RU2682834C1 - Roll-up for pneumatic tests - Google Patents

Roll-up for pneumatic tests Download PDF

Info

Publication number
RU2682834C1
RU2682834C1 RU2018116826A RU2018116826A RU2682834C1 RU 2682834 C1 RU2682834 C1 RU 2682834C1 RU 2018116826 A RU2018116826 A RU 2018116826A RU 2018116826 A RU2018116826 A RU 2018116826A RU 2682834 C1 RU2682834 C1 RU 2682834C1
Authority
RU
Russia
Prior art keywords
test
compressor
module
gas
test medium
Prior art date
Application number
RU2018116826A
Other languages
Russian (ru)
Inventor
Владимир Евгеньевич Малыгин
Сергей Владимирович Вербицкий
Алексей Анатольевич Агафонов
Равиль Исмаилович Кильдеев
Яна Анатольевна Синельникова
Original Assignee
Федеральное государственное унитарное предприятие "Крыловский государственный научный центр"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное государственное унитарное предприятие "Крыловский государственный научный центр" filed Critical Федеральное государственное унитарное предприятие "Крыловский государственный научный центр"
Priority to RU2018116826A priority Critical patent/RU2682834C1/en
Application granted granted Critical
Publication of RU2682834C1 publication Critical patent/RU2682834C1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • G01N3/12Pressure testing

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

FIELD: test equipment.SUBSTANCE: invention relates to the field of roll-up for pneumatic testing of oil and gas equipment, can be used for testing in the conditions of the landfill. Roll-up for pneumatic tests according to the invention is made in the form of at least three structurally independent transportable modules having a closed rigid case, covering the bottom, roof and side surfaces of the module. Three modules above-mentioned include the observation and control data collection module, which contains the control and monitoring equipment, as well as the test module connected to it and the test module with the test object located in it, instrumentation and testing equipment, including a compressor and a receiver installed between the compressor and the test object, through which the compressor is connected to the test object, and a gas test medium storage module with storage tanks for the gas test medium. Moreover, the last two of these modules are interconnected by a pipeline supply and return gas test medium, one end of which is connected to the storage tanks of the gas test medium in the storage and distribution module of the gas test medium, and other end to the compressor in the test module thereof. In this case, the supply and return pipeline for the gas test medium is equipped with two bypass lines connected in parallel with the compressor to the receiver behind the compressor and to the pipeline in front of the compressor.EFFECT: creation of roll-up for pneumatic tests with improved performance characteristics in terms of ensuring the possibility of safe testing at high pressures of the gas test medium and the reusability of the existing gas test medium in the storage module.1 cl, 4 dwg

Description

Изобретение относится к области мобильных стендов для пневматических испытаний нефтегазового оборудования и может быть использовано для испытаний в условиях полигона с применением естественных или дешевых грунтовых искусственных защитных сооружений взамен мощных железобетонных защитных конструкций на территории промышленного предприятия, когда применение таких конструкций экономически не оправдано ввиду эпизодичности испытаний.The invention relates to the field of mobile stands for pneumatic testing of oil and gas equipment and can be used for testing in a test site using natural or cheap soil artificial protective structures instead of powerful reinforced concrete protective structures on the territory of an industrial enterprise, when the use of such structures is not economically justified due to the episodic testing.

Известен мобильный стенд для пневматических испытаний ГАКС-ММ-1 (http://gaksnpo.ru/portfolio/234), содержащий испытательное оборудование 1, а также оборудование системы управления 2, установленные в транспортабельном модуле 3 (фиг. 1), имеющем встроенную прочную защитную перегородку 4, отделяющую испытательное оборудование 1 от оборудования системы управления 2. Указанная перегородка 4 выполняет функцию защитной конструкции, необходимость которой оговорена нормативными требованиями (Руководящий документ. Правила проведения пневматических испытаний изделий на прочность и герметичность. РД 26-12-29-88, Приложение 2). Транспортабельный модуль 3 обладает достаточной прочностью, что позволяет производить многократные передислокации мобильного стенда в зависимости от места расположения объекта испытаний. Мобильный стенд для пневматических испытаний обладает простотой конструкции, компактностью и обеспечивает проведение испытаний в эксплуатационных условиях при выполнении ремонтов нефтегазового оборудования - прототип.Known mobile stand for pneumatic testing GAKS-MM-1 (http://gaksnpo.ru/portfolio/234), containing test equipment 1, as well as equipment of the control system 2, installed in a transportable module 3 (Fig. 1), having a built-in a solid protective partition 4 that separates the test equipment 1 from the equipment of the control system 2. The specified partition 4 performs the function of a protective structure, the need for which is specified by regulatory requirements (Guidance document. Rules for conducting pneumatic tests ed Strength and tightness. RD 26-12-29-88, Appendix 2). Transportable module 3 has sufficient strength, which allows multiple relocation of the mobile stand, depending on the location of the test object. A mobile stand for pneumatic testing has a simple design, compactness and provides for testing under operational conditions when performing repairs of oil and gas equipment - a prototype.

