RU2667242C1 - Method of developing well oil reservoir with horizontal termination - Google Patents
Method of developing well oil reservoir with horizontal termination Download PDFInfo
- Publication number
- RU2667242C1 RU2667242C1 RU2017136227A RU2017136227A RU2667242C1 RU 2667242 C1 RU2667242 C1 RU 2667242C1 RU 2017136227 A RU2017136227 A RU 2017136227A RU 2017136227 A RU2017136227 A RU 2017136227A RU 2667242 C1 RU2667242 C1 RU 2667242C1
- Authority
- RU
- Russia
- Prior art keywords
- well
- horizontal
- sections
- packers
- productive
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000004519 manufacturing process Methods 0.000 claims abstract description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 17
- 238000005553 drilling Methods 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 abstract description 5
- 238000005755 formation reaction Methods 0.000 abstract description 5
- 238000012423 maintenance Methods 0.000 abstract description 4
- BVKZGUZCCUSVTD-UHFFFAOYSA-L Carbonate Chemical compound [O-]C([O-])=O BVKZGUZCCUSVTD-UHFFFAOYSA-L 0.000 abstract description 3
- 238000011161 development Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 244000309464 bull Species 0.000 description 3
- 239000012530 fluid Substances 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000000926 separation method Methods 0.000 description 3
- 239000007788 liquid Substances 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000007747 plating Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Edible Oils And Fats (AREA)
- Earth Drilling (AREA)
Abstract
Description
Изобретение относится к нефтедобывающей промышленности и может найти применение при разработке неоднородных терригенных или карбонатных продуктивных пластов скважинами с горизонтальным окончанием.The invention relates to the oil industry and may find application in the development of heterogeneous terrigenous or carbonate reservoirs with horizontal wells.
Известен способ разработки массивной залежи нефти (патент RU №2443854, МПК Е21В 43/20, Е21В 34/08, опубл. 27.02.2012 в бюл. №6), включающий исследование свойств пласта, бурение нагнетательных скважин и разветвленной добывающей скважины с горизонтальными участками, закачку вытесняющего агента в нагнетательные скважины и отбор продукции через добывающую скважину, при этом два горизонтальных участка добывающей скважины располагают друг над другом в пределах одного продуктивного пласта, проводят исследования горизонтальных участков на продуктивность каждого, после чего между горизонтальными участками устанавливают регулируемый от давления клапан со сменным жиклером в проходном канале, отбор из добывающей скважины осуществляют одним насосом, установленным выше клапана с производительностью больше продуктивности верхнего горизонтального участка, но меньше продуктивности двух участков, при этом клапан выполнен с возможностью разобщения горизонтальных участков при превышении уровнем жидкости в скважине выше максимально допустимого значения, сообщения снизу вверх горизонтальных участков при снижении уровня жидкости ниже минимально допустимого.A known method of developing a massive oil reservoir (patent RU No. 2443854, IPC ЕВВ 43/20, ЕВВ 34/08, published on 02/27/2012 in Bull. No. 6), including the study of reservoir properties, drilling of injection wells and branched production wells with horizontal sections , the injection of the displacing agent into the injection wells and the selection of products through the production well, while two horizontal sections of the producing well are located one above the other within the same reservoir, studies of horizontal sections on the productivity of each second, after which a pressure-controlled valve with a replaceable nozzle is installed in the passageway between the horizontal sections, the selection from the production well is carried out by one pump installed above the valve with a productivity higher than the productivity of the upper horizontal section, but less than the productivity of two sections, while the valve is made with the possibility uncoupling of horizontal sections when the liquid level in the well exceeds the maximum allowable value, messages from bottom to top of horizontal tkov when the liquid level below the minimum.
Недостатками данного способа являются:The disadvantages of this method are:
- узкая область применения из-за реализации без учета зональной неоднородности только в пластах массивного типа;- narrow scope due to implementation without taking into account zonal heterogeneity only in massive formations;
- высокая стоимость реализации из-за необходимости использования двух горизонтальных участков скважины.- high cost of sales due to the need to use two horizontal sections of the well.
