System for estimation and forecast of discharges of waste water Download PDFInfo
- Publication number
- RU2606039C1 RU2606039C1 RU2015126923A RU2015126923A RU2606039C1 RU 2606039 C1 RU2606039 C1 RU 2606039C1 RU 2015126923 A RU2015126923 A RU 2015126923A RU 2015126923 A RU2015126923 A RU 2015126923A RU 2606039 C1 RU2606039 C1 RU 2606039C1
- Authority
- RU
- Russia
- Prior art keywords
- water
- analysis
- input
- unit
- receiving tank
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Control Of Positive-Displacement Pumps (AREA)
Abstract
Description
Изобретение относится к системам водоотведения, а именно к устройствам оценки и прогнозирования сбросов сточных вод в окружающую среду. The invention relates to wastewater systems, and in particular to devices for assessing and predicting wastewater discharges into the environment.
Известна «Система для определения и обеспечения показателей надёжности и бесперебойности сетей водоснабжения и водоотведения» (см. Заявка: 2013142609/08 от 18.09.2013, Рос. Федерация: МПК G06Q50/00 (2012.01) / Кармазинов Ф. В., Мельник Е. А., Нефедова Е. Д., Трухин Ю. А., Курганов Ю. А., Ильин Ю. А., Игнатчик В. С., Игнатчик С. Ю.; опубл. 27.03.2015, Бюл. № 9), содержащая блок первичной обработки информации, блок расчёта показателей надёжности элементов сети, блок определения вероятностных показателей надёжности сети, блок определения технологических показателей надёжности сети водоотведения, блок оптимизации показателей надёжности сети. В системе имеется ячейка определения объёма аварийного сброса неочищенных сточных вод из-за аварий и засорений
где
Недостатком указанного технического решения является узкая область функциональных возможностей, т.к. оно рассчитано на определение объёмов аварийных сбросов сточных вод только из-за аварий и засорений участков сетей. Это необходимо, но не достаточно для оценки сбросов всей системы. Необходимо также определять объёмы сбросов сточных вод по причинам аварийности на канализационных насосных станциях и при поступлении на них нерасчётных расходов сточных вод, например, в период дождей редкой повторяемости. С применением указанной системы это оценить не представляется возможным.The disadvantage of this technical solution is a narrow area of functionality, because it is designed to determine the volume of emergency wastewater discharges only due to accidents and clogging of network sections. This is necessary, but not sufficient, to estimate discharges of the entire system. It is also necessary to determine the volume of wastewater discharges due to accidents at sewer pumping stations and when they receive unaccounted wastewater costs, for example, during rains of rare frequency. Using this system, this is not possible to evaluate.
Наиболее близким аналогом к заявляемому изобретению служит полезная модель «Система управления энергопотреблением при эксплуатации общесплавных канализационных насосных станций» (см. патент на полезную модель №94291, Рос. Федерация: МПК F04B51/00 (2006.01)/ Кармазинов Ф.В., Кинебас А.К., Трухин Ю.А., Ильин Ю.А., Игнатчик В.С., Игнатчик С.Ю. и др.; опубл. 20.05.2010, Бюл. № 14), включающая:The closest analogue to the claimed invention is the utility model "Energy management system for the operation of alloyed sewage pumping stations" (see utility model patent No. 94291, Russian Federation: IPC F04B51 / 00 (2006.01) / Karmazinov F.V., Kinebas A .K., Trukhin Yu.A., Ilyin Yu.A., Ignatchik V.S., Ignatchik S.Yu. et al .; publ. 05.20.2010, Bull. No. 14), including:
- по меньшей мере, два насоса с всасывающими и напорными трубопроводами, приёмный резервуар с подводящим трубопроводом;- at least two pumps with suction and pressure pipelines, a receiving tank with a supply pipe;
- модуль анализа диагностируемых параметров, содержащий блок сравнения подач, блок коррекции диагностируемого параметра по частоте вращения вала, блок коррекции диагностируемого параметра по диаметру рабочего колеса, блок анализа диагностируемых параметров, блок ввода эталонного диагностируемого параметра, при этом выход блока сравнения подач подключён к входу блока коррекции диагностируемого параметра по частоте вращения вала, вход блока коррекции диагностируемого параметра по диаметру рабочего колеса подключён к выходу блока коррекции диагностируемого параметра по частоте вращения вала, а выходы блоков коррекции диагностируемого параметра по диаметру рабочего колеса и ввода эталонного диагностируемого параметра - к входу блока анализа диагностируемых параметров; - a module for analyzing diagnosed parameters, comprising a feed comparison unit, a block for diagnosing a parameter diagnosed by shaft rotation speed, a block for diagnosing a parameter being diagnosed by impeller diameter, a block for analyzing diagnosed parameters, an input block for diagnosing a reference parameter, while the output of the feed comparison block is connected to the input of the block correction of the diagnosed parameter by the shaft rotation frequency, the input of the diagnosed parameter correction block by the impeller diameter is connected to the output of the rectification of the diagnosed parameter by the shaft rotation frequency, and the outputs of the blocks of correction of the diagnosed parameter by the impeller diameter and input of the reference diagnosed parameter to the input of the block of analysis of the diagnosed parameters;
- модуль контрольно-измерительных приборов, содержащий, по меньшей мере, два датчика подачи насоса, по меньшей мере, два датчика давления, установленные соответственно на всасывающем и напорном трубопроводах, датчик частоты вращения вала насоса, измеритель потребляемой мощности, при этом все датчики и измеритель потребляемой мощности модуля контрольно-измерительных приборов выполнены мобильными и дополнительно снабжены устройствами записи данных и каналами связи, выходы устройств записи данных, по меньшей мере, двух датчиков давления, датчика частоты вращения вала насоса и измерителя потребляемой мощности при помощи каналов связи подключены к входу блока коррекции диагностируемого параметра по частоте вращения вала, а выходы устройств записи данных, по меньшей мере, двух датчиков подачи насоса - к входу блока сравнения подач; - a module of control and measuring instruments, comprising at least two pump supply sensors, at least two pressure sensors mounted respectively on the suction and pressure pipes, a pump shaft speed sensor, a power consumption meter, while all sensors and a meter power consumption of the instrumentation module is made mobile and additionally equipped with data recording devices and communication channels, outputs of data recording devices of at least two pressure sensors, a pump shaft speed sensor and a power consumption meter are connected via communication channels to the input of the diagnosed parameter correction unit by the shaft rotation speed, and the outputs of the data recording devices of at least two pump supply sensors to the input of the feed comparison unit;
- модуль оптимизации энергопотребления, содержащий блок формирования гидравлических характеристик сетей, к входу которого при помощи каналов связи подключены выходы устройств записи данных, по меньшей мере, двух датчиков давления и выход блока сравнения подач, блок анализа энергопотребления, блок ввода диагностируемых параметров насосов-конкурентов, блок анализа энергопотребления насосов-конкурентов, при этом выходы блока анализа диагностируемых параметров и блока формирования гидравлических характеристик сетей подключены к входу блока анализа энергопотребления, выходы блока формирования гидравлических характеристик сетей и блока ввода диагностируемых параметров насосов-конкурентов подключены к входу блока анализа энергопотребления насосов-конкурентов, при этом блок анализа энергопотребления, блок анализа энергопотребления насосов-конкурентов выполнены с возможностью определения суммарного энергопотребления, модуль перекачки воды снабжён приёмным резервуаром с подводящим трубопроводом, модуль контрольно-измерительных приборов - датчиком интенсивности дождя с устройством записи данных и каналом связи, модуль оптимизации энергопотребления - блоком ввода объёма приёмного резервуара, блоком анализа водопритока, блоком ввода характеристик бассейна канализования. Всасывающие и напорные трубопроводы, по меньшей мере, двух насосов соединены с приёмным резервуаром, выходы блока сравнения подач, блока ввода объёма приёмного резервуара, блока ввода характеристик бассейна канализования и устройства записи данных датчика интенсивности дождя при помощи канала связи подключены к входу блока анализа водопритока, а выход блока анализа водопритока подключён к входу блока анализа энергопотребления и к входу блока анализа энергопотребления насосов-конкурентов. - an energy consumption optimization module comprising a unit for generating hydraulic characteristics of networks, to the input of which, through communication channels, the outputs of data recording devices of at least two pressure sensors and the output of a feed comparison unit, an energy analysis unit, an input unit for diagnosed parameters of competitor pumps, unit for energy analysis of competitor pumps, while the outputs of the unit for analyzing diagnosed parameters and the unit for generating hydraulic characteristics of networks are connected to the input power analysis unit, the outputs of the unit for generating hydraulic characteristics of networks and the input unit for diagnosing parameters of competing pumps are connected to the input of the energy analysis unit of competing pumps, while the energy analysis unit, energy analysis unit of competing pumps are configured to determine the total energy consumption, water transfer module equipped with a receiving tank with a supply pipe, the instrumentation module with an intensity sensor rain with a data recording device and a communication channel, an energy optimization module — a unit for inputting a volume of a receiving tank, a unit for analyzing water inflow, a unit for entering characteristics of a sewage basin. The suction and pressure pipelines of at least two pumps are connected to the receiving tank, the outputs of the feed comparison unit, the input tank volume input unit, the sewage pool characteristics input unit, and the rain intensity sensor data recorder are connected to the input of the water inflow analysis unit via a communication channel, and the output of the water inflow analysis unit is connected to the input of the energy analysis unit and to the input of the energy analysis unit of competitor pumps.
Для указанной системы характерны два недостатка: низкая надёжность и ограниченные функциональные возможности.This system is characterized by two drawbacks: low reliability and limited functionality.
