SU1079757A1 - Apparatus for constructing cast-in-place shell pile - Google Patents

Apparatus for constructing cast-in-place shell pile Download PDF

Info

Publication number
SU1079757A1
SU1079757A1 SU823434145A SU3434145A SU1079757A1 SU 1079757 A1 SU1079757 A1 SU 1079757A1 SU 823434145 A SU823434145 A SU 823434145A SU 3434145 A SU3434145 A SU 3434145A SU 1079757 A1 SU1079757 A1 SU 1079757A1
Authority
SU
USSR - Soviet Union
Prior art keywords
concrete
openings
former
pile
concrete mix
Prior art date
Application number
SU823434145A
Other languages
Russian (ru)
Inventor
Явдат Шафагутдинович Зиязов
Олег Львович Денисов
Original Assignee
Научно-Исследовательский Институт Промышленного Строительства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-Исследовательский Институт Промышленного Строительства filed Critical Научно-Исследовательский Институт Промышленного Строительства
Priority to SU823434145A priority Critical patent/SU1079757A1/en
Application granted granted Critical
Publication of SU1079757A1 publication Critical patent/SU1079757A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

УСТРОЙСТВО ДЛЯ ВОЗВЕДЕНИЯ НАБИВНОЙ СВАИ-ОБОЛОЧКИ, включакнцее бетонолитную трубу с проемами в нижней части дл  подачи бетонной смеси и формирователь, отличающеес   тем, что, с целью снижени  материалоемкости и упрощени  конструкции , проемы дл  подачи бетонной смеси образованы на боковой поверхности бетонолитной трубы, а формирователь выполнен в виде полого конуса, вершиной заведенного в полость бетонолитной трубы и прикрепленного к ней на уровне нижней границы проемов.A DEVICE FOR CONSTRUCTING A PRESSURE PILED ENVIRONMENT, including a concrete pipe with openings in the lower part for supplying concrete mix and a former, characterized in that, in order to reduce material consumption and simplifying the design, openings for supplying concrete mix are formed on the lateral surface of the concrete casting pipe, and the former made in the form of a hollow cone, the apex of a concrete-tube pushed into the cavity and attached to it at the level of the lower border of the openings.

