RU2558051C1 - Method of open development of deposits of solid mineral resources - Google Patents

Method of open development of deposits of solid mineral resources Download PDF

Info

Publication number
RU2558051C1
RU2558051C1 RU2014124605/03A RU2014124605A RU2558051C1 RU 2558051 C1 RU2558051 C1 RU 2558051C1 RU 2014124605/03 A RU2014124605/03 A RU 2014124605/03A RU 2014124605 A RU2014124605 A RU 2014124605A RU 2558051 C1 RU2558051 C1 RU 2558051C1
Authority
RU
Russia
Prior art keywords
mining
overburden
conveyors
loading
spreader
Prior art date
Application number
RU2014124605/03A
Other languages
Russian (ru)
Inventor
Антон Юрьевич Чебан
Original Assignee
Федеральное Государственное Бюджетное Учреждение Науки Институт Горного Дела Дальневосточного Отделения Российской Академии Наук (Игд Дво Ран)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное Государственное Бюджетное Учреждение Науки Институт Горного Дела Дальневосточного Отделения Российской Академии Наук (Игд Дво Ран) filed Critical Федеральное Государственное Бюджетное Учреждение Науки Институт Горного Дела Дальневосточного Отделения Российской Академии Наук (Игд Дво Ран)
Priority to RU2014124605/03A priority Critical patent/RU2558051C1/en
Application granted granted Critical
Publication of RU2558051C1 publication Critical patent/RU2558051C1/en

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

FIELD: mining operations.
SUBSTANCE: invention relates to the mining industry and can be used in stripping and mining operations at the fields, composed of dense and semi-hard rocks, with use of boom surface miners, spreaders and other mining machines. The method comprises continuous extraction and direct overburden waste disposal, continuous extraction, transportation, sorting of mineral resources. The front of mining operations is located along the short axis of the career field, the continuous working of overburden bench of high altitude is performed simultaneously on two sub-benches using boom surface miners. The overburden on the conveyors of the boom surface miners is fed through the receiving devices to the conveyors of the loading consoles of the spreader. The process of combining the conveyors of the boom surface miners with the receiving devices of the loading consoles and positioning of the spreader relative the boom surface miners is provided by the automatic control system. The mining operations are carried out with the use of excavating milling machine, the mineral resources are fed by the loader to the hopper of the mobile reloading unit with a conveyor and then to the mobile-sorting unit.
EFFECT: increase of the productivity of mining operations in the development of deep deposits of mineral resources composed of dense and semi-hard rocks.
2 dwg

Description

Изобретение относится к горной промышленности и может быть использовано при выполнении вскрышных и добычных работ на месторождениях, сложенных из плотных и полускальных пород, с применением стреловых карьерных комбайнов, отвалообразователей и других горных машин.The invention relates to the mining industry and can be used when performing overburden and mining operations in deposits composed of dense and semi-rock, using boom mining combines, dump formers and other mining machines.

Известен способ отработки обводненных россыпей, включающий вскрытие, отработку полезного ископаемого по фронту горных работ с последующей отсыпкой вскрышных пород в выработанное пространство [1].There is a method of mining waterlogged placers, including the opening, mining of minerals on the front of mining with subsequent dumping of overburden in the worked out space [1].

Недостатками данного способа являются невысокая производительность горных работ в связи с использованием выемочного оборудования циклического действия, при этом применяемое оборудование не позволяет производить разработку месторождений, сложенных плотными и полускальными горными породами, без их предварительного разупрочнения.The disadvantages of this method are the low productivity of mining operations in connection with the use of mining equipment of cyclic action, while the equipment used does not allow the development of deposits composed of dense and half rock formations without preliminary softening.

Известен способ разработки на основе двухподуступной схемы экскавации с изменением горизонта стояния отвалообразователя [2]. В данной схеме роторный экскаватор последовательно отрабатывает два или три подуступа, при этом отвалообразователь последовательно устанавливают на кровле и почве залежи и предотвале или на промежуточном вскрышном горизонте, кровле залежи и предотвале.There is a known method of development based on a two-way excavation scheme with a change in the standing horizon of a spreader [2]. In this scheme, a bucket wheel excavator sequentially fulfills two or three sub-steps, while the dumping agent is sequentially installed on the roof and soil of the deposit and prevented or on the intermediate overburden horizon, the roof of the deposit and prevented.

