низовой грани контрфорсов, равном 0,40 ,5, необходимом дл  обеспечени  прочности и устойчивости законченной строительством плотины под действием эксплуатационных нагрузок, верховое , строение плотины, возведенное на высоту 0,65-0,80, от полной высоты плотины, с упорной призмой, отсыпанной неполным профилем на высоту не более, чем 0,30-0,40 от ее полной высоты, может воспринимать давление воды со стороны верхнего бьефа при промежуточном напоре, удовлетвор   требовани м действующих норм. На фиг. 1 показана плотина, возведенна  предлагаемым способом, в е@ законченном виде, поперечный разрез; на фиг. 2 - сечение А-А на фиг. 1; на фиг. 3 - частично возведенна  .плотина при вводе гидроузла в эксплуатацию на промежуточном -напоре, поперечный разрез; на фиг. 4 - узел 1 на фиг. 2. . Способ осуществл ют следующим образом. По.сле осушени  котлована, подготовки основани  и устройства зуба 1 возвод т нижнюю часть контрфорсов 2 с железобетонным экраном.3 и поддерживающими конструкци ми. Последние могут быть выполнены, например, в виде сборочных арочных малоармированных бетонных элементов 4, свободно опертых на контрфорсы 2. Толщина элементов 4 определ етс  расчетом прочности из услови  воспри ти  ими бокового давлени  от каменной наброски и инъекционного раствора при заданной проектом высоте  русов омоноличивани  наброски. Производ т отсыпку камн  5 задан-, ного гранулометрического составаOften, the breaching refers to hydraulic engineering, in particular, to methods of erecting high dams of mixed type. There is a known method of erection of a non-abrasive stone dam with a screen, which includes dumping a stone into a stop prism, installation of subscreen masonry or preparation, laying the screen (l. The disadvantage of the method is the forced lag of each subsequent operation from the previous one, which hinders the rate of preparation of the pressure front of the dam. There is also known a method of erecting mixed dams, including concreting of buttresses and screen plates, as well as dumping coarse-grained soil into a stop prism with the creation of columns in the lower part of the dam stonework massifs, adjacent to buttresses and screen, built on top of the dam with a massive concrete ridge 2 The disadvantage of this method is the inherent lag of each subsequent operation from the previous one, due to the necessity of jointly erecting a stop prism and columnar arrays separated by a transition zone from sand-gravel soil. The purpose of the invention is to simplify the production of works and accelerate the introduction of a hydro-system at an intermediate head. The goal is achieved by the fact that, according to the method, the thrust prism and columnar arrays are erected separately with the advance growth of the latter, one-time props, from the bottom side during stone filling and in the process of monolithing the outline with temporary supporting structures. These designs can be like removable, reusable and non-removable, left in the dam body. In the first case, they can be made in the form of shield elements made of wood or metal, and fastened after installation into place by means of anchoring into the underlying monolithic part of the columnar array. In the second case, it is advisable to construct these structures from reinforced concrete precast arched elements supported by buttresses. The use of these structures, which perceive the pressure of the rock sling and the injection solution during its monolithing, simplifies the work, and the autonomous erection of columnar arrays significantly speeds up the preparation of the pressure front when filling the reservoir and shortens the time of commissioning of the hydroelectric complex at intermediate pressures with minimal start-up work. complex. In particular, the calculations made show that when the lower face of the buttresses is inclined equal to 0.40, 5, necessary to ensure the strength and stability of the completed dam under the action of operational loads, the upper structure of the dam, raised to a height of 0.65-0.80 , from the full height of the dam, with a stop prism poured by an incomplete profile to a height of not more than 0.30-0.40 from its full height, can perceive water pressure from the upstream by intermediate head to meet the requirements of existing rm FIG. 1 shows a dam erected by the proposed method, in e @ finished form, a cross section; in fig. 2 is a section A-A in FIG. one; in fig. 3 - partially erected by a dam when entering the hydro system into operation at an intermediate pressure, cross section; in fig. 4 — node 1 in FIG. 2.. The method is carried out as follows. After the foundation pit is drained, the base is prepared and the tooth 1 is installed, the lower part of the buttresses 2 is erected with a reinforced concrete screen.3 and supporting structures. The latter can be performed, for example, in the form of assembly arched low-reinforced concrete elements 4, freely supported on buttresses 2. The thickness of elements 4 is determined by calculating the strength from the condition that they perceive the lateral pressure from the rock bed and the injection solution at a given height of the comrades. Stone is poured 5 of a predetermined particle size distribution.

в отсеки, образованные контрфорсами 2, экраном 3 и поддерживающими. конструкци ми 4. Отсыпку камн  5 ведут сло ми высотой 10-15 м в зависимости от производственных условий Производ т омоноличивание каменно наброски известными приемами, образу  столбчатые массивы 6. Устраивают под зубом 1 цементационную завесу 7 и дренажные скважины 8. Далее в той же последовательности наращивают контрфорсы 2, экран 3, поддерживаю щие конструкции из элементов 4 и столбчатые массивы 6 на высоту до 0,65-0,80 от полной высоты плотины и отсыпают неполным профилем упорную призму 9 на высоту 0,30-0,40 от ее проектной высоты.in the compartments formed by buttresses 2, screen 3 and supporting. 4. Laying of stone 5 is carried out in layers of 10–15 m in height, depending on the working conditions. Monolithing stone sketches are made using known methods, forming columnar arrays 6. A cementing curtain 7 and drainage wells 8 are placed under the tooth 1. Then in the same sequence increasing counterforts 2, screen 3, supporting structures from elements 4 and columnar arrays 6 to a height of 0.65-0.80 from the full height of the dam and pouring the partial prism 9 to a height of 0.30-0.40 from its design with an incomplete profile heights.