Однако, известному стенду присущи недостатки, заключающиеся в том, что он рассчитан на небольшие (до 63 МПа (630 кг/см2),) предельные давления, при которых проводятся испытания и при которых согласно РД 26-12-29-88 в качестве испытательной среды может использоваться атмосферный воздух.However, the well-known stand has inherent disadvantages in that it is designed for small (up to 63 MPa (630 kg / cm2)) extreme pressures at which tests are carried out and at which, according to RD 26-12-29-88, as a test atmospheric air can be used.

Кроме того, встроенная защитная перегородка, отделяющая зону управления от зоны испытаний и защищающая ее, не является достаточным препятствием разлетанию фрагментов испытываемого оборудования по другим направлениям при его разрушении и действию ударной волны в результате возможного взрыва в процессе испытаний.In addition, the built-in protective partition that separates the control zone from the test zone and protects it is not a sufficient obstacle to flying pieces of the equipment under test in other directions during its destruction and the action of a shock wave as a result of a possible explosion during the test.

Задачей предполагаемого изобретения является улучшение эксплуатационных характеристик стенда для пневматических испытаний в части обеспечения возможности безопасного проведения испытаний при более высоких давлениях газовой испытательной среды, и возможности многократного использования имеющегося запаса газовой испытательной среды в модуле хранения.The objective of the proposed invention is to improve the operational characteristics of the bench for pneumatic testing in terms of ensuring the possibility of safe testing at higher pressures of the gas test medium, and the possibility of reusing the existing supply of gas test medium in the storage module.

Это достигается тем, что мобильный стенд для пневматических испытаний, характеризующийся тем, что по изобретению он выполнен в виде по меньшей мере трех конструктивно независимых транспортабельных модулей, имеющих замкнутый жесткий корпус, охватывающий днище, крышу и боковые поверхности модуля. В число трех упомянутых модулей входят модуль сбора данных наблюдения и управления, содержащий аппаратуру управления и наблюдения, а также связанные с ним каналами связи и управления испытательный модуль с размещенными в нем испытываемым объектом, контрольно-измерительными приборами и испытательным оборудованием, включающим компрессор и установленный между компрессором и испытываемым объектом ресивер, посредством которого компрессор подключен к испытываемому объекту, и модуль хранения газовой испытательной среды со встроенными в него емкостями для хранения газовой испытательной среды. Причем последние два из упомянутых модулей соединены между собой трубопроводом подачи и возврата газовой испытательной среды, один конец которого присоединен к емкостям для хранения газовой испытательной среды в модуле хранения и распределения газовой испытательной среды, а его другой конец - к компрессору в испытательном модуле. При этом трубопровод подачи и возврата газовой испытательной среды оснащен двумя байпасными линиями, подключенными параллельно с компрессором к ресиверу за компрессором и к трубопроводу перед компрессором. Причем в одну байпасную линию встроен фильтр с запорной арматурой на его входе и выходе, а в другую встроен регулирующий клапан подачи газовой испытательной среды.This is achieved by the fact that the mobile stand for pneumatic testing, characterized in that according to the invention it is made in the form of at least three structurally independent transportable modules having a closed rigid body covering the bottom, roof and side surfaces of the module. The three modules mentioned include a monitoring and control data acquisition module containing control and monitoring equipment, as well as associated communication and control channels, a test module with a test object, instrumentation and test equipment, including a compressor and installed between a compressor and a test object, a receiver through which the compressor is connected to the test object, and a gas test medium storage module with built-in its containers for storing a gas test medium. Moreover, the last two of the mentioned modules are interconnected by a pipeline for supplying and returning a gas test medium, one end of which is connected to containers for storing a gas test medium in the storage and distribution module of the gas test medium, and its other end is connected to the compressor in the test module. In this case, the gas test medium supply and return pipeline is equipped with two bypass lines connected in parallel with the compressor to the receiver behind the compressor and to the pipeline in front of the compressor. Moreover, a filter with shut-off valves at its inlet and outlet is integrated in one bypass line, and a control valve for supplying a gas test medium is built into another.

