RU2620670C1 - Method of limitation of produced water inflow to production well - Google Patents

Method of limitation of produced water inflow to production well Download PDF

Info

Publication number
RU2620670C1
RU2620670C1 RU2016122120A RU2016122120A RU2620670C1 RU 2620670 C1 RU2620670 C1 RU 2620670C1 RU 2016122120 A RU2016122120 A RU 2016122120A RU 2016122120 A RU2016122120 A RU 2016122120A RU 2620670 C1 RU2620670 C1 RU 2620670C1
Authority
RU
Russia
Prior art keywords
water
density
diesel fuel
production
insulating material
Prior art date
Application number
RU2016122120A
Other languages
Russian (ru)
Inventor
Габдрашит Султанович Абдрахманов
Раис Салихович Хисамов
Рамзис Рахимович Кадыров
Марс Талгатович Ханнанов
Дильбархон Келамединовна Хасанова
Original Assignee
Публичное акционерное общество "Татнефть" им. В.Д.Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Публичное акционерное общество "Татнефть" им. В.Д.Шашина filed Critical Публичное акционерное общество "Татнефть" им. В.Д.Шашина
Priority to RU2016122120A priority Critical patent/RU2620670C1/en
Application granted granted Critical
Publication of RU2620670C1 publication Critical patent/RU2620670C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/32Preventing gas- or water-coning phenomena, i.e. the formation of a conical column of gas or water around wells
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/46Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
    • C09K8/467Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement containing additives for specific purposes
    • C09K8/487Fluid loss control additives; Additives for reducing or preventing circulation loss

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

FIELD: oil-and-gas industry.
SUBSTANCE: invention relates to oil and gas industry, in particular to methods of water insulation works in the production wells. According to the method the operation string is perforated against production zone. A highly permeable shield is formed in additionally perforated through the operation string top part of the aquiferous zone. This is performed by water insulating material delivery to this zone. Preliminary prior to stimulation of the formation fluids inflow the perforation interval of production and aquiferous zones is separated by a packer installation. In the operation string additionally tubing string is lowered till tight fixation of tubing lower part in the packer. The tubing string is partially filled with insulating material. As insulating material 10-15% paraffin solution in diesel fuel is used with density below water density in the aquiferous stratum. After paraffin solution in diesel fuel injection in the tubing string the process liquid on water base is injected. At the process liquid density exceeding density of the paraffin solution in diesel fuel the process liquid is injected via separating plug. Height of the process liquid column is determined according to an analytical expression considering height of the process liquid column, pressure in aquiferous part of the formation, distance from wellhead to top border of the perforation interval in the aquiferous stratum, density of the process liquid and paraffin solution in diesel fuel.
EFFECT: method limiting the produced water inflow in the production well increasing efficiency of water insulation.
1 dwg, 1 tbl, 1 ex

Description

Изобретение относится к нефтегазодобывающей промышленности, в частности к способам проведения водоизоляционных работ в добывающих скважинах.The invention relates to the oil and gas industry, in particular to methods for waterproofing work in producing wells.

Известен способ разработки нефтяной залежи с водонефтяными зонами, включающий перфорацию обсадной колонны в нефтенасыщенной зоне продуктивного пласта, установку пакера, установку в скважине глубинного насоса, закачку нефти из нефтенасыщенной зоны и отбор пластовой жидкости из скважины на поверхность. Перфорацию обсадной колонны в нефтенасыщенной зоне продуктивного пласта осуществляют с разделением продуктивного пласта на две части, устанавливают пакер на расстоянии от двух до пяти метров выше водонефтяного контакта, затем устанавливают глубинный насос двойного действия над продуктивным пластом так, что всасывающий клапан насоса располагают выше установленного пакера в верхней части продуктивного пласта, а в процессе добычи пластовой жидкости часть отбираемой нефти из верхней части продуктивного пласта закачивают в продуктивный пласт ниже пакера (патент РФ № 2386795, МПК Е21В 43/16, опубл. 20.04.2010 г.).A known method of developing an oil reservoir with oil-water zones, including perforation of the casing in the oil-saturated zone of the reservoir, installing a packer, installing a downhole pump in the well, pumping oil from the oil-saturated zone, and taking formation fluid from the well to the surface. Perforation of the casing in the oil-saturated zone of the reservoir is carried out with the division of the reservoir into two parts, a packer is installed at a distance of two to five meters above the oil-water contact, then a double-acting deep pump is installed above the reservoir so that the pump suction valve is positioned above the installed packer in the upper part of the reservoir, and during the production of reservoir fluid, part of the selected oil from the upper part of the reservoir is pumped into the productive formation below the packer (RF patent number 2386795, IPC E 21 B 43/16, publ. 20.04.2010).

