SU1010923A1 - Method for conducting explosion operations in boundary zone - Google Patents
Method for conducting explosion operations in boundary zone Download PDFInfo
- Publication number
- SU1010923A1 SU1010923A1 SU803210182A SU3210182A SU1010923A1 SU 1010923 A1 SU1010923 A1 SU 1010923A1 SU 803210182 A SU803210182 A SU 803210182A SU 3210182 A SU3210182 A SU 3210182A SU 1010923 A1 SU1010923 A1 SU 1010923A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- explosive
- explosive charges
- cut
- explosion
- screen gap
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
СПОСОБ ПРОИЗВОДСТВА ВЗРЫВНЫХ РАБОТ В ПРИКОНТУРНОЙ ЗОНЕ, основанный на многор дном . гчэнальном короткозамедленном варывании с предварительным образованием экранной щели в предельном контуре борта карьера путем мгновенного взрыва р$зда зар дов взрывчатого вещества, расположенного параллельно борту карьера, отличающийс тем, что, с целью снижени сейсмического воздействи на оставл емый массив и охран51емые объекты, взрывом зар дов взрывчатого вещества со стороны забо около экранной щели создают вруб а затем короткоi замедленно взрывают диагональные р ды зар дов ВВ в направлении от начального (Л вруба во фланг взрывнс о блока.METHOD OF MANUFACTURE OF EXPLOSIVE WORKS IN THE CROC-CIRCUIT ZONE, based on multi-bottom. short-delayed boiling with the preliminary formation of a screen gap in the marginal contour of the pit wall by instantaneous explosion of explosive charges placed parallel to the pit board, characterized in that, in order to reduce the seismic effect on the array and protected objects, an explosive charge explosives on the side of the bottom near the screen gap create a cut and then briefly slowly detonate diagonal rows of explosive charges in the direction from the initial (L cut into the flan vzryvns of the unit.
Description
Изобретение относитс к взрывным работам и может быть использовано на открытых разработках при отработке при контурных лент бортов карьеров. Известен способ производства взрывных работ в приконтурной зоне, основгшный на использовании клиновых и пор дных схем короткозамедленного взрывани С1 3 . Недостатком этого способа вл етс то, что он не обеспечивает охраноспособности объектов вблизи места производства без специальных защит ных средств. . Наиболее близким техническим рбшением к предлагаемому вл етс способ производства взрывных работ в приконтурной зоне, основанный на многор5Шном диагональном короткозамедленном взрывании с предварительным образованием экранной щели в предельном контуре борта карьера путем мгновенного взрыва р да зар дов взрывчатого вещества (ВВ), расположенного параллель но борту карьера 2 . Недостаток указанного способа заклю чаетс в том, что в глубь массива об . зательно проникают, хот и существенно уменьшенные, о ® мощные уда ные волны, которые способны ощутимо снизить прочность и устойчивость оставл емых породных уступов, а также и охран емых объектов вблизи места производства взрыва. Цель изобретени - снижение сейсмического воздействи на оставл емый ма сив и охран емые объекты. Цель дости1 аетс тем, что взрывом зар дов взрывчатого вещества со сторо ны забо около экранной щели создают вруб, а затем короткоаамедленно взрывают диагональные р ды зар дов ВВ в направлении от начального вруба во фланг взрывного блока. На чертеже приведена последователь- ность операций по предлагаемому способу производства взрывных работ в приконтурной зоне. Сначала образуют экранную щель путем мгновенного взрыва О-го р да зар дов ВВ, расположенного параллельно борту карьера, затем взрывом зар да ВВ 1-го р да, двух зар дов ВВ 2-го р да со стороны забо около экранной щели создают вруб и потом с корот КИМ замедлением последовательно взрывают диагональные р ды ВВ 3-12 в направлении от начального вруба фо фланг взрываемого блока с обеспечением качественного дроблени массива. При этом ударные волны, направленные в сторону оставл емого массива (экранной щели), гас тс во взорванной горной массе, а ударные волны, направленные в сторону выработанного пространства, способствуют дополнительному дроблению породнь1Х кусков. Опытные взрывы, выполненные на Кальмакырском карьере, полностью под-рвердили ожи/7.аемые результаты предлагаемого способа производства взрывных работ на уступах. Предлагаемый способ позвол ет улучщить качество дроблени горной ассы; сохранить компактность развала взорванной горной массы за счет локальности полосы блока в пределах каждого взрываемого р да скважин; снизить эффект сейсмического действи взрыва в сторону оставл емого массива и охран емых объектов. Данна технологи может дать экономию О, 2-О, 3 руб. на 1 м взорваниой массы.The invention relates to blasting operations and can be used in open cast mining for the development of contour ribbons of pit walls. A known method of blasting operations in the marginal zone, based on the use of wedge and perimeter schemes of short-delay blasting C1 3. The disadvantage of this method is that it does not ensure the protection of objects near the production site without special protective equipment. . The closest technical solution to the present invention is a method of blasting operations in the marginal zone, based on multi-angle diagonal short-delay blasting with preliminary formation of a screen gap in the marginal edge of the pit wall by instantaneously exploding a series of explosive charges (BB) located parallel to the pit wall 2 The disadvantage of this method lies in the fact that deep into the array about. The powerful, successful waves, which are capable of significantly reducing the strength and stability