Первый недостаток (низкая надёжность ) заключается в том, что при эксплуатации системы возможны ситуации, когда приёмный резервуар, насосы и подводящий трубопровод будут подтоплены вследствие того, что приток воды на них будет больше суммы подач насосов. Из-за подтопления приёмного резервуара и насосов возможна остановка работы всей системы. Причинами таких ситуаций могут быть:The first drawback (low reliability) is that during the operation of the system there may be situations when the receiving tank, pumps and supply pipe will be flooded due to the fact that the influx of water to them will be greater than the sum of the pump flows. Due to flooding of the receiving tank and pumps, the entire system can stop working. The reasons for such situations may be:
1. Снижение суммарной подачи насосов из-за их отказов;1. Reducing the total supply of pumps due to their failures;
2. Появление сверхрасчётного притока, например, при интенсивном дожде редкой повторяемости.2. The occurrence of over-calculated inflow, for example, with intense rain of rare frequency.
В результате часть воды через люки колодцев будет сброшена в окружающую среду, а расход воды, поступающей на канализационную насосную станцию и объем сбрасываемых в окружающую среду сточных вод известная система определить не сможет. As a result, part of the water through the manholes will be discharged into the environment, and the known system will not be able to determine the flow rate of water entering the sewage pumping station and the amount of sewage discharged into the environment.
Второй недостаток (ограниченные функциональные возможности) заключается в том, что с применением известной системы можно оптимизировать только энергопотребление насосов, но ее нельзя применить для оптимизации выбросов сточных вод в окружающую среду.The second drawback (limited functionality) is that using the known system it is possible to optimize only the energy consumption of pumps, but it cannot be applied to optimize wastewater emissions into the environment.
Задачей настоящего изобретения является повышение надёжности и расширение функциональных возможностей системы. The objective of the present invention is to increase reliability and expand the functionality of the system.
Повышение надёжности системы (в рамках решения поставленной задачи) предполагается до уровня, при котором в условиях превышения притока воды над суммой подач насосов:Increasing the reliability of the system (as part of the solution of the task) is assumed to the level at which, in the event of an excess of water flow over the sum of the pump flows:
- приёмный резервуар и насосы будут защищены от подтопления;- the receiving tank and pumps will be protected from flooding;
- сохранится возможность определения расхода сточных вод, поступающих в систему;- it will remain possible to determine the flow rate of wastewater entering the system;
- появляется возможность оценивать объем сбрасываемых в окружающую среду сточных вод.- it becomes possible to estimate the amount of wastewater discharged into the environment.
Расширение функциональных возможностей системы (в рамках решения поставленной задачи) предполагается до уровня, когда при помощи предлагаемой системы появится возможность минимизировать выбросы сточных вод в окружающую среду. The expansion of the system’s functionality (as part of the solution of the task) is expected to the point where, using the proposed system, it will be possible to minimize wastewater emissions into the environment.
Поставленная задача решена так, что в известной системе, включающей: The problem is solved so that in a known system, including:
-модуль перекачки воды, содержащий, по меньшей мере, два насоса с всасывающими и напорными трубопроводами, приёмный резервуар с подводящим трубопроводом, при этом всасывающие трубопроводы, по меньшей мере, двух насосов соединены с приёмным резервуаром; a water pumping unit comprising at least two pumps with suction and pressure pipes, a receiving tank with a supply pipe, while the suction pipes of at least two pumps are connected to the receiving tank;
-модуль анализа диагностируемых параметров; - module for the analysis of diagnosed parameters;
-модуль контрольно-измерительных приборов, содержащий или, по меньшей мере, два датчика подачи насоса, и/или, по меньшей мере, два датчика давления, установленные на напорных трубопроводах, и/или измеритель потребляемой мощности, при этом все датчики и измеритель потребляемой мощности модуля контрольно-измерительных приборов снабжены устройствами записи данных и каналами связи; - a module of control and measuring instruments, containing either at least two pump supply sensors and / or at least two pressure sensors installed on pressure pipelines and / or a power consumption meter, while all sensors and a power meter the power of the instrumentation module is equipped with data recording devices and communication channels;
- блок ввода объёмов приёмного резервуара с каналом связи, блок анализа водопритока, в соответствии с настоящим изобретением:- a unit for inputting volumes of a receiving tank with a communication channel, a unit for analyzing water inflow, in accordance with the present invention:
- датчики подачи насосов выполнены с возможностью измерения подачи каждого насоса, измеритель потребляемой мощности выполнен с возможностью измерения силы тока и/или потребляемой мощности каждого насоса, блок ввода объёмов приёмного резервуара и блок анализа водопритока включены в состав модуля анализа диагностируемых параметров; - the pump supply sensors are configured to measure the supply of each pump, the power consumption meter is configured to measure the current strength and / or power consumption of each pump, the input unit for the volumes of the receiving tank and the water inflow analysis unit are included in the module for analyzing diagnosed parameters;
- модуль анализа диагностируемых параметров дополнительно снабжён блоком ввода геометрических характеристик приёмного резервуара, снабжённого каналом связи, блоком ввода гидравлических характеристик подводящего трубопровода, снабжённого каналом связи, блоком анализа откачки воды из приёмного резервуара, снабжённого устройством записи данных и каналом связи, блоком вероятностного анализа водопритока, снабжённого каналом связи, блоком вероятностного анализа суммарной подачи насосов, снабжённого каналом связи, блоком ввода вероятностных и технологических показателей надёжности насосов, снабжённого каналом связи, блоком вероятностного анализа накопительного расхода сточных вод, снабжённого каналом связи, блоком анализа объёма сточных вод, сбрасываемых в окружающую среду, блоком ввода прогнозных вероятностных характеристик водопритока, снабжённого каналом связи, блоком прогнозного анализа объёма сточных вод, сбрасываемых в окружающую среду; - the module for analyzing diagnosed parameters is additionally equipped with an input unit for the geometric characteristics of the receiving tank equipped with a communication channel, an input unit for the hydraulic characteristics of the supply pipe equipped with a communication channel, an analysis unit for pumping water from the receiving tank equipped with a data recording device and a communication channel, a probabilistic analysis of water inflow, equipped with a communication channel, a probabilistic analysis unit for the total pump flow, equipped with a communication channel, an input unit of fixed and technological reliability indicators for pumps equipped with a communication channel, a probabilistic analysis unit for the accumulated wastewater flow rate, equipped with a communication channel, an analysis unit for the volume of wastewater discharged into the environment, an input unit for the predicted probabilistic characteristics of the water inflow equipped with a communication channel, a predictive analysis unit for the volume of sewage water discharged into the environment;
- блок анализа водопритока дополнительно снабжён двумя каналами связи, соединяющими его выход с входами блока вероятностного анализа водопритока и блока анализа объёма сточных вод, сбрасываемых в окружающую среду;- the water inflow analysis unit is additionally equipped with two communication channels connecting its output to the inputs of the probabilistic water inflow analysis unit and the unit for analyzing the volume of wastewater discharged into the environment;
- выход блока вероятностного анализа водопритока при помощи канала связи подключён к входу блока вероятностного анализа накопительного расхода сточных вод, а выход блока ввода вероятностных и технологических показателей надёжности насосов при помощи канала связи подключён к входу блока вероятностного анализа суммарной подачи насосов;- the output of the block of probabilistic analysis of water inflow using the communication channel is connected to the input of the block of probabilistic analysis of the cumulative flow rate of wastewater, and the output of the block of input of probabilistic and technological indicators of reliability of pumps using the communication channel is connected to the input of the block of probabilistic analysis of the total supply of pumps;
- выход блока вероятностного анализа суммарной подачи насосов при помощи канала связи подключён к входу блока вероятностного анализа накопительного расхода сточных вод, выход которого при помощи канала связи подключён к входу блока анализа объёма сточных вод, сбрасываемых в окружающую среду; - the output of the block of probabilistic analysis of the total supply of pumps using the communication channel is connected to the input of the block of probabilistic analysis of the cumulative flow of wastewater, the output of which using the communication channel is connected to the input of the block of analysis of the volume of wastewater discharged into the environment;
- выход блока ввода прогнозных вероятностных характеристик водопритока при помощи канала связи подключён к входу блока вероятностного анализа накопительного расхода сточных вод, а выход блока анализа объёма сточных вод, сбрасываемых в окружающую среду, подключён к входу блока прогнозного анализа объёма сточных вод, сбрасываемых в окружающую среду;- the output of the input block of the predicted probabilistic characteristics of the water inflow through the communication channel is connected to the input of the block of the probabilistic analysis of the accumulated waste water flow, and the output of the block of analysis of the volume of wastewater discharged into the environment is connected to the input of the predictive analysis block of the volume of wastewater discharged into the environment ;
- модуль контрольно-измерительных приборов дополнительно снабжён датчиком уровня воды, установленным на подводящем трубопроводе и датчиком уровня воды, установленным в приёмном резервуаре, снабжёнными устройствами записи данных и каналами связи; - the instrumentation module is additionally equipped with a water level sensor installed on the inlet pipe and a water level sensor installed in the receiving tank, equipped with data recording devices and communication channels;
- модуль перекачки воды дополнительно снабжён запорно-регулирующим устройством с исполнительным органом, установленным на подводящем трубопроводе между датчиком уровня воды, установленным на подводящем трубопроводе, и приёмным резервуаром, устройством управления, снабжённым каналом связи. - the water pumping module is additionally equipped with a shut-off and control device with an actuator mounted on the inlet pipe between the water level sensor installed on the inlet pipe and the receiving tank, a control device equipped with a communication channel.