Выполнение мобильного стенда для пневматических испытаний, состоящим по меньшей мере из трех конструктивно независимых транспортабельных модулей, включающих модуль сбора данных наблюдения и управления, содержащий аппаратуру управления и наблюдения, а также связанные с ним каналами связи и соединенные между собой испытательный модуль с установленным в нем испытываемым объектом и испытательным оборудованием и модуль хранения и распределения газовой испытательной среды со встроенными в него емкостями для хранения газовой испытательной среды, позволяет рационально разместить модуль сбора данных наблюдения и управления по отношению к остальным модулям на полигоне при подготовке испытаний и благодаря этому обеспечить безопасность персонала в модуле сбора данных наблюдения и управления при проведении испытаний испытываемого объекта при повышенных (свыше 63 МПа) уровнях давления газовой испытательной среды, что улучшает эксплуатационные характеристики стенда.Implementation of a mobile stand for pneumatic testing, consisting of at least three structurally independent transportable modules, including a monitoring and control data collection module, containing control and monitoring equipment, as well as associated communication channels and interconnected test module with the test module installed in it object and test equipment and a module for storing and distributing a gas test medium with built-in containers for storing a gas test environment, it makes it possible to rationally place the monitoring and control data collection module with respect to the other modules on the training ground during test preparation and thereby ensure the safety of personnel in the monitoring and control data collection module when testing the test object at elevated (over 63 MPa) gas pressure levels test environment, which improves the performance of the stand.

Наличие в трубопроводе подачи и возврата испытательной среды двух байпасных линий, подключенных параллельно с компрессором, в одном из которых встроен фильтр с запорной арматурой на входе и выходе из него, а другой - регулирующий клапан, обеспечивает возможность повторного (многократного) использования газовой испытательной среды при возврате ее в емкости для хранения через упомянутый фильтр, а также плавное выравнивание давления в модуле хранения и распределения и в испытываемом объекте, благодаря чему улучшаются эксплуатационные характеристики стенда.The presence of two bypass lines connected in parallel with the compressor in the test medium supply and return piping, one of which has a filter with shut-off valves at its inlet and outlet, and the other a control valve, makes it possible to reuse (repeatedly) use the gas test medium when return it to storage tanks through the mentioned filter, as well as smooth pressure equalization in the storage and distribution module and in the test object, thereby improving operational characteristics stand specifications.

Сущность предполагаемого изобретения поясняется рисунками, где на фиг. 2 схематично показан состав модулей мобильного стенда для пневматических испытаний, их схематическое расположение в рабочем положении в условиях полигона и функциональные связи между модулями, на фиг. 3 - испытательный модуль с расположенными в нем испытываемым объектом и испытательным оборудованием, а фиг. 4 - модуль хранения и распределения испытательной среды.The essence of the alleged invention is illustrated by drawings, where in FIG. 2 schematically shows the composition of the modules of the mobile stand for pneumatic tests, their schematic location in the working position in the conditions of the range and the functional relationships between the modules, in FIG. 3 is a test module with a test object and test equipment located therein, and FIG. 4 - module storage and distribution of the test environment.

