SU1023109A1 - Method of forming front relief and draining slits in development workings - Google Patents

Method of forming front relief and draining slits in development workings Download PDF

Info

Publication number
SU1023109A1
SU1023109A1 SU802898095A SU2898095A SU1023109A1 SU 1023109 A1 SU1023109 A1 SU 1023109A1 SU 802898095 A SU802898095 A SU 802898095A SU 2898095 A SU2898095 A SU 2898095A SU 1023109 A1 SU1023109 A1 SU 1023109A1
Authority
SU
USSR - Soviet Union
Prior art keywords
well
drilling
drill
cutting
wells
Prior art date
Application number
SU802898095A
Other languages
Russian (ru)
Inventor
Виктор Александрович Садчиков
Вадим Георгиевич Лазарев
Original Assignee
Карагандинское отделение Восточного научно-исследовательского института по безопасности работ в горной промышленности
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Карагандинское отделение Восточного научно-исследовательского института по безопасности работ в горной промышленности filed Critical Карагандинское отделение Восточного научно-исследовательского института по безопасности работ в горной промышленности
Priority to SU802898095A priority Critical patent/SU1023109A1/en
Application granted granted Critical
Publication of SU1023109A1 publication Critical patent/SU1023109A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

СПОСОБ ОБРАЗОВАНИЯ ПЕРЕДОВЫХ РАЗГРУЗОЧНО-ДРЕНАЖНЫХ ЩЕЛЕЙ В ПОДГОТОВИТЕЛЬШЛХ ВЫРАБОТКАХ, включающий бурение параллельных скважин и подрезание угольного пласта между ними, отличающийс  тем, что, с целью повышени  безопасности работ путем перемещени  зоны концентрации напр жений из  ри ,забойной части подготовительной вы работки вглубь массива и интенсификации процесса дренировани  газа из него, в начале бур т одну скважину на всю глубину подрезки, а затем бур т другую скважину с одновременной подрезкой угольного массива между скважинами при помощи врацакщегос  механизма, ко (П торый шарнирно прикрепл ют одним конце к направл ющей, которую помещают в первую пробуренную скважину, а другим концом - к буровому ставу, осуS 1вествл ющему бурение второй скважины . ..METHOD OF FORMING ADVANCED UNLOADING AND DRAINING GASES IN PREPARATORY DEVELOPMENTS, including drilling parallel wells and cutting the coal seam between them, in order to improve the safety of work by moving the stress concentration zone from the target, the training component will be prepared. the process of draining gas from it, at the beginning of drilling one well to the full depth of trimming, and then drilling another well with simultaneous trimming of the coal massif between the wells with the aid of a rotating mechanism, which (p. pivotally attached at one end to the guide, which is placed in the first drilled well, and at the other end - to the drilling rig, the secondary drilling of the second well ...