При этом: Wherein:
- блок вероятностного анализа накопительного расхода сточных вод выполнен с возможностью определения функции плотности вероятности накопительного расхода Qнакоп= Qприт – Qкнс, где Qприт, Qкнс – расход водопритока и суммарная подача насосов; - block of probability analysis accumulating wastewater flow is arranged to determine the cumulative probability density function of the flow Q = Q accumulation attraction - CND Q where Q attraction, Q CND - total water production rate and feed pumps;
- блок анализа водопритока выполнен с возможностью определения графика водопритока, поступающего в подводящий трубопровод перед приёмным резервуаром, и корреляционной зависимости между продолжительностью подтопления подводящего трубопровода и накопительным расходом Qнакоп сточных вод;- water influx analysis unit configured to determine schedule water inflow entering the feed line to the receiving tank, and the correlation between the duration of flooding and metering line accumulative flow Q accumulation of wastewater;
- выход устройства записи данных датчика уровня воды, установленного в приёмном резервуаре, при помощи каналов связи подключён к входу устройства управления и к входу блока анализа водопритока, выход устройства управления – к входу исполнительного органа запорно-регулирующего устройства, а устройство управления выполнено с возможностью формирования сигналов управления на исполнительный орган запорно-регулирующего устройства; - the output of the data recording device of the water level sensor installed in the receiving tank, using communication channels connected to the input of the control device and to the input of the water inflow analysis unit, the output of the control device to the input of the actuator of the shut-off and control device, and the control device is configured to form control signals to the executive body of the locking and regulating device;
- выход блока ввода объёма приёмного резервуара, выходы устройств записи данных, по меньшей мере, двух датчиков подачи насоса, двух датчиков давления и измерителя потребляемой мощности при помощи каналов связи подключены к входу блока анализа откачки воды из приёмного резервуара; - the output of the input unit of the volume of the receiving tank, the outputs of the data recording devices of at least two pump supply sensors, two pressure sensors and a power consumption meter using communication channels are connected to the input of the analysis unit for pumping water from the receiving tank;
- выход устройства записи данных датчика уровня воды, установленного на подводящем трубопроводе, при помощи канала связи подключен к входу блока анализа водопритока;- the output of the data recording device of the water level sensor installed on the inlet pipe is connected via the communication channel to the input of the water inflow analysis unit;
- выходы блоков ввода геометрических характеристик приёмного резервуара, ввода гидравлических характеристик подводящего трубопровода и устройства записи данных блока анализа откачки воды из приёмного резервуара при помощи каналов связи подключены к входу блока анализа водопритока. - the outputs of the input blocks of the geometric characteristics of the receiving tank, the input of the hydraulic characteristics of the supply pipe and the data recorder of the analysis unit for pumping water from the receiving tank using communication channels are connected to the input of the water inflow analysis unit.
Имеется вариант развития, когда корреляционная зависимость между продолжительностью подтопления подводящего трубопровода и накопительным расходом сточных вод представлена в видеThere is a development option when the correlation between the duration of the flooding of the supply pipe and the cumulative flow of wastewater is presented in the form
t=k1/Qнакоп+k2,t = k 1 / Q stack + k 2 ,
где t - продолжительность подтопления подводящего трубопровода, ч; Qнакоп - накопительный расход сточных вод, тыс. м3/ч; k1, k2 – эмпирические коэффициенты.where t is the duration of the flooding of the supply pipe, h; Qaccumulation - cumulative wastewater consumption, thousand m3/ h; kone, k2- empirical coefficients.
Имеется вариант развития, когда блок ввода геометрических характеристик приёмного резервуара выполнен с возможностью ввода средней площади поперечного сечения приёмного резервуара.There is a development option when the input unit of the geometric characteristics of the receiving tank is configured to enter the average cross-sectional area of the receiving tank.
Имеется вариант развития, когда блок ввода гидравлических характеристик подводящего трубопровода выполнен с возможностью ввода зависимости объёма воды в подводящем трубопроводе от уровня воды в нем в виде There is a development option when the input unit for the hydraulic characteristics of the supply pipe is configured to input the dependence of the volume of water in the supply pipe on the water level in it in the form
dVкол(t)/dt = k3*ln(dНкол(t))+k4,dV count (t) / dt = k 3 * ln (dН count (t)) + k 4 ,
где dVкол(t) - производная объёма воды в подводящем трубопроводе, м3/ч; dНкол(t) – производная уровня воды в подводящем трубопроводе, м/ч; k3, k4 – эмпирические коэффициенты.where dVcount(t) - derivative of the volume of water in the supply pipe, m3/ h; dНcount(t) is the derivative of the water level in the supply pipe, m / h; k3, kfour- empirical coefficients.
Отличительными признаками заявляемой «Системы для оценки и прогнозирования сбросов сточных вод» являются:Distinctive features of the claimed "System for the assessment and forecasting of wastewater discharges" are:
1. Выполнение датчиков подачи насосов с возможностью измерения подачи каждого насоса;1. The implementation of the sensors supply pumps with the ability to measure the flow of each pump;
2. Выполнение измерителя потребляемой мощности с возможностью измерения силы тока и/или потребляемой мощности каждого насоса;2. The implementation of the meter power consumption with the ability to measure the current strength and / or power consumption of each pump;
3. Включение блока ввода объёмов приёмного резервуара и блока анализа водопритока в состав модуля анализа диагностируемых параметров;3. Inclusion of a unit for inputting volumes of a receiving tank and a unit for analyzing water inflow into the module for analyzing diagnosed parameters;
4. Дополнительное снабжение модуля анализа диагностируемых параметров блоком ввода геометрических характеристик приёмного резервуара, снабжённого каналом связи;4. Additional supply of the module for analysis of diagnosed parameters with an input unit for the geometric characteristics of the receiving tank equipped with a communication channel;
5. Дополнительное снабжение модуля анализа диагностируемых параметров блоком ввода гидравлических характеристик подводящего трубопровода, снабжённого каналом связи;5. Additional supply of the module for the analysis of diagnosed parameters with an input unit for the hydraulic characteristics of the supply pipe equipped with a communication channel;
6. Дополнительное снабжение модуля анализа диагностируемых параметров блоком анализа откачки воды из приёмного резервуара, снабжённого устройством записи данных и каналом связи;6. Additional supply of the module for analyzing diagnosed parameters with a unit for analyzing water pumping from a receiving tank equipped with a data recording device and a communication channel;
7. Дополнительное снабжение модуля анализа диагностируемых параметров блоком вероятностного анализа водопритока, снабжённого каналом связи;7. Additional supply of the module for the analysis of diagnosed parameters with a block of probabilistic analysis of the water inflow equipped with a communication channel;
8. Дополнительное снабжение модуля анализа диагностируемых параметров блоком вероятностного анализа суммарной подачи насосов, снабжённого каналом связи;8. Additional supply of the module for the analysis of diagnosed parameters with a block of probabilistic analysis of the total supply of pumps equipped with a communication channel;
9. Дополнительное снабжение модуля анализа диагностируемых параметров блоком ввода вероятностных и технологических показателей надёжности насосов, снабжённого каналом связи;9. Additional supply of the module for the analysis of diagnosed parameters with an input unit for the probabilistic and technological reliability indicators of pumps equipped with a communication channel;
10. Дополнительное снабжение модуля анализа диагностируемых параметров блоком вероятностного анализа накопительного расхода сточных вод, снабжённого каналом связи;10. Additional supply of the module for the analysis of diagnosed parameters with a block of probabilistic analysis of the cumulative flow rate of wastewater equipped with a communication channel;
11. Дополнительное снабжение модуля анализа диагностируемых параметров блоком анализа объёма сточных вод, сбрасываемых в окружающую среду;11. Additional supply of the module for analyzing diagnosed parameters with a unit for analyzing the volume of wastewater discharged into the environment;
12. Дополнительное снабжение модуля анализа диагностируемых параметров блоком ввода прогнозных вероятностных характеристик водопритока, снабжённого каналом связи; 12. Additional supply of the module for the analysis of diagnosed parameters with the input unit of the predicted probabilistic characteristics of the water inflow equipped with a communication channel;
13. Дополнительное снабжение модуля анализа диагностируемых параметров блоком прогнозного анализа объёма сточных вод, сбрасываемых в окружающую среду;13. Additional supply of the module for analysis of diagnosed parameters with a predictive analysis unit for the volume of wastewater discharged into the environment;
14. Дополнительное снабжение блока анализа водопритока двумя каналами связи;14. Additional supply of the block of analysis of water inflow with two communication channels;
15. Соединение выхода блока анализа водопритока при помощи двух каналов связи с входами блока вероятностного анализа водопритока и блока анализа объёма сточных вод, сбрасываемых в окружающую среду;15. Connection of the output of the water inflow analysis unit using two communication channels with the inputs of the probabilistic analysis of water inflow and the unit for analyzing the volume of wastewater discharged into the environment;
16. Подключение выхода блока вероятностного анализа водопритока при помощи канала связи к входу блока вероятностного анализа накопительного расхода сточных вод;16. Connecting the output of the block of probabilistic analysis of water inflow using a communication channel to the input of the block of probabilistic analysis of the cumulative flow rate of wastewater;
17. Подключение выхода блока ввода вероятностных и технологических показателей надёжности насосов при помощи канала связи к входу блока вероятностного анализа суммарной подачи насосов;17. Connecting the output of the input block of probabilistic and technological indicators of pump reliability using the communication channel to the input of the block of probabilistic analysis of the total pump supply;
18. Подключение выхода блока вероятностного анализа суммарной подачи насосов при помощи канала связи к входу блока вероятностного анализа накопительного расхода сточных вод;18. Connecting the output of the block of probabilistic analysis of the total supply of pumps using the communication channel to the input of the block of probabilistic analysis of the cumulative flow rate of wastewater;
19. Подключение выхода блока вероятностного анализа накопительного расхода сточных вод к входу блока анализа объёма сточных вод, сбрасываемых в окружающую среду;19. Connecting the output of the block of probabilistic analysis of the accumulated flow of wastewater to the input of the block for analyzing the volume of wastewater discharged into the environment;