Мобильный стенд для пневматических испытаний состоит по меньшей мере из трех конструктивно независимых транспортабельных модулей 1, 2 и 3 (фиг. 2), имеющих замкнутый жесткий корпус 4, охватывающий днище, крышу и боковые поверхности модуля (фиг. 2, 3). В число упомянутых модулей входят модуль сбора данных наблюдения и управления 1, содержащий аппаратуру сбора данных, управления и наблюдения 5 (фиг. 2), а также связанные с ним каналами связи и управления 6 испытательный модуль 2 с установленным в нем испытываемым объектом 7 (фиг. 3) и модуль хранения и распределения газовой испытательной среды 3, в котором встроены емкости 8 для хранения газовой испытательной среды (фиг. 2, 4). В испытательном модуле 2 размещены также контрольно-измерительные приборы 9 и испытательное оборудование, включающее компрессор 10 и ресивер 11, посредством которого компрессор 10 подключен к испытываемому объекту 7 (фиг. 3). Испытательный модуль 2 и модуль хранения и распределения газовой испытательной среды 3 соединены между собой трубопроводом подачи и возврата 12 газовой испытательной среды (фиг. 2), один конец которого присоединен к емкостям 8 для хранения газовой испытательной среды в модуле хранения и распределения 3 газовой испытательной среды, а его другой конец - к компрессору 10, в испытательном модуле 2 (фиг. 2, 3, 4). Трубопровод подачи и возврата 12 газовой испытательной среды оснащен двумя байпасными линиями 13 и 14, подключенными параллельно с компрессором 10 к ресиверу 11 за компрессором 10 и к трубопроводу подачи и возврата 12 газовой испытательной среды перед компрессором 10. Причем в байпасную линию 13 встроен фильтр 15 с запорной арматурой на его входе 16 и на выходе 17, а в другую байпасную линию 14 встроен регулирующий клапан подачи 18 газовой испытательной среды (фиг. 3).A mobile stand for pneumatic testing consists of at least three structurally independent transportable modules 1, 2 and 3 (Fig. 2), having a closed rigid housing 4, covering the bottom, roof and side surfaces of the module (Fig. 2, 3). The mentioned modules include the monitoring and control data collection module 1, which contains the data collection, control and monitoring equipment 5 (Fig. 2), as well as the test module 2 with the test object 7 installed in it, connected with the communication and control channels 6 (Fig. 2) 3) and a module for storing and distributing a gas test medium 3, in which containers 8 for storing a gas test medium are integrated (Figs. 2, 4). Instrumentation 9 and test equipment, including a compressor 10 and a receiver 11, through which the compressor 10 is connected to the test object 7 (Fig. 3), are also located in the test module 2. The test module 2 and the storage and distribution module of the gas test medium 3 are interconnected by a supply and return pipe 12 of the gas test medium (Fig. 2), one end of which is connected to the containers 8 for storing the gas test medium in the storage and distribution module 3 of the gas test medium , and its other end - to the compressor 10, in the test module 2 (Fig. 2, 3, 4). The gas supply and return pipe 12 of the gas test medium is equipped with two bypass lines 13 and 14, connected in parallel with the compressor 10 to the receiver 11 behind the compressor 10 and to the gas test and return pipe 12 of the gas test medium in front of the compressor 10. Moreover, a filter 15 s is built into the bypass line 13 shutoff valves at its inlet 16 and at the outlet 17, and in another bypass line 14 is a control valve 18 for supplying a gas test medium (Fig. 3).

Мобильный стенд для пневматических испытаний работает следующим образом.Mobile stand for pneumatic testing is as follows.

В исходном состоянии все три модуля 1, 2 и 3 мобильного испытательного стенда, включая модуль сбора данных наблюдения и управления 1, испытательный модуль 2 и модуль хранения и распределения испытательной среды 3, находятся на производственном предприятии в режиме хранения, будучи защищенными от внешних загрязняющих факторов и температурных перепадов (на рисунке не показано).In the initial state, all three modules 1, 2 and 3 of the mobile test bench, including the monitoring and control data collection module 1, test module 2 and the storage and distribution module of the test medium 3, are in storage at the production facility, being protected from external polluting factors and temperature differences (not shown in the figure).