Description

юYu

соwith

соwith

Изобретение относитс  к горной, преимущественно к угольной промышленности , и может быть использовано дл  борьбы с газом при разработке газоносных выбросоопасных пластов. Известен способ образовани  разгрузочных щелей в подготовительных выработках с помощью специальной установки УЩ-lM, заключающийс  в по следовательном выбуривании по всей ширине выработки серии параллельных соприкасающихс  скважин, при которо за счет разруиюни  целиков угл  меж ними образуетс  щель . Недостатком способа  вл етс  то что он не обеспечивает образование щелей глубиной более 2 м, что снижа эффект разгрузки призабойной зоны пласта от концентрации напр жений. Наиболее близким к изобретению техническим решением  вл етс  способ образовани  щелей, в котором угольный массив между параллельно пробуренными на всю глубину обработ ки подрезаетс  исполнительным органом , приводимым в действие от лебедки и выпо;:(йенным в виде каната с укрепленньми на нем зубкеили t2. Недостатком данного способа  вл етс  то, что он не может быть использован в подготовительных выработках , так как дл  его реализации необходимо наличие заранее окон туренного выработками и скважинами угольного массива, а также сравнительно небольша  глубина обработки степень дренировани  газа из него. Цель изобретени  - повышение без опасности работ за счет перемещени  зоны концентрации напр жений из при забойной части подготовительной выработки вглубь массива и интенсификаци  процесса дренировани  газа из него. Поставленна  цель достигаетс  те что согласно способу образовани  передовых разгрузочно-дренажных щелей в подготовительных выработках, включающему бурение параллельных скважин и подрезание угольного плас та между ними, в начале бур т одну скважину на всю глубину подрезки, а затем бур т другую скважину с одновременной подрезкой угольного мас сива между скважинами при помощи вр чающегос  режущего механизма, который шарнирно прикрепл ют одним концом к направл ющей, которую помещают в первую пробуренную скважину, а другнам концом - к буровому ставу, осуществл ющему бурение второй сква жины. На чертеже приведена схема реали зации способа. На чертеже .показаны пробуренна  и бурима  2 скважины, разгрузочнодренажна  щель 3, вращающийс  режущий механизм 4, направл юща  5, буровой став 6., конические зубчатые шестерни 7-9, упорный фланец10, шарикоподшипник 11, резец с победитовые наконечником 12, роликовый подшипник 13, распорные швелера 14 и муфты 15. Способ образовани  разгрузочнодренажных щелей в подготовительных выработках осуществл етс  следующим образом. В левой или правой половине выработки по ходу ее движени  бур т скважину 1 на всю глубину подрезки массива. Бурение скважины 2 упротивоположной стороны выработки совмещают с подрезкой угольного массива между скважинами и образованием горизонтальной разгрузочно-дренажной щели 3 вращающимс  режущим механизмом 4. Параллельность буримой скважины 2 ранее пробуренной скважине 1 обеспечиваетс  направл ющей 5. Устройство дл  образовани  разгрузочно-дренажной щели в подготовительной выработке работает следующим образом... При работе бурового станка от бурового става 6 через конические шестерни 7 и 8 вращение передаетс  исполнительному механизму 4, т.е. режущей штанге, шарнирно соединенной с помощью шарикоподшипников 11 с направл ющей 5. В результате вращени  режзлцей штанги 4 резщл с победитовыми наконечниками 12 внедр ютс  в угольный массив между скважинами и разрушают его. Подача поступательного движени  вращающемус  режущему механизму 4 вглубь массива и направл ющей 5 вдоль пробуренной скважины 1 производитс  за счет мол ности двигател  бурового станка и осуществл етс  посредством установленной на буровом ставе ё упорного фланца 10, распорных шеелеров 14 и муфты 15. Штыб из образуемой щели выноситс  водой, подаваемой в буримую скважину . После образовани  разгрузочно-дренажной щели 3 с необходимыми параметрами исполнительный орган извлекают из угольного массива. При извлечении, а также при его зажатии, что, может возникнуть при быстром Течении процесса разгрузки угольного массива и уменьшени  вьюоты щели еще в ходе ее прорезани , буровому ставу б и вращающемус  исполнительному органу .4 через конические зубчатые шестерни 8 и 9 необходимо придать вращение в обратном направлений. При разгрузке массива в щель и в атмосферу выработки может выпел тьс  большое количество метана. В тех случа х, когда средствами вентил ции нельз  обеспечить разбавление метана в выработке до допустимых пределов, щель в забое