20. Подключение выхода блока ввода прогнозных вероятностных характеристик водопритока к входу блока вероятностного анализа накопительного расхода сточных вод;20. Connecting the output of the input block of the predicted probabilistic characteristics of the water inflow to the input of the block of probabilistic analysis of the cumulative discharge of wastewater;
21. Подключение выхода блока анализа объёма сточных вод, сбрасываемых в окружающую среду, при помощи канала связи к входу блока прогнозного анализа объёма сточных вод, сбрасываемых в окружающую среду;21. Connection of the output of the unit for analysis of the volume of wastewater discharged into the environment, using the communication channel to the input of the predictive analysis unit of the volume of wastewater discharged into the environment;
22. Дополнительное снабжение модуля контрольно-измерительных приборов датчиком уровня воды, установленным на подводящем трубопроводе;22. Additional supply of the instrumentation module with a water level sensor installed on the supply pipe;
23. Дополнительное снабжение модуля контрольно-измерительных приборов датчиком уровня воды, установленным в приёмном резервуаре, снабжённым устройствами записи данных и каналами связи; 23. Additional supply of the instrumentation module with a water level sensor installed in the receiving tank, equipped with data recording devices and communication channels;
24. Дополнительное снабжение модуля перекачки воды запорно-регулирующим устройством с исполнительным органом, установленным на подводящем трубопроводе между датчиком уровня воды, установленным на подводящем трубопроводе, и приёмным резервуаром;24. Additional supply of the water pumping module with a locking-regulating device with an actuator installed on the inlet pipe between the water level sensor installed on the inlet pipe and the receiving tank;
25. Дополнительное снабжение модуля перекачки воды устройством управления, снабжённым каналом связи;25. Additional supply of the water pumping module with a control device equipped with a communication channel;
26. Выполнение блока вероятностного анализа накопительного расхода сточных вод с возможностью определения функции плотности вероятности накопительного расхода Qнакоп= Qприт – Qкнс, где Qприт, Qкнс – расход водопритока и суммарная подача насосов;26. Execution unit probabilistic analysis cumulative flow of wastewater to determine the cumulative probability density function flow Q = Q accumulation attraction - CND Q where Q attraction, Q CND - total water production rate and feed pumps;
27. Выполнение блока анализа водопритока с возможностью определения графика водопритока, поступающего в подводящий трубопровод перед приёмным резервуаром; 27. The implementation of the block analysis of water inflow with the ability to determine the schedule of water inflow entering the supply pipe in front of the receiving tank;
28. Выполнение блока анализа водопритока с возможностью определения корреляционной зависимости между продолжительностью подтопления подводящего трубопровода и накопительным расходом Qнакоп сточных вод;28. Analyzing water production unit to determine correlation between the duration of flooding and metering line cumulative flow rate Q accumulation of wastewater;
29. Подключение выхода устройства записи данных датчика уровня воды, установленного в приёмном резервуаре, при помощи каналов связи к входу устройства управления;29. Connecting the output of the data recording device of the water level sensor installed in the receiving tank, using communication channels to the input of the control device;
30. Подключение выхода устройства записи данных датчика уровня воды, установленного в приёмном резервуаре, при помощи каналов связи к входу блока анализа водопритока; 30. Connecting the output of the data recording device of the water level sensor installed in the receiving tank, using communication channels to the input of the water inflow analysis unit;
31. Подключение выхода устройства управления к входу исполнительного органа запорно-регулирующего устройства;31. Connecting the output of the control device to the input of the executive body of the locking-regulating device;
32. Выполнение устройства управления с возможностью формирования сигналов управления на исполнительный орган запорно-регулирующего устройства;32. The implementation of the control device with the possibility of generating control signals to the executive body of the locking and regulating device;
33. Подключение при помощи канала связи выхода блока ввода объёмов приёмного резервуара к входу блока анализа откачки воды из приёмного резервуара; 33. Connection via the communication channel of the output of the input unit of the volumes of the receiving tank to the input of the analysis unit of the pumping of water from the receiving tank;
34. Подключение при помощи канала связи выходов устройств записи данных, по меньшей мере, двух датчиков подачи насоса к входу блока анализа откачки воды из приёмного резервуара;34. Connection via the communication channel of the outputs of the data recording devices of at least two sensors of the pump supply to the input of the analysis unit for pumping water from the receiving tank;
35. Подключение при помощи канала связи выходов устройств двух датчиков давления к входу блока анализа откачки воды из приёмного резервуара;35. Connection using the communication channel of the outputs of the devices of two pressure sensors to the input of the analysis unit for pumping water from the receiving tank;
36. Подключение при помощи канала связи выхода измерителя потребляемой мощности к входу блока анализа откачки воды из приёмного резервуара;36. Connection using the communication channel of the output of the power consumption meter to the input of the analysis unit for pumping water from the receiving tank;
37. Подключение при помощи канала связи выхода устройства записи данных датчика уровня воды, установленного на подводящем трубопроводе, к входу блока анализа водопритока;37. Connection via the communication channel of the output of the data recording device of the water level sensor installed on the inlet pipe to the input of the water inflow analysis unit;
38. Подключение при помощи канала связи выхода блока ввода геометрических характеристик приёмного резервуара к входу блока анализа водопритока;38. Connection via the communication channel of the output of the input unit of the geometric characteristics of the receiving tank to the input of the water analysis block;
39. Подключение при помощи канала связи выхода блока ввода гидравлических характеристик подводящего трубопровода к входу блока анализа водопритока;39. Connection via the communication channel of the output of the input block of the hydraulic characteristics of the supply pipe to the input of the block of water inflow analysis;
40. Подключение при помощи канала связи выхода устройства записи данных блока анализа откачки воды из приёмного резервуара к входу блока анализа водопритока;40. Connection via the communication channel of the output of the data recorder of the analysis unit for pumping water from the receiving tank to the input of the analysis unit for water inflow;
41. Представление корреляционной зависимости между продолжительностью подтопления подводящего трубопровода и накопительным расходом сточных вод в виде41. Presentation of the correlation between the duration of the flooding of the supply pipe and the cumulative flow rate of wastewater in the form
t=k1/Qнакоп+k2,t = k 1 / Q stack + k 2 ,
где t - продолжительность подтопления подводящего трубопровода, ч; Qнакоп - накопительный расход сточных вод, тыс. м3/ч; k1, k2 – эмпирические коэффициенты;where t is the duration of the flooding of the supply pipe, h; Qaccumulation - cumulative wastewater consumption, thousand m3/ h; kone, k2- empirical coefficients;
42. Выполнение блока ввода геометрических характеристик приёмного резервуара с возможностью ввода средней площади поперечного сечения приёмного резервуара;42. The implementation of the input unit of the geometric characteristics of the receiving tank with the ability to enter the average cross-sectional area of the receiving tank;
43. Выполнение блока ввода гидравлических характеристик подводящего трубопровода с возможностью ввода зависимости объёма воды в подводящем трубопроводе от уровня воды в нем в виде 43. The implementation of the input block hydraulic characteristics of the supply pipe with the ability to enter the dependence of the volume of water in the supply pipe from the water level in it in the form
dVкол(t)/dt = k3*ln(dНкол(t))+ k4,dV count (t) / dt = k 3 * ln (dН count (t)) + k 4 ,
где dVкол(t) - производная объёма воды в подводящем трубопроводе, м3/ч; dНкол(t) – производная уровня воды в подводящем трубопроводе, м/ч; k3, k4 – эмпирические коэффициенты.where dV count (t) is the derivative of the volume of water in the supply pipe, m 3 / h; dH count (t) - derivative of the water level in the supply pipe, m / h; k 3, k 4 are empirical coefficients.
По сведениям, имеющимся у авторов, отличительные признаки № 1, 2, 21, 25, 30, 32, 34 в технической литературе известны, а остальные - нет, что отвечает условию патентоспособности «новизна».According to the information available to the authors, the distinguishing features No. 1, 2, 21, 25, 30, 32, 34 are known in the technical literature, and the rest are not, which meets the condition of patentability “novelty”.
Совместное применение в заявляемом устройстве указанных отличительных признаков позволяет получить положительный эффект, заключающийся в том, что повышается надёжность и расширяются функциональные возможности системы. The combined use of the claimed distinctive features in the inventive device allows to obtain a positive effect, namely, that the reliability is increased and the functionality of the system is expanded.
Надёжность системы повышается до уровня, при котором в условиях превышения притока воды над суммой подач насосов:The reliability of the system increases to a level at which, in the event of an excess of water inflow over the sum of the pump flows:
- приёмный резервуар и насосы будут защищены от подтопления, поскольку наличие отличительных признаков № 22-25, 29, 31, 32 позволяет ограничить за счёт прикрывания запорно–регулирующего устройства поступление в приёмный резервуар притока воды, по расходу превышающего сумму подач насосов;- the receiving tank and pumps will be protected from flooding, since the presence of distinctive features No. 22-25, 29, 31, 32 allows you to limit the flow of water into the receiving tank due to covering the shut-off and regulating device, the flow rate exceeding the sum of the pump flows;
- сохранится возможность определения расхода сточных вод, поступающих в систему, поскольку наличие отличительных признаков № 1-7, 30, 33-43 позволяет обеспечить диагностику расхода воды (определения графика притока) в условиях, когда его поступление в приёмный резервуар регулируется запорно-регулирующим устройством;- it will remain possible to determine the flow rate of wastewater entering the system, since the presence of distinguishing features No. 1-7, 30, 33-43 allows for the diagnosis of water flow (determine the flow schedule) in conditions when its flow into the receiving tank is controlled by a shut-off and control device ;
- появляется возможность оценить объем сбрасываемых в окружающую среду сточных вод, поскольку наличие отличительных признаков № 7 – 11, 14-19, 26 – 28 позволяет обеспечить оценку объёма сбрасываемых в окружающую среду сточных вод.- it becomes possible to estimate the volume of wastewater discharged into the environment, since the presence of distinctive features No. 7 - 11, 14-19, 26 - 28 allows us to provide an estimate of the volume of wastewater discharged into the environment.