Производ т заполнение водохранилища с подъемом уровн  воды в верхнем бьефе до отметки, определ емой высотой возведенной верховой части плотины. Ввод т гидроузел в эксплуа- тацию на промежуточном напоре. Надстраивают контрфорсы массивньм бетонным гребнем 10 и отсыпают упорную призму до проектного профил  11.The reservoir is filled with the rise of the water level in the upstream to the mark determined by the height of the raised upper part of the dam. The waterworks are put into operation at an intermediate head. The buttresses are massively built up with a massive concrete ridge 10 and the persistent prism is poured to the design profile 11.

Предлагаемый способ возведени  плотины позвол ет существенно уменьшить объемы строительных работ пускового комплекса при вводе гидроузла в эксплуатацию на промежуточном напоре и ускорить ввод в эксплуатацию одного или двух агрегатов ГЭС, дополнительную выработку электроэнергии.The proposed dam erection method significantly reduces the construction work of the start-up complex when commissioning the hydroelectric complex at an intermediate head and speeds up the commissioning of one or two HPP units and additional power generation.

Claims (1)

СПОСОБ ВОЗВЕДЕНИЯ ПЛОТИНЫ вание контрфорсов и плит экрана, а также отсыпку крупнообломочного грунта в упорную призму с созданием в нижней части плотин столбчатых массивов из омоноличенной каменной наброски, примыкающих вплотную к контрфорсам и экрану, надстроенных в верхней части плотины бетонным массивным гребнем, отличающийся тем, что, с целью упрощения производства работ и ускорения ввода гидроузла на промежуточном напоре, упорную призму и столбчатые массивы возводят раздельно с опережающим ростом последних, одновременно подпирая их с низовой стороны при отсыпке камня и в процессе работ по омоноличиванию наброски временны-METHOD FOR CONSTRUCTING WEIRS Buttresses and screen plates, as well as pouring coarse clastic soil into a persistent prism with the creation of columnar arrays of monolithic stone outline in the lower part of the dams, adjacent to the buttresses and the screen, built on the upper part of the dam with a massive concrete ridge, which differs in that , in order to simplify the work and accelerate the commissioning of the hydraulic system at an intermediate pressure, the thrust prism and columnar arrays are erected separately with the faster growth of the latter, while propping up them from the bottom side when dumping the stone and in the process of monopolizing the drafts of temporary СМЕШАННОГО ТИПА, включающий бетонироми поддерживающими конструкциями.MIXED TYPE, including betoniromi supporting structures.
SU843687160A 1984-01-06 1984-01-06 Method of erecting a composition dam SU1162894A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843687160A SU1162894A1 (en) 1984-01-06 1984-01-06 Method of erecting a composition dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843687160A SU1162894A1 (en) 1984-01-06 1984-01-06 Method of erecting a composition dam

Publications (1)

Publication Number Publication Date
SU1162894A1 true SU1162894A1 (en) 1985-06-23

Family

ID=21098451

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843687160A SU1162894A1 (en) 1984-01-06 1984-01-06 Method of erecting a composition dam

Country Status (1)

Country Link
SU (1) SU1162894A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1.. Моисеев С.Н. и Моисеев И.С. Каменно-земл ные плотины. М,, Энерги , 1977, с. 205, рис.10-8. 2. Авторское свидетельство СССР по за вке № 35176 18/29-15, кл. Е 02 в 7/1)6, 1982. (Ь4) *

Similar Documents

Publication Publication Date Title
CN205742213U (en) Foundation pit supporting construction
CN110541721A (en) Support system and construction method for fully weathered surrounding rock tunnel in water-rich quicksand stratum
CN101725258A (en) Integral jacking method of heritage buildings
CN109184699B (en) Construction method for passing existing river channel under open trench tunnel
CN111794254A (en) Railway slope prefabricated assembled post-cast framework slope protection structure and construction method thereof
CN109403339B (en) Deep foundation pit composite supporting structure combining double-row piles with center island method and supporting method thereof
CN208934002U (en) A kind of barrier wall structure
SU1162894A1 (en) Method of erecting a composition dam
CN203066083U (en) Supporting structure for two adjacent foundation pits
CN113323722B (en) Special tunnel water burst treatment method
CN212772394U (en) Underground building supporting system
CN104878763B (en) Main building basement supporting construction with annex
CN114263187A (en) Foundation pit bottom plate force transmission structure and construction method thereof
SU968151A1 (en) Dam made of locally available materials
CN114351746B (en) Mountain area river-following steep bank slope pile foundation platform and construction method
RU2045613C1 (en) Process of erection of hydraulic power station from floating module units
CN217556961U (en) Expanding shell type prestressed anchor rod and spray anchor combined supporting structure for vertical shaft deep foundation pit
RU2209267C1 (en) Process of earth fixing
SU1124084A1 (en) Dam and method of erecting same
CN220266625U (en) Grouting piece stone retaining wall body grouting reinforcement structure
CN212614717U (en) Construction structure of rich water weak surrounding rock large-section tunnel
CN218233557U (en) Bubble mixed light concrete retaining wall concrete prefabricated formwork structure
CN210421109U (en) Foundation pit supporting device
SU1201398A1 (en) Dam
IL34532A (en) System for the deepening of the bottom in front of moles and retaining walls of marine and river installations and the re-inforced moles so obtained