of the remaining rock ledges, as well as the protected objects near the site of the explosion, penetrate them, albeit significantly reduced. The purpose of the invention is to reduce the seismic impact on the array and protected objects. The goal is achieved by blasting explosive charges from the side of the bottom near the screen gap to create a cut, and then briefly immediately explode diagonal rows of explosive charges in the direction from the initial cut to the flank of the explosive block. The drawing shows the sequence of operations for the proposed method of blasting operations in the marginal zone. First, a screen gap is formed by an instantaneous explosion of an O-th row of explosive charges located parallel to the pit wall, then an explosion of an explosive charge of the 1st row, two explosive charges of the 2nd row from the bottom side near the screen gap creates then, with a short CMM deceleration, the diagonal rows of explosives 3–12 are successively exploded in the direction from the initial cut to the flank of the exploding block, ensuring high-quality crushing of the array. At the same time, shock waves directed toward the array to be left (screen gap) are extinguished in the blasted rock mass, and shock waves directed toward the developed space contribute to additional crushing of rock pieces. Experimental explosions carried out at Kalmakyr quarry, fully confirmed ozhi / 7.shee results of the proposed method of blasting operations on the ledges. The proposed method allows to improve the quality of the crushing of the mountain asy; to maintain the compactness of the collapse of the blasted rock mass due to the locality of the block strip within each exploded series of wells; reduce the effect of seismic explosion in the direction of the array and protected objects. This technology can save O, 2-O, 3 rubles. on 1 m of explosive mass.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU803210182A SU1010923A1 (en) | 1980-11-28 | 1980-11-28 | Method for conducting explosion operations in boundary zone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU803210182A SU1010923A1 (en) | 1980-11-28 | 1980-11-28 | Method for conducting explosion operations in boundary zone |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1010923A1 true SU1010923A1 (en) | 1983-10-07 |
Family
ID=20929035
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU803210182A SU1010923A1 (en) | 1980-11-28 | 1980-11-28 | Method for conducting explosion operations in boundary zone |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1010923A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2723419C1 (en) * | 2019-12-23 | 2020-06-11 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Тихоокеанский государственный университет" | Method of development of local areas of mineralization in strong rocks |
RU2784839C1 (en) * | 2022-04-29 | 2022-11-30 | Владимир Арнольдович Белин | Method for carrying out explosive operations in the circuit zone of quarry |
-
1980
- 1980-11-28 SU SU803210182A patent/SU1010923A1/en active
Non-Patent Citations (1)
Title |
---|
1. Кутузов Б. Н. и др. Проектирование взрывных работ. М., Недра, 1974, с. 1О2. 2. Друкованный М. Ф. , Ефремов Э. И. ; Ильин В. И. Буровзрывные работы на карьерах. М,, Недра, 1969, с. (прототип). * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2723419C1 (en) * | 2019-12-23 | 2020-06-11 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Тихоокеанский государственный университет" | Method of development of local areas of mineralization in strong rocks |
RU2784839C1 (en) * | 2022-04-29 | 2022-11-30 | Владимир Арнольдович Белин | Method for carrying out explosive operations in the circuit zone of quarry |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1010923A1 (en) | Method for conducting explosion operations in boundary zone | |
SU1707201A1 (en) | Method of bench working by blasting | |
RU2017960C1 (en) | Method for rock breaking by blasting | |
RU2784839C1 (en) | Method for carrying out explosive operations in the circuit zone of quarry | |
RU2023877C1 (en) | Method of screened explosions | |
RU2150673C1 (en) | Method for installation of blasting network for crushing of difficulty exploitable rocks | |
RU2059070C1 (en) | Method for making kerf cavity | |
RU2225509C1 (en) | Method for explosive breaking in pit-faces of underground purifying enclosures | |
SU1055209A1 (en) | Method of winning outburst-hazardous coal seam | |
RU2200298C2 (en) | Procedure of blast breaking of ore blocks cleaved by dike | |
RU2175434C2 (en) | Process of destruction of pillars | |
SU863862A1 (en) | Method of mining thick ore bodies | |
RU2725721C1 (en) | Method for formation of charge in well combined open-underground mining | |
SU1523682A1 (en) | Method of preventing rock bumps | |
RU2017959C1 (en) | Method for rock blasting | |
RU2010969C1 (en) | Method of opencast drilling and blasting works exercising | |
RU2046941C1 (en) | Pillars demolition method | |
RU2184928C1 (en) | Method for conducting of drilling and blasting operations | |
SU1091634A1 (en) | Method of blast breaking of rock | |
RU1789701C (en) | Method for mineral opencast mining | |
EA014255B1 (en) | A method for developing complex ore massifs with explosive-based ore-preparation | |
SU607018A1 (en) | Method of combined mining of thick mineral deposits | |
SU1130003A1 (en) | Method of conducting blating work | |
SU1113655A1 (en) | Method of blasting mineral deposits | |
SU791975A1 (en) | Method of driving preparatory working in beds prezenting coal and gas outburst hazard |