Функциональные возможности системы повышаются до уровня, когда при помощи предлагаемой системы появляется возможность оптимизировать (например, свести до минимума) выбросы сточных вод в окружающую среду. Это достигается благодаря наличию отличительных признаков № 12-13, 20 – 21, в соответствии с которыми:The functionality of the system is increased to the level where, using the proposed system, it becomes possible to optimize (for example, minimize) the wastewater emissions into the environment. This is achieved due to the presence of distinctive features No. 12-13, 20 - 21, in accordance with which:
- появляется дополнительная функциональная возможность оценивать объёмы сбрасываемых в окружающую среду сточных вод при увеличении или уменьшении притока;- there is an additional functional opportunity to estimate the volume of wastewater discharged into the environment with an increase or decrease in inflow;
- появляется дополнительная функциональная возможность за счет применения инженерных мероприятий снижать выбросы сточных вод в окружающую среду.- there is an additional functionality through the use of engineering measures to reduce wastewater emissions into the environment.
Полученный эффект является техническим в соответствии с Национальным стандартом Российской Федерации «Надежность в технике. Термины и определения» IEC 60050 (191):1990-12.The effect obtained is technical in accordance with the National standard of the Russian Federation “Reliability in technology. Terms and definitions ”IEC 60050 (191): 1990-12.
Предлагаемая авторами система отличается от прототипа конструктивно.The system proposed by the authors is structurally different from the prototype.
На фиг. 1 представлена схема системы оценки и прогнозирования сбросов сточных вод, на фиг. 2 - пример построения графика водопритока, на фиг. 3 – пример результата анализа фактических данных, в результате которого получена корреляционная зависимость между продолжительностью подтопления подводящего трубопровода и накопительным расходом сточных вод, на фиг. 4 – пример результатов вероятностного анализа водопритока в виде функции плотности распределения водопритока fQ(Qприт), на фиг. 5 - пример результатов вероятностного анализа водопритока в виде функции плотности распределения суммарной подачи насосов fQ(Qкнс), на фиг. 6 – пример результатов вероятностного анализа накопительного расхода сточных вод, на фиг. 7 – пример результатов анализа объёма сточных вод, сбрасываемого в окружающую среду, на фиг. 8 – пример с результатами оценки эффективности инженерных мер, направленных на снижение выбросов сточных вод в окружающую среду. In FIG. 1 is a diagram of a system for estimating and predicting wastewater discharges; FIG. 2 - an example of plotting water inflow, in FIG. 3 - an example of the result of the analysis of actual data, which resulted in a correlation between the duration of the flooding of the supply pipe and the cumulative flow rate of wastewater, in FIG. 4 - an example of the results of a probabilistic analysis of water inflow in the form of a function of the density of distribution of water inflow f Q (Q pr ), in FIG. 5 is an example of the results of a probabilistic analysis of water inflow as a function of the distribution density of the total pump supply f Q (Q KNS ), in FIG. 6 - an example of the results of a probabilistic analysis of the cumulative flow rate of wastewater, in FIG. 7 is an example of the results of the analysis of the volume of wastewater discharged into the environment, in FIG. 8 is an example with the results of evaluating the effectiveness of engineering measures aimed at reducing wastewater emissions into the environment.
Устройство содержит (см. фиг. 1):The device contains (see. Fig. 1):
1. Модуль перекачки воды, содержащий:1. A water pumping unit, comprising:
- по меньшей мере, два насоса 1 и 2 с всасывающими 3, 4 и напорными 5, 6 трубопроводами, приёмный резервуар 7 с подводящим трубопроводом 8, при этом всасывающие 3 и 4 трубопроводы, по меньшей мере, двух насосов 1, 2 соединены с приёмным резервуаром 7; - at least two
- запорно-регулирующее устройство 9 с исполнительным органом 10, устройство управления 11, снабжённое каналом связи 12, выполненное с возможностью формирования сигналов управления на исполнительный орган 10 запорно - регулирующего устройства 9;- locking and regulating
2. Модуль контрольно-измерительных приборов, содержащий:2. A module for instrumentation, comprising:
- или, по меньшей мере, два датчика 13 и 14 подачи насоса, и/или, по меньшей мере, два датчика 15, 16 давления, установленные на напорных 5, 6 трубопроводах и/или измеритель 17 потребляемой мощности;- or at least two
- датчик 18 уровня воды, установленный на подводящем трубопроводе 8, и датчик 19 уровня воды, установленный в приёмном резервуаре 7, при этом все датчики 13-16, 18-19 и измеритель 17 потребляемой мощности снабжены устройствами 20 записи данных и каналами связи 21.- a
При этом датчики 13 и 14 подачи насоса выполнены с возможностью измерения подачи каждого насоса, а измеритель 17 потребляемой мощности - с возможностью измерения силы тока и/или потребляемой мощности каждого насоса.In this case, the
3. Модуль анализа диагностируемых параметров, содержащий:3. A module for analyzing diagnosed parameters, comprising:
- блок 22 ввода геометрических характеристик приёмного резервуара, снабжённый каналом связи 23;- block 22 input geometric characteristics of the receiving tank, equipped with a communication channel 23;
- блок 24 анализа откачки воды из приёмного резервуара, снабжённый устройством записи данных 25 и каналом связи 26;-
- блок 27 анализа водопритока;-
- блок 28 ввода объёмов приёмного резервуара с каналом связи 29;-
- блок 30 ввода гидравлических характеристик подводящего трубопровода, снабжённый каналом связи 31;-
- блок 32 вероятностного анализа водопритока, снабжённый каналом связи 33;- block 32 of the probabilistic analysis of water inflows, equipped with a
- блок 34 вероятностного анализа суммарной подачи насосов, снабжённый каналом связи 35;-
- блок 36 ввода вероятностных и технологических показателей надёжности насосов, снабжённый каналом связи 37; -
- блок 38 вероятностного анализа накопительного расхода сточных вод, снабжённый каналом связи 39; - block 38 of the probabilistic analysis of the cumulative flow of wastewater, equipped with a
- блок 40 анализа объёма сточных вод, сбрасываемых в окружающую среду. -
При этом:Wherein:
- запорно-регулирующее устройство 9 с исполнительным органом 10 установлено на подводящем трубопроводе 8 между датчиком 18 уровня воды, установленным на подводящем трубопроводе 8, и приёмным резервуаром 7;- the locking-regulating
- выход устройства 20 записи данных датчика 19 уровня воды, установленного в приёмном резервуаре 7, при помощи каналов связи 21 подключён к входу устройства управления 11 и входу блока 27 анализа водопритока, выход устройства управления 11 при помощи канала связи 12 - к входу исполнительного органа 10 запорно-регулирующего устройства 9;- the output of the
- устройства 20 записи данных датчиков 13 - 16 и измерителя 17 потребляемой мощности при помощи каналов связи 21 подключены к входу блока 24 анализа откачки воды из приёмного резервуара;- a
- устройство записи данных 25 блока 24 анализа откачки воды из приёмного резервуара при помощи канала связи 26 подключено к входу блока 27 анализа водопритока;- the
- выход блока 22 ввода геометрических характеристик приёмного резервуара при помощи канала связи 23 подключён к входу блока 27 анализа водопритока;- the output of the input unit 22 of the geometric characteristics of the receiving tank using the communication channel 23 is connected to the input of the
- выход блока 28 ввода объёмов приёмного резервуара при помощи канала связи 29 подключён к входу блока 24 анализа откачки воды из приёмного резервуара;- the output of the unit for inputting the volumes of the receiving
- выход блока 30 ввода гидравлических характеристик подводящего трубопровода при помощи канала связи 31 подключён к входу блока 27 анализа водопритока.- the output of the
Кроме того:Besides:
- блок 27 анализа водопритока дополнительно снабжён двумя каналами связи 41 и 42, соединяющими его выход соответственно с входами блока 32 вероятностного анализа водопритока и блока 40 анализа объёма сточных вод, сбрасываемых в окружающую среду;-
- выход блока 32 вероятностного анализа водопритока при помощи канала связи 33 подключён к входу блока 38 вероятностного анализа накопительного расхода сточных вод, а выход блока 36 ввода вероятностных и технологических показателей надёжности насосов при помощи канала связи 37 подключён к входу блока 34 вероятностного анализа суммарной подачи насосов;- the output of the
- выход блока 34 вероятностного анализа суммарной подачи насосов при помощи канала связи 35 подключён к входу блока 38 вероятностного анализа накопительного расхода сточных вод, выход которого при помощи канала связи 39 подключён к входу блока 40 анализа объёма сточных вод, сбрасываемых в окружающую среду;- the output of the
- выход устройства 20 записи данных датчика 18 уровня воды, установленного на подводящем трубопроводе 8, при помощи канала связи 21 подключено к входу блока 27 анализа водопритока;- the output of the
- модуль анализа диагностируемых параметров дополнительно снабжён блоком 43 ввода прогнозных вероятностных характеристик водопритока, снабжённого каналом связи 44, позволяющим соединять выход блока 43 ввода прогнозных вероятностных характеристик водопритока с входом блока 38 вероятностного анализа накопительного расхода сточных вод;- the module for analyzing diagnosed parameters is additionally equipped with a
- модуль анализа диагностируемых параметров дополнительно снабжён блоком 45 прогнозного анализа объёма сточных вод, сбрасываемых в окружающую среду, к входу которого при помощи канала связи 46 подключён выход блока 40 анализа объёма сточных вод, сбрасываемых в окружающую среду. - the module for analyzing diagnosed parameters is additionally equipped with a
Работа системы проиллюстрирована на примере, когда модуль перекачки воды оборудован двумя (и более) насосами. В соответствии с настоящим изобретением количество насосов может быть разным, но принцип работы системы от этого не меняется.The operation of the system is illustrated by the example when the water pumping module is equipped with two (or more) pumps. In accordance with the present invention, the number of pumps may be different, but the principle of operation of the system does not change from this.