Description

СОWITH

1 ел Изобретение относитс  к строитель ству, в частности к фундаментостроению , и может быть использовано при возведении набивной сваи-оболочки. Известен способ формовани  трубопроводов в грунте,.содержащий одновременную подачу формук цего материала в скважину и проходку полым элементом , причем скорость продвижени  полого элемента не превышает скорост заполнени  сква шны смесью М. ; Наиболее близким к предлагаемому  вл етс  устройство дл  возведени  набивной сваи-оболЬчки, включающее бетонолитную трубу с проемами в нижней части дл  подачи бетонной смеси и формирователь Г2 . В известшлх случа х недостатками  вл ютс  повышайа  материалоёмкость при возведении набивной оболочки и сложность конструкции. ; Цель изобретений - снижение материалоемкости к упрощение конструк .ЦИИ. -.. - . , ...;, , .;., : / , Поставленна  цель достигаетс  тем что в устройстве дл  .возведени  набивной сваи-оболочки, вкЗночаюЩем бетонолитную трубу с Проемами в нижней части дл  подачи бетонной смеси и формователь, проеМы дл  подачи бетонной смеси образоваш на боковой поверхности бетонол тной трубы, а формирователь выпол 1ен в виде полого конуса, вершиной зaвeдeннofо в полость бетонолитной трубы и прикрепленного к ней на уровне нижней границы проемов. На фиг. 1 изображено устройство дл  возведени  набивной сваи-оболочки в начале процесса бетонировани , продольный разрез; на фиг. 2 - то же, в конце процесса. Устройство дл  возведени  набивно сваи-оболочки содержит бетонолитную трубу 1 с проемами 2 дл  подачи бетонной смеси на ее боковой поверхнос ти и формирователь 3, выполненный в виде полого конуса, с расположенным в его полости вибратором 4. Устройство работает следукнцим образом . В предварительно образованную скважину 5 до упора с дном опускают устройство. При необходимости в скв жине 5 может быть установлен арматур ный каркас. Затем через полость бетонолитной трубы 1 и проемы 2 в пространство между стенками скважины 5 и формователем 3 подают жесткую бетонную смесь 6. После заполнени  скважины 5 жесткой бетонной смесью 6 на высоту 1,5-3 диаметра скважины 5 включают вибратор 4 и равномерно поднимают бетонолитную трубу 1 с формователем 3 из скважины 5 с одновременной подачей жесткой бетонной смеси 6. При этом скорость подъема устройства из скважины 5 должна быть равна скорости подачи бетонной смеси 6, чтобы формирователь 3 всегда.был полностью закрыт бетонной смесью 6. По мере извлечени  устройства из скважины жестка  бетонна  смесь 6 уплотн етс  с помощью вибратора 4.и раздвигаетс  в стороны стенок скважины за счет формовател  3, тем самым увеличива  ее дйаметр и способность набивной сваи-оболочки. Высота (длина) формировател  3 должна быть не менее 1,5-3 диаметров ск1зажины 5.. В противном случае, бетонна  смесь 6 осыпаетс  изаплывает под дно формовател  по мере его извлечени  из скважины 5. При вьгсоте формовател  3 более 1,5-3 диаметров скважины увеличиваютс  силы трени  бетонной смеси 6 по боковой поверх- . ностй устройства, что повьппает усили  извлечени  последнего из скважины 5. Кроме того диаметр нижнего поперечного сечени  формовател  3 должен быть меньще диаметра скважины 5 на удвоенную толщину стенки набивной сваи-оболочки с учетом удвоенной величины деформации грунта при предельном его сопроти йении. Величина деформации грунта при предельном сопротивлении определ етс  с помощью прессиоМетров или штамповыми испытани ми. Устройство в конце процесса бетонировани  и извлечени  из скважины 5 доходит до упора с обсадной направл ющей воронкой 7 и извлекаетс  вместе с ней из скважины, образу  таким образом набивную сваю-оболочку . Устройство просто по конструкции, его использование сокращает материа- . лоемкость возведени  набивной сваиоболочки .1 Invention The invention relates to the construction, in particular, to foundation engineering, and can be used in the construction of a ramming pile. A known method of forming pipelines in the ground, containing simultaneous feeding of mold materials into the well and penetration by a hollow element, the advancement rate of the hollow element does not exceed the filling rate of the wellbore mixture M. Closest to the present invention is a device for erecting a ramming pile-shell comprising a concrete casting tube with openings in the lower part for feeding the concrete mix and a former G2. In known cases, the disadvantages are increased material consumption during the construction of the stuffed casing and the complexity of the design. ; The purpose of the inventions is to reduce the consumption of materials to simplify the design. - .. -. , ...;,,.;.,: /, The goal is achieved by the fact that in the device for the production of ramming piles, enclosing the concrete pipe with the Apertures in the lower part for feeding the concrete mix and the former, on the lateral surface of the concrete pipe, and the former is made in the form of a hollow cone, the tip of which is located in the cavity of the concrete pipe and attached to it at the level of the lower border of the openings. FIG. 1 shows a device for erecting a stuffed pile shell at the beginning of the concreting process, a longitudinal section; in fig. 2 - the same at the end of the process. The device for erecting a pile shell casing contains a concrete pipe 1 with openings 2 for feeding the concrete mixture to its side surface and a former 3, made in the form of a hollow cone, with a vibrator 4 located in its cavity. The device operates in the following way. In the pre-formed well 5 until it stops with the bottom, lower the device. If necessary, a reinforcement cage can be installed in well 5. Then through the cavity of the concrete pipe 1 and the openings 2 into the space between the walls of the borehole 5 and the former 3 serves hard concrete mix 6. After filling the well 5 with hard concrete mix 6 to a height of 1.5-3 times the diameter of the bore 5, turn on the vibrator 4 and evenly lift the concrete tube 1 with a former 3 from a well 5 with simultaneous feeding of a rigid concrete mix 6. In this case, the lifting speed of the device from well 5 must be equal to the feed speed of the concrete mix 6 so that the former 3 was always closed by the concrete mix 6. As extracting device out of the hole rigid concrete mixture 6 is compressed by means of the vibrator is expanded in 4.I side walls of the well due to shaping unit 3, thereby increasing its ability dyametr and ramming piles shell. The height (length) of the former 3 must be at least 1.5-3 times the diameter of the skzhazhiny 5. Otherwise, the concrete mix 6 falls off and melts under the bottom of the former as it is withdrawn from the well 5. With an overflow of the former 3 more than 1.5-3 the borehole diameters increase the friction force of the concrete mix 6 along the lateral surface. device, which makes the effort to extract the last of the bore 5. In addition, the diameter of the lower cross section of the former 3 should be less than the diameter of bore 5 by twice the wall thickness of the ramming pile, taking into account the double value of the soil deformation with its maximum resistance. The magnitude of the soil deformation with limiting resistance is determined by means of pressiometers or die tests. The device, at the end of the process of concreting and withdrawing from the well 5, reaches as far as the stop with the casing guide funnel 7 and is removed together with it from the well, thus forming a rammed pile-shell. The device is simple in construction, its use reduces the material. capacity of erection of stuffed pile shell.