Недостатками данного способа являются необходимость перестановки роторного экскаватора и отвалообразователя, снижающая производительность комплекса горного оборудования, и ограничение разрабатываемых горных пород по прочности.The disadvantages of this method are the need for rearrangement of a rotary excavator and a spreader, reducing the productivity of the complex of mining equipment, and the limitation of the developed rocks for strength.

Наиболее близким по технической и технологической сущности является способ открытой разработки угольных месторождений, включающий непрерывную выемку и бестранспортное отвалообразование вскрышных пород, выемку, перемещение, погрузку полезного ископаемого непосредственно экскаватором в процессе его непрерывной работы, сортировку и упаковку полезного ископаемого [3].The closest in technical and technological essence is the method of open-pit mining of coal deposits, including continuous excavation and non-transport dumping of overburden, mining, moving, loading minerals directly with an excavator during its continuous operation, sorting and packing of minerals [3].

Данный способ применим для разработки неглубоких месторождений полезных ископаемых, сложенных горными породами невысокой прочности.This method is applicable for the development of shallow mineral deposits, composed of rocks of low strength.

Технический результат заключается в повышении производительности горных работ при разработке глубоких месторождений полезных ископаемых, сложенных плотными и полускальными породами.The technical result consists in increasing the productivity of mining during the development of deep mineral deposits composed of dense and semi-rock formations.

Технический результат достигается тем, что в способе открытой разработки месторождений твердых полезных ископаемых, включающем непрерывную выемку и бестранспортное отвалообразование вскрышных пород в выработанное пространство посредством отвалообразователя, непрерывную выемку, перемещение, погрузку, подачу полезного ископаемого на мобильно-сортировочный агрегат, сортировку полезного ископаемого, фронт ведения горных работ располагается вдоль короткой оси карьерного поля, при этом непрерывная отработка вскрышного уступа большой высоты ведется одновременно на двух подуступах с использованием стреловых карьерных комбайнов, а вскрышная порода по конвейерам стреловых карьерных комбайнов подается через приемные устройства на конвейеры загрузочных консолей отвалообразователя, затем последовательно перемещается к перегрузочному бункеру, питателю и посредством разгрузочной консоли во внутренний отвал, при этом загрузочные консоли отвалообразователя имеют возможность независимого перемещения в пространстве, а процесс совмещения конвейеров стреловых карьерных комбайнов с приемными устройствами загрузочных консолей отвалообразователя и позиционирование отвалообразователя относительно стреловых карьерных комбайнов обеспечивается автоматической системой управления, включающей датчики контроля, установленные на загрузочных консолях, и системный блок управления процессом, установленный на раме отвалообразователя, при этом добычные работы полезного ископаемого ведутся с применением землеройно-фрезерной машины, а полезное ископаемое подается погрузчиком в бункер мобильного перегрузочного агрегата с конвейером и затем посредством конвейера к мобильно-сортировочному агрегату, установленному на дневной поверхности.The technical result is achieved by the fact that in the method of open development of solid mineral deposits, including continuous excavation and transport-free dumping of overburden into a mined space using a spreader, continuous mining, moving, loading, supplying minerals to a mobile sorting unit, sorting minerals, front mining operations is located along the short axis of the quarry field, while continuous overburden mining is large heights are carried out simultaneously on two sub-steps using boom mining combines, and overburden is conveyed via boom mining conveyors via receiving devices to conveyors of the loading consoles of the dumping unit, then it is successively moved to the loading bunker, feeder and through the unloading console to the internal dump, while the loading consoles spreaders have the ability to independently move in space, and the process of combining conveyors boom career combines with receiving devices of the loading consoles of the spreader and the positioning of the spreader relative to the jib miners is provided by an automatic control system that includes control sensors installed on the loading consoles and a system process control unit mounted on the frame of the spreader, while mining is carried out using earthmoving the milling machine, and the mineral is fed by the loader to the hopper of the mobile reloading about the unit with the conveyor and then through the conveyor to the mobile sorting unit mounted on the day surface.

