SU1102640A1 - Ground slope for taking stone large-size fraction - Google Patents

Ground slope for taking stone large-size fraction Download PDF

Info

Publication number
SU1102640A1
SU1102640A1 SU823447747A SU3447747A SU1102640A1 SU 1102640 A1 SU1102640 A1 SU 1102640A1 SU 823447747 A SU823447747 A SU 823447747A SU 3447747 A SU3447747 A SU 3447747A SU 1102640 A1 SU1102640 A1 SU 1102640A1
Authority
SU
USSR - Soviet Union
Prior art keywords
slope
height
soil
fraction
soil slope
Prior art date
Application number
SU823447747A
Other languages
Russian (ru)
Inventor
Владимир Александрович Маслов
Виктор Петрович Замула
Игорь Дмитриевич Ткачевский
Original Assignee
Всесоюзный научно-исследовательский институт транспортного строительства
Трест "Бамстроймеханизация"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский институт транспортного строительства, Трест "Бамстроймеханизация" filed Critical Всесоюзный научно-исследовательский институт транспортного строительства
Priority to SU823447747A priority Critical patent/SU1102640A1/en
Application granted granted Critical
Publication of SU1102640A1 publication Critical patent/SU1102640A1/en

Links

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

ГРУНТОСПУСК ДЛЯ ОТБОРА .КРУПНОЙ ФРАКЦИИ КАМНЯ, включающий наклонную плоскость в виде грунтового откоса, отличающийс  тем,что, с целью повышени  выхода крупной фракции за счет снижени  ее дроблени  при падении, грунтоспуск снабжен тормоз щим элементом в виде горки высотой 0,03-0,10 высоты грунтового откоса, расположенной на рассто нии 0,02-0,04 тзйлсоты 1рунтового откоса, при этсж нижи   часть грунтового откоса до 0,25 его высоты выполнена с уклоном (l:5)- fl:10). СЛ СA GROUND FRONT FOR SELECTION OF A LARGE STONE FRACTION, including an inclined plane in the form of a soil slope, characterized in that, in order to increase the yield of a large fraction by reducing its crushing during a fall, the ground release is equipped with a 0.03-0 slide height inhibiting element, 10 of the height of the soil slope, located at a distance of 0.02-0.04 tsyilsotov 1runtovogo slope, at this time, a part of the soil slope to 0.25 of its height is made with a slope (l: 5) - fl: 10). SL C

Description

Изобретение относитс  к устройствам дл  разделени ; смеси сыпучего материала на фракции по крупности.This invention relates to separation devices; mixture of bulk material into fractions by size.

Известно устройство дл  инерционного разделени  смеси сыпучего материала по крупности в свободном падении при поперечно направленном потоке более мелкого материала С 1 .A device is known for the inertial separation of a mixture of bulk material by size in free fall with a transversely directed stream of finer material C 1.

1(едостатком этого устройства  вл етс  низка  эффективность выделени  крупной фракций.1 (the residue of this device is the low emission efficiency of the coarse fractions.

Наиболее близким к изобретению по технической сущности  вл етс  грунтоспуск дл  отбора крупной фракции камн , включающий наклонную плоскость в виде грунтового откоса С 23, при stoM разделение осуществл ют посредством послойного выделени  образовавшихс  фракций.Closest to the invention by technical essence is a ground release for the selection of a large fraction of stone, including an inclined plane in the form of a soil slope C 23, with stoM separation carried out by layer-by-layer separation of the fractions formed.

Недостатками известного устройства  вл ютс  низкий выход крупной фракции камн  за счет ее дроблени  при падении и ухудшение качества крупной фракции камн  вследствие ее засорени  мелким материалом.The disadvantages of the known device are the low yield of the coarse fraction of the stone due to its crushing in the fall and the deterioration of the quality of the coarse fraction of the stone due to its clogging with fine material.

Цель изобретени  - повышение выхода крупной фракции за счет снижени  ее дроблени  при падении.The purpose of the invention is to increase the yield of the coarse fraction by reducing its fragmentation in the fall.