Недостатком известного способа является то, что часть добываемой нефти перекачивается в водоносную часть пласта. Производительность скважины снижается. Кроме того, образующаяся в пласте нефтяная эмульсия нестойка и легко вытесняется потоком воды к скважине. Эффективность водоизоляционных работ остается невысокой. Все это приводит к повышению обводненности добываемой продукции.The disadvantage of this method is that part of the produced oil is pumped into the aquifer of the reservoir. Well productivity is declining. In addition, the oil emulsion formed in the formation is unstable and is easily displaced by the flow of water to the well. The effectiveness of waterproofing works remains low. All this leads to an increase in water cut of the extracted products.

Наиболее близким по технической сущности является способ ограничения притока пластовых вод в добывающую скважину. Способ включает перфорацию эксплуатационной колонны против продуктивной зоны с последующим определением пластовых давлений, создание водонепроницаемого экрана в дополнительно перфорированной через эксплуатационную колонну верхней части водоносной зоны путем размещения в ней изолирующего материала, вызов притока пластовых флюидов и добычу нефти по колонне лифтовых труб из скважины при депрессии на продуктивную зону. Перед вызовом притока пластовых флюидов разобщают интервалы перфорации продуктивной и водоносной зон установкой пакера в эксплуатационной колонне, спускают дополнительную колонну труб до герметичной фиксации ее нижней части в пакере, заполняют всю дополнительную колонну труб изолирующим материалом. Изолирующий материал выбирают с плотностью, обеспечивающей эквивалентность давления столба изолирующего материала и давления в водоносной зоне, а размещение изолирующего материала в водоносной зоне осуществляют втягиванием при депрессии на продуктивную зону (патент РФ № 2451165, МПК Е21В 43/16, опубл. 20.05.2012 г. – прототип).The closest in technical essence is a way to limit the influx of formation water into the production well. The method includes perforation of the production string against the production zone with subsequent determination of reservoir pressure, creating a waterproof screen in the upper part of the aquifer additionally perforated through the production string by placing insulating material in it, causing inflow of formation fluids and oil production through the pipe string from the well during depression productive zone. Before calling the influx of formation fluids, the perforation intervals of the productive and aquifer zones are separated by installing the packer in the production casing, lowering the additional pipe string until the lower part is sealed in the packer, filling the entire additional pipe string with insulating material. The insulating material is selected with a density that ensures the equivalence of the column pressure of the insulating material and the pressure in the aquifer, and the placement of the insulating material in the aquifer is carried out by pulling in depression on the productive zone (RF patent No. 2451165, IPC ЕВВ 43/16, published on 05/20/2012 . - prototype).

Недостатком известного способа является то, что в нем применяются в качестве изолирующего материала растворы полиолефинов, например полиэтилена, полипропилена, их сополимеров: полиизопрена, полиизобутилена или их смесей, которые растворяются только при высоких температурах и в растворителях, которые нецелесообразно применять на скважине – циклогексан, бензол, четыреххлористый углерод, трихлорэтан при 70оС, ксилол при 75оС и т.д. Применение раствора алкилированной серной кислоты также является недостатком способа, так как она является тяжелой жидкостью, с плотностью выше плотности пластовой воды и нефти, из-за чего она не может располагаться в зоне водонефтяного контакта, а уходит вниз, в связи с этим не происходят подтягивания в зону водонефтяного контакта (ВНК) и изоляция водопритока неосуществима.The disadvantage of this method is that it uses as an insulating material solutions of polyolefins, for example polyethylene, polypropylene, their copolymers: polyisoprene, polyisobutylene or mixtures thereof, which dissolve only at high temperatures and in solvents that are inappropriate to use in the well - cyclohexane, benzene, carbon tetrachloride, trichloroethane at 70 ° C xylene at 75 ° C, etc. The use of a solution of alkylated sulfuric acid is also a disadvantage of the method, since it is a heavy liquid with a density higher than the density of formation water and oil, because of which it cannot be located in the oil-water contact zone, but goes down, in this connection, pull-ups do not occur in the zone of oil-water contact (VNK) and isolation of water inflow is not feasible.