Возможность формирования требуемой последовательности выполняемых действий предложенными средствами позволяет решить поставленную задачу, определяет новизну, промышленную применимость и изобретательский уровень разработки.The possibility of forming the required sequence of actions by the proposed means allows us to solve the problem, determines the novelty, industrial applicability and inventive step of development.

Сущность предлагаемого способа открытой разработки месторождений твердых полезных ископаемых поясняется чертежами.The essence of the proposed method for open development of solid mineral deposits is illustrated by drawings.

На фиг. 1 - схема разработки месторождения твердых полезных ископаемых; на фиг. 2 - вид сверху на фиг. 1.In FIG. 1 is a diagram of development of a solid mineral deposit; in FIG. 2 is a plan view of FIG. one.

Способ открытой разработки месторождений твердых полезных ископаемых осуществляется следующим образом.The method of open development of solid mineral deposits is as follows.

Осуществляется непрерывная выемка и бестранспортное отвалообразование вскрышных пород 1 в выработанное пространство 2 посредством отвалообразователя 3, непрерывная выемка, перемещение, погрузка, подача полезного ископаемого 4 на мобильно-сортировочный агрегат 5, сортировка полезного ископаемого. Фронт ведения горных работ 6 располагается вдоль короткой оси 7 карьерного поля 8. Непрерывная отработка вскрышного уступа 9 большой высоты ведется одновременно на двух подуступах 10 и 11 с использованием стреловых карьерных комбайнов 12 и 13. Вскрышная порода 1 по конвейерам 14, 15 стреловых карьерных комбайнов 12, 13 подается через приемные устройства 16, 17 на конвейеры загрузочных консолей 18, 19 отвалообразователя 3. Вскрышная порода последовательно перемещается к перегрузочному бункеру 20, питателю 21 и посредством разгрузочной консоли 22 во внутренний отвал 23. Загрузочные консоли 18, 19 отвалообразователя 3 имеют возможность независимого перемещения в пространстве. Процесс совмещения конвейеров 14, 15 стреловых карьерных комбайнов 12, 13 с приемными устройствами 16, 17 загрузочных консолей 18, 19 отвалообразователя 3 и позиционирование отвалообразователя 3 относительно стреловых карьерных комбайнов 12, 13 обеспечивается автоматической системой управления 24, включающей датчики контроля 25 и 26, установленные на загрузочных консолях 18, 19, и системный блок управления процессом 27, установленный на раме 28 отвалообразователя 3. Добычные работы полезного ископаемого 4 ведутся с применением землеройно-фрезерной машины 29. Разрушенное полезное ископаемое 4 подается погрузчиком 30 в бункер 31 мобильного перегрузочного агрегата 32. Посредством конвейера 33 полезное ископаемое поступает на мобильно-сортировочный агрегат 5, установленный на дневной поверхности 34.Continuous excavation and non-transport dumping of overburden 1 into a mined-out space 2 is carried out by means of a dumping machine 3, continuous extraction, moving, loading, supply of mineral 4 to the mobile sorting unit 5, mineral sorting. The mining front 6 is located along the short axis 7 of the quarry field 8. Continuous mining of the overburden ledge 9 of high height is carried out simultaneously on two sub-stages 10 and 11 using boom quarry combines 12 and 13. The overburden 1 along conveyors 14, 15 boom quarry combines 12 , 13 is fed through receiving devices 16, 17 to the conveyors of the loading consoles 18, 19 of the spreader 3. The overburden is sequentially moved to the transfer hopper 20, the feeder 21 and through the discharge console 22 to the inside dump 23. The loading consoles 18, 19 of the spreader 3 have the ability to independently move in space. The process of combining the conveyors 14, 15 of the jib miners 12, 13 with the receiving devices 16, 17 of the loading consoles 18, 19 of the spreader 3 and the positioning of the spreader 3 relative to the jib miners 12, 13 is provided by an automatic control system 24, including control sensors 25 and 26 installed on the loading consoles 18, 19, and the process control system unit 27 mounted on the frame 28 of the spreader 3. Mining operations of the mineral 4 are carried out using earth-milling machines 29. Destroyed minerals 4 is supplied to the hopper loader 30, mobile handling unit 31, 32. By means of the conveyor 33 is supplied to fossil Useful mobile-sorting machine 5 mounted on the surface 34.