Система может проводить: The system can carry out:
- оценку фактических сбросов сточных вод из системы водоотведения в окружающую среду;- assessment of actual wastewater discharges from the sewage system into the environment;
- оценку сбросов сточных вод из системы водоотведения в окружающую среду при прогнозном изменении притока, а также количества, показателей надёжности и подачи насосов. - assessment of wastewater discharges from the sewage system into the environment in case of a predicted change in the inflow, as well as the quantity, reliability and supply of pumps.
При проведении оценки фактических сбросов сточная вода с расходом Qприт по подводящему трубопроводу 8 при открытом запорно-регулирующем устройстве 9 свободно поступает в приёмный резервуар 7, уровень воды в котором начинает подниматься. При достижении первого верхнего уровня в работу включается один насос (номер 1 или 2). При этом суммарная подача насосов Qкнс равна подаче работающего насоса. После этого возможны следующие режимы работы модуля перекачки воды. In evaluating actual discharges the wastewater at a flow rate Q attraction from the supply line 8 with an open shut-off and regulating
Первый режим, когда расход воды Qприт, поступающей в приёмный резервуар 7, меньше подачи одного насоса. В этом режиме уровень воды в приёмном резервуаре 7 начинает снижаться. При достижении первого минимального уровня насос отключается. Объем воды V1, находящийся в приёмном резервуаре 7 между первым минимальным и первым верхним уровнем, вводится через блок 28 ввода объёмов приёмного резервуара.The first mode, when the flow rate of water Q pr , entering the receiving
Второй режим, когда расход воды Qприт, поступающей в приёмный резервуар 7, больше подачи одного насоса, но меньше подачи двух параллельно работающих. Модуль перекачки воды из первого режима во второй режим попадает, когда уровень воды в приёмном резервуаре 7 продолжает подниматься до второго верхнего уровня. В результате включается в работу второй насос (суммарная подача насосов Qкнс равна сумме подач работающих насосов) и уровень воды в приёмном резервуаре 7 начинает снижаться. При достижении второго минимального уровня один насос отключается, а один продолжает работать. Объем воды V2, находящийся в приёмном резервуаре 7 между первым минимальным и вторым верхним уровнем, вводится через блок 28 ввода объёмов приёмного резервуара.The second mode, when the flow rate of water Q prit entering the receiving
Третий режим, когда расход воды Qприт, поступающей в приёмный резервуар 7, больше подачи двух параллельно работающих - Qкнс. В третий режим модуль перекачки воды попадает из второго режима, когда уровень воды в приёмном резервуаре продолжает подниматься до третьего верхнего уровня. Объем воды V3, находящейся в приёмном резервуаре 7 между первым минимальным и третьим верхним уровнем, вводится через блок 28 ввода объёмов приёмного резервуара.The third mode, when the flow rate of water Q pr coming into the receiving
Информация о повышении уровня через выход устройства 20 записи данных датчика 19 уровня воды, установленного в приёмном резервуаре 7, при помощи канала связи 21 поступает к входу устройства управления 11. Для предотвращения затопления модуля перекачки воды из выхода устройства управления 11 при помощи канала связи 12 к входу исполнительного органа 10 запорно-регулирующего устройства 9 поступает команда на прикрытие. В результате:Information about the level increase through the output of the
- уровень воды в приёмном резервуаре 7 начнёт снижаться;- the water level in the receiving
- уровень воды в подводящем трубопроводе 8 начнёт повышаться, поскольку в нем начнёт аккумулироваться вода за счёт накопительного расхода Qнакоп= Qприт – Qкнс, где Qприт, Qкнс – расход водопритока и суммарная подача насосов.- the water level in the supply pipe 8 begins to rise, as it starts to accumulate water at the expense of accumulating flow rate Q = Q accumulation attraction - CND Q where Q attraction, Q CND - total water production rate and feed pumps.
В течение всего третьего режима устройство управления 11 путём прикрытия – открытия будет поддерживать уровень воды, например, на третьем верхнем уровне. Система вернётся из третьего режима во второй, когда при полностью открытом запорно-регулирующем устройстве 9 уровень воды в приёмном резервуаре 7 будет продолжать снижаться. During the entire third mode, the control device 11 by covering - opening will maintain the water level, for example, at the third upper level. The system will return from the third mode to the second, when with the shut-off-regulating
Перечисленные режимы работы модуля перекачки воды относятся к режимам «старт – стоп». Настоящим изобретением не исключается другой тип режима работы, когда уровень воды в приёмном резервуаре 7 поддерживается примерно на одинаковом уровне за счёт включения – выключения насосных агрегатов. Это практикуется на больших канализационных насосных станциях, где число насосов значительно больше двух. Но, при этом, третий режим неизбежен при поступлении нерасчётных расходов воды, например, в дождь. The listed operating modes of the water pumping module are related to the “start-stop” modes. The present invention does not exclude another type of operating mode when the water level in the receiving
В целом, в третьем режиме суммарная откачка Qкнс воды насосами будет меньше поступающего расхода Qприт (водопритока), поэтому ее оценить по суммарной производительности насосов невозможно. Для решения этой задачи включаются в работу модуль контрольно-измерительных приборов и анализа диагностируемых параметров.In general, in the third mode, the total pumping Q KNS of water by the pumps will be less than the incoming flow Q pr (water inflow), therefore it is impossible to evaluate it from the total pump capacity. To solve this problem, a module of instrumentation and analysis of diagnosed parameters are included in the work.
Датчики 13 - 19 синхронно (т.е. в одно и то же время) и через один и тот же интервал времени (например, 1 минуту) снимают показания и записывают в устройствах 20 записи данных, где таким образом хранится массив информации. При этом настоящим изобретением предусматривается возможность двух вариантов применения датчиков 13 - 17.Sensors 13 - 19 synchronously (i.e. at the same time) and after the same time interval (for example, 1 minute) take readings and record in
Первый вариант, когда применяется только один тип, т.е. или только датчики 13 и 14 подачи насоса, или только датчики 15, 16 давления, или только измеритель 17 потребляемой мощности. Этого достаточно для того, чтобы в блоке 24 анализа откачки воды из приёмного резервуара, куда информация от датчиков поступает по каналам связи 21, проанализировать и сохранить в устройстве записи данных 25 массив информации, характеризующий график изменения во времени расхода воды (суммарной подачи насосов), откачиваемой из приёмного резервуара 7. На фигуре 2 для примера этот график обозначен позицией 44, отражающей изменение расхода Qкнс, тыс. м3/ч. The first option, when only one type is used, i.e. or only
При работе модуля перекачки воды в режиме «старт – стоп» расход откачиваемой воды в первом варианте дополнительно оценивается объёмным способом, с учётом объёмов приёмного резервуара. Информация о (V1, V2, V3 и т.д.) последних поступает в блок 24 анализа откачки воды из приёмного резервуара при помощи канала связи 29 из блока 28 ввода объёмов приёмного резервуара. В этом случае показания датчиков 15, 16 давления или измерителя 17 потребляемой мощности используются только для фиксации времени начала и окончания откачки воды из приёмного резервуара 7. Точность этого способа зависит от режима работы модуля перекачки воды, поскольку расход в этом случае оценивается как среднее значение продолжительности наполнения и откачки приёмного резервуара 7. Чем меньше эта продолжительность, тем больше точность оценки. When the water pumping module is operating in the “start-stop” mode, the flow rate of the pumped water in the first embodiment is additionally estimated by the volumetric method, taking into account the volumes of the receiving tank. Information about (V 1 , V 2 , V 3 , etc.) of the latter enters the
Второй вариант, когда они применяются одновременно. Это может быть реализовано в системах, на которых они уже установлены для контроля технологических показателей работы. В этом случае повысится надёжность системы в целом и точность оценки за счёт сопоставления результатов измерений. The second option is when they are applied simultaneously. This can be implemented in systems on which they are already installed to control technological performance indicators. In this case, the reliability of the system as a whole and the accuracy of the assessment will be improved by comparing the measurement results.