В предложенном изобретении решается задача повышения эффективности ограничения водопритока к добывающим скважинам.The proposed invention solves the problem of increasing the efficiency of restricting water inflow to production wells.

Задача решается тем, что в способе ограничения притока пластовых вод в добывающую скважину, включающем перфорацию эксплуатационной колонны против продуктивной зоны, создание высокопроницаемого экрана в дополнительно перфорированной через эксплуатационную колонну верхней части водоносной зоны путем подачи в нее водоизолирующего материала, предварительно перед вызовом притока пластовых жидкостей разобщение интервала перфорации продуктивной и водоносной зоны установкой пакера, в эксплуатационной колонне спуск дополнительной колонны насосно-компрессорных труб (НКТ) до герметичной фиксации нижней части НКТ в пакере, частичное заполнение дополнительной колонны НКТ изолирующим материалом, согласно изобретению в качестве водоизолирующего материала используют 10-15%-ный раствор парафина в дизельном топливе с плотностью меньше плотности воды в водоносном пласте, после закачивания раствора парафина в дизельном топливе в колонну НКТ закачивают технологическую жидкость на водной основе, причем при плотности технологической жидкости больше плотности раствора парафина в дизельном топливе, закачивание технологической жидкости проводят через разделительную пробку, высоту столба технологической жидкости определяют по формулеThe problem is solved in that in a method of restricting formation water inflow into a production well, including perforation of a production string against a production zone, creating a highly permeable screen in the upper part of the aquifer additionally perforated through the production string by supplying water-insulating material to it, previously prior to calling the formation fluid influx the interval of perforation of the productive and aquifer by installing the packer, in the production casing run additional columns tubing (tubing) until the lower part of the tubing is sealed in the packer, partially filling the additional tubing string with insulating material, according to the invention, a 10-15% solution of paraffin in diesel fuel with a density lower than the density of water in the aquifer is used as a water-insulating material formation, after injecting a solution of paraffin in diesel fuel into the tubing string, water-based process fluid is pumped, and at a density of the process fluid greater than the density of the paraffin solution in diesel fuel, pumping of the process fluid is carried out through the separation plug, the height of the column of the process fluid is determined by the formula

h1= QUOTE

Figure 00000001
Figure 00000001
,h 1 = QUOTE
Figure 00000001
Figure 00000001
,

где h1 – высота столба технологической жидкости, м;where h 1 - the height of the column of the process fluid, m;

Pпл - давление в водоносной части пласта, Па;Ppl - pressure in the aquifer, Pa;

Н - расстояние от устья скважины до верхней границы интервала перфорации в водоносном пласте, м;N is the distance from the wellhead to the upper boundary of the perforation interval in the aquifer, m;

ρ1 - плотность технологической жидкости, кг/м3;ρ 1 is the density of the process fluid, kg / m 3 ;

ρ2 - плотность раствора парафина в дизельном топливе, кг/м3.ρ 2 - the density of the solution of paraffin in diesel fuel, kg / m 3 .

Сущность изобретенияSUMMARY OF THE INVENTION

На эффективность ограничения водопритока в добывающие скважины оказывают влияние состав и свойства водоизолирующего материала, а также технология его закачки. Существующие технические решения не в полной мере позволяют эффективно снижать водоприток к добывающим скважинам. В предложенном изобретении решается задача повышения эффективности ограничения водопритока к добывающим скважинам. Задача решается следующим образом.The efficiency and limitations of water inflow into production wells are affected by the composition and properties of the water-insulating material, as well as the technology of its injection. Existing technical solutions do not fully allow to effectively reduce water production to production wells. The proposed invention solves the problem of increasing the efficiency of restricting water inflow to production wells. The problem is solved as follows.

