RU80044U1 - GENERAL POWER CONTROL SYSTEM - Google Patents

GENERAL POWER CONTROL SYSTEM Download PDF

Info

Publication number
RU80044U1
RU80044U1 RU2007118250/22U RU2007118250U RU80044U1 RU 80044 U1 RU80044 U1 RU 80044U1 RU 2007118250/22 U RU2007118250/22 U RU 2007118250/22U RU 2007118250 U RU2007118250 U RU 2007118250U RU 80044 U1 RU80044 U1 RU 80044U1
Authority
RU
Russia
Prior art keywords
unit
power
output
capacities
control
Prior art date
Application number
RU2007118250/22U
Other languages
Russian (ru)
Inventor
Владимир Викторович Хлебников
Артем Владимирович Бортневский
Original Assignee
Открытое Акционерное Общество "Первая Генерирующая Компания Оптового Рынка Электроэнергии" (Оао "Огк-1")
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое Акционерное Общество "Первая Генерирующая Компания Оптового Рынка Электроэнергии" (Оао "Огк-1") filed Critical Открытое Акционерное Общество "Первая Генерирующая Компания Оптового Рынка Электроэнергии" (Оао "Огк-1")
Priority to RU2007118250/22U priority Critical patent/RU80044U1/en
Application granted granted Critical
Publication of RU80044U1 publication Critical patent/RU80044U1/en

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Полезная модель относится к системам управления и может применяться, в частности, в электроэнергетике для обеспечения минимально необходимого долгосрочного уровня технологической производительности компании. Система управления генерирующими мощностями содержит блок динамического моделирования работоспособности энергоблоков и управляющий блок. В системе первый вход блока динамического моделирования связан с выходом системы энергоблоков, второй вход блока динамического моделирования связан с выходом блока хранения данных о генерирующих мощностях, управляющий блок связан с блоком динамического моделирования в двустороннем режиме и имеет возможность передачи данных для управления мощностями на систему энергоблоков. В результате обеспечивается расширение функциональных возможностей системы по сравнению с известными аналогами. Кроме того такое выполнение системы позволяет осуществлять не только текущий мониторинг генерирующих мощностей, но также на основе разных показателей - текущего состояния энергоблоков, заложенных нормативов, планируемых работ по вводу-выводу мощностей, изменению уровня износа и других внешних условий и ограничений - моделировать состояние (размеры) мощностей в будущем и получать оценочные данные, которые далее могут быть использованы, в частности, для оценки эффективности инвестиционных проектов, прогнозирования технологической эффективности предприятия. 3 з.п. ф-лы, 1 ил.The utility model relates to control systems and can be applied, in particular, in the electric power industry to ensure the minimum required long-term level of technological productivity of a company. The control system for generating capacities comprises a dynamic modeling unit for operability of power units and a control unit. In the system, the first input of the dynamic simulation block is connected to the output of the power unit system, the second input of the dynamic simulation block is connected to the output of the storage unit for data on generating capacities, the control unit is connected to the dynamic simulation block in a two-way mode and has the ability to transfer data for power control to the system of power units. The result is the expansion of the functionality of the system compared to well-known analogues. In addition, such a system implementation allows not only current monitoring of generating capacities, but also on the basis of various indicators - the current state of power units, established standards, planned works on input / output of capacities, changes in the level of wear and other external conditions and limitations - to simulate the state (dimensions ) capacities in the future and receive estimated data, which can then be used, in particular, to assess the effectiveness of investment projects, forecasting technological efficiency ciency of the enterprise. 3 s.p. f-ly, 1 ill.

Description

Полезная модель относится к системам управления и может применяться, в частности, в электроэнергетике для обеспечения минимально необходимого долгосрочного уровня технологической производительности компании.The utility model relates to control systems and can be applied, in particular, in the electric power industry to ensure the minimum required long-term level of technological productivity of a company.

Известна система управления мощностями (см. ЕР 1720125, Пауэр Менеджмент Лтд., G06Q 30/00, опубл. 08.11.2006), содержащая, по крайней мере, один источник данных о генерирующих мощностях, блок анализа состояния генерирующих мощностей, канал связи для передачи данных от источника данных на блок анализа состояния мощностей, причем последний выполнен с возможностью генерации отчетов о текущем состоянии генерирующих мощностей. К недостаткам известного решения следует отнести то, что указанная система позволяет лишь производить мониторинг текущего состояния используемых мощностей, а возможность прогнозирования и планирования минимально необходимого размера мощностей в ней не предусмотрена. Это в свою очередь не позволяет использовать полученные при помощи известной системы результаты при планировании производства электроэнергии и расчете эффективности инвестиционных проектов, связанных с управлением мощностями.A well-known capacity management system (see EP 1720125, Power Management Ltd., G06Q 30/00, published 08.11.2006) containing at least one source of data on generating capacities, a unit for analyzing the status of generating capacities, a communication channel for transmission data from the data source to the power status analysis unit, the latter being configured to generate reports on the current state of generating capacities. The disadvantages of the known solution include the fact that this system only allows monitoring the current state of the used capacities, and the possibility of forecasting and planning the minimum required size of capacities is not provided for in it. This, in turn, does not allow the use of the results obtained using the well-known system in planning electricity production and calculating the effectiveness of investment projects related to capacity management.