тампонируетс  и к ней подводитс  разр жение от газротсасываюцей сети.The invention relates to the mining, mainly to the coal industry, and can be used to control gas in the development of gas-bearing outburst formations. There is a known method of forming relief slots in preparatory workings using a special USh-lM installation, consisting in successive drilling out of the entire width of the production of a series of parallel contiguous wells, in which a gap is formed between them through the accumulation of coal. The disadvantage of this method is that it does not provide the formation of cracks with a depth of more than 2 m, which reduces the effect of discharge of the bottomhole formation zone from stress concentration. The closest technical solution to the invention is a slotting method, in which a coal massif between parallel drilled to the full depth of processing is cut by an executive body actuated from a winch and a discharge;: (Yenny in the form of a rope with trenches fixed to it or t2. Disadvantage This method is that it cannot be used in preparatory workings, since for its implementation it is necessary to have a coal massif in advance of the excavation and boreholes, as well as But the depth of processing is the degree of gas drainage from it.The purpose of the invention is to increase without danger of work by moving the stress concentration zone from the downhole part of the preparatory development to the depth of the array and intensifying the gas drainage process from it.The goal is achieved by using the advanced discharge method - drainage gaps in the preparatory workings, including the drilling of parallel wells and the cutting of the coal plate between them, at the beginning of the drilling of one well for the entire the depth of the undercut, and then drill another well while simultaneously cutting the coal mass between the wells using a rotating cutting mechanism that is hinged at one end to the guide, which is placed in the first drilled well, and at the end of the drill hole, to drilling the second well. The drawing shows a scheme for implementing the method. The drawing shows drilled and drilled wells 2, an unloading drainage slit 3, a rotating cutting mechanism 4, a guide 5, a drill stand 6., bevel gears 7-9, thrust flange 10, a ball bearing 11, a cutter with a tip 12, a roller bearing 13 , spacer channels 14 and sleeves 15. The method of forming discharge-drainage slits in the preparatory workings is carried out as follows. In the left or right half of the development, along the course of its movement, a borehole 1 is drilled to the entire depth of the array trimming. Drilling of the well 2 on the opposite side of the mine is combined with cutting the coal mass between the wells and forming a horizontal relief and drainage slot 3 by a rotating cutting mechanism 4. Parallel drilling of the well 2 to the previously drilled well 1 is provided with a guide 5. The device for forming a discharge drainage slot in the preparatory development works as follows ... When the drilling machine is operating from the drill rod 6 through bevel gears 7 and 8, the rotation is transmitted to the actuator at 4, i.e. a cutting rod pivotally connected by means of ball bearings 11 with a guide 5. As a result of the rotation of the rod 4, the cutting rod with the lugs 12 are inserted into the coal mass between the wells and destroy it. The translational movement of the rotating cutting mechanism 4 into the array and the guide 5 along the drilled well 1 is carried out due to the molost of the drilling machine and is carried out by means of a fixed flange 10, spacer shchelerov 14 and coupling 15. installed on the drill rim water supplied to the drilled well. After the discharge and drainage slit 3 is formed with the necessary parameters, the executive body is removed from the coal massif. When extracting, as well as when it is clamped, what may occur during the rapid course of the unloading of the coal massif and the reduction in the viewpoint of the slit even during its cutting, the drilling rig b and the rotary actuator .4 through bevel gears 8 and 9 must be rotated reverse directions. When unloading the array into the slot and into the atmosphere, a large amount of methane can be released. In cases where ventilation means cannot provide for the dilution of methane in the mine to within acceptable limits, the gap in the bottomhole is plugged and discharge from the gas-suction network is supplied to it.