На фиг. 1 приведена схема осуществления способа. Обозначения: 1-привод штангового насоса; 2 – двухканальная устьевая арматура; 3 – контейнер-цистерна; 4 – эксплуатационная обсадная колонна 168 мм; 5 – дополнительная колонна НКТ; 6 – пакер; 7 – водоносная зона; 8 – продуктивная зона; 9 – параллельный двухканальный якорь; 10 – насос вставной; 11 – штанги; 12 - короткая колонна НКТ, 13 - вентиль для подачи раствора парафина в дизельном топливе, 14 - вентиль для подачи технологической жидкости.In FIG. 1 shows a diagram of the implementation of the method. Designations: 1-drive sucker rod pump; 2 - two-channel wellhead reinforcement; 3 - tank container; 4 - production casing 168 mm; 5 - additional tubing string; 6 - packer; 7 - aquifer; 8 - productive zone; 9 - parallel two-channel anchor; 10 - plug-in pump; 11 - rods; 12 - short tubing string, 13 - valve for supplying a solution of paraffin in diesel fuel, 14 - valve for supplying the process fluid.

Способ реализуют следующим образом. The method is implemented as follows.

Перфорируют эксплуатационную колонну (э/к) против продуктивной зоны 8 (фиг. 1). Дополнительно перфорируют верхнюю часть водоносной зоны 7, определяют пластовое давление в продуктивной и водоносной зонах, для разобщения интервала перфорации между ними устанавливают пакер 6. Спускают короткую колонну НКТ со вставным глубинным насосом 10 и дополнительную колонну НКТ 5 до герметичной фиксации в нижней части пакера. Дополнительную колонну снабжают вентилем 13 для последующей подачи водоизолирующего материала и вентилем 14 для подачи технологической жидкости. Заполняют колонну НКТ водоизолирующим материалом и технологической жидкостью для уравновешивания пластового давления в водоносном пласте (на фиг. 1 не показано). Вызывают приток пластовых флюидов и осуществляют добычу продукции по короткой колонне НКТ из скважины при депрессии на продуктивную зону, созданную работой вставного насоса 10. При депрессии на водонефтяной пласт с подошвенной водой в его водоносной зоне снижается пластовое давление и инициируется движение пластовой воды в интервал перфорации продуктивной зоны вследствие конусообразования за счет непосредственного контакта изолирующего материала, находящегося сверху пластовой воды, так как его удельный вес меньше плотности пластовой воды. За счет непосредственного контакта раствора парафина в дизельном топливе через интервал перфорации водоносной зоны происходит его втягивание в каналы и происходит контактирование с нефтью. При взаимодействии с нефтью осаждается парафин и асфальтеновые вещества, вследствие чего образуется водоизолирующий экран.Perforated production casing (electric) against the productive zone 8 (Fig. 1). Additionally, the upper part of the aquifer 7 is perforated, the reservoir pressure in the productive and aquifer zones is determined, the packer 6 is installed to separate the perforation interval between them. The short tubing string with an inserted deep-well pump 10 and the additional tubing string 5 are lowered until they are tightly fixed at the bottom of the packer. An additional column is equipped with a valve 13 for the subsequent supply of water-insulating material and a valve 14 for supplying the process fluid. The tubing string is filled with water-insulating material and process fluid to balance reservoir pressure in the aquifer (not shown in FIG. 1). An inflow of formation fluids is caused and production is carried out along a short tubing string from the well during depression to the productive zone created by the operation of the plug-in pump 10. When depressed to the oil-water formation with bottom water in its aquifer, the reservoir pressure decreases and movement of formation water into the production perforation interval is initiated zones due to cone formation due to direct contact of the insulating material located on top of the formation water, since its specific gravity is less than the density of the formation th water. Due to direct contact of the solution of paraffin in diesel fuel through the interval of perforation of the aquifer, it is drawn into the channels and comes into contact with oil. When interacting with oil, paraffin and asphaltene substances precipitate, as a result of which a water-proof screen is formed.

В качестве изолирующего материала можно использовать растворы парафина в растворителе парафина или других доступных технологичных и экологически безопасных растворителях, в которых парафин легко и технологично растворяется при температуре 20-25 оС.The insulating material may be a paraffin wax solution in a solvent or other technologically available and environmentally safe solvents in which the wax dissolves easily manufacturable at a temperature of 20-25 ° C.

Реагенты, применяемые в предложении:Reagents used in the proposal:

- парафин по ГОСТ 23683-89;- paraffin according to GOST 23683-89;

- дизельное топливо по ГОСТ 305-82 или ГОСТ Р 52368-2005; - diesel fuel in accordance with GOST 305-82 or GOST R 52368-2005;

- пластовая вода плотностью от 1000 до 1180 кг/м3.- produced water with a density of from 1000 to 1180 kg / m 3 .

