RU2659295C1 - Method of development of a poorly explored oil field - Google Patents
Method of development of a poorly explored oil field Download PDFInfo
- Publication number
- RU2659295C1 RU2659295C1 RU2017127807A RU2017127807A RU2659295C1 RU 2659295 C1 RU2659295 C1 RU 2659295C1 RU 2017127807 A RU2017127807 A RU 2017127807A RU 2017127807 A RU2017127807 A RU 2017127807A RU 2659295 C1 RU2659295 C1 RU 2659295C1
- Authority
- RU
- Russia
- Prior art keywords
- wells
- reservoir
- drilling
- oil
- grid
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 238000011161 development Methods 0.000 title abstract description 7
- 238000005553 drilling Methods 0.000 claims abstract description 23
- 238000004519 manufacturing process Methods 0.000 claims abstract description 16
- 238000002347 injection Methods 0.000 claims abstract description 8
- 239000007924 injection Substances 0.000 claims abstract description 8
- 238000013461 design Methods 0.000 claims abstract description 6
- 238000011084 recovery Methods 0.000 claims abstract description 5
- 238000007789 sealing Methods 0.000 claims abstract description 4
- 238000006073 displacement reaction Methods 0.000 claims abstract description 3
- 238000005056 compaction Methods 0.000 claims description 6
- 239000003795 chemical substances by application Substances 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract 1
- 239000012530 fluid Substances 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 241000499489 Castor canadensis Species 0.000 description 1
- 235000011779 Menyanthes trifoliata Nutrition 0.000 description 1
- 230000004308 accommodation Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- Acoustics & Sound (AREA)
- Remote Sensing (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
Предложение относится к нефтегазодобывающей промышленности и может быть использовано при разработке нефтяной малоразведанной залежи.The proposal relates to the oil and gas industry and can be used in the development of undeveloped oil deposits.
Известен способ поиска и разведки многопластовых залежей нефти (патент RU №2159944, МПК G01V /00, опубл. в бюл. №33 от 27.11.2000 г.), приуроченных к складкам, характеризующимся смещением сводов нижнего и верхнего этажей разведки, включающий на основе данных сейсморазведки бурение поисковой скважины, заложенной в своде локального поднятия, подготовленного по верхнему этажу разведки до базисного горизонта и на основе статистического анализа геолого-геофизических материалов по соотношению контуров и сводов нижнего и верхнего этажей нефтеносности, осуществляют опоискование нижнего этажа разведки путем проводки разведочной скважины, которую бурят по восстанию слоев в профиле с поисковой скважиной на расстоянии 0.7-1.5 км от нее. Опоискование нижнего этажа разведки осуществляют выборочным углублением добывающих скважин из утвержденной технологической схемы разработки залежи на верхний этаж разведки.A known method for the search and exploration of multilayer oil deposits (patent RU No. 2159944, IPC G01V / 00, published in Bulletin No. 33 of 11/27/2000), confined to folds, characterized by the displacement of the arches of the lower and upper floors of exploration, including on the basis of seismic data drilling a prospecting well laid in the local elevation arch prepared along the upper exploration floor to the base horizon and based on statistical analysis of geological and geophysical materials based on the ratio of the contours and arches of the lower and upper oil levels, They search for the lower floor of the exploration by drilling an exploratory well, which is drilled according to the uprising of layers in the profile with a prospecting well at a distance of 0.7-1.5 km from it. The search for the lower floor of the exploration is carried out by selective deepening of production wells from the approved technological scheme for the development of deposits on the upper floor of the exploration.
Недостатками данного способа является то, что он не предусматривает оптимизацию размещения добывающих и нагнетательных скважин, а это влечет за собой большие финансовые затраты и бурение нерентабельных скважин.The disadvantages of this method is that it does not provide optimization of the placement of production and injection wells, and this entails high financial costs and drilling unprofitable wells.