Целью настоящей полезной модели является создание системы управления мощностями, в частности, производственными мощностями, генерирующими электроэнергию, которая характеризовалась бы более широкими функциональными возможностями по сравнению с известным аналогом.The purpose of this utility model is to create a capacity management system, in particular, production facilities that generate electricity, which would be characterized by wider functionality compared to the well-known counterpart.

Указанная цель достигается в системе управления мощностями, которая содержит блок динамического моделирования работоспособности энергоблоков и связанный с ним в двустороннем режиме управляющий блок, причем первый вход блока динамического моделирования связан с выходом системы энергоблоков, второй вход блока динамического моделирования связан с выходом блока хранения данных о генерирующих мощностях, а управляющий блок имеет возможность передачи данных для управления мощностями на систему энергоблоков.This goal is achieved in the power management system, which contains a dynamic modeling unit for the operation of power units and a control unit associated with it in a two-way mode, the first input of the dynamic modeling unit connected to the output of the power unit system, the second input of the dynamic modeling unit connected to the output of the generating data storage unit capacities, and the control unit has the ability to transfer data to control capacities on the system of power units.

Предлагаемая структура системы позволяет осуществлять не только текущий мониторинг генерирующих мощностей, но также на основе текущего состояния энергоблоков, заложенных нормативов, планируемых работ по вводу-выводу мощностей, The proposed structure of the system allows not only ongoing monitoring of generating capacities, but also on the basis of the current state of power units, established standards, planned works on input-output capacities,

изменению уровня износа и других внешних условий и ограничений моделировать состояние (размеры) мощностей в будущем и получать оценочные данные, которые далее могут быть использованы, в частности, для оценки эффективности инвестиционных проектов, прогнозирования технологической эффективности предприятия. Ключевым элементом структуры системы является наличие обратной связи между управляющим блоком и блоком динамического моделирования, что позволяет решать в системе различные оптимизационные задачи, производя при необходимости корректировку указанных внешних условий, ограничений. Наличие связей между блоком моделирования и системой энергоблоков, а также блоком хранения данных позволяет вводить в блок моделирования различные виды данных, влияющих на текущее и будущее функционирование мощностей. Связь управляющего блока с системой энергоблоков обеспечивает передачу итоговых результатов моделирования для дальнейшего использования в управлении и планировании работ в системе энергоблоков.changes in the level of depreciation and other external conditions and restrictions to simulate the state (size) of capacities in the future and obtain estimated data that can then be used, in particular, to assess the effectiveness of investment projects, forecasting the technological efficiency of the enterprise. A key element of the system structure is the presence of feedback between the control unit and the block of dynamic modeling, which allows us to solve various optimization problems in the system, making adjustments to these external conditions and restrictions, if necessary. The presence of links between the simulation unit and the power unit system, as well as the data storage unit, allows you to enter various types of data into the simulation unit that affect the current and future operation of the capacities. The connection of the control unit with the system of power units provides the transfer of the final simulation results for further use in the management and planning of work in the system of power units.

Предпочтительно, второй выход системы энергоблоков связан с входом блока хранения данных о генерирующих мощностях, третий выход системы энергоблоков связан со входом в блок внешних систем управления, выходы которого связаны с блоком динамического моделирования и управляющим блоком. Связь блока моделирования и управляющего блока с внешними системами управления позволяет решать задачу оптимизации генерирующих мощностей с дополнительными условиями, относящимися к финансовой или административной деятельности предприятия, что наряду с расширением функциональных возможностей системы повышает в конечном итоге эффективность управления предприятием в целом.Preferably, the second output of the power unit system is connected to the input of the generating capacity data storage unit, the third output of the power unit system is connected to the input to the external control system unit, the outputs of which are connected to the dynamic modeling unit and the control unit. The connection of the modeling unit and the control unit with external control systems allows us to solve the problem of optimizing generating capacities with additional conditions related to the financial or administrative activities of the enterprise, which, along with expanding the functionality of the system, ultimately increases the overall management efficiency of the enterprise.