При подготовке к проведению испытаний выполняются мероприятия в условиях производственного предприятия, при которых в испытательный модуль 2 устанавливается испытываемый объект 7 и фиксируется посредством штатного крепления (на рисунке не показано). Производится заправка емкостей 8 газовой испытательной средой в модуле хранения и распределения 3. Испытываемый объект 7 оснащается контрольно-измерительными приборами 9, а испытательный модуль 2 - аппаратурой сбора данных, управления и наблюдения 5.In preparation for the test, measures are taken in the conditions of the manufacturing enterprise, in which the test object 7 is installed in test module 2 and fixed by means of a standard mount (not shown in the figure). The tanks 8 are filled with a gas test medium in the storage and distribution module 3. The test object 7 is equipped with instrumentation 9, and test module 2 with data acquisition, control, and monitoring equipment 5.

Для проведения испытаний стенд транспортируется на полигон автотранспортом, где модули 1, 2 и 3 мобильного испытательного стенда устанавливаются (фиг. 2) с выполнением следующих условий. Испытательный модуль 2 и модуль хранения и распределения испытательной среды 3 размещаются на близком расстоянии друг от друга, а модуль сбора данных наблюдения и управления с персоналом 1 отделяется от указанных модулей 2 и 3 и располагается на безопасном от них расстоянии.For testing, the test bench is transported to the test site by road, where modules 1, 2 and 3 of the mobile test bench are installed (Fig. 2) with the following conditions. The test module 2 and the storage and distribution module of the test medium 3 are located at a close distance from each other, and the monitoring and control data collection module with personnel 1 is separated from these modules 2 and 3 and is located at a safe distance from them.

После подключения всех модулей стенда к источнику силового электроснабжения (на рисунке не показано) подключаются каналы связи и управления 6, соединяющие контрольно-измерительные приборы 9 на испытываемом объекте 7 с аппаратурой сбора данных, управления и наблюдения 5 в модуле 1 сбора данных наблюдения и управления (фиг. 2).After connecting all the modules of the stand to the source of power supply (not shown in the figure), communication and control channels 6 are connected, connecting the instrumentation 9 at the test object 7 with the data acquisition, control and monitoring equipment 5 in the monitoring and control data collection module 1 ( Fig. 2).

Затем выполняется монтаж участков трубопровода 12 подачи и возврата испытательной среды вне модулей 2 и 3 (фиг. 2). Подается газовая испытательная среда в испытываемый объект 7 через трубопровод 12 подачи и возврата испытательной газовой среды. При этом запорный клапан на входе 19 в компрессор 10 закрыт и закрыты запорные клапаны 16 и 17 на байпасной линии 13 (фиг. 3). Регулирующий клапан 18 путем частичного открытия обеспечивает постепенное повышение давления в испытываемом объекте 7 до его выравнивания с давлением в емкостях 8 для хранения газовой испытательной среды в модуле 3 хранения и распределения газовой испытательной среды. Дальнейшее повышение давления в испытываемом объекте 7 обеспечивается компрессором 10. Для этого все запорные клапаны 16 и 17 на байпасной линии 13 и регулирующий клапан 18 на байпасной линии 14 закрываются. Открывается запорный клапан 19 на входе в компрессор 10 и производится запуск компрессора 10. После достижения давления в испытываемом объекте 7, при котором проводятся испытания, компрессор 10 останавливают с одновременным закрытием запорного клапана 19 на входе в компрессор (фиг. 3).Then, sections of the pipeline 12 for supplying and returning the test medium outside the modules 2 and 3 are installed (Fig. 2). The gas test medium is supplied to the test object 7 through the pipeline 12 for supplying and returning the test gas medium. In this case, the shut-off valve at the inlet 19 to the compressor 10 is closed and the shut-off valves 16 and 17 on the bypass line 13 are closed (Fig. 3). The control valve 18 by partial opening provides a gradual increase in pressure in the test object 7 until it is equalized with the pressure in the containers 8 for storing the gas test medium in the module 3 for storing and distributing the gas test medium. A further increase in pressure in the test object 7 is provided by the compressor 10. For this, all shut-off valves 16 and 17 on the bypass line 13 and the control valve 18 on the bypass line 14 are closed. The shut-off valve 19 at the inlet to the compressor 10 is opened and the compressor 10 is started. After reaching the pressure in the test object 7 at which the tests are carried out, the compressor 10 is stopped while the shut-off valve 19 at the inlet to the compressor is closed (Fig. 3).

В итоге выполнения указанных выше операций стенд готов к испытаниям.As a result of the above operations, the stand is ready for testing.