Наиболее близким по технической сущности и достигаемому результату является способ разработки нефтяной малоразведанной залежи (патент RU №2447270, МПК Е21В 43/16, опубл. в бюл. №10 от 10.04.2012 г.), включающий разбуривание залежи редкой сеткой проектных скважин, отбор продукции через добывающие скважины и нагнетание рабочего агента через нагнетательные скважины. В пробуренной скважине проводят детализационные сейсмоисследования методом вертикального сейсмопрофилирования в направлении повышенных гипсометрических отметок структуры по трем направлениям, расходящимся не более чем на 60° и в длину не более 600 м, уточняют прогнозный структурный план продуктивного пласта, выделяют участки повышения гипсометрических отметок, при подтверждении прогнозного структурного плана по результатам исследований проектную скважину бурят в направлении сейсмопрофилей в зону повышенных гипсометрических отметок на расстоянии 300-400 м от пробуренной, при неподтверждении прогнозного структурного плана переразмещают проектную скважину в зону повышенных гипсометрических отметок по новому структурному плану и бурят в новом месте, скорректированном по результатам вертикального сейсмопрофилирования и наличию рентабельной нефтенасыщенной толщины не менее двух метров, обсаживают скважину и осваивают в качестве добывающей в сводовой и/или присводовой частях структур, контролирующих залежь нефти и/или нагнетательной в пониженных частях структур, в приконтурной области и не менее 70 м от контура нефтеносности, по результатам бурения корректируют размещение проектного фонда скважин.The closest in technical essence and the achieved result is a method of developing an underexplored oil reservoir (patent RU No. 2447270, IPC ЕВВ 43/16, published in bulletin No. 10 of 04/10/2012), including drilling a reservoir with a rare grid of design wells, selection production through production wells and injection of a working agent through injection wells. In a drilled well, detailed seismic surveys are carried out using the vertical seismic profiling method in the direction of elevated hypsometric marks of the structure in three directions diverging by no more than 60 ° and no more than 600 m in length, the forecast structural plan of the productive formation is clarified, areas for increasing the hypsometric marks are identified, with confirmation of the forecast structural plan based on the research results, the project well is drilled in the direction of seismic profiles in the zone of elevated hypsometric marks to a distance of 300-400 m from the drilled one, if the forecast structural plan is not confirmed, the project well is moved to the zone of elevated hypsometric marks according to the new structural plan and drilled in a new location, adjusted according to the results of vertical seismic profiling and the presence of cost-effective oil-saturated thickness of at least two meters, casing the well and master as mining in the vaulted and / or arched parts of the structures that control the oil and / or injection reservoir in the lower parts of the structures, rikonturnoy region and not less than 70 m from the oil-bearing circuit, according to the results of drilling corrected accommodation design wells.
Недостатком данного способа является то, что он не учитывает условия проведения детализационных сейсмоисследований методом вертикального сейсмопрофилирования на залежах нефти разбуренных наклонно-направленными скважинами.The disadvantage of this method is that it does not take into account the conditions for conducting detailed seismic surveys by the method of vertical seismic profiling in oil deposits drilled by directional wells.
Технической задачей является повышение технологической и экономической эффективности разработки залежи нефти, за счет повышения достоверности информации о прогнозных гипсометрических отметках кровли эксплуатационного объекта, подтверждаемое прогнозной толщиной по вертикали в наклонно-направленных скважинах для размещения проектного фонда скважин и/или уплотнения проектной сетки.The technical task is to increase the technological and economic efficiency of the development of oil deposits, by increasing the reliability of the information about the predicted hypsometric marks of the roof of the production facility, confirmed by the predicted vertical thickness in directional wells to accommodate the project fund of wells and / or compaction of the design grid.
Технический результат, который может быть получен при осуществлении заявленного способа, - увеличить успешность бурения рентабельных скважин существующей сетки или ее уплотнения.The technical result that can be obtained by implementing the inventive method is to increase the success of drilling cost-effective wells of an existing grid or its compaction.
Новым является то, что в наклонно-направленной скважине в купольной или прикупольной зоне со смещением забоя от устья не более 200 метров проводят детализационные сейсмоисследования методом непродольного вертикального сейсмопрофилирования (НВСП) с разводом профилей на 50° по кругу, уточняют прогнозный структурный план продуктивного пласта, проводят уплотнение существующей сетки добывающих скважин бурением дополнительного количества скважин малого диаметра, причем закладывают скважины к бурению по уплотняющей сетке на толщины 4 и более метров с расстоянием между скважинами 150 метров, а на толщины менее 4 метров с расстоянием между скважинами 300 метров, тем самым увеличивают КИН на 7%.New is that in a directional well in a domed or domed zone with a bottom offset from the mouth of no more than 200 meters, detailed seismic surveys are carried out using the non-longitudinal vertical seismic profiling method (NVSP) with a profile separation of 50 ° in a circle, and the forecast structural plan of the reservoir is specified, compaction of the existing grid of production wells is carried out by drilling an additional number of small diameter wells, and wells are laid for drilling along the sealing grid to a thickness of 4 and more meters with the distance between the wells 150 meters, and a thickness of less than 4 meters with the distance between the wells 300 meters, thereby increasing the recovery factor of 7%.