Предпочтительно, блок динамического моделирования выполнен с возможностью формирования функции максимально-возможной выработки во времени , где fi(t) - функция максимально-возможной выработки по i-му энергоблоку и передачи полученных значений функции в управляющий блок.Preferably, the dynamic modeling unit is configured to form a function of the maximum possible output in time , where f i (t) is the function of the maximum possible generation by the i-th power unit and the transfer of the obtained values of the function to the control unit.

Предпочтительно управляющий блок выполнен с возможностью передачи полученных значений fi(t) на систему энергоблоков для корректировки максимальной выработки по каждому i-му блоку в пределах значений fi(t).Preferably, the control unit is configured to transmit the obtained values of f i (t) to the system of power units to adjust the maximum output for each i-th unit within the values of f i (t).

Полезная модель поясняется далее более подробно со ссылкой на прилагаемый чертеж, на котором изображена принципиальная схема реализации полезной модели.The utility model is explained in more detail below with reference to the accompanying drawing, which shows a schematic diagram of the implementation of the utility model.

Позициями на чертежах обозначены: 1 - блок динамического моделирования работоспособности энергоблоков, 2 - управляющий блок, 3 - блок хранения данных о генерирующих мощностях, 4 - система энергоблоков, 5 - блок внешних системы управления.The positions in the drawings indicate: 1 - unit for dynamic modeling of operability of power units, 2 - control unit, 3 - unit for storing data on generating capacities, 4 - unit system, 5 - unit for external control systems.

В случае реализации, показанном на чертеже, первый вход в блок динамического моделирования работоспособности энергоблоков 1 связан с выходом из системы энергоблоков 4, второй вход в блок 1 связан с выходом блока хранения данных 3, третий вход в блок 1 связан с первым выходом блока управления 2, первый вход в который связан с выходом из блока моделирования 1. При этом второй выход из блока управления 2 связан со входом в систему энергоблоков 4, которая помимо связанного с блоком 1 выхода может иметь также второй выход, связанный со входом в блок 3 хранения данных и третий выход, связанный со входом в блок внешних систем управления 5. Блок внешних систем 5 может быть также связан своим первым выходом с блоком динамического моделирования 1, а вторым - с управляющим блоком 2. Следует отметить, что здесь и далее под связью между блоками понимается возможность передавать посредством указанной связи данные от одного блока к другому, связанному с ним, напрямую либо через какое-то промежуточное звено. Все связи между блоками могут быть реализованы на практике посредством каналов связи известного типа, уместных в том или ином конкретном варианте осуществления полезной модели, включая каналы проводной, беспроводной и/или радиосвязи с использованием любых уместных протоколов, известных из уровня техники (например, TCP/IP и пр.).In the case of the implementation shown in the drawing, the first entrance to the unit for dynamic simulation of operability of power units 1 is connected to the output from the system of power units 4, the second entrance to unit 1 is connected to the output of data storage unit 3, the third input to unit 1 is connected to the first output of control unit 2 , the first entrance to which is connected to the exit from the simulation block 1. In this case, the second exit from the control unit 2 is connected to the entrance to the system of power units 4, which, in addition to the output connected to the block 1, can also have a second output connected to the entrance to the 3 x block data analysis and the third output associated with the input to the block of external control systems 5. The block of external systems 5 can also be connected by its first output to the block of dynamic modeling 1, and the second to the control block 2. It should be noted that hereinafter under the link between blocks is understood the ability to transmit through the specified data from one block to another associated with it, directly or through some kind of intermediate link. All communications between blocks can be implemented in practice through communication channels of a known type that are relevant in a particular embodiment of the utility model, including wired, wireless and / or radio channels using any relevant protocols known from the prior art (e.g., TCP / IP, etc.).

В предпочтительных случаях осуществления полезной модели первый вход в блок 1 моделирования предназначен для ввода информации о текущих характеристиках мощностей, второй вход в блок 1 предназначен для ввода необходимых данных из нормативной и регламентирующей документации, планах ввода-вывода, исторической информации о мощностях, удельный расход топлива. С блока 5 внешних систем управления на блок 1 моделирования могут передаваться условия и ограничения, накладываемые оптимальными решениями, полученными в указанных внешних системах (например, планы ремонтов, способных изменить мощности, показатели процессов, оценки талантов и компетенции т.п.). С блока управления 2 на блок моделирования 1 могут передаваться условия и ограничения моделирования, а также данные о возможных управленческих решениях (инвестиционных проектах, касающихся мощностей). Блок 1 моделирования на основании все полученной информации производит моделирование работоспособности энергоблоков с формированием функцию максимально-возможной выработки во времени , где fi(t) - функция In preferred cases, the implementation of the utility model, the first entrance to the modeling block 1 is intended to enter information about the current characteristics of the capacities, the second entrance to block 1 is intended to enter the necessary data from the regulatory and regulatory documentation, input-output plans, historical information about the capacities, specific fuel consumption . From block 5 of external control systems to block 1 of modeling, conditions and restrictions imposed by optimal solutions obtained in the specified external systems (for example, repair plans that can change capacities, process indicators, talent assessments and competencies, etc.) can be transferred. From the control unit 2 to the simulation unit 1, the conditions and limitations of the simulation can be transferred, as well as data on possible management decisions (investment projects related to capacities). Block 1 simulation, based on all the information received, performs a simulation of the health of power units with the formation of the function of the maximum possible generation in time where f i (t) is the function