/ /

Г-; R-;

1one

фие1FIE1

Claims (1)

УСТРОЙСТВО ДЛЯ ВОЗВЕДЕНИЯ НАБИВНОЙ СВАИ-ОБОЛОЧКИ, включающее бетонолитную трубу с проемами в нижней части для подачи бетонной смеси и формирователь, отличающеес я тем, что, с целью снижения материалоемкости и упрощения конструкции, проемы для подачи бетонной смеси образованы на боковой поверхности бетонолитной трубы, а формирователь выполнен в виде полого конуса, вершиной заведенного в полость бетонолитной трубы и прикрепленного к ней на уровне нижней границы проемов.DEVICE FOR ESTABLISHING A PACKED PILING-SHELL, comprising a concrete pipe with openings in the lower part for supplying concrete mixture and a shaper, characterized in that, in order to reduce material consumption and simplify the design, openings for supplying concrete mixture are formed on the side surface of the concrete pipe, and the shaper is made in the form of a hollow cone, the top of a concrete pipe inserted into the cavity and attached to it at the level of the lower boundary of the openings. >>
SU823434145A 1982-05-11 1982-05-11 Apparatus for constructing cast-in-place shell pile SU1079757A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823434145A SU1079757A1 (en) 1982-05-11 1982-05-11 Apparatus for constructing cast-in-place shell pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823434145A SU1079757A1 (en) 1982-05-11 1982-05-11 Apparatus for constructing cast-in-place shell pile

Publications (1)

Publication Number Publication Date
SU1079757A1 true SU1079757A1 (en) 1984-03-15

Family

ID=21010458

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823434145A SU1079757A1 (en) 1982-05-11 1982-05-11 Apparatus for constructing cast-in-place shell pile

Country Status (1)

Country Link
SU (1) SU1079757A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101705681B (en) * 2009-10-29 2011-08-03 杭州萧宏建设集团有限公司 Switching device of cast equipment of concrete bored pile
RU2739531C1 (en) * 2020-07-07 2020-12-25 федеральное государственное бюджетное образовательное учреждение высшего образования "Белгородский государственный технологический университет им. В.Г. Шухова" Method for erection of built-in-place pile-shell

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР № 495931, кл. Е 16 L 1/00, 1970. 2. Авторское свидетельство СССР по за вке № 3372779/33, кл. Е 02 D 5/34, 1981 (прототип). *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101705681B (en) * 2009-10-29 2011-08-03 杭州萧宏建设集团有限公司 Switching device of cast equipment of concrete bored pile
RU2739531C1 (en) * 2020-07-07 2020-12-25 федеральное государственное бюджетное образовательное учреждение высшего образования "Белгородский государственный технологический университет им. В.Г. Шухова" Method for erection of built-in-place pile-shell

Similar Documents

Publication Publication Date Title
EP0170503B1 (en) Ground treatment
KR100968656B1 (en) Apparatus and method for forming compacted piers with multiple lifts
US4618289A (en) Method of forming a cast-in-place support column
US3842608A (en) Method and means for installing load bearing piles in situ
US3540225A (en) Construction pile and a method of producing same in situ
CN103114578B (en) Grouting molding pedestal pile and construction method thereof and pedestal expanding device
US4009582A (en) Method for forming deep cast-in-place caseless concrete piles
US3823562A (en) Process of production of piles, pile packs, and subterranean pile walls
US3512365A (en) Method of forming a pile in situ
SU1079757A1 (en) Apparatus for constructing cast-in-place shell pile
US2779161A (en) Method and device for constructing foundation piles in the ground
US4619558A (en) Apparatus for producing in-situ concreted piles with enlarged bases
US3184924A (en) Method of forming concrete pile in situ
US3254492A (en) Casting of piles in situ
EP0084921B1 (en) Piles
US3429129A (en) Method for producing foundations for columns and the like
EP0519575A1 (en) Method of making a foundation pile
US3423944A (en) Method for forming end bearing concrete piles
US2550408A (en) Method and device for making waterhandling installations and installations made according to this method
US1607613A (en) Making concrete foundation piers and the like
GB2070668A (en) Auger for the manufacturing of concrete foundation piles
EP0142528B1 (en) Process and equipment for manufacturing in-situ concrete monolithic piles with non-uniform section
RU1786225C (en) Method of erecting pile
GB2064627A (en) Method of Piling
US1887630A (en) Method and device for the production of piles of concrete and the like