Указанна  цель достигаетс  тем, что грунтоспуск дл  отбора крупной фракции камн , включающий наклонную плоскость в виде грунтового iOTKOca, снабжен тормоз щим элементом в виде горки высотой 0,03-0,10 высрты грунтового откоса расположенной на рассто нии 0,02-0,04 высоты грунтового откоса, при этом нижн   част грунтового откоса до четверти его высоты выполнена с уклоном (1:5) (1:10).This goal is achieved by the fact that the ground release for the selection of a large fraction of stone, including an inclined plane in the form of a ground iOTKOca, is provided with an inhibiting element in the form of a slide with a height of 0.03–0.10 rytra soil slope located at a distance of 0.02–0.04 the height of the soil slope, while the lower part of the soil slope to a quarter of its height is made with a slope (1: 5) (1:10).

На фиг. 1 изображен грунтоспуск уположенным откосом в нижней четвер грунтового откоса; на фиг. 2 то же, с тормоз щим элементйм в виде горки.FIG. 1 shows the soil release by a laid-back slope in the lower four of the soil slope; in fig. 2 the same, with the braking element in the form of a slide.

Грунтоспуск состоит из грунтового откоса 1 с верхней площадкой 2 f на которую помещаетс  подлежаща  разделению по крупнос и скальна  горна  масса 3. В нижней частиThe grenade pad consists of a ground slope 1 with an upper platform 2 f on which the mass to be divided is divided into large and rocky mountain 3. In the lower part

грунтового откоса 1 выполнен уположенный участок 4 и тормоз щий элемент 5 в виде горки, на которых расположена крупна  фракци  породы 6.the soil slope 1 is made flat section 4 and the braking element 5 in the form of a hill, on which a large fraction of rock 6 is located.

Разделение на грунтоспуске осущевл етс  следующим образом.The separation on the grating is performed as follows.

На площадку 2 насыпаетс  исходна  скальна  масса 3, котора  бульдозером сталкиваетс  на грунтовый откос 1. При движении массы по откосу происходит ее разделение на фракции, причем элементами 4 и 5 крупные камни 6 задерживаютс  на уположенной части спуска вследствие возрастани  сил сопротивлени  их качению, уравновешивающих инерционную движущую силу, либо откладываютс - вследствие потери кинетической энергии на преодоление высоты горки сразу за ней. Соответственно фракци грунта меныдего размера откладываютс  на откосе вьпае зоны уположени , либо отсекаютс  горкой и откладываютс  между нижней частью откоса и горкой. Из отвалов фракционный камень подбирают, например фронталь ным тракторным погрузчиком, груз т на автосамосвалы и вывоз т на место отсыпки..At site 2, the initial rock mass 3 is poured, which is bulldozed into the ground slope 1. When the mass moves along the slope, it is divided into fractions, with elements 4 and 5 of large stones 6 being retained on the flattened part of the descent due to an increase in the rolling resistance forces balancing the inertia the driving force is either deposited due to the loss of kinetic energy to overcome the height of the hill immediately behind it. Accordingly, soil fractions of a different size are deposited on the slope above the zone of positioning, or are cut off by the slide and deposited between the lower part of the slope and the slide. From dumps, a fractional stone is picked up, for example, with a frontal tractor loader, cargo t to dump trucks and taken to the dumping site.

В качестве базового объекта прин т комплект машин дл  pacчиcтkи камней расчетного размера в горной массе, их погрузки на транспорт и перемещени  отходов в отвгш,включающий гидравлический экскаватор с ковшом емкостью 1,5 м и бульдозер на тракторе мощностью 320 л.р.As a base object, a set of machines for calculating stones of calculated size in rock mass, loading them into transport and transferring waste to waste, including a hydraulic excavator with a 1.5 m bucket and a bulldozer on a tractor with a capacity of 320 l.

Применение предлагаемой конструкции грунтоспуска с тормоз щими устройствами при объеме работ 100 тыс.м фракционного камн  может дать экономию в размере 45 тыс.руб. и 503 машино/смен в год.The application of the proposed design of a ground-start with braking devices with a workload of 100 thousand m of fractional stone can provide savings of 45 thousand rubles. and 503 cars / shifts per year.