максимально-возможной выработки по i-му энергоблоку. Численные значения полученной функции далее предпочтительно передаются на управляющий блок 2, который в свою очередь, учитывая информацию, полученную от системы моделей управления, как то требуемый размер мощностей, оценка прибыли на единицу мощности, плановые параметры ключевых показателей результативности и т.д., либо производит изменение некоторых условий и ограничений, что может послужить организацией нового цикла моделирования, либо формирует итоговый пакет данных, включающий как указанные значения функции выработки, так и иную информацию (например, расход топлива, инвестиционная эффективность и прочие функции в зависимости от времени). Сформированный пакет данных передается далее с блока управления 2 на систему энергоблоков 4, где может быть использован как в текущих целях, так и при планировании производства. Кроме того, по крайней мере часть данных может передаваться на блок внешних систем управления 5 для их использования в решении иных оптимизационных задач (например, разработке планов ремонта, набора и/или повышения квалификации персонала, расчету финансовых или энергетических потоков и т.п.), а часть - в блок хранения данных о мощностях 3.the maximum possible output on the i-th power unit. The numerical values of the obtained function are then preferably transferred to the control unit 2, which, in turn, taking into account the information received from the system of control models, such as the required capacity size, profit estimate per unit capacity, planned parameters of key performance indicators, etc., or makes a change in some conditions and restrictions, which can serve as the organization of a new modeling cycle, or forms a final data packet that includes both the specified values of the generation function and another and formation (e.g., fuel consumption, investment efficiency and other functions depending on the time). The generated data packet is transmitted further from the control unit 2 to the system of power units 4, where it can be used both for current purposes and when planning production. In addition, at least part of the data can be transferred to the block of external control systems 5 for their use in solving other optimization problems (for example, developing repair plans, recruiting and / or advanced training of personnel, calculating financial or energy flows, etc.) , and part - in the storage unit for capacity data 3.

На практике система энергоблоков 4 может представлять собой расположенный на территории электростанции комплекс энергоблоков, каждый из которых функционирует на характерном для данной станции виде топлива (газ, мазут, ядерное топливо и т.п.). В состав системы 4 может также входить одно или несколько традиционных устройств контроля работы энергоблоков, которые могут помимо прочего включают в себя сервер контроля, к которому посредством кабельной или радиочастотной связи обеспечен доступ оператора. На указанном сервере может быть установлено известное программное обеспечение, позволяющее собирать и анализировать данные о текущем состоянии и производительности энергоблоков. Текущее состояние энергоблоков может определяться, в частности, процентом износа энергоблоков, величиной производимой мощности в кВт и т.п.In practice, the system of power units 4 can be a complex of power units located on the territory of the power plant, each of which operates on the type of fuel characteristic of the given station (gas, fuel oil, nuclear fuel, etc.). The system 4 may also include one or more conventional devices for monitoring the operation of power units, which may, among other things, include a monitoring server to which operator access is provided via cable or radio frequency communication. Known software can be installed on the specified server, which allows collecting and analyzing data on the current state and performance of power units. The current state of power units can be determined, in particular, by the percentage of wear of power units, the amount of power produced in kW, etc.

Блок хранения данных о мощностях 3 может быть расположен там же, на территории электростанции и представлять собой отдельный сервер для хранения данных (снабженный любой известной СУБД), связанный каналами связи с сервером контроля, либо как вариант располагаться на вышеуказанном сервере контроля (на одном из его дисков). С сервера контроля на блок хранения данных 3 (соответственно, в отдельный сервер хранения данных либо на физический или логический диск на сервере контроля) передаются данные о текущем состоянии и производительности энергоблоков, где они сохраняются в архив, в результате чего в блоке хранения данных 3 постепенно накапливается массив исторической информации о состоянии мощностей, расходах топлива и проч. Кроме того, в блоке хранения данных 3 может содержаться информация о планах (сроках и объемах) проведения The power data storage unit 3 can be located in the same place, on the territory of the power plant and can be a separate data storage server (equipped with any known DBMS) connected by communication channels to the control server, or alternatively located on the above control server (on one of its drives). From the control server to the data storage unit 3 (respectively, to a separate data storage server or to a physical or logical disk on the control server) data on the current state and performance of the power units is transmitted, where they are stored in the archive, as a result of which gradually in the data storage unit 3 an array of historical information is accumulating on the status of capacities, fuel consumption, etc. In addition, the data storage unit 3 may contain information about plans (dates and volumes) for