Известен также способ разработки нефтяного пласта скважиной с горизонтальным окончанием (патент RU №2590918, МПК Е21В 43/16, Е21В 43/12, Е21В 43/25, опубл. 10.07.2016 в бюл. №19), включающий бурение или выбор уже пробуренной горизонтальной скважины, выделение по горизонтальному стволу интервалов продуктивного пласта, различающихся по свойствам, спуск в скважину колонны насосно-компрессорных труб с пакером, разделение интервалов продуктивного пласта пакером, спуск в скважину насоса, регулирующих устройств в виде электрических клапанов и манометров-термометров, подъем продукции на поверхность насосом по внутритрубному пространству, при этом предварительно между интервалами продуктивного пласта устанавливают оборудование локального крепления скважины, в скважину спускают компоновку, состоящую из пакера, колонны насосно-компрессорных труб, корпуса клапанного оборудования с расположенными в нем нижним электрическим клапаном для регулирования притока по колонне насосно-компрессорных труб, манометром-термометром для замера давления в колонне насосно-компрессорных труб перед корпусом, верхним электрическим клапаном для регулирования притока из затрубного пространства в полость корпуса, манометром-термометром для замера давления в затрубном пространстве и манометром-термометром для замера давления всасывания насоса, и колонны насосно-компрессорных труб до устья скважины, проводят освоение скважины в три этапа с отбором продукции по колонне насосно-компрессорных труб и затрубному пространству, только по колонне насосно-компрессорных труб и затем только по затрубному пространству, анализируют результаты замеров дебитов и обводненности продукции, эксплуатируют интервал скважины с меньшей обводненностью при остановке эксплуатации интервала с большей обводненностью при начальном повышенном дебите до снижения забойного давления и уровня жидкости ниже оптимального и при последующем рабочем дебите с поддержанием стабильным забойного давления, скважину эксплуатируют до превышения обводненности продукции из эксплуатируемого интервала обводненности продукции из второго интервала и затем эксплуатируют оба интервала одновременно, поддерживают обводненность обоих интервалов на одинаковом уровне.There is also a method of developing an oil reservoir with a horizontal completion well (patent RU No. 2590918, IPC ЕВВ 43/16, ЕВВ 43/12, Е21В 43/25, published on July 10, 2016 in Bull. No. 19), including drilling or selecting an already drilled horizontal well, allocation of horizontal intervals of the reservoir, differing in properties, descent of the tubing string with the packer into the well, separation of the intervals of the reservoir by the packer, descent of the pump into the well, control devices in the form of electric valves and manometers-thermometer s, raising the product to the surface by the pump along the in-pipe space, and then, between the intervals of the reservoir, the equipment for local fastening of the well is installed, the assembly consisting of a packer, tubing string, valve equipment body with a lower electric valve located in it is lowered into the well regulating the inflow along the tubing string, pressure gauge-thermometer for measuring pressure in the tubing string in front of the housing, ver with an electric valve for regulating the inflow from the annulus into the cavity of the body, a manometer-thermometer for measuring pressure in the annulus and a manometer-thermometer for measuring the suction pressure of the pump, and the string of tubing to the wellhead, the well is developed in three stages with selection products for the tubing string and annulus, only for the tubing string and then only for the annulus, analyze the flow rate measurements in and water cut, exploit the interval of the well with less water cut when stopping the operation of the interval with greater water cut at the initial increased flow rate until the bottomhole pressure drops and the fluid level is below the optimum and with the subsequent production flow rate while maintaining stable bottom hole pressure, the well is operated until the water cut from the production well is exceeded water cut interval from the second interval and then operate both intervals at the same time, support water cut nnosti both slots at the same level.
Недостатками данного способа являются:The disadvantages of this method are:
- сложность установки и ремонта из-за большого количества технически и технологически сложных взаимосвязанных конструктивных элементов, устанавливаемых в скважине, а при неисправности одного из элементов необходимо извлечение всей конструкции с остановкой добычи из скважины;- the complexity of installation and repair due to the large number of technically and technologically complex interconnected structural elements installed in the well, and if one of the elements fails, it is necessary to remove the entire structure with stopping production from the well;
- сложное управление из-за необходимости согласованного управления как насосом, так и клапанами;- complex control due to the need for coordinated control of both the pump and valves;
- большие временные и материальные затраты на изготовление, спуск и ремонт конструктивных элементов при реализации способа.- large time and material costs for the manufacture, descent and repair of structural elements during the implementation of the method.