Сущность изобретения в том, что на этапе проектирования при составлении проектного документа, когда решается вопрос об определении для каждого эксплуатационного объекта рационального размещения добывающих и нагнетательных скважин на основе структурного плана продуктивного пласта, имеет место дефицит исходной информации, поскольку эта информация получена по редкой сетке разведочных скважин, а в залежах малых размеров возможно по единственной пробуренной скважине. Поэтому ошибочное представление о прогнозном структурном плане, его гипсометрических отметках, о свойствах коллектора приводят к недостаточно точному определению местоположения поднятия, контролирующего залежь, толщины продуктивного пласта. Размещение и бурение добывающих и нагнетательных скважин на основании полученных данных снижает эффективность разбуривания залежей, выбора системы разработки и повышает финансовые затраты. В предложенном способе решается задача увеличения успешности бурения рентабельных скважин существующей сетки или ее уплотнения.The essence of the invention is that at the design stage during the preparation of the project document, when it is decided to determine for each production facility the rational distribution of production and injection wells based on the structural plan of the reservoir, there is a shortage of initial information, since this information was obtained from a rare grid of exploration wells, and in small deposits it is possible for a single drilled well. Therefore, an erroneous idea of the predicted structural plan, its hypsometric marks, and reservoir properties lead to insufficiently accurate determination of the location of the uplift that controls the reservoir and the thickness of the reservoir. The location and drilling of production and injection wells on the basis of the data obtained reduces the efficiency of drilling deposits, choosing a development system and increases financial costs. The proposed method solves the problem of increasing the success of drilling cost-effective wells of the existing grid or its compaction.
Способ осуществляют в следующей последовательности.The method is carried out in the following sequence.
Разрабатывают нефтяную залежь в терригенных отложениях бобрикового горизонта со следующими характеристиками: глубина 1180 м, пластовая температура 25°С, пластовое давление 12,0 МПа, средняя пористость 24%, средняя проницаемость 0,210 мкм2, вязкость нефти в пластовых условиях 89,7 мПа*с, плотность нефти 0,923 т/м3. Залежь пластовосводовая.An oil reservoir is developed in terrigenous sediments of the beaver horizon with the following characteristics: depth 1180 m, reservoir temperature 25 ° C, reservoir pressure 12.0 MPa, average porosity 24%, average permeability 0.210 μm 2 , oil viscosity at reservoir conditions 89.7 MPa * s, oil density 0.923 t / m 3 . Plastovodovy deposit.
Залежь оконтурена внешним контуром нефтеносности 1. Первоначально залежь разбуривают одной наклонно-направленной добывающей скважиной 2. Осуществляют ее обустройство и вводят в эксплуатацию. Дебит вязкой безводной нефти составил 7 т/сут. Строят структурный план 3 продуктивного пласта, используя данные бурения и сейсмоисследований 2Д. Из построений следует, что на значительной части залежи структурный план построен исходя из данных сейсмоисследований 2Д с плотностью сейсмопрофилей 4, 5 равной 3,1 п. км/км2 и расстоянием между ними 600-1200 метров и полностью отсутствует детализация по свойствам коллектора. Поэтому дальнейшее разбуривание залежи представляет большие геологические риски.The deposit is contoured by an external oil-bearing circuit 1. Initially, the deposit is drilled with a single directional production well 2. It is equiped and put into operation. The flow rate of viscous anhydrous oil was 7 tons / day. Build a structural plan 3 of the reservoir, using data from drilling and 2D seismic surveys. It follows from the constructions that in a significant part of the reservoir, the structural plan was built on the basis of 2D seismic data with a density of
В добывающей наклонно-направленной скважине 2 в купольной или прикупольной зоне со смещением забоя от устья не более 200 метров проводят детализационные сейсмоисследования методом непродольного вертикального сейсмопрофилирования (НВСП) с разводом профилей 6-10 на 50° по кругу. После проведения вертикального сейсмопрофилирования и по его результатам уточняют структурный план по кровле продуктивного пласта участка залежи, где закладывают скважины 11 к бурению по уплотняющей сетки на толщины 4 и более метров 12 с расстоянием между скважинами 150 метров, а на толщины менее 4 метров 13 с расстоянием между скважинами 300 метров. Проводят уплотнение существующей сетки добывающих скважин бурением дополнительного количества скважин малого диаметра, тем самым увеличивают КИН на 7%.In an producing
Использование предлагаемого способа разработки нефтяной малоразведанной залежи позволяет исключить бурение пустых и обводненных скважин и увеличить КИН.Using the proposed method for developing an underexplored oil reservoir allows to exclude drilling of empty and flooded wells and increase the oil recovery factor.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2017127807A RU2659295C1 (en) | 2017-08-03 | 2017-08-03 | Method of development of a poorly explored oil field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2017127807A RU2659295C1 (en) | 2017-08-03 | 2017-08-03 | Method of development of a poorly explored oil field |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2659295C1 true RU2659295C1 (en) | 2018-06-29 |