регламентных работ, связанных с выводом мощностей из процесса производства, сроки введения в действие новых мощностей, регулирующая и нормативная информация, накладывающая, например, ограничения на производительность мощностей, расход топлива и проч.routine maintenance related to the withdrawal of capacities from the production process, the timing of the commissioning of new capacities, regulatory and regulatory information that imposes, for example, restrictions on capacity productivity, fuel consumption, etc.

Посредством каналов связи (например, посредством виртуальной частной сети VPN) сервер контроля энергоблоков и блок хранения данных 3 связаны с аппаратным комплексом управляющей компании, который географически может быть значительно удален от электростанции.Via communication channels (for example, via a virtual private network VPN), the power unit monitoring server and data storage unit 3 are connected to the management company hardware complex, which geographically can be significantly removed from the power plant.

Указанный аппаратный комплекс может включать в себя сервер корпоративной информационной базы данных (БД) и архивирования, серверы внешних систем управления, составляющих в совокупности блок внешних систем управления 5, а также сервер управления мощностями, на котором на логическом или физическом диске размещен по крайней мере блок 1 моделирования. Управляющий блок 2 может содержаться как на логическом или физическом диске сервера управления, так и на отдельном сервере, входящем в аппаратный комплекс управляющей компании.The specified hardware complex may include a corporate information database (DB) server and archiving, servers of external control systems, which together comprise a block of external control systems 5, as well as a capacity management server on which at least a block is located on a logical or physical disk 1 simulation. The control unit 2 may be contained both on the logical or physical disk of the management server, or on a separate server included in the hardware of the management company.

Сервер корпоративной БД является связующим звеном, посредством которого блок хранения данных 3 и система энергоблоков (через сервер контроля) связаны с блоками моделирования 1 и управления 2, а также блоком внешних систем управления (СУ) 5. Посредством структурированной кабельной сети все элементы аппаратного комплекса управляющей компании связаны между собой, предпочтительно следующим образом: сервер корпоративной БД связан в двустороннем режиме (т.е. с возможностью как отправки, так и получения данных) с сервером управления мощностями, а также связан с серверами внешних СУ (блока 5) с возможностью передачи на них данных, и при этом указанные серверы блока 5 связаны с сервером управления мощностями (а при наличии дополнительного сервера для управляющего блока - и с этим сервером) с возможностью передачи на этот сервер (серверы) данных внешних СУ.The corporate database server is the link through which the data storage unit 3 and the power unit system (through the control server) are connected to the simulation units 1 and control 2, as well as to the external control system unit (SU) 5. Through a structured cable network, all elements of the control hardware complex the companies are interconnected, preferably as follows: the corporate database server is connected in a two-way mode (i.e. with the ability to both send and receive data) with the capacity management server, it is also connected to the servers of external control systems (block 5) with the possibility of transferring data to them, and at the same time, the indicated servers of block 5 are connected to the capacity management server (and, if there is an additional server for the control block, to this server) with the possibility of transferring to this server (servers) data of external control systems.

В рамках настоящее полезной модели в качестве внешних СУ могут использоваться, например, система управления финансовыми потоками (предназначенная для оптимизации этих потоков в рамках предприятия), энергетическими потоками (для оптимизации процессов покупки-продажи электроэнергии на рынке), система управления талантами и компетенциями (оптимизирующая использование человеческих ресурсов на предприятии), система управления надежностью (оптимизация регламентных работ, строительства новых энергоблоков и электростанций), а также системы оптимизации прочих показателей, оказывающих влияние на работу предприятия.Within the framework of the present utility model, for example, external control systems for financial flows management (designed to optimize these flows within the enterprise), energy flows (for optimizing the processes of buying and selling electricity on the market), and a talent and competency management system (optimizing use of human resources at the enterprise), a reliability management system (optimization of routine maintenance, construction of new power units and power plants), as well as systems optimization of other parameters that influence the operation of the enterprise.

Система может работать следующим образом.The system can work as follows.