К входу блока 27 анализа водопритока поступает следующая информация:The following information is received at the input of
- от устройства 25 записи данных блока 24 анализа откачки воды из приёмного резервуара 7 при помощи канала связи 26. Информация представляется в виде графика изменения во времени расхода воды, откачиваемой из приёмного резервуара 7, т.е. Qкнс(t);- from the
- от выхода устройства 20 записи данных датчика 19 уровня воды, установленного в приёмном резервуаре 7, при помощи канала связи 21. Информация представляется в виде графика изменения во времени уровня воды в приёмном резервуаре 7. На фигуре 2 для примера этот график обозначен позицией 45, отражающей изменение уровня Нрез(t), м.в.с.;- from the output of the
- от выхода блока 22 ввода геометрических характеристик приёмного резервуара 7 (например, в виде средней площади поперечного сечения) при помощи канала связи 23. Информация представляется в виде константы. По этой причине блок 22 не оборудуется устройством записи данных. Однако произведение этой константы на значения из массива информации об уровне воды в приёмном резервуаре 7, поступающей от выхода устройства 20 записи данных датчика 19 уровня воды, позволяет в блоке 27 анализа водопритока получить информацию в виде графика изменения во времени объёма воды в приёмном резервуаре 7 (на фигуре 2 не показан);- from the output of the input unit 22 of the geometric characteristics of the receiving tank 7 (for example, in the form of an average cross-sectional area) using the communication channel 23. The information is presented in the form of a constant. For this reason, unit 22 is not equipped with a data recorder. However, the product of this constant by the values from the array of information about the water level in the receiving
- от выхода устройства 20 записи данных датчика 18 уровня воды, установленного на подводящем трубопроводе 8, при помощи канала связи 21. На фигуре 2 для примера этот график обозначен позицией 46, отражающей изменение уровня Нкол(t), м.в.с.;- from the output of the
- от выхода блока 30 ввода гидравлических характеристик подводящего трубопровода (например, в виде зависимости объёма воды от уровня воды в подводящем трубопроводе) при помощи канала связи 31. Информация представляется в виде функции. По этой причине блок 30 не оборудуется устройством записи данных. Однако применение этой функции позволяет на основании информации, полученной от датчика 18 уровня воды в подводящем трубопроводе, вычислять объем воды в нем.- from the output of the
Этой информации достаточно для того, чтобы в блоке 27 анализа водопритока:This information is sufficient to ensure that in
-
Определить график водопритока, поступающего в подводящий трубопровод 8 перед приёмным резервуаром 7, на основании следующего уравнения баланса водыDetermine the schedule of water inflow entering the inlet pipe 8 in front of the receiving
tank 7, based on the following water balance equation - Определить корреляционную зависимость между продолжительностью подтопления подводящего трубопровода и накопительным расходом Qнакоп сточных вод, т.к.:Determine the correlation between the duration of the flooding of the supply pipeline and the cumulative flow rate Q of the accumulation of wastewater, because:
Qприт(t)=Qкнс(t)+dVрез(t)/dt+dVкол(t)/dt,Q pr (t) = Q kns (t) + dV rez (t) / dt + dV count (t) / dt,
где dVрез(t) = dНрез(t)*S, S - средняя площадь поперечного сечения приёмного резервуара 7, поступающая из блока 22 ввода геометрических характеристик приёмного резервуара; dVкол(t)/dt = f1(dНкол(t)), f1 - зависимость объёма воды от уровня воды Нкол(t) в подводящем трубопроводе 7, поступающая из блока 30 ввода гидравлических характеристик подводящего трубопровода. По одному из вариантов развития where dV rez (t) = dH rez (t) * S, S is the average cross-sectional area of the receiving
dVкол(t)/dt=f1(Нкол(t))=k3*ln(dНкол(t))+k4, м3/ч. dV count (t) / dt = f 1 (N count (t)) = k 3 * ln (dН count (t)) + k 4 , m 3 / h.
На фигуре 2 для примера полученный график Qприт(t) обозначен позицией 47, отражающий изменение водопритока, тыс. м3/ч;In figure 2, for example, the obtained graph Q pr (t) is indicated by 47, reflecting the change in water inflow, thousand m 3 / h;
- продолжительность t подтопления подводящего трубопровода 8 возможно определить по продолжительности повышения уровня воды в нем;- the duration t of flooding of the supply pipe 8 can be determined by the duration of the increase in water level in it;
- накопительный расход Qнакоп сточных вод возможно определить по формуле Qнакоп = Qприт - Qкнс. В том случае, когда Qнакоп > 0 имеет место подтопление подводящего трубопровода 8. - Q cumulative flow of wastewater accumulation may be determined by the formula Q = Q accumulation attraction - Q CND. In the case when Q accumulation > 0, there is flooding of the supply pipe 8.
На фигуре 3 для примера показан результат анализа фактических данных 48, в результате которого получена корреляционная зависимость 49 по формулеThe figure 3 for example shows the result of the analysis of
t=k1/Qнакоп+k2,t = k 1 / Q stack + k 2 ,
где k1=8, k2=0,55.where kone= 8, k2= 0.55.
В блоке 32 вероятностного анализа водопритока на основании графика водопритока Qприт(t), определённого за длительный период, например один год, в блоке 27 анализа водопритока, поступающего по каналу связи 41, получаются результаты вероятностного анализа водопритока. Настоящим изобретением допускаются различные варианты предоставления результатов такого анализа. В качестве примера, на фиг. 4 представлен вариант, когда он приведён в виде функции плотности распределения водопритока fQ(Qприт). In
Дополнительно через блок 36 ввода вероятностных и технологических показателей надёжности насосов вводится требуемая информация. Допустим (для сплошного примера демонстрации работоспособности системы), что для перекачки водопритока, функция плотности распределения которого представлена на фиг. 4, необходима станция с четырьмя насосами первого типа с подачей Qн1 и семью насосами второго типа с подачей Qн2. Тогда в блоке 36 для примера вводится следующая информация;Additionally, through the
- Вероятностные показатели:Probability indicators:
- Технологические показатели:Technological indicators:
- интенсивность отказов насосов первого типа л1= 0,002, 1/ч;- the failure rate of the pumps of the first type l 1 = 0.002, 1 / h;
- интенсивность отказов насосов второго типа л2= 0,001666667, 1/ч;- the failure rate of the pumps of the second type l 2 = 0,001666667, 1 / h;
- интенсивность восстановления насосов первого типа м1= 0,001538, 1/ч;- the recovery rate of the pumps of the first type m 1 = 0.001538, 1 / h;
- интенсивность восстановления насосов второго типа м2= 0,001429, 1/ч.- the recovery rate of the pumps of the second type m 2 = 0.001429, 1 / h.
- подача насосов первого типа Qн1= 7,5, тыс. м3/ч;- supply of pumps of the first type Q n1 = 7.5, thousand m 3 / h;
- подача насосов второго типа Qн1= 17, тыс. м3/ч.- supply of pumps of the second type Q n1 = 17, thousand m 3 / h.
Эта информация по каналу связи 37 поступает в блок 34 вероятностного анализа суммарной подачи насосов, в котором выполняется анализ вероятностей суммарной подачи насосов. Настоящим изобретением предусматривается возможность применения различных методов расчёта для проведения заявленного анализа. Для примера, на фиг. 5 представлен результат, полученный путём решения системы дифференциальных уравнений Колмогорова, описывающей процесс изменения состояний насосов, и представленный в виде функции плотности распределения суммарной подачи насосов fQ(Qкнс). This information via the communication channel 37 enters the
В результате, в блок 38 вероятностного анализа накопительного расхода сточных вод поступает следующая информация:As a result, the following information is received in
- из блока 32 вероятностного анализа водопритока - результаты анализа водопритока, например, в виде функции плотности распределения водопритока fQ(Qприт), представленной на фиг. 4;- from the
- из блока 34 вероятностного анализа суммарной подачи насосов - результаты анализа суммарной подачи, например, в виде функции плотности распределения суммарной подачи насосов fQ(Qкнс), представленной на фиг. 5.- from the
Этой информации достаточно для того, чтобы в блоке 38 вероятностного анализа накопительного расхода сточных вод выполнить вероятностный анализ разницы двух случайных величин - Qприт и Qкнс , и получить ее, например, в виде функции плотности распределения fQ(Qнакоп) накопительного расхода Qнакоп. Для примера, на фиг. 6 представлен результат такого анализа.This information is sufficient to perform a probabilistic analysis of the difference of two random variables - Qpritand Qkns, and get it, for example, as a function of the distribution density fQ(Qaccumulation) cumulative flow rate Qaccumulation. For example, in FIG. 6 presents the result of such an analysis.
В блок 40 анализа объёма сточных вод, сбрасываемых в окружающую среду, поступает следующая информация:In
- из блока 38 вероятностного анализа накопительного расхода сточных вод - результаты анализа накопительного расхода, например, в виде функции плотности распределения накопительного расхода fQ(Qнакоп), представленной на фиг. 6;- from the
- из блока 27 анализа водопритока - результаты анализа корреляционной зависимости между продолжительностью подтопления подводящего трубопровода 8 и накопительным расходом Qнакоп сточных вод, представленной на фиг. 3.- analysis of the water production unit 27 - depending on the results of analysis of the correlation between the duration of flooding supply pipe 8 and a flow rate Q accumulating wastewater accumulation of Fig. 3.
Этой информации достаточно для того, чтобы в блоке 40 анализа объёма сточных вод, сбрасываемых в окружающую среду, выполнить:This information is sufficient for in
- оценку зависимости общей продолжительности T эксплуатации системы за год (или другой требуемый период), когда Qнакоп > 0, от Qнакоп. Результаты такой оценки представлены на фигуре 7 позицией 50;- an assessment of the dependence of the total duration T of the system operation for the year (or other required period), when Q accumulation > 0, from Q accumulation . The results of such an assessment are presented in figure 7 at 50;
- оценку зависимости количества случаев N в году (или другой требуемый период), когда Qнакоп > 0, от Qнакоп. Результаты такой оценки представлены на фигуре 7 позицией 51. При этом для оценки использована корреляционная зависимость между продолжительностью подтопления подводящего трубопровода 8 и накопительным расходом Qнакоп, обозначенная позицией 52; - an assessment of the dependence of the number of cases N in a year (or other required period), when Q accumulation > 0, from Q accumulation . The results of such an assessment are presented in figure 7 at 51. In this case, a correlation between the duration of the underflooding of the supply pipe 8 and the cumulative flow rate Q accumulation , indicated by 52, was used for the assessment;
- оценку интегрального объёма V сточных вод, сбрасываемых в окружающую среду за год (или другой требуемый период). Результаты такой оценки представлены на фигуре 7 позицией 53. - assessment of the integral volume V of wastewater discharged into the environment for a year (or other required period). The results of this assessment are presented in figure 7 at 53.
Этот пример иллюстрирует повышение надёжности предлагаемой системы по сравнению с прототипом, т.к. ее применение в условиях превышения притока воды над суммой подач насосов позволит сохранить ее работоспособность поскольку:This example illustrates the increased reliability of the proposed system compared to the prototype, because its use in conditions of excess of water inflow over the sum of pump flows will allow to maintain its operability since:
- приёмный резервуар и насосы будут защищены от подтопления;- the receiving tank and pumps will be protected from flooding;
- сохранится возможность определения расхода сточных вод, поступающих в систему;- it will remain possible to determine the flow rate of wastewater entering the system;
- появляется возможность оценивать объем сбрасываемых в окружающую среду сточных вод.- it becomes possible to estimate the amount of wastewater discharged into the environment.
При проведении оптимизации сбросов сточных вод из системы водоотведения в окружающую среду возможны следующие режимы ее работы.When optimizing wastewater discharges from the sewage system into the environment, the following modes of operation are possible.
