SU1118775A1 - Steam power plant - Google Patents

Steam power plant Download PDF

Info

Publication number
SU1118775A1
SU1118775A1 SU813328691A SU3328691A SU1118775A1 SU 1118775 A1 SU1118775 A1 SU 1118775A1 SU 813328691 A SU813328691 A SU 813328691A SU 3328691 A SU3328691 A SU 3328691A SU 1118775 A1 SU1118775 A1 SU 1118775A1
Authority
SU
USSR - Soviet Union
Prior art keywords
building system
condensate
built
steam
separator
Prior art date
Application number
SU813328691A
Other languages
Russian (ru)
Inventor
Всеволод Константинович Балабанович
Валентина Александровна Чиж
Владимир Федорович Чернак
Original Assignee
Белорусский Ордена Трудового Красного Знамени Политехнический Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Белорусский Ордена Трудового Красного Знамени Политехнический Институт filed Critical Белорусский Ордена Трудового Красного Знамени Политехнический Институт
Priority to SU813328691A priority Critical patent/SU1118775A1/en
Application granted granted Critical
Publication of SU1118775A1 publication Critical patent/SU1118775A1/en

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

ТЕПЛОВАЯ ЭЛЕКТРИЧЕСКАЯ СТАНЦИЯ, содержаща  по меньщей мере две паротурбинные установки, в тракте конденсата и питательной воды которых установлены конденсатные насосы, регенеративные подогреватели с дренажными трубопроводами и деаэратор, а котел одной установки имеет промежуточный пароперегреватель и встроенный сепаратор, подключенный к растопочному расщирителю с трубопроводами отвода воды и пара, отличающа с  тем, что, с целью повышени  экономичности путем утилизации тепла при пуске и выработки дополнительной мощности, трубопроводы отвода воды и пара и промежуточный пароперегреватель дополнительно сообщены с по меньщей мере одним регенеративным подогревателем другой установки, дренажный трубопровод первого по ходу I конденсата регенеративного подогревател  которой подключен к тракту конденсата дру (Л гой установки. 00 елTHERMAL ELECTRIC STATION, containing at least two steam turbine plants, in the condensate and feedwater path of which condensate pumps, regenerative heaters with drainage pipes and deaerator are installed, and the boiler of one plant has an intermediate superheater and a built-in separator, which is connected to a building system, and a building system that has the box, and the system is connected to a heating system and a built-in separator that is connected to a building system, and a building system that is connected to a building system, and a built-in separator that is connected to a building system, and a building system that has been applied to a building system, and a built-in separator that is connected to a heating system, and a built-in separator that is connected to a heating system, and a built-in system, and a system that has a system, and a building system that has been connected to a building system, has an emergency superheater and a built-in separator that has been connected to a building system, and a building system that has been connected to a heating system and a dehumidifier is installed. and a couple, characterized in that, in order to increase efficiency by utilizing heat during start-up and generating additional power, oprovody drainage and steam reheater and further communicated with at least one mensche regenerative preheater other unit, drain conduit downstream of the first I condensate regenerative preheater which is connected to the condensation path Drew (A goy installation. 00 ate

Description

Изобретение относитс  к теплоэнергетике и может быть использовано на электрических станци х, имеющих паротурбинные установки с пр моточными котлами.The invention relates to a power system and can be used in power plants having steam turbine plants with flow boilers.

Известна паротурбинна  установка с пр моточным котлом, к встроенному сепаратору которого подключен растопочный расширитель , сообщенный с допрлнительным расширителем, который подключен по пару к цилиндру низкого давлени  (ЦНД), а промежуточный пароперегреватель котла также сообщен с ЦНД 1.A steam turbine installation with a flow boiler is known, to which the built-in separator is connected a pilot spreader communicated with an additional spreader which is connected in pairs to a low pressure cylinder (LPC), and an intermediate superheater of the boiler is also in communication with the LPC 1.

Недостатком такой установки  вл етс  сравнительно большой расход топлива на пуск, обусловленный утилизацией тепла в дополнительном расширителе при низких параметрах, определ емых состо нием пара перед ЦНД, отсутствием возможности утилизации пускового тепла на ранней стадии растопки котла, а также отсутствием св зи между пускаемой и работающей установками .The disadvantage of such an installation is a relatively high fuel consumption at start-up, due to heat utilization in the additional expander with low parameters determined by the state of steam before the low-pressure cylinder, the inability to utilize the starting heat at the early stage of the boiler firing, and the lack of communication installations.