Данные о текущем состоянии генерирующих мощностей (например, значения производимой мощности по каждому энергоблоку) фиксируются устройствами контроля работы энергоблоков и передаются далее на сервер контроля, откуда далее записываются в соответствующий массив в блоке хранения данных 3. В результате такой записи в блоке хранения 3 образуется массив значений производимой мощности в разные периоды времени (т.е. зависимость производимой мощности от времени). Кроме того, в блоке хранения данных могут быть зафиксированы максимальные значения мощности для каждого из энергоблоков станции, уровень износа (может быть подсчитан, например, по амортизации) сроки проведения регламентных работ, работ по подключению новых энергоблоков, увеличению.Data on the current state of generating capacities (for example, the values of the generated power for each power unit) are recorded by the power unit control devices and transmitted further to the control server, from where they are then written to the corresponding array in data storage unit 3. As a result of such a record, an array is formed in storage unit 3 values of the produced power at different time periods (i.e., the dependence of the produced power on time). In addition, in the data storage unit, maximum power values for each of the power units of the station can be fixed, the level of wear (can be calculated, for example, by depreciation), the timing of routine maintenance, work on connecting new power units, and an increase.

При запуске блока 1 моделирования работоспособности энергоблоков либо циклично через определенный промежуток времени текущие показатели мощности и указанные архивные и нормативные данные запрашиваются сервером корпоративной БД на сервере контроля и блоке хранения данных 3, соответственно. После получения этих данных на сервере корпоративной БД они передаются на сервер управления мощностями и вводятся в качестве исходных данных для моделирования работы энергоблоков в блоке 1.When starting the unit 1 simulation of the health of power units or cyclically after a certain period of time, the current power indicators and the indicated archive and regulatory data are requested by the corporate database server on the control server and data storage unit 3, respectively. After receiving this data on the corporate database server, it is transferred to the capacity management server and entered as input data for modeling the operation of power units in block 1.

Целевой функцией, оптимизируемой в блоке моделирования 1, является зависимость максимально-возможной выработки (например, в кВт) от времени, численно определенная для текущего и спрогнозированная для будущих периодов (т.е. охватывающая текущий период расчета, а также заданные периоды времени в прошлом и будущем). Оптимизация производится в зависимости от условий, наложенных известными физическими ограничениями производства (заложены в основном в блоке хранения данных 3), а также планируемыми показателями движения финансовых и энергетических потоков, прогнозируемой динамикой компетентности сотрудников, планами ремонта и иными показателями деятельности компании. Часть этих ограничений (например, желаемые показатели прибыли или объема продаж электроэнергии) может задаваться вручную оператором системы управления мощностями, и вводиться в управляющий блок 2 с последующей передачей ограничений в блок 1.The objective function optimized in simulation block 1 is the dependence of the maximum possible output (for example, in kW) on time, numerically determined for the current and predicted for future periods (i.e., covering the current calculation period, as well as given time periods in the past and the future). Optimization is carried out depending on the conditions imposed by the well-known physical limitations of production (laid down mainly in the data storage unit 3), as well as the planned indicators of the movement of financial and energy flows, the predicted dynamics of the competence of employees, repair plans and other indicators of the company. A part of these restrictions (for example, the desired profit or sales of electricity) can be set manually by the operator of the capacity management system, and entered into control unit 2 with the subsequent transfer of restrictions to unit 1.

В блоке 1 на основании архивных и текущих показателей мощности известными числовыми методами (методом интерполяции) может быть построена зависимость вырабатываемой мощности от времени с поправкой на амортизацию (может быть использована в частности линейная регрессионная функция, коэффициенты которой оцениваются по фактическим данным численно). Далее на базе полученной зависимости может производиться экстраполяция значений максимальной выработки в будущие периоды fi(t) с возможными поправками полученной зависимости вырабатываемой мощности от In block 1, on the basis of archival and current power indicators using known numerical methods (interpolation method), the dependence of the generated power on time adjusted for depreciation can be constructed (in particular, a linear regression function can be used, the coefficients of which are estimated numerically from actual data). Further, on the basis of the obtained dependence, extrapolation of the values of the maximum output in future periods f i (t) with possible corrections of the obtained dependence of the generated power on