Сущность способа заключается в перфорировании эксплуатационной колонны против продуктовой зоны и закачке водоизолирующего материала в верхнюю часть водоносной зоны с созданием там водоизолирующего экрана. Предварительно устанавливают пакер для разобщения интервала перфорации продуктивной и водоносной зоны. В эксплуатационную колонну спускают дополнительную колонну НКТ до герметичной фиксации ее нижней части в пакере, частично заполняют дополнительную колонну НКТ изолирующим материалом. В качестве водоизолирующего материала используют 10-15 %-ный раствор парафина в дизельном топливе, причем плотность раствора парафина должна быть меньше плотности воды в водоносном пласте.The essence of the method is to perforate the production casing against the food zone and pump water-insulating material into the upper part of the aquifer, creating a water-insulating screen there. Pre-install the packer to separate the interval of perforation of the productive and aquifer. An additional tubing string is lowered into the production string until the lower part is sealed in the packer, and the additional tubing string is partially filled with insulating material. As a water-insulating material using a 10-15% solution of paraffin in diesel fuel, and the density of the paraffin solution should be less than the density of water in the aquifer.

После закачивания раствора парафина в дизельном топливе в колонну НКТ закачивается технологическая жидкость на водной основе с такой плотностью и в таком объеме, чтобы вес столба раствора парафина в дизельном топливе и вес технологической жидкости уравновешивал пластовое давление в водоносном пласте. Условие равновесия можно записать следующим уравнением:After injecting a solution of paraffin in diesel fuel into the tubing string, water-based technological fluid is pumped with such a density and in such a volume that the weight of a column of paraffin solution in diesel fuel and the weight of the process fluid balance the reservoir pressure in the aquifer. The equilibrium condition can be written as follows:

πr2h1ρ1+πr2h2ρ2=Pпл∙πr2 или h1ρ1+h2ρ2=Pпл, (1)πr 2 h 1 ρ 1 + πr 2 h 2 ρ 2 = Ppl ∙ πr 2 or h 1 ρ 1 + h 2 ρ 2 = Ppl, (1)

где h1 – высота столба технологической жидкости;where h 1 - the height of the column of the process fluid;

h2 – высота столба раствора парафина в дизельном топливе;h 2 - the height of the column of a solution of paraffin in diesel fuel;

ρ1 - плотность технологической жидкости;ρ 1 is the density of the process fluid;

ρ2 - плотность раствора парафина в дизельном топливе;ρ 2 is the density of the solution of paraffin in diesel fuel;

Pпл - давление в водоносной части пласта. Ppl - pressure in the aquifer of the reservoir.

Выразим h2 через H, тогдаExpress h 2 through H, then

h2=Н-h1, (2)h 2 = H-h 1 , (2)

где Н - расстояние от устья скважины до верхней границы интервала перфорации в водоносном пласте. Тогда уравнение (1) запишется в следующем виде:where H is the distance from the wellhead to the upper boundary of the perforation interval in the aquifer. Then equation (1) can be written as follows:

h1ρ1+(Н-h12=Pпл или h1= QUOTE

Figure 00000001
Figure 00000001
(3) h 1 ρ 1 + (H-h 1 ) ρ 2 = Ppl or h 1 = QUOTE
Figure 00000001
Figure 00000001
(3)

Водоизолирующие свойства предлагаемого в способе водоизолирующего материала изучались на моделях пласта длиной 30 см и внутренним диаметром 2,7 см, заполненных кварцевым песком фракции 0,2-0,3 мм, которые позволяют моделировать закачку реагентов в пласт. По результатам модельных испытаний рассчитывают коэффициент изоляции Y, который характеризует степень снижения проницаемости модели, по формуле Y= QUOTE

Figure 00000002
Figure 00000002
∙100 %, The water-insulating properties of the water-insulating material proposed in the method were studied on reservoir models with a length of 30 cm and an inner diameter of 2.7 cm filled with quartz sand of a fraction of 0.2-0.3 mm, which allow modeling the injection of reagents into the formation. Based on the results of model tests, the insulation coefficient Y, which characterizes the degree of decrease in the permeability of the model, is calculated according to the formula Y = QUOTE
Figure 00000002
Figure 00000002
∙ 100%

где К1 – проницаемость модели до изоляции,where K 1 - the permeability of the model to isolation,

К2 - проницаемость модели после изоляции.To 2 - the permeability of the model after isolation.