Способ повышает производительность при выполнении вскрышных и добычных работ на месторождениях твердых полезных ископаемых, сложенных из плотных и полускальных пород, с применением стреловых карьерных комбайнов, отвалообразователя, землеройно-фрезерных машин, погрузчиков и другого горного оборудования.The method improves productivity when performing overburden and mining operations on solid mineral deposits composed of dense and semi-solid rocks, with the use of boom mining combines, a spreader, earthmoving and milling machines, loaders and other mining equipment.

Источники информацииInformation sources

1. Патент РФ №2011826 от 30.04.1994. Способ разработки обводненных россыпей.1. RF patent No. 20111826 dated 04/30/1994. A method for developing waterlogged placers.

2. Ржевский В.В. Открытые горные работы. Учебник для вузов. В 2-х частях. Часть 2. Технологии и комплексная механизация. - 4-е изд., перераб. и доп. - М.: Недра, 1985. - С. 235, рис. 7.5.2. Rzhevsky V.V. Open cast mining. Textbook for high schools. In 2 parts. Part 2. Technologies and complex mechanization. - 4th ed., Revised. and add. - M .: Nedra, 1985 .-- S. 235, Fig. 7.5.

3. Патент РФ №2078928 от 10.05.1997. Способ открытой разработки угольных месторождений.3. RF patent No. 2078928 dated 05/10/1997. The method of open development of coal deposits.

Claims (1)

Способ открытой разработки месторождений твердых полезных ископаемых, включающий непрерывную выемку и бестранспортное отвалообразование вскрышных пород в выработанное пространство посредством отвалообразователя, непрерывную выемку, перемещение, погрузку, подачу полезного ископаемого на мобильно-сортировочный агрегат, сортировку полезного ископаемого, отличающийся тем, что фронт ведения горных работ располагается вдоль короткой оси карьерного поля, при этом непрерывная отработка вскрышного уступа большой высоты ведется одновременно на двух подуступах с использованием стреловых карьерных комбайнов, а вскрышная порода по конвейерам стреловых карьерных комбайнов подается через приемные устройства на конвейеры загрузочных консолей отвалообразователя, затем последовательно перемещается к перегрузочному бункеру, питателю и посредством разгрузочной консоли во внутренний отвал, при этом загрузочные консоли отвалообразователя имеют возможность независимого перемещения в пространстве, а процесс совмещения конвейеров стреловых карьерных комбайнов с приемными устройствами загрузочных консолей отвалообразователя и позиционирование отвалообразователя относительно стреловых карьерных комбайнов обеспечивается автоматической системой управления, включающей датчики контроля, установленные на загрузочных консолях, и системный блок управления процессом, установленный на раме отвалообразователя, при этом добычные работы полезного ископаемого ведутся с применением землеройно-фрезерной машины, а полезное ископаемое подается погрузчиком в бункер мобильного перегрузочного агрегата с конвейером и затем посредством конвейера к мобильно-сортировочному агрегату, установленному на дневной поверхности. The method of open development of solid mineral deposits, including continuous excavation and non-transport dumping of overburden into a mined space by means of a dumping machine, continuous excavation, moving, loading, supplying minerals to a mobile sorting unit, sorting minerals, characterized in that the mining front located along the short axis of the quarry field, while continuous mining overburden ledge of great height is carried out simultaneously This is done on two sub-steps using boom pit combines, and overburden is conveyed via boom pit conveyors via receiving devices to conveyors of the loading consoles of the dumping unit, then sequentially moves to the reloading hopper, feeder and through the unloading console to the internal dump, while the loading consoles of the dumping unit have the possibility of independent movement in space, and the process of combining conveyors boom mining combines with receiving equipment with the triplets of the loading consoles of the spreader and the positioning of the spreader relative to the jib miners is provided by an automatic control system that includes control sensors installed on the loading consoles and a system process control unit mounted on the frame of the spreader, while mining of minerals is carried out using an earth-milling machine, and the mineral is fed by a loader to the hopper of a mobile reloading unit with a conveyor followed by a mobile conveyor and screening unit mounted on the surface.
RU2014124605/03A 2014-06-17 2014-06-17 Method of open development of deposits of solid mineral resources RU2558051C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2014124605/03A RU2558051C1 (en) 2014-06-17 2014-06-17 Method of open development of deposits of solid mineral resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2014124605/03A RU2558051C1 (en) 2014-06-17 2014-06-17 Method of open development of deposits of solid mineral resources