Наиболее близким является способ разработки нефтяного пласта скважинами с горизонтальным окончанием (патент RU №2540720, МПК Е21В 43/16, опубл. 10.02.2015 в бюл. №4), включающий бурение или выбор уже пробуренных горизонтальных скважин, выделение участков в виде интервалов продуктивного пласта, спуск в скважину насоса, разделение участков пакерами и отбор продукции скважины из каждого участка, при этом при разработке терригенного или карбонатного пласта предварительно в горизонтальном стволе скважины определяют профиль притока, выявляют участки с профилем притока, отличающиеся друг от друга по удельному дебиту нефти на 20% и более, в местах изменения профиля притока устанавливают пакеры, в центр каждого участка спускают на колонне труб один насос при максимальном расстоянии между насосами в горизонтальном стволе не более 200 м, насосы размещают последовательно на одной колонне труб, каждый последующий насос от конца горизонтального ствола к его началу выбирают из условия обеспечения дебита жидкости не менее суммы дебитов жидкости предыдущих насосов.The closest is a method of developing an oil reservoir with horizontal completion wells (patent RU No. 2540720, IPC ЕВВ 43/16, published on 02/10/2015 in bull. No. 4), including drilling or selection of already drilled horizontal wells, allocation of sections in the form of productive intervals formation, descent into the well of the pump, separation of sections by packers and selection of well products from each section, while during the development of a terrigenous or carbonate formation, the inflow profile is determined previously in the horizontal wellbore, sections with Ofil inflows, differing in specific oil flow rate by 20% or more, packers are installed in places where inflow profile changes, one pump is lowered into the center of each section at a pipe string with a maximum distance between pumps in a horizontal well of not more than 200 m, pumps are placed sequentially on one pipe string, each subsequent pump from the end of the horizontal shaft to its beginning is selected from the condition that the fluid flow rate is not less than the sum of the fluid flow rates of the previous pumps.
Недостатками данного способа являются:The disadvantages of this method are:
- сложность установки и ремонта из-за большого количества насосов, устанавливаемых в скважине, а при неисправности одного из насосов необходимо извлечение всей конструкции с остановкой добычи из скважины;- the complexity of installation and repair due to the large number of pumps installed in the well, and if one of the pumps fails, it is necessary to remove the entire structure with stopping production from the well;
- сложное управление из-за необходимости согласованного управления насосами;- complex control due to the need for coordinated pump control;
- большие временные и материальные затраты на изготовление, спуск и ремонт насосов при реализации способа.- large time and material costs for the manufacture, launching and repair of pumps during the implementation of the method.
Технической задачей предполагаемого изобретения является создание дешевого и технологичного способа разработки нефтяного пласта скважиной с горизонтальным окончанием, позволяющего производить спуск, ремонт, обслуживание спущенных конструктивных элементов.The technical task of the alleged invention is the creation of a cheap and technologically advanced method of developing an oil reservoir with a horizontal end well, which allows lowering, repair, maintenance of deflated structural elements.
Техническая задача решается способом разработки нефтяного пласта скважиной с горизонтальным окончанием, включающим бурение или выбор уже пробуренных горизонтальных скважин, выделение участков в виде интервалов продуктивного пласта с профилем притока, отличающихся друг от друга по удельному дебиту нефти на 20% и более, разделение участков пакерами, спуск в скважину насоса и отбор продукции скважины из каждого участка с поддержанием одинаковой обводненности на участках, причем за счет клапанов и/или жиклеров пакеров уменьшают отборы высокопродуктивных участков и выравнивают фронт заводнения около горизонтального окончания скважины, чем удлиняют эксплуатацию скважины в заданном режиме для обеспечения отбора дополнительной продукции.The technical problem is solved by a method of developing an oil reservoir with a horizontal end well, including drilling or selecting already drilled horizontal wells, identifying sections in the form of intervals of the reservoir with an inflow profile that differ from each other in specific oil production by 20% or more, separating the sections with packers, the descent into the well of the pump and the selection of well production from each section while maintaining the same water cut in the sections, and due to valves and / or packer nozzles, the high near-productive sections and even out the waterflooding front near the horizontal end of the well, which lengthens well operation in a given mode to ensure the selection of additional products.