Из представленных в табл. 1 результатов видно, что коэффициент изоляции в водонасыщенной модели с применением предложенного способа через 24 ч и 6 мес составил 96-100 % и 90-95 % соответственно, что доказывает его качественную изолирующую способность, а оптимальным для изоляции является 10-15%-ный раствор парафина в дизельном топливе.Of the presented in table. From the results of 1 it can be seen that the isolation coefficient in the water-saturated model using the proposed method after 24 hours and 6 months was 96-100% and 90-95%, respectively, which proves its high-quality insulating ability, and 10-15% is optimal for isolation paraffin solution in diesel fuel.

Водоизолирующий эффект при этом достигается за счет осаждения парафина в зоне водонефтяного контакта (ВНК). При концентрации парафина в дизельном топливе менее 10% коэффициент изоляции уменьшается. При концентрации парафина в дизельном топливе 15 % получается насыщенный раствор, более 15% парафин не растворяется. The water-insulating effect is achieved due to the deposition of paraffin in the zone of oil-water contact (WOC). When the paraffin concentration in diesel fuel is less than 10%, the insulation coefficient decreases. When the concentration of paraffin in diesel fuel is 15%, a saturated solution is obtained, more than 15% paraffin does not dissolve.

Пример практического применения. An example of practical application.

Предлагаемый способ реализован на добывающей скважине с текущим забоем на глубине 1800 м с э/к диаметром 168 мм. Установлено, что в интервале 1750-1755 м находится нефтенасыщенная зона, а в интервале 1759-1765 - водоносная зона. Глубинным манометром определено гидростатическое давление столба жидкости в этих интервалах, равное 20,13 МПа и 20,23 МПа соответственно при плотности скважинной жидкости 1150 кг/м3.The proposed method is implemented on a production well with a current bottom at a depth of 1800 m with electric wire with a diameter of 168 mm. It was established that in the interval 1750-1755 m there is an oil-saturated zone, and in the interval 1759-1765 there is an aquifer. The hydrostatic pressure of the liquid column in these intervals, equal to 20.13 MPa and 20.23 MPa, respectively, with the density of the borehole fluid 1150 kg / m 3, was determined with a depth gauge.

В э/к на глубине 1758 м установлен пакер, спущена колонна лифтовых труб диаметром 73 мм со вставным насосом, прием которого расположен на глубине 1290 м. В э/к спущена дополнительная колонна труб диаметром 30 мм, нижняя часть которой оснащена дополнительными манжетами, герметично зафиксированными в пакере. В дополнительную колонну труб закачивали 3 м3 раствора парафина в дизельном топливе, затем через разделительную пробку закачивали технологическую жидкость плотностью 1180 кг/м3 в количестве 3,9 м3. Объемы жидкостей рассчитаны по вышеприведенным формулам (1, 2, 3). Дополнительная колонна труб связана напорным трубопроводом с емкостью, заполненной технологической жидкостью плотностью 1180 кг/м3 (например, пластовой девонской водой). Скважина введена в эксплуатацию с установившимся дебитом нефти 15 т/сут. Через трое суток при депрессии на продуктивную зону 7,32 МПа в емкости в течение 14 ч отмечено снижение уровня технологической жидкости. Количество технологической жидкости уменьшилось на 0,5 м3, а в водоносную зону через перфорированные отверстия втянуто 0,5 м3 раствора парафина в дизельном топливе. Через 70 сут отмечено повторное снижение уровня технологической жидкости в емкости, которое продолжалось в течение 5 ч, при этом установлено, что в водоносную зону через перфорационные отверстия втянуто 0,165 м3 раствора парафина в дизельном топливе. Замер содержания воды в продукции скважины показал отсутствие следов воды в нефти. После этого скважина продолжала работать в режиме безводной добычи нефти до планового подземного ремонта в течение 932 сут. A packer was installed in the electric cable at a depth of 1758 m, a column of elevator pipes with a diameter of 73 mm was lowered with a plug-in pump, the intake of which is located at a depth of 1290 m. fixed in the packer. A 3 m 3 solution of paraffin in diesel fuel was pumped into an additional pipe string, then a process fluid with a density of 1180 kg / m 3 in the amount of 3.9 m 3 was pumped through a separation plug. The volumes of liquids are calculated according to the above formulas (1, 2, 3). An additional pipe string is connected by a pressure pipeline to a tank filled with process fluid with a density of 1180 kg / m 3 (for example, reservoir Devonian water). The well was put into operation with a steady oil flow rate of 15 tons / day. Three days later, with depression on the productive zone of 7.32 MPa in the tank for 14 hours, a decrease in the level of the process fluid was noted. The amount of process fluid decreased by 0.5 m 3 , and 0.5 m 3 of paraffin solution in diesel fuel was drawn into the aquifer through perforated holes. After 70 days, there was a repeated decrease in the level of the process fluid in the tank, which lasted for 5 hours, while it was found that 0.165 m 3 of paraffin solution in diesel fuel was drawn into the aquifer through perforations. Measurement of water content in the production of the well showed the absence of traces of water in the oil. After that, the well continued to operate in anhydrous oil production mode until a planned underground repair for 932 days.