времени на величину мощности, выводимой в определенные периоды из оборота для ремонта (передается из блока 5 внешних систем), а также исходя из инвестиционных планов по вводу новых мощностей в строй (величина вводимой мощности может варьироваться оператором через управляющий блок 2). Полученные значения fi(t) для каждого i-го энергоблока передаются далее из блока моделирования 1 в управляющий блок 2, в котором производится проверка соответствия полученных значений мощности по каждому энергоблоку fi(t) и всех энергоблоков в целом ожидаемым значениям дохода от реализации электроэнергии (определяется путем умножения значения выработки на текущие или прогнозируемые цены на произведенный кВт), ожидаемой в этом случае рентабельности производства (вычислением отношения доходов к расходам), иным желаемым показателям (например, требуемому размеру мощностей исходя из требуемого объема продаж электроэнергии и т.п.).time for the amount of power that is withdrawn from circulation for certain periods for repair (transferred from block 5 of external systems), as well as on the basis of investment plans for putting new capacities into operation (the amount of commissioned power can be varied by the operator through control unit 2). The obtained values of f i (t) for each i-th power unit are transferred further from the simulation block 1 to the control unit 2, in which the correspondence of the received power values for each power unit f i (t) and all power units as a whole is checked expected values of income from the sale of electricity (determined by multiplying the value of generation by current or forecast prices for kW produced), expected production profitability (by calculating the ratio of income to expenses), other desired indicators (for example, the required size of capacities based on the required sales electricity, etc.).

В случае соответствия указанных показателей ожидаемым величинам полученные значения fi(t) максимальной выработки для каждого блока, а также иные данные (например, прогнозируемые расходы топлива, исходя из полученной оценки выработки) передаются через сервер корпоративной БД на вход системы энергоблоков 4 (на сервер управления) и производственный процесс на станции в дальнейшем корректируется в рамках полученных значений fi(t). Кроме того, полученные оценочные значения мощности и величина суммарной выработки могут передаваться на блок внешних систем управления 5 для их использования при решении внешних задач управления надежностью, компетенциями, финансовыми и энергетическими потоками и т.д.If these indicators meet the expected values, the obtained values of f i (t) of the maximum output for each unit, as well as other data (for example, the predicted fuel consumption, based on the obtained estimate of the output) are transmitted through the corporate database server to the input of power unit 4 (to the server control) and the production process at the station is further adjusted in the framework of the obtained values of f i (t). In addition, the estimated power values and the total output can be transferred to the block of external control systems 5 for their use in solving external tasks of managing reliability, competencies, financial and energy flows, etc.

В случае, если полученные оценочные показатели максимальной мощности по каждому из блоков и всей станции в целом не удовлетворительны, моделирование может быть произведено снова (по команде управляющего блока 2, передаваемой на блок 1). При этом могут быть изменены как ограничения, накладываемые объемом вновь вводимых, выводимых из оборота мощностей и т.п., так и сама модель (например, вместо линейной регрессии может быть использована нелинейная модель, либо изменен порядок регрессии). В результате нескольких итераций моделирования может быть выбрано оптимальное решение, устраивающее аналитиков по всем или большинству заданных критериев.If the obtained estimated indicators of maximum power for each of the blocks and the entire station as a whole are not satisfactory, the simulation can be performed again (at the command of the control unit 2 transmitted to block 1). In this case, both the restrictions imposed by the volume of newly commissioned, withdrawn from the turnover of capacities, etc., and the model itself can be changed (for example, instead of a linear regression, a non-linear model can be used, or the regression order can be changed). As a result of several simulation iterations, the optimal solution that suits analysts according to all or most of the specified criteria can be selected.

В заключение следует отметить, что вышеприведенное описание конкретных случаев реализации полезной модели не является исчерпывающим и не может таким образом рассматриваться, как ограничивающее объем испрашиваемой правовой охраны каким либо образом. Ясно, что вместо указанных параметров, вида и типа передаваемой информации в In conclusion, it should be noted that the above description of specific cases of the implementation of the utility model is not exhaustive and cannot thus be considered as limiting the scope of the requested legal protection in any way. It is clear that instead of the specified parameters, the type and type of information transmitted in

отдельных случаях реализации могут быть использованы и иные параметры, виды и типы информации. При этом такие примеры не будут выходить за рамки существа полезной модели, которое определяется не передаваемой информацией между блоками, а именно компоновкой системы управления мощностями в том виде, как это изложено в прилагаемой формуле полезной модели.In individual implementation cases, other parameters, types and types of information can be used. Moreover, such examples will not go beyond the essence of the utility model, which is determined by the information not transmitted between the units, namely, the layout of the power management system in the form described in the attached utility model formula.

Claims (4)