Новым является то, что бурят горизонтальные окончания скважин или выбирают горизонтальные скважины так, чтобы их наиболее продуктивные участки в горизонтальных скважинах располагались последовательно ближе к забою, по мере обводнения продукции наиболее обводненные и продуктивные участки последовательно от забоя отсекают проходными пакерами с регулируемыми клапанами и/или жиклерами, позволяющими поддерживать одинаковую обводненность продукции по всей длине горизонтального окончания скважины при добыче одним насосом, располагаемым над ближним к устью из установленных пакеров.What is new is that horizontal wells are drilled or horizontal wells are selected so that their most productive sections in horizontal wells are located sequentially closer to the bottom, as waterlogging products, the most flooded and productive sections are sequentially cut from the bottom by passage packers with adjustable valves and / or jets, allowing to maintain the same water cut of the product along the entire length of the horizontal end of the well during production by one pump, are located over near to the mouth of the installed packers.
На чертеже изображена схема реализации способа.The drawing shows a diagram of the implementation of the method.
Способ реализуется следующим образом.The method is implemented as follows.
Способ разработки нефтяного пласта 1 скважиной 2 с горизонтальным окончанием 3 включает бурение или выбор уже пробуренных горизонтальных скважин 2, выделение участков 4, 5 и 6 в виде интервалов продуктивного пласта 1 с профилем притока, отличающихся друг от друга по удельному дебиту нефти на 20% и более, разделение участков пакерами 7 и 8, спуск в скважину 2 насоса 9 и отбор продукции скважины 1 из каждого участка 4, 5 и 6 с поддержанием одинаковой обводненности на этих участках 4, 5 и 6. При этом бурят горизонтальные окончания 3 скважины 2 или выбирают горизонтальные скважины 2 так, чтобы их наиболее продуктивные участки 4 и 5 (продуктивность участка 4 выше участка 5, а участка 5 - участка 6) в горизонтальных окончаниях 3 скважин 2 располагались последовательно ближе к забою скважины 2. По мере обводнения продукции (более 90%) наиболее обводненные и продуктивные участки сначала 4, а потом и 5 последовательно от забоя отсекают проходными пакерами 7 и 8 соответственно с регулируемыми и съемными клапанами и/или жиклерами 10 и 11 (показаны условно), позволяющими поддерживать одинаковую обводненность продукции за счет регулируемого отбора по всей длине горизонтального окончания 3 скважины 2 при добыче одним насосом 9, располагаемым над ближним к устью из установленных пакеров - пакера 7 сначала, а потом пакера 8. Регулируемое уменьшение отбора благодаря клапанам и/или жиклерам 10 и 11 пакеров 7 и 8 из высокопродуктивных участков 4 или 4 и 5 приводит к выравниванию фронта заводнения около горизонтального окончания 3 скважины 2 и более длительной эксплуатации скважины 2 в рентабельном режиме, без отсечения участков 4 или 4 и 5 и без проведения в них водоизоляционных работ, что экономит материальные и временные затраты, а отбор продукции из горизонтального окончания 3 скважины 2 позволяет добыть дополнительные объемы продукции нефтяного пласта 1. Регулируемые клапаны и/или жиклеры 10 и 11 могут изготавливаться по любой из известных конструкций (см патенты RU №№2441141, 2443854 или т.п.). При выходе из строя или при необходимости регулировки клапанов и/или жиклеров 10 и 11 их извлекают известными труболовками (см. патенты RU №№45769, 43577, 40379 или т.п.) после извлечения насоса 9 и заменяют на клапаны и/или жиклеры 10 и 11 с требуемой пропускной способностью (определяется эмпирическим путем), с последующей установкой на место. Чаще всего выходят из строя насосы 9, но их извлечение, ремонт и замена происходят в штатном режиме, как и при эксплуатации скважин 2 без установленных пакеров 7 и 8.A method of developing an
Предлагаемый способ разработки нефтяного пласта скважиной с горизонтальным окончанием наиболее экономически и технологически эффективен, при этом позволяет производить стандартный, технологически несложный процесс спуска, ремонт, обслуживание спущенных конструктивных элементов.The proposed method of developing an oil reservoir with a horizontal well is the most economically and technologically efficient, while it allows for the production of a standard, technologically uncomplicated descent process, repair, and maintenance of deflated structural elements.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2017136227A RU2667242C1 (en) | 2017-10-12 | 2017-10-12 | Method of developing well oil reservoir with horizontal termination |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2017136227A RU2667242C1 (en) | 2017-10-12 | 2017-10-12 | Method of developing well oil reservoir with horizontal termination |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2667242C1 true RU2667242C1 (en) | 2018-09-18 |