Применение изобретени  позвол ет на 10-15% увеличить выход, крупной фракции. Наличие уположенного участка 4 и тсфмоз щего элемента 5 в виде горки снижает передрабливание крупных кусков при их падении.The application of the invention allows for a 10-15% increase in the yield of the coarse fraction. The presence of a laid-out area 4 and a sliding element 5 in the form of a slide reduces the pererablivanie large pieces when they fall.

fD,02-ffM)fffD, 02-ffM) ff

П.1P.1

Claims (1)

ГРУНТОСПУСК ДЛЯ ОТБОРА.КРУПНОЙ ФРАКЦИИ КАМНЯ, включающий наклонную плоскость в виде грунтового откоса, отличающийся тем,что, с целью повышения выхода крупной фракции за счет снижения ее дробления при падении, грунтоспуск снабжен тормозящим элементом в виде горки высотой 0,03-0,10 высоты грунтового откоса, расположенной на расстоянии 0,02-0,04 высоты грунтового откоса, при этом нижняя часть грунтового откоса до 0,25 его высоты выполнена с уклоном (1:5)-(1:10).PRIMER RELEASE FOR SELECTION OF A LARGE STONE FRACTION, including an inclined plane in the form of a soil slope, characterized in that, in order to increase the yield of a large fraction by reducing its crushing during a fall, the soil drain is equipped with a braking element in the form of a slide 0.03-0.10 in height. the height of the soil slope, located at a distance of 0.02-0.04 height of the soil slope, while the lower part of the soil slope to 0.25 of its height is made with a slope (1: 5) - (1:10). , g, g
SU823447747A 1982-05-31 1982-05-31 Ground slope for taking stone large-size fraction SU1102640A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823447747A SU1102640A1 (en) 1982-05-31 1982-05-31 Ground slope for taking stone large-size fraction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823447747A SU1102640A1 (en) 1982-05-31 1982-05-31 Ground slope for taking stone large-size fraction

Publications (1)

Publication Number Publication Date
SU1102640A1 true SU1102640A1 (en) 1984-07-15

Family

ID=21014958

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823447747A SU1102640A1 (en) 1982-05-31 1982-05-31 Ground slope for taking stone large-size fraction

Country Status (1)

Country Link
SU (1) SU1102640A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU723584B2 (en) * 1997-07-08 2000-08-31 Wagner Investments Pty Ltd Gravitational fines classifier

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР I 724229, кл. В 07 В 13/10, 1976, 2. Авторское свидетельство СССР 825191; кл. В 07 В 13/10, 1978 (прототип). *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU723584B2 (en) * 1997-07-08 2000-08-31 Wagner Investments Pty Ltd Gravitational fines classifier

Similar Documents

Publication Publication Date Title
US20100171360A1 (en) Method for open pit bench mining
SU1102640A1 (en) Ground slope for taking stone large-size fraction
EA001981B1 (en) Method and apparatus for pipeline trench padding
US3493266A (en) Portable combination mining and separating assembly
SU1255676A1 (en) Method of construcing an earth-and-stone dam
CN210304018U (en) River channel grit is gathered and system of processing
JP2019167675A (en) Bucket for particulate matter transport and particulate matter transport method
GB2443191A (en) Soil recycling apparatus
JP2020163319A (en) Manufacturing method to convert inorganic sludge into recycled soil
SU1687779A1 (en) Stripping and opencasting of mineral deposits
KR200211214Y1 (en) A Stone separator
US1244203A (en) Method of and apparatus for placer-mining.
SU994634A1 (en) Excavator bucket
JPS6330524Y2 (en)
JPS56153026A (en) Quarrying method of crushed stone
RU1794191C (en) Method of opencast mining of deposit of mineral resources
RU2039272C1 (en) Method for dumping and working of hard rocks with coarse fractionation
SU929840A1 (en) Method for open-cast mining of mineral depositis
JPH0137732Y2 (en)
JPS6117999B2 (en)
Rakipov et al. Selection and justification of the reduced impact technologies of amber production at the Primorskoye field
Loftus, WKB*, Stucke, HJ** & Rankin Mining and treatment plant practice at the Finsch Mine, De Beers Consolidated Mines, Limited
RU1836571C (en) A scraper plant
SU1546635A1 (en) Method and apparatus for recultivating slopes of hard rock dumps
SU1374054A1 (en) Wheel excavator operating member