После завершения испытаний испытательная газовая среда через байпасную линию 13 и трубопровод подачи и возврата газовой испытательной среды 12 возвращается в емкости 8 модуля 3, проходя очистку в фильтре 15 (фиг. 3). Затем разобщают функциональные связи между модулями 1, 2 и 3 и производится их погрузка на автотранспорт с доставкой на предприятие и приведением указанных модулей в исходное состояние для хранения.After completion of the tests, the test gas medium through the bypass line 13 and the gas supply and return pipe of the gas test medium 12 is returned to the containers 8 of the module 3, being cleaned in the filter 15 (Fig. 3). Then the functional connections between modules 1, 2 and 3 are disconnected and they are loaded onto motor vehicles with delivery to the enterprise and bringing said modules to their original state for storage.

Предлагаемый мобильный стенд для пневматических испытаний обладает улучшенными эксплуатационными характеристиками в части обеспечения возможности безопасного проведения испытаний при более высоких давлениях газовой испытательной среды, чем в прототипе, и возможности многократного использования имеющегося запаса газовой испытательной среды в модуле хранения, что выгодно отличает его от прототипа.The proposed mobile stand for pneumatic testing has improved performance in terms of ensuring the possibility of safe testing at higher pressures of the gas test medium than in the prototype, and the possibility of reusing the existing supply of gas test medium in the storage module, which distinguishes it from the prototype.

Claims (1)

Мобильный стенд для пневматических испытаний, характеризующийся тем, что он выполнен в виде, по меньшей мере, трех конструктивно независимых транспортабельных модулей, имеющих замкнутый жесткий корпус, охватывающий днище, крышу и боковые поверхности модуля, в числе которых модуль сбора данных наблюдения и управления, содержащий аппаратуру управления и наблюдения, а также связанные с ним каналами связи и управления испытательный модуль с размещенными в нем испытываемым объектом, контрольно-измерительными приборами и испытательным оборудованием, включающим компрессор и установленный между компрессором и испытываемым объектом ресивер, посредством которого компрессор подключен к испытываемому объекту, и модуль хранения газовой испытательной среды со встроенными в него емкостями для хранения газовой испытательной среды, причем последние два из упомянутых модулей соединены между собой трубопроводом подачи и возврата газовой испытательной среды, один конец которого присоединен к емкостям для хранения газовой испытательной среды в модуле хранения и распределения газовой испытательной среды, а его другой конец - к компрессору в испытательном модуле, при этом трубопровод подачи и возврата газовой испытательной среды оснащен двумя байпасными линиями, подключенными параллельно с компрессором к ресиверу за компрессором и к трубопроводу перед компрессором, причем в одну байпасную линию встроен фильтр с запорной арматурой на его входе и выходе, а в другую встроен регулирующий клапан подачи газовой испытательной среды.A mobile stand for pneumatic testing, characterized in that it is made in the form of at least three structurally independent transportable modules having a closed rigid body covering the bottom, roof and side surfaces of the module, including a monitoring and control data acquisition module, comprising control and monitoring equipment, as well as associated communication and control channels, a test module with a test object, instrumentation and test equipment in it satisfaction, comprising a compressor and a receiver installed between the compressor and the test object, by means of which the compressor is connected to the test object, and a gas test medium storage module with built-in containers for storing the gas test medium, the last two of which are interconnected by a supply pipe and return of the gas test medium, one end of which is connected to containers for storing the gas test medium in the gas storage and distribution module the test medium, and its other end - to the compressor in the test module, while the gas test medium supply and return pipe is equipped with two bypass lines connected in parallel with the compressor to the receiver behind the compressor and to the pipeline in front of the compressor, and a filter is built into one bypass line with shut-off valves at its inlet and outlet, and a control valve for supplying a gas test medium is built into another.
RU2018116826A 2018-05-04 2018-05-04 Roll-up for pneumatic tests RU2682834C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2018116826A RU2682834C1 (en) 2018-05-04 2018-05-04 Roll-up for pneumatic tests

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2018116826A RU2682834C1 (en) 2018-05-04 2018-05-04 Roll-up for pneumatic tests

Publications (1)