Известна, теплова  электрическа  станци  (ТЭС), содержаща  по меньшей мере две паротурбинные установки, в тракте KQH-; денсата и питательной воды которых установлены конденсатные насосы, регенеративные подогреватели с дренажными трубопроводами и деаэратор, а котел одной установки имеет промежуточный пароперегреватель и встроенный сепаратор, подключенный к растопочному расширителю с трубопроводами отвода воды и пара 2.The thermal electric station (TPP), containing at least two steam turbine installations, is known in the KQH- path; condensate pumps, regenerative heaters with drainage pipes and a deaerator are installed in the condensate pumps and feedwater, and the boiler of one unit has an intermediate superheater and an integrated separator connected to the pilot dilator with drainage pipes for steam and steam 2.

Недостатком такой ТЭС  вл етс  сравнительно большой расход топлива на пуск, обусловленный сбросом в конденсатор пускового тепла в виде пара, охлаждающего промежуточный пароперегреватель, а также отсутствие возможности получени  дополнительной мощности на электростанции без увеличени  расхода топлива до момента синхронизации и вз ти  нагрузки паротурбинной установкой, котел которой растапливаетс .The disadvantage of such a TPP is a relatively large fuel consumption at start-up, due to discharge of start-up heat into the condenser in the form of steam that cools the intermediate superheater, as well as the inability to obtain additional power at the power plant without increasing the fuel consumption before synchronization and loading the steam turbine unit, the boiler which is melted down.

Целью изобретени   вл етс  повышение экономичности путем утилизации тепла,при пуске и выработки дополнительной мощности .The aim of the invention is to improve the economy by utilizing heat during start-up and generating additional power.

Указанна  цель достигаетс  тем, что в тепловой электрической станции, содержащей по меньшей мере две паротурбинные установки, в тракте конденсата и питательной воды которых установлены конденсатные насосы, регенеративные подогреватели с дренажными трубопроводами и деаэратор , а котел одной установки имеет промежуточный пароперегреватель и встроенный сепаратор, подключенный к растопочному расширителю с трубопроводами отвода воды и пара, последние и промежуточный пароперегреватель дополнительно сообщены с по меньшей мере одним регенеративным подогревателем другой установки, дренажныйThis goal is achieved by the fact that in a thermal power plant containing at least two steam turbine plants, in the condensate path and feedwater of which are installed condensate pumps, regenerative heaters with drain pipes and a deaerator, and the boiler of one plant has an intermediate superheater and an integrated separator connected to the pilot dilator with pipelines for the removal of water and steam, the latter and the intermediate superheater are additionally communicated with at least one reheater enerativnym another heater installation, drain

трубопровод первого по ходу конденсата регенеративного подогревател  которой подключен к тракту конденсата другой установки .the pipeline of the first in the course of condensate regenerative heater which is connected to the condensate path of another installation.

5 На чертеже представлена принципиальна  схема ТЭС.5 The drawing shows a schematic diagram of a thermal power plant.

Теплова  электрическа  станци ,содержит по меньщей мере две паротурбинные установки 1 и 2, в трактах 3 и 4 конденса0 та и питательной воды которых установлены конденсатные насосы 5 и 6, регенеративные подогреватели низкого 7 и BbicoKoro 8 давлени  (ПНД и ПВД) с дренажными трубопроводами 9, 10 и деаэратор П.. Котел одной паротурбинной установки 2 имеет про5 межуточный пароперегреватель 12 и встроенный сепаратор 13, включенный параллельно встроенной задвижке 14 и подключенный к растопочному расширителю 15 с трубопроводами 16 и 17 отвода воды и пара. Про0 межуточный пароперегреватель 12 трубопроводом 18, а растопочный расширитель 15 трубопроводами 16 и 17 отвода воды и пара дополнительно сообщены с по меньшей мере одним регенеративным подогревателем 8 другой установки .1, отборы 19 пара кото рой-подключены к регенеративным подогревател м 7 и 8. Дренажный трубопровод 20 первого по ходу конденсата ПНД 7 парогтурбинной установки 1 подключен к тракту 3 конденсата другой паротурбинной установQ ки 2 трубопроводом 21, на котором установлен дренажный насос 22. В тракте 3 конденсата паротурбинной установки 2 установлена блочна  обессоливающа  установка (БОУ) 23. Обе паротурбинные установки 1 и 2 имеют кощенсаторы 24 и 25The heat electric station contains at least two steam-turbine plants 1 and 2, in paths 3 and 4 of condensate and feed water of which condensate pumps 5 and 6 are installed, low-pressure regenerative heaters 7 and BbicoKoro 8 pressure (HDPE and LDPE) with drainage pipes 9 , 10 and deaerator P. .. The boiler of one steam turbine installation 2 has a pro-intermediate steam superheater 12 and an integrated separator 13 connected in parallel with the built-in valve 14 and connected to the pilot dilator 15 with pipelines 16 and 17 of the drainage of water and steam. The intermediate steam superheater 12 is connected to pipeline 18, and the pilot expander 15 via pipes 16 and 17 of the water and steam outlet is additionally connected with at least one regenerative heater 8 of another installation .1, the steam extraction 19 is connected to regenerative heaters 7 and 8. Drainage steam the pipeline 20 of the first along the course of the condensate PND 7 steam turbine installation 1 is connected to the path 3 of the condensate of another steam turbine unit 2 by pipe 21, on which a drainage pump 22 is installed. In the path 3 of the condensate steam turbine mouth ovki 2 installed malic obessolivayuscha unit (BOU) 23. Both steam-turbine plant 1 and 2 are 24 and 25 koschensatory