Family
ID=63580494
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2017136227A RU2667242C1 (en) | 2017-10-12 | 2017-10-12 | Method of developing well oil reservoir with horizontal termination |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2667242C1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2747200C1 (en) * | 2020-07-28 | 2021-04-29 | Общество с ограниченной ответственностью "Карбон-Ойл" | Method of oil reservoir development |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5335732A (en) * | 1992-12-29 | 1994-08-09 | Mcintyre Jack W | Oil recovery combined with injection of produced water |
RU2539486C1 (en) * | 2014-03-17 | 2015-01-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method for oil development with horizontal wells |
RU2540720C1 (en) * | 2014-02-10 | 2015-02-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Development of oil seam by horizontal well extensions |
RU2544207C1 (en) * | 2014-03-03 | 2015-03-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Development of oil seam by horizontal multihole wells |
RU2605860C1 (en) * | 2015-10-29 | 2016-12-27 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method of developing oil deposit by horizontal wells |
RU2616052C1 (en) * | 2016-05-05 | 2017-04-12 | Публичное акционерное общество "Татнефть" им. В.Д. Шашина | Method development of shaly carbonate oil pays |
-
2017
- 2017-10-12 RU RU2017136227A patent/RU2667242C1/en active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5335732A (en) * | 1992-12-29 | 1994-08-09 | Mcintyre Jack W | Oil recovery combined with injection of produced water |
RU2540720C1 (en) * | 2014-02-10 | 2015-02-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Development of oil seam by horizontal well extensions |
RU2544207C1 (en) * | 2014-03-03 | 2015-03-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Development of oil seam by horizontal multihole wells |
RU2539486C1 (en) * | 2014-03-17 | 2015-01-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method for oil development with horizontal wells |
RU2605860C1 (en) * | 2015-10-29 | 2016-12-27 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method of developing oil deposit by horizontal wells |
RU2616052C1 (en) * | 2016-05-05 | 2017-04-12 | Публичное акционерное общество "Татнефть" им. В.Д. Шашина | Method development of shaly carbonate oil pays |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2747200C1 (en) * | 2020-07-28 | 2021-04-29 | Общество с ограниченной ответственностью "Карбон-Ойл" | Method of oil reservoir development |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2328590C1 (en) | Separate maintenance process for injection or production well and implementation variants | |
RU2015156402A (en) | METHOD OF IMPROVED PRODUCTION OF HYDROCARBONS USING MULTIPLE ARTIFICIALLY EDUCATED CRACKS | |
RU2558058C1 (en) | Interval hydraulic fracturing of carbonate formation in horizontal wellbore with bottom water | |
RU2363839C1 (en) | Procedure for development of high viscous oil deposits | |
RU2483209C1 (en) | Method of hydraulic fracturing of well formation | |
RU2334867C1 (en) | Method of simultaneous-separate operation of several payout beds and installation of well for implementation of this method | |
RU2417306C1 (en) | Procedure for development of oil deposit | |
US8668011B2 (en) | Method of hydraulically fracturing a formation | |
RU2667242C1 (en) | Method of developing well oil reservoir with horizontal termination | |
RU2506417C1 (en) | Development method of high-viscosity oil deposit | |
RU2599156C1 (en) | Method of interval treatment of bottom hole zone of horizontal well shaft | |
RU2418162C1 (en) | Method for improving permeability of bed during extraction of high-viscosity oil | |
RU2339807C1 (en) | Method of extraction of heavy and high viscous hydrocarbons from undeground deposits | |
US10544663B2 (en) | Method of well completion | |
RU2620099C1 (en) | Method of increasing productivity of development wells and injection capacity of injection wells | |
RU2339808C1 (en) | Method for extraction of heavy and high viscous hydrocarbons out of underground deposit | |
RU2680158C1 (en) | Method of formation geomechanical impact | |
US20110203792A1 (en) | System, method and assembly for wellbore maintenance operations | |
RU2505668C1 (en) | Method of developing oil pool using horizontal multibranch wells | |
RU2425961C1 (en) | Well operation method | |
RU2708747C1 (en) | Method for multiple hydraulic fracturing of formation in horizontal borehole of well | |
RU2363838C1 (en) | Procedure for development of bitumen deposits | |
RU2724715C1 (en) | Operating method of water-flooded oil formation | |
RU2315166C1 (en) | Well construction method | |
RU2584435C1 (en) | Method of developing oil deposits |