Publication Number Publication Date
RU2682834C1 true RU2682834C1 (en) 2019-03-21

Family

ID=65858550

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2018116826A RU2682834C1 (en) 2018-05-04 2018-05-04 Roll-up for pneumatic tests

Country Status (1)

Country Link
RU (1) RU2682834C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU211835U1 (en) * 2022-03-25 2022-06-27 Орлов Владимир Александрович Laboratory and research bench for the water-air mode of operation of a gravity-flow drainage system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1264042A1 (en) * 1985-01-07 1986-10-15 Государственный Проектно-Изыскательский И Научно-Исследовательский Институт Гражданской Авиации Rig for testing soft shells
UA67967A (en) * 2003-07-24 2004-07-15 Kharkiv Cardiovascular Surgery Unit for pneumatic pulse fatigue strength test of articles
RU2242739C2 (en) * 2003-01-21 2004-12-20 Государственное образовательное учреждение высшего профессионального образования Тюменский государственный нефтегазовый университет Method and device for testing shells
CN103076231A (en) * 2012-03-23 2013-05-01 甘肃蓝科石化高新装备股份有限公司 Mobile hydraulic pressure test machine oil well pipe stabilizing device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1264042A1 (en) * 1985-01-07 1986-10-15 Государственный Проектно-Изыскательский И Научно-Исследовательский Институт Гражданской Авиации Rig for testing soft shells
RU2242739C2 (en) * 2003-01-21 2004-12-20 Государственное образовательное учреждение высшего профессионального образования Тюменский государственный нефтегазовый университет Method and device for testing shells
UA67967A (en) * 2003-07-24 2004-07-15 Kharkiv Cardiovascular Surgery Unit for pneumatic pulse fatigue strength test of articles
CN103076231A (en) * 2012-03-23 2013-05-01 甘肃蓝科石化高新装备股份有限公司 Mobile hydraulic pressure test machine oil well pipe stabilizing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU211835U1 (en) * 2022-03-25 2022-06-27 Орлов Владимир Александрович Laboratory and research bench for the water-air mode of operation of a gravity-flow drainage system

Similar Documents

Publication Publication Date Title
RU2553850C1 (en) Plant to drain liquefied hydrocarbon gases (lhg) from tank car, method of lhg draining from tank car with application of said plant, plant for degassing of said tank car with its application as well as method of lhg draining and tank gas degassing with application of these plants
CN104689499B (en) Aircraft fire extinguishing system attachment detects and device for filling
US9701523B2 (en) Buried pipeline repair system
RU2682834C1 (en) Roll-up for pneumatic tests
CN106813987A (en) Gas cylinder low-temperature test system
US9903783B2 (en) Transportable hose-test containers, systems and methods
CN104865129A (en) Skid-mounted multifunctional anti-blowout pipe pressure test system
US20190249828A1 (en) Module and system for depressurising a cryogenic tank
CN204164588U (en) A kind of petrochemical industry leakage-baffling device
CN103432694A (en) Acid dangerous chemical leakage emergency disposal method and movable type disposal system of acid dangerous chemical leakage emergency disposal method
RU117988U1 (en) MOBILE CONTAINER PUMP UNIT
RU2616038C1 (en) Mobile system for year-round survey of oil and gas wells
CN104890503A (en) CNG gas storage system for forklift
US20140116522A1 (en) Fluid conduit arrangement
CN105372008B (en) Test port for fuel distributor
US20090078323A1 (en) Air discharge device
CN220764708U (en) Emergency cover throwing tester
RU2611119C1 (en) Stand for power plants with used process gas accumulation testing
RU61838U1 (en) MOBILE GAS FILLING COMPLEX
CN203832324U (en) Self-propelled high-pressure nitrogen charging device
CN103935283B (en) Self-propelled high pressure nitrogen charging equipment
RU2252901C1 (en) Method of filling spacecraft hydraulic temperature control system equipped with hydropneumatic compensator with heat-transfer agent and device for realization of this method
US2098529A (en) Method and apparatus for charging blasting cartridges
RU2497731C1 (en) Device to compensate for losses of working medium from hydraulic main line of sealed manned compartment thermal control system and method of its operation
WO2017182717A1 (en) Intermodal fluid tank, system for fluid dispensing and corresponding methods