Процесс разгрузки угольного массива от горного и газового давлени  за счет образовани  щели заканчиваетс  в течение нескольких часов. Поэтому сразу после извлечени  исполнительного органа и демонтажа оборудовани  можно возобновить работы по проведению выработки.The process of unloading the coal mass from mountain and gas pressure due to the formation of a gap ends within a few hours. Therefore, immediately after the removal of the executive body and dismantling of the equipment, it is possible to resume work on the development.

Данный способ позвол ет повысить безопасность ведени  работ за счет интенсификации газовыцелени  из выбросоопасного угольного пласта и iпредотвратить выбросоопасную ситуаI цию в призабойной части выработки.This method allows to increase the safety of operations due to the intensification of gas from the outburst coal seam and prevent the outburst hazard in the wellbore part of the mine.

Claims (1)

СПОСОБ ОБРАЗОВАНИЯ ПЕРЕДОВЫХ РАЗГРУЗОЧНО-ДРЕНАЖНЫХ ЩЕЛЕЙ В ПОДГОТОВИТЕЛЬНЫХ ВЫРАБОТКАХ, включающий бурение параллельных скважин и подрезание угольного пласта между ними, отличающийся тем, что, с целью повышения безопас·' ности работ путем перемещения эоны концентрации напряжений из призабойной части подготовительной выработки вглубь массива и интенсификации процесса дренирования газа из него, в начале бурят одну скважину на всю глубину’подрезки, а затем бурят другую скважину с одновременной подрезкой угольного массива между скважинами при помощи вращающегося режущего механизма, который шарнирно прикрепляют одним кон· цом к направляющей, которую помещают в первую пробуренную скважину, а другим концом - к буровому ставу, осуществляющему бурение второй скважины. . · осуществляется следующим или правой половине выходу ее движения бурят на всю глубину подрезки буровой став 6., конические зубчатые шестерни 7-9, упорный фланец 10, шарикоподшипник 11, резец с победитовые наконечником 12, роликовый подшипник 13, распорные швелера 14 и муфты 15.METHOD FOR FORMING ADVANCED UNLOADING AND DRAINAGE SLITS IN PREPARATORY WORKS, including drilling parallel wells and cutting a coal seam between them, characterized in that, in order to increase the safety of work by moving the concentration concentration aeons from the bottomhole part of the preparatory workout to gas drainage from it, at the beginning they drill one well to the entire depth of undercutting, and then they drill another well while trimming the coal mass between the wells contact by a rotating cutting mechanism, which is pivotally attached one con · Tzom to the guide, which is placed in the first drilled hole and the other end - to a drilling rod, to drill a second well. . It is carried out in the next or right half that its movement is drilled to the full depth of cutting of drill string 6., bevel gears 7-9, thrust flange 10, ball bearing 11, cutter with win-end tip 12, roller bearing 13, spacer channels 14 and couplings 15. Способ образования разгрузочнодренажных щелей в подготовительных выработках образом.The method of formation of discharge gaps in the preparatory workings way. В левой работки по скважину 1 массива. Бурение скважины 2 у противоположной стороны выработки совмещают с подрезкой угольного массива между скважинами и образованием горизонтальной разгрузочно-дренажной щели 3 вращающимся режущим механизмом 4.In the left work on the well 1 array. Drilling a well 2 at the opposite side of the mine is combined with trimming the coal mass between the wells and forming a horizontal discharge and drainage slot 3 with a rotating cutting mechanism 4. Параллельность буримой скважины- 2 ранее пробуренной скважине 1 обеспечивается направляющей 5.The parallelism of the borehole-2 previously drilled borehole 1 is provided by the guide 5. Устройство для образования разгрузочно-дренажной щели в подгото~с .· вительной выработке работает сле дующим образом.. .A device for the formation of an unloading-drainage gap in the preparatory ~ sec. · Development works as follows ... При работе бурового станка от бурового става 6 через конические шестерни 7 и 8 вращение передается исполнительному механизму 4, т.е. режущей штанге, шарнирно соединенной с помощью шарикоподшипников 11 с направляющей 5. В результате вращения режущей штанги 4 резцы с победитовыми наконечниками 12 внедряются в угольный массив между скважинами и разрушают его.When the drilling rig is operating from the drill stand 6 through the bevel gears 7 and 8, the rotation is transmitted to the actuator 4, i.e. a cutting rod pivotally connected by means of ball bearings 11 to the guide 5. As a result of rotation of the cutting rod 4, the cutters with victorious tips 12 are introduced into the coal mass between the wells and destroy it. Подача поступательного движения вращающемуся режущему механизму 4 вглубь массива и направляющей 5 вдоль пробуренной скважины 1 производится за счет мощности двигателя бурового стайка и осуществляется посредством установленной на буровом ставе 6 упорного фланца 10, распорных швелеров 14 и муфты 15.The forward movement of the rotary cutting mechanism 4 deep into the array and the guide 5 along the drilled well 1 is carried out due to the engine power of the drilling flock and is carried out by means of a thrust flange 10 mounted on the drill stand 6, expansion channels 14 and the coupling 15. Штыб из образуемой щели выносится водой, подаваемой в буримую скважину.The bayonet is removed from the gap formed by the water supplied to the drill hole. После образования разгрузочно-дренажной щели 3 с необходимыми параметрами исполнительный орган извлекают из угольного массива. При извлечении, а также при его зажатии, что,может возникнуть при быстром течении процесса разгрузки угольного массива и уменьшения высоты щели еще в ходе ее прорезания, буровому ставу б и вращающемуся исполнительному органу .4 через конические зубчатые шестерни 8 й 9 необходимо придать вращение в обратном направлений.After the formation of the discharge and drainage gap 3 with the necessary parameters, the executive body is removed from the coal mass. During extraction, as well as when it is clamped, which may occur during the rapid course of unloading the coal mass and reducing the height of the slot even during its cutting, the drill stand b and the rotating actuator .4 through bevel gears 8th 9 it is necessary to give rotation to reverse directions. При разгрузке массива в щель и в атмосферу выработки может выделяться большое количество метана. В тех случаях, когда средствами вентиляции нельзя обеспечить разбавле15When the array is unloaded into the gap and into the atmosphere, a large amount of methane can be released. In cases where ventilation cannot be provided with dilution15
SU802898095A 1980-01-30 1980-01-30 Method of forming front relief and draining slits in development workings SU1023109A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802898095A SU1023109A1 (en) 1980-01-30 1980-01-30 Method of forming front relief and draining slits in development workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802898095A SU1023109A1 (en) 1980-01-30 1980-01-30 Method of forming front relief and draining slits in development workings