1. Система управления генерирующими мощностями, содержащая блок динамического моделирования работоспособности энергоблоков и управляющий блок, в которой первый вход блока динамического моделирования связан с выходом системы энергоблоков, второй вход блока динамического моделирования связан с выходом блока хранения данных о генерирующих мощностях, управляющий блок связан с блоком динамического моделирования в двустороннем режиме и имеет возможность передачи данных для управления мощностями на систему энергоблоков.1. A control system for generating capacities, comprising a dynamic modeling unit for operability of power units and a control unit in which the first input of the dynamic modeling unit is connected to the output of the power unit system, the second input of the dynamic modeling unit is connected to the output of the generating capacity data storage unit, the control unit is connected to the unit dynamic modeling in a two-way mode and has the ability to transfer data for capacity management to the system of power units. 2. Система по п.1, отличающаяся тем, что второй выход системы энергоблоков связан с входом блока хранения данных о генерирующих мощностях, третий выход системы энергоблоков связан со входом в блок внешних систем управления, выходы которого связаны с блоком динамического моделирования и управляющим блоком.2. The system according to claim 1, characterized in that the second output of the power unit system is connected to the input of the data storage unit about generating capacities, the third output of the power unit system is connected to the input of the external control system unit, the outputs of which are connected to the dynamic modeling unit and the control unit. 3. Система по любому из пп.1 и 2, отличающаяся тем, что блок динамического моделирования выполнен с возможностью формирования функции максимально возможной выработки во времени
Figure 00000001
, где fi(t) - функция максимально возможной выработки по i-му энергоблоку и передачи полученных значений функции в управляющий блок.
3. The system according to any one of claims 1 and 2, characterized in that the dynamic modeling unit is configured to form the function of the maximum possible output in time
Figure 00000001
, where f i (t) is the function of the maximum possible generation by the i-th power unit and the transfer of the obtained function values to the control unit.
4. Система по п.3, отличающаяся тем, что управляющий блок выполнен с возможностью передачи полученных значений fi(t) на систему энергоблоков для корректировки максимальной выработки по каждому i-му блоку в пределах значений fi(t).
Figure 00000002
4. The system according to claim 3, characterized in that the control unit is configured to transmit the obtained values of f i (t) to the system of power units to adjust the maximum output for each i-th block within the values of f i (t).
Figure 00000002
RU2007118250/22U 2007-05-17 2007-05-17 GENERAL POWER CONTROL SYSTEM RU80044U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2007118250/22U RU80044U1 (en) 2007-05-17 2007-05-17 GENERAL POWER CONTROL SYSTEM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2007118250/22U RU80044U1 (en) 2007-05-17 2007-05-17 GENERAL POWER CONTROL SYSTEM

Publications (1)

Publication Number Publication Date
RU80044U1 true RU80044U1 (en) 2009-01-20

Family

ID=40376543

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2007118250/22U RU80044U1 (en) 2007-05-17 2007-05-17 GENERAL POWER CONTROL SYSTEM

Country Status (1)

Country Link
RU (1) RU80044U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2559416C2 (en) * 2010-12-07 2015-08-10 Альстом Текнолоджи Лтд Optimised integrated control for oxy-fuel combustion power plant

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2559416C2 (en) * 2010-12-07 2015-08-10 Альстом Текнолоджи Лтд Optimised integrated control for oxy-fuel combustion power plant

Similar Documents

Publication Publication Date Title
Kuznetsova et al. Reinforcement learning for microgrid energy management
Rebennack Generation expansion planning under uncertainty with emissions quotas
CN102930354B (en) A kind of community power consumption prediction method and device
CN110543697B (en) Electric power market simulation running system
CN107958291A (en) The method and system related for the field engineering resource of power plant maintenance with distributing
Artto Fifteen years of project risk management applications–where are we going?
CN113888132A (en) Energy management system of large-scale industrial enterprise
CN116914747B (en) Power consumer side load prediction method and system
Ranaweera et al. Effect of probabilistic inputs on neural network-based electric load forecasting
CN116599151A (en) Source network storage safety management method based on multi-source data
CN114693122A (en) Power grid planning method based on digital twinning technology
Zhu et al. An optimization decision support approach for risk analysis of carbon emission trading in electric power systems
CN116933945A (en) Project construction period prediction method based on multiple linear regression
Pawlish et al. A decision support system for green data centers
CN113821008A (en) Energy management control method and energy management center for large-scale industrial enterprise
CN113723684A (en) Device and method for load prediction and energy management of enterprise power users
RU80044U1 (en) GENERAL POWER CONTROL SYSTEM
Milligan et al. Stochastic methods for planning and operating power systems with large amounts of wind and solar power
CN116029412A (en) Power distribution network plan power outage execution tracking and optimization decision method
RU78970U1 (en) ENERGY FLOW MANAGEMENT SYSTEM
Fregonara et al. LCC Analysis to evaluate the economic sustainability of technological scenarios on the district scale
RU80047U1 (en) RELIABILITY MANAGEMENT SYSTEM
Gupta et al. Electricity Power Consumption Forecasting Techniques: A survey
Bettinelli et al. Decision support systems for energy production optimization and network design in district heating applications
Asih et al. Cost-volume-profit analysis for uncertain capacity planning: A case study paper

Legal Events

Date Code Title Description
MM1K Utility model has become invalid (non-payment of fees)

Effective date: 20090518