5 и могут быть подключены к пр моточному котлу и трубопроводами 16, 17, 18, 21 св заны между собой.5 and can be connected to the flow boiler and pipelines 16, 17, 18, 21 are interconnected.

Теплова  электрическа  станци  в пе . риод пуска одной паротурбинной установки 2 и работающей под нагрузкой другой паротурбинной установки 1 работает следующим образом.Thermal electric station in ne. The start-up period of one steam-turbine unit 2 and operating under load of another steam-turbine unit 1 operates as follows.

На начальной стадии пуска паротурбинной установки 2 вода (дренаж) и пар растопочного расширител  15 по трубопрово5 дам 16 и 17 подают в тот регенеративный подогреватель 8 паротурбинной установки 1, давление греющего пара в котором несколько ниже давлени  в растопочном расщирителе 15, а пар после промежуточного пароперегревател  12 по трубопроводу 18 подают в один из регенеративных подогревателей 8 паротурбинной установки 1. При этом происходит вытеснение греющего пара регенеративных отборов 19 установки 1 теплом дренажа и пара растопочного расщирител  15At the initial stage of launching a steam turbine unit 2, water (drainage) and steam of a pilot spreader 15 are supplied via pipelines 16 and 17 to that regenerative heater 8 of a steam turbine plant 1, the heating steam pressure in which is slightly lower than the pressure in the kindling furnace 15, and the steam after an intermediate superheater 12 through the pipeline 18 is fed into one of the regenerative heaters 8 of the steam turbine installation 1. In this case, the heating steam of the regenerative selections 19 of the installation 1 is displaced by the heat of drainage and the steam of the heating p Assistant 15

5 и паром после промежуточного пароперегревател  12. Вытесненный пар, соверша  работу в установке 1, вырабатывает дополнительную мощность. Каскадный сброс дренажа растопочного расширител  15 по дренажным трубопроводам 9 и 10 в системе регенеративных подогревателей 7 и 8 обеспечивает снижение его потенциала, определ емого насыщением воды при давлении в нижнем по ходу пара регенеративном подогревателе 7, что позвол ет подать этот дренаж по трубопроводу 21 посредством дренажного насоса 22 в тракт 3 основного конденсата паротурбинной установки 2, где в зависимости от качества дренажа может быть обеспечен вывод из тракта пускаемого котла загр знений или очистка конденсата в БОУ 23. Очищенный конденсат из БОУ 23 конденсатным насосом 6 подаетс  в котел . Подача конденсата непосредственно на вход БОУ 23 исключает потерю тепла в конденсаторе 24 установки 1, а также упрощает схему отвода гор чих потоков пара и воды в конденсатор 25 пускаемой установки 2. Таким образом, подключение трубопроводов отвода воды и пара из растопочного расширител  и трубопровода отвода пара из тракта гор чего промперегрева котла пускаемой паротурбинной установки к регенеративным подогревател м работающей паротурбинной установки при полной их взаимозамен емости обеспечивает утилизацию пускового тепла с момента пуска до вз ти  нагрузки пускаемой паротурбинной установкой , что повыщает экономичность при одновременной выработке дополнительной мощности .5 and the steam after the intermediate superheater 12. The displaced steam, completing the work in unit 1, generates additional power. Cascade dumping of the pilot spreader 15 through drainage pipelines 9 and 10 in the system of regenerative heaters 7 and 8 reduces its potential, which is determined by saturation of water at the downstream pressure of the steam regenerative heater 7, which allows this drainage to be supplied through pipeline 21 through drainage pump 22 to path 3 of the main condensate of a steam turbine unit 2, where, depending on the quality of drainage, discharge from the path of the fired boiler to contamination or cleaning of condensate in BOW 2 can be provided 3. The purified condensate from the BDU 23 is fed to the boiler by a condensate pump 6. The supply of condensate directly to the input of the BFU 23 eliminates heat loss in the condenser 24 of installation 1, and also simplifies the scheme for removing hot streams of steam and water into the condenser 25 of the commissioned installation 2. Thus, the connection of the pipelines for the removal of water and steam from the ignition expander and the pipeline for removal of steam from the path of hot heating of the boiler of the started-up steam-turbine plant to the regenerative heaters of the operating steam-turbine plant with their full interchangeability ensures the utilization of the starting heat from the moment starting to load Let ti taken turbine installation that povyschaet efficiency with simultaneous generation of additional power.