Publications (1)

Publication Number Publication Date
SU1023109A1 true SU1023109A1 (en) 1983-06-15

Family

ID=20884463

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802898095A SU1023109A1 (en) 1980-01-30 1980-01-30 Method of forming front relief and draining slits in development workings

Country Status (1)

Country Link
SU (1) SU1023109A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110107346A (en) * 2019-06-21 2019-08-09 三门前庭机械科技有限公司 Dedicated automatic gas-removing system in a kind of coal mine hole

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Большинский М.И. и др. Борьба с гаэовыпелени ми при проведении .: выработок по выбросоопасн М пластам и породам. М., ЦНИЭИуголь, 1978, с.11-15. 2. Некрасовский Я.Е. Работы Днепропетровского горного института в области механизации разработки ьггольных планетов, onacilbDc по внезапным выбросём yfл и газа. Веб.: Борьба с внезапными выбросами в угольных шахтах . М., Госгортехиздат, 1962, с.263-270 (прототип). . *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110107346A (en) * 2019-06-21 2019-08-09 三门前庭机械科技有限公司 Dedicated automatic gas-removing system in a kind of coal mine hole

Similar Documents

Publication Publication Date Title
US4299295A (en) Process for degasification of subterranean mineral deposits
RU2472941C1 (en) Coal bed hydraulic fracturing method
US3650564A (en) Mining method for methane drainage and rock conditioning
US4330155A (en) Bore hole mining
US4950034A (en) Shaft excavation method
WO2022098830A3 (en) Basement rock hybrid drilling
SU1023109A1 (en) Method of forming front relief and draining slits in development workings
CN109779678B (en) A slot machine for taking out of this coal seam gas
US4025116A (en) Method of operating a constant depth linear cutting head on a retrofitted continuous mining machine
CN217269979U (en) Coal seam gas treatment equipment
CN113090264B (en) Horizontal deep borehole CO for hard coal seam and hard rock stratum 2 Fracturing safety roof control method
US4123109A (en) Mining method
RU2059813C1 (en) Method for mining steeply dipping ore bodies
SU1666729A1 (en) Method of working driving in hard rock mass
US3758160A (en) Method and apparatus for mining vein material only
SU912925A1 (en) Carriage for underground drilling of wells
SU929868A1 (en) Method of preventing spontaneous coal and gas outbursts in stoping and preparotary workings
ES446894A1 (en) Method of reinforcing rock strata
RU2730471C1 (en) Method for underground development of gently sloping and inclined ore bodies
SU1033758A1 (en) Method of protecting seam-type mine workings
SU883514A1 (en) Method for degassing mined space of coal bed
SU700653A1 (en) Method of driving ascending mine workings
RU1828925C (en) Method for working driving
RU2039258C1 (en) Method for preparation of extraction pillar
SU1337517A1 (en) Method of combined underground/open mining of coal beds