Применение предложенного способа позволит решить задачу повышения эффективности ограничения водопритока к добывающим скважинам.The application of the proposed method will solve the problem of increasing the efficiency of limiting water inflow to production wells.

Claims (7)


Способ ограничения притока пластовых вод в добывающую скважину, включающий перфорацию эксплуатационной колонны против продуктивной зоны, создание высокопроницаемого экрана в дополнительно перфорированной через эксплуатационную колонну верхней части водоносной зоны путем подачи в нее водоизолирующего материала, предварительно перед вызовом притока пластовых жидкостей разобщение интервала перфорации продуктивной и водоносной зоны установкой пакера, в эксплуатационной колонне спуск дополнительной колонны насосно-компрессорных труб (НКТ) до герметичной фиксации нижней части НКТ в пакере, частичное заполнение дополнительной колонны НКТ изолирующим материалом, отличающийся тем, что в качестве водоизолирующего материала используют 10-15 %-ный раствор парафина в дизельном топливе с плотностью меньше плотности воды в водоносном пласте, после закачивания раствора парафина в дизельном топливе в колонну НКТ закачивают технологическую жидкость на водной основе, причем при плотности технологической жидкости больше плотности раствора парафина в дизельном топливе закачивание технологической жидкости проводят через разделительную пробку, высоту столба технологической жидкости определяют по формуле

A method of restricting formation water inflow into a production well, including perforation of the production string against the productive zone, creating a highly permeable screen in the upper part of the aquifer additionally perforated through the production string by supplying water-insulating material thereto, prior to calling the formation fluid inflow, separation of the perforation interval of the productive and aquifer installing the packer, in the production casing, launching an additional tubing string ub (tubing) until the lower part of the tubing is sealed in the packer, partially filling the additional tubing string with insulating material, characterized in that a 10-15% solution of paraffin in diesel fuel with a density lower than the density of water in an aquifer is used as a water-insulating material, after injecting a solution of paraffin in diesel fuel, a water-based technological fluid is pumped into the tubing string; moreover, when the density of the process fluid is greater than the density of the solution of paraffin in diesel fuel, of the process fluid is conducted through the separating tube, the height of the process fluid column is determined by the formula
h1= QUOTE
Figure 00000003
Figure 00000003
,
h 1 = QUOTE
Figure 00000003
Figure 00000003
,
где h1 – высота столба технологической жидкости, м;where h 1 - the height of the column of the process fluid, m; Pпл - давление в водоносной части пласта, Па;    Ppl - pressure in the aquifer, Pa; Н - расстояние от устья скважины до верхней границы интервала перфорации в водоносном пласте, м;    N is the distance from the wellhead to the upper boundary of the perforation interval in the aquifer, m; ρ1 - плотность технологической жидкости, кг/м3;ρ 1 is the density of the process fluid, kg / m 3 ; ρ2 - плотность раствора парафина в дизельном топливе, кг/м3. ρ 2 - the density of the solution of paraffin in diesel fuel, kg / m 3 .
RU2016122120A 2016-06-04 2016-06-04 Method of limitation of produced water inflow to production well RU2620670C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2016122120A RU2620670C1 (en) 2016-06-04 2016-06-04 Method of limitation of produced water inflow to production well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2016122120A RU2620670C1 (en) 2016-06-04 2016-06-04 Method of limitation of produced water inflow to production well