Claims (1)

ТЕПЛОВАЯ ЭЛЕКТРИЧЕСКАЯ СТАНЦИЯ, содержащая по меньшей мере две паротурбинные установки, в тракте кон- денсата и питательной воды которых установлены конденсатные насосы, регенеративные подогреватели с дренажными трубопроводами и деаэратор, а котел одной установки имеет промежуточный пароперегреватель и встроенный сепаратор, подключенный к растопочному расширителю с трубопроводами отвода воды и пара, отличающаяся тем, что, с целью повышения экономичности путем утилизации тепла при пуске и выработки дополнительной мощности, трубопроводы отвода воды и пара и промежуточный пароперегреватель дополнительно сообщены с по меньшей мере одним регенеративным подогревателем другой установки, дренажный трубопровод первого по ходу конденсата регенеративного подогревателя которой подключен к тракту конденсата другой установки.THERMAL ELECTRIC STATION, containing at least two steam turbine units, condensate pumps, regenerative heaters with drain pipes and a deaerator are installed in the condensate and feed water path, and the boiler of one unit has an intermediate superheater and an integrated separator connected to the expansion pipe water and steam removal, characterized in that, in order to increase efficiency by utilizing heat during start-up and generating additional power, piping The water and steam removal odes and the intermediate superheater are additionally communicated with at least one regenerative heater of another installation, the drainage pipe of the first regenerative heater along the condensate of which is connected to the condensate path of another installation. «А"A 1 11187751 1118775
SU813328691A 1981-08-14 1981-08-14 Steam power plant SU1118775A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813328691A SU1118775A1 (en) 1981-08-14 1981-08-14 Steam power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813328691A SU1118775A1 (en) 1981-08-14 1981-08-14 Steam power plant

Publications (1)

Publication Number Publication Date
SU1118775A1 true SU1118775A1 (en) 1984-10-15

Family

ID=20973355

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813328691A SU1118775A1 (en) 1981-08-14 1981-08-14 Steam power plant

Country Status (1)

Country Link
SU (1) SU1118775A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР № 891975, кл. F 01 К 13/02, 1980. 2. Котельные и турбинные установки энергоблоков мощностью 500 и 800 МВт. Под ред. В. Е. Дорощука и В. Б. Рубина, М., «Энерги , 1979, с. 478-492. *

Similar Documents

Publication Publication Date Title
RU2152527C1 (en) Method of operation of gas-and-steam turbine plant and plant operating according to this method
RU2193726C2 (en) Waste heat-powered steam generator
US6269626B1 (en) Regenerative fuel heating system
US4099384A (en) Integral separator start-up system for a vapor generator with constant pressure furnace circuitry
US6497102B2 (en) Method for supplementing a saturated steam generation system having at least one steam turbine set, and steam power plant supplemented using the method
US6256978B1 (en) Power generation in a combination power plant with a gas turbine and a steam turbine
JPH10506165A (en) Method of operating combined gas and steam turbine equipment and equipment operated by this method
JP2001514353A (en) Operating method of combined gas and steam turbine facility and combined gas and steam turbine facility for implementing the method
RU2688078C2 (en) Coaling welded electric installation with oxy-ignition with heat integrating
RU2153081C1 (en) Combined-cycle-plant and its operating process
RU2062332C1 (en) Combined-cycle plant
JP2002526706A (en) Gas / steam turbine combined facility
US20030000214A1 (en) Gas and steam turbine installation
KR100615730B1 (en) Gas and steam turbine installation
RU2152521C1 (en) Condensate degassing method and device
RU2564367C2 (en) Steam-turbine power plant
US6460325B2 (en) Method of converting a system generating saturated steam, having at least one steam turbine group, and power station converted in accordance with the method
SU1118775A1 (en) Steam power plant
RU2631961C1 (en) Method for operation of binary combined cycle power plant
JP2022124996A (en) Thermal power generation plant and control method for thermal power generation plant
JP2007183068A (en) Once-through exhaust heat recovery boiler
JPS6035104A (en) Super high-temperatue, high-pressure steam turbine plant
JP4842071B2 (en) Operation method of once-through exhaust heat recovery boiler and operation method of power generation equipment
RU2078229C1 (en) Steam-and-gas plant
JPS60138213A (en) Composite cycle waste heat recovery power generating plant