Первый режим, когда прогнозируется изменение алгоритмов работы (или реконструкция) только модуля перекачки воды при фактически измеренном водопритоке. В этом случае:The first mode, when a change in the operating algorithms (or reconstruction) of only the water pumping module is predicted at the actually measured water inflow. In this case:
- блок 43 ввода прогнозных вероятностных характеристик водопритока не включается в работу;-
- модуль контрольно-измерительных приборов и модуль анализа диагностируемых параметров работают так же, как и при оценке фактических сбросов за исключением того, что в блоке 36 ввода вероятностных и технологических показателей надёжности насосов осуществляется ввод новых вероятностных и технологических показателей надёжности насосов, отражающих результаты изменения алгоритмов работы (или реконструкции) насосов, а в блок 45 прогнозного анализа объёма сточных вод, сбрасываемых в окружающую среду, по каналу связи 46 поступают для сравнения результаты прогноза в этом режиме. - the instrumentation module and the module for analyzing diagnosed parameters work the same way as when evaluating the actual discharges, except that in
Для примера на фиг. 8 позицией 54 обозначены результаты оценки количества случаев N в году (или другой требуемый период), когда Qнакоп > 0, от Qнакоп, а позицией 55 – результаты оценки интегрального объёма V сточных вод, сбрасываемых в окружающую среду за год (или другой требуемый период) при уменьшении вдвое интенсивностей отказов насосов. For the example of FIG. 8, 54 indicates the results of estimating the number of cases of N in a year (or another required period), when Q accumulation is > 0, from Q accumulation , and 55 indicates the results of estimating the integral volume V of wastewater discharged into the environment for a year (or other required period) with a halving of the pump failure rate.
Второй режим, когда прогнозируется изменение водопритока при сохранении алгоритмов работы (или реконструкция) модуля перекачки воды. В этом случае:The second mode, when the change in water inflow is predicted while maintaining the algorithms of operation (or reconstruction) of the water pumping module. In this case:
- модуль контрольно-измерительных приборов и модуль анализа диагностируемых параметров не включается в работу;- the module of instrumentation and the module for analysis of diagnosed parameters is not included in the work;
- в блоке 43 ввода прогнозных вероятностных характеристик водопритока вводятся прогнозные вероятностные характеристики водопритока;- in
- в остальном модуль анализа диагностируемых параметров работает так же, как и в первом режиме. - Otherwise, the module for analyzing diagnosed parameters works in the same way as in the first mode.
Для примера на фиг. 8 позицией 56 обозначены результаты оценки количества случаев N в году (или другой требуемый период), когда Qнакоп > 0, от Qнакоп, а позицией 57 – результаты оценки интегрального объёма V сточных вод, сбрасываемых в окружающую среду за год (или другой требуемый период) при увеличении на 16% водопритока. For the example of FIG. 8, 56 indicates the results of estimating the number of cases N in a year (or another required period), when Q accumulation is > 0, from Q accumulation , and 57 indicates the results of estimating the integral volume V of wastewater discharged into the environment for a year (or other required period) with an increase of 16% in water inflow.
Третий режим, когда прогнозируется изменение водопритока при одновременном изменении алгоритмов работы (или реконструкция) модуля перекачки воды. В этом случае:The third mode, when the change in water inflow is predicted while changing the algorithms of work (or reconstruction) of the water pumping module. In this case:
- модуль контрольно-измерительных приборов и модуль анализа диагностируемых параметров не включается в работу;- the module of instrumentation and the module for analysis of diagnosed parameters is not included in the work;
- в блоке 43 ввода прогнозных вероятностных характеристик водопритока вводятся прогнозные вероятностные характеристики водопритока;- in
- в блоке 36 ввода вероятностных и технологических показателей надёжности насосов осуществляется ввод новых вероятностных и технологических показателей надёжности насосов, отражающих результаты изменения алгоритмов работы (или реконструкции) насосов.- in the
Для примера на фиг. 8 позицией 58 обозначены результаты оценки количества случаев N в году (или другой требуемый период), когда Qнакоп > 0, от Qнакоп, а позицией 59 – результаты оценки интегрального объёма V сточных вод, сбрасываемых в окружающую среду за год (или другой требуемый период) при одновременном увеличении на 16% водопритока и уменьшении вдвое интенсивностей отказов насосов.For the example of FIG. 8,
Этот пример иллюстрирует расширение функциональных возможностей предлагаемой системы, поскольку ее применение позволило обосновать уменьшение интенсивности отказов насосов в качестве инженерной меры, направленной на оптимизацию (снижение) сбросов сточных вод в окружающую среду. This example illustrates the expansion of the functionality of the proposed system, since its application made it possible to justify a decrease in the failure rate of pumps as an engineering measure aimed at optimizing (reducing) wastewater discharges into the environment.
Таким образом, предлагаемая система соответствует критерию «промышленная применимость».Thus, the proposed system meets the criterion of "industrial applicability".
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2015126923A RU2606039C1 (en) | 2015-07-06 | 2015-07-06 | System for estimation and forecast of discharges of waste water |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2015126923A RU2606039C1 (en) | 2015-07-06 | 2015-07-06 | System for estimation and forecast of discharges of waste water |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2606039C1 true RU2606039C1 (en) | 2017-01-10 |
Family
ID=58452289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2015126923A RU2606039C1 (en) | 2015-07-06 | 2015-07-06 | System for estimation and forecast of discharges of waste water |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2606039C1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2802098C1 (en) * | 2023-05-30 | 2023-08-22 | Общество с ограниченной ответственностью "ЯМЯ-ИНЖИНИРИНГ" | Ship sewage pumping plant |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4987913A (en) * | 1988-06-25 | 1991-01-29 | Kabushiki Kaisha Toshiba | Apparatus and method for controlling operation of storm sewage pump |
RU94291U1 (en) * | 2009-12-15 | 2010-05-20 | Государственное Унитарное Предприятие "Водоканал Санкт-Петербурга" | ENERGY CONSUMPTION MANAGEMENT SYSTEM DURING OPERATION OF SEWER PUMP STATIONS (SPS) |
RU2013142609A (en) * | 2013-09-18 | 2015-03-27 | ГУП "Водоканал Санкт-Петербурга" | SYSTEM FOR DETERMINING AND SECURING INDICATORS OF RELIABILITY AND UNINTERRUPTIBILITY OF WATER SUPPLY AND WATER DISCHARGE NETWORKS |
-
2015
- 2015-07-06 RU RU2015126923A patent/RU2606039C1/en active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4987913A (en) * | 1988-06-25 | 1991-01-29 | Kabushiki Kaisha Toshiba | Apparatus and method for controlling operation of storm sewage pump |
RU94291U1 (en) * | 2009-12-15 | 2010-05-20 | Государственное Унитарное Предприятие "Водоканал Санкт-Петербурга" | ENERGY CONSUMPTION MANAGEMENT SYSTEM DURING OPERATION OF SEWER PUMP STATIONS (SPS) |
RU2013142609A (en) * | 2013-09-18 | 2015-03-27 | ГУП "Водоканал Санкт-Петербурга" | SYSTEM FOR DETERMINING AND SECURING INDICATORS OF RELIABILITY AND UNINTERRUPTIBILITY OF WATER SUPPLY AND WATER DISCHARGE NETWORKS |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2802098C1 (en) * | 2023-05-30 | 2023-08-22 | Общество с ограниченной ответственностью "ЯМЯ-ИНЖИНИРИНГ" | Ship sewage pumping plant |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU94291U1 (en) | ENERGY CONSUMPTION MANAGEMENT SYSTEM DURING OPERATION OF SEWER PUMP STATIONS (SPS) | |
US10795382B2 (en) | Method and apparatus for model-based control of a water distribution system | |
KR101146207B1 (en) | Waterworks compact management system and method thereof | |
KR101105192B1 (en) | Method for selecting section of water leakage suspicion by water network analysis and water supply integrated management operating system with function thereof | |
CN104897188A (en) | Method and experiment apparatus for analyzing drainage pipeline siltation characteristics | |
CN110651171B (en) | Volumetric real-time flow engine | |
Ahm et al. | Estimation of combined sewer overflow discharge: a software sensor approach based on local water level measurements | |
RU2599331C1 (en) | System for assessing wastewaters discharges into environment | |
CN113792367B (en) | PySWMM-based drainage system multi-source inflow infiltration and outflow dynamic estimation method | |
RU2606039C1 (en) | System for estimation and forecast of discharges of waste water | |
JP3839361B2 (en) | Rainwater runoff coefficient prediction method, rainwater inflow prediction method, rainwater runoff coefficient prediction program, and rainwater inflow forecast program | |
Hamilton | Sources of uncertainty in Canadian low flow hydrometric data | |
RU2596029C2 (en) | Water inflow diagnostic system | |
AU2002254665B2 (en) | Flow transport analysis method and system | |
RU2557349C1 (en) | System of diagnostic of water flowrate | |
KR20120066138A (en) | Automatical measuring device and method for continuous wave overtopping | |
TWI310428B (en) | Rainwater draining support system, and rainwater draining support method | |
RU2560831C2 (en) | System for determining and assuring parameters of reliability and regular supply of water supply and water discharge networks | |
KR102080066B1 (en) | System for monitoring illegal waste- water discharge | |
RU2802098C1 (en) | Ship sewage pumping plant | |
RU2726919C1 (en) | System for rapid diagnosis of water influx | |
RU2637527C1 (en) | System of water inflow estimation | |
RU2566419C1 (en) | Method to determine water flow rate | |
Panasiuk et al. | The feasibility of using flap gates as constriction flow meters for estimating sanitary sewer overflows (SSO) | |
RU139008U1 (en) | DEVICE FOR DETERMINING THE TECHNICAL CONDITION OF THE PUMP |