Publications (1)

Publication Number Publication Date
RU2620670C1 true RU2620670C1 (en) 2017-05-29

Family

ID=59031947

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2016122120A RU2620670C1 (en) 2016-06-04 2016-06-04 Method of limitation of produced water inflow to production well

Country Status (1)

Country Link
RU (1) RU2620670C1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3691072A (en) * 1969-12-31 1972-09-12 Union Oil Co Soluble oil composition
SU872734A1 (en) * 1979-12-04 1981-10-15 Центральная Научно-Исследовательская Лаборатория Производственного Ордена Трудового Красного Знамени Объединения "Оренбургнефть" Composition for isolation of inflow of formation water into well and method of preparing same
RU2177539C2 (en) * 1999-10-08 2001-12-27 Ойл Технолоджи (Оверсиз) Продакшн Лтд. Composition for isolation of lost circulation zones and shutoff of formation water inflows to well and method of composition preparation
RU2221130C1 (en) * 2002-05-13 2004-01-10 Открытое акционерное общество "Управление по повышению нефтеотдачи пластов и капитальному ремонту скважин" ОАО "УПНП и КРС" Technique limiting water inflow into production well
RU2451165C1 (en) * 2011-07-07 2012-05-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for restriction of brine water inflow to production well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3691072A (en) * 1969-12-31 1972-09-12 Union Oil Co Soluble oil composition
SU872734A1 (en) * 1979-12-04 1981-10-15 Центральная Научно-Исследовательская Лаборатория Производственного Ордена Трудового Красного Знамени Объединения "Оренбургнефть" Composition for isolation of inflow of formation water into well and method of preparing same
RU2177539C2 (en) * 1999-10-08 2001-12-27 Ойл Технолоджи (Оверсиз) Продакшн Лтд. Composition for isolation of lost circulation zones and shutoff of formation water inflows to well and method of composition preparation
RU2221130C1 (en) * 2002-05-13 2004-01-10 Открытое акционерное общество "Управление по повышению нефтеотдачи пластов и капитальному ремонту скважин" ОАО "УПНП и КРС" Technique limiting water inflow into production well
RU2451165C1 (en) * 2011-07-07 2012-05-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for restriction of brine water inflow to production well

Similar Documents

Publication Publication Date Title
RU2566542C1 (en) Hydraulic fracturing method for producing formation with clay layer and bottom water
RU2483209C1 (en) Method of hydraulic fracturing of well formation
RU2460875C1 (en) Carbonate formation hydraulic fracturing method
US10961436B2 (en) Hydrocarbon recovery using complex water and carbon dioxide emulsions
RU2451165C1 (en) Method for restriction of brine water inflow to production well
CN105822252A (en) Well cementation pipe column combination and well cementation method
RU2456441C1 (en) Production method of high-viscous oil by means of simultaneous pumping of steam and extraction of liquid from single horizontal well
RU2540713C1 (en) Method of oil pool development
RU2515675C1 (en) Isolation method of water influx to oil producer
RU2456431C1 (en) Water influx isolation method
RU2695906C1 (en) Method for development of weakly permeable oil deposit with application of horizontal wells and water and gas impact
RU2620670C1 (en) Method of limitation of produced water inflow to production well
RU2569941C2 (en) Bottom water isolation method
RU2418942C1 (en) Procedure for well development
RU2011135865A (en) METHOD FOR INSULATING FLOOR WATER FLOW IN DEPTH AND HORIZONTAL WELLS
WO2016065478A1 (en) Dynamic loading and thermal fracturing of hydrocarbon formations
RU2418157C1 (en) Development method of oil deposit with horizontal wells
RU2459072C1 (en) Method of hydraulic fracturing of low-permeable formation of injection well
RU2012141519A (en) METHOD FOR ORGANIZING VERTICAL-LATERAL FLOODING
RU2393343C1 (en) Method of supply of hydrocarbons from watering out formation
RU2534555C1 (en) Interval isolation method of brine water influx in horizontal wells
RU2566345C1 (en) Method of formation hydraulic fracturing with water influx isolation in production wells
RU2613689C1 (en) Method of productive formation hydraulic fracturing with clay layer and gas-bearing horizon
RU2495231C1 (en) Flushing method for wells with lost-circulation formation
RU2444611C1 (en) Isolation method of productive formation from bottom water inflow