Family
ID=62815807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2017127807A RU2659295C1 (en) | 2017-08-03 | 2017-08-03 | Method of development of a poorly explored oil field |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2659295C1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112069701A (en) * | 2019-05-22 | 2020-12-11 | 中国石油天然气股份有限公司 | Oil reservoir development method and device |
RU2760112C1 (en) * | 2021-05-27 | 2021-11-22 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method for developing oil deposits with low-permeability reservoirs |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5058012A (en) * | 1989-02-07 | 1991-10-15 | Marathon Oil Company | Method of extrapolating reservoir performance |
RU2333349C1 (en) * | 2007-01-09 | 2008-09-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method of development of oil field |
RU2334087C1 (en) * | 2007-01-26 | 2008-09-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method of development of oil pools obstructed by erosion trench |
RU2447270C1 (en) * | 2011-05-27 | 2012-04-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method to develop low-explored oil deposit |
RU2546704C1 (en) * | 2014-04-15 | 2015-04-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Less explored oil deposit development method |
RU2587661C1 (en) * | 2015-09-24 | 2016-06-20 | Публичное акционерное общество "Татнефть" им. В.Д. Шашина | Method for development of explored oil deposit |
-
2017
- 2017-08-03 RU RU2017127807A patent/RU2659295C1/en active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5058012A (en) * | 1989-02-07 | 1991-10-15 | Marathon Oil Company | Method of extrapolating reservoir performance |
RU2333349C1 (en) * | 2007-01-09 | 2008-09-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method of development of oil field |
RU2334087C1 (en) * | 2007-01-26 | 2008-09-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method of development of oil pools obstructed by erosion trench |
RU2447270C1 (en) * | 2011-05-27 | 2012-04-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method to develop low-explored oil deposit |
RU2546704C1 (en) * | 2014-04-15 | 2015-04-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Less explored oil deposit development method |
RU2587661C1 (en) * | 2015-09-24 | 2016-06-20 | Публичное акционерное общество "Татнефть" им. В.Д. Шашина | Method for development of explored oil deposit |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112069701A (en) * | 2019-05-22 | 2020-12-11 | 中国石油天然气股份有限公司 | Oil reservoir development method and device |
RU2760112C1 (en) * | 2021-05-27 | 2021-11-22 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method for developing oil deposits with low-permeability reservoirs |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109577982B (en) | Wall type continuous mining and continuous filling water-retaining coal mining and water resource migration monitoring and water damage early warning method | |
CN103902780B (en) | Solid filling coal mining earth's surface Deformation prediction method | |
CN102272414B (en) | Method for optimizing well production in reservoirs having flow barriers | |
RU2339801C2 (en) | Method for development of multi-horizon non-uniform oil fields by means of branched horizontal wells | |
RU2382183C1 (en) | Multi zone oil reservoir at late stage with unstable cover formation and non-homogeneous collector development method | |
RU2447270C1 (en) | Method to develop low-explored oil deposit | |
RU2587661C1 (en) | Method for development of explored oil deposit | |
RU2672292C1 (en) | Method for oil deposit development with horizontal wells with multi-stage fracing | |
RU2678337C1 (en) | Multi-layer deposits with hard-to-recover oil reserves development method by the compacting grid method | |
RU2659295C1 (en) | Method of development of a poorly explored oil field | |
Liu et al. | A prediction model and numerical simulation of the location of the longwall face during the highest possible failure period of gob gas ventholes | |
RU2474678C1 (en) | Development method of oil deposit with horizontal wells | |
Wu et al. | Key technologies and orientation of EGR for the Sulige tight sandstone gas field in the Ordos Basin | |
EA010964B1 (en) | Identifying a stress anomaly in a subsurface region | |
CN110851991B (en) | Underground water flow numerical simulation method | |
RU2443855C1 (en) | Development method of oil deposit with layer-by-layer heterogeneity | |
RU2431038C1 (en) | Procedure for development of deposit of oil in layerd reservoirs | |
CN108921350B (en) | Metal mine goaf overlying rock mass movement space-time law prediction method | |
RU2546704C1 (en) | Less explored oil deposit development method | |
RU2536523C1 (en) | Development of multi-zone gas field | |
RU2524703C1 (en) | Development of minor oil deposits | |
RU2285795C1 (en) | Oil deposit development method | |
RU2477792C1 (en) | Method for defining height of water conveying cracks zone over mined-out area at stratified deposits | |
Guarascio et al. | Numerical model simulation of the subsidence induced by solution mining cavities | |
RU2447272C1 (en) | Method of massive deposit development |