Publications (1)

Publication Number Publication Date
RU2558051C1 true RU2558051C1 (en) 2015-07-27

Family

ID=53762650

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2014124605/03A RU2558051C1 (en) 2014-06-17 2014-06-17 Method of open development of deposits of solid mineral resources

Country Status (1)

Country Link
RU (1) RU2558051C1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2596157C1 (en) * 2015-08-14 2016-08-27 Федеральное Государственное Бюджетное Учреждение Науки Институт Горного Дела Дальневосточного Отделения Российской Академии Наук (Игд Дво Ран) Method of open mining of solid minerals
RU2630023C1 (en) * 2016-07-20 2017-09-05 Федеральное Государственное Бюджетное Учреждение Науки Институт Горного Дела Дальневосточного Отделения Российской Академии Наук (Игд Дво Ран) Method for steeply-dipping solid mineral deposits development
CN108222941A (en) * 2018-03-19 2018-06-29 长沙有色冶金设计研究院有限公司 A kind of opencut continuous exploitation method
RU2748875C1 (en) * 2020-09-03 2021-06-01 Федеральное государственное бюджетное учреждение науки Хабаровский Федеральный исследовательский центр Дальневосточного отделения Российской академии наук Method for the development of solid mineral deposits

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1023091A1 (en) * 1982-01-15 1983-06-15 Предприятие П/Я Р-6767 Arrangement for forming dumps on steep slopes
SU1159991A1 (en) * 1984-12-28 1985-06-07 Киевский институт автоматики им.ХХУ съезда КПСС Apparatus for automated monitoring of power duty of metal structures of equipment of bucket-wheel excavator
RU2078928C1 (en) * 1994-10-18 1997-05-10 Акционерное общество открытого типа "КатэкНИИуголь" Method of opencast mining of coal deposits
WO2011105906A2 (en) * 2010-02-26 2011-09-01 Superior Highwall Miners Inc. Launch vehicle for a mining system, a mining system and a method for mining

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1023091A1 (en) * 1982-01-15 1983-06-15 Предприятие П/Я Р-6767 Arrangement for forming dumps on steep slopes
SU1159991A1 (en) * 1984-12-28 1985-06-07 Киевский институт автоматики им.ХХУ съезда КПСС Apparatus for automated monitoring of power duty of metal structures of equipment of bucket-wheel excavator
RU2078928C1 (en) * 1994-10-18 1997-05-10 Акционерное общество открытого типа "КатэкНИИуголь" Method of opencast mining of coal deposits
WO2011105906A2 (en) * 2010-02-26 2011-09-01 Superior Highwall Miners Inc. Launch vehicle for a mining system, a mining system and a method for mining

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2596157C1 (en) * 2015-08-14 2016-08-27 Федеральное Государственное Бюджетное Учреждение Науки Институт Горного Дела Дальневосточного Отделения Российской Академии Наук (Игд Дво Ран) Method of open mining of solid minerals
RU2630023C1 (en) * 2016-07-20 2017-09-05 Федеральное Государственное Бюджетное Учреждение Науки Институт Горного Дела Дальневосточного Отделения Российской Академии Наук (Игд Дво Ран) Method for steeply-dipping solid mineral deposits development
CN108222941A (en) * 2018-03-19 2018-06-29 长沙有色冶金设计研究院有限公司 A kind of opencut continuous exploitation method
RU2748875C1 (en) * 2020-09-03 2021-06-01 Федеральное государственное бюджетное учреждение науки Хабаровский Федеральный исследовательский центр Дальневосточного отделения Российской академии наук Method for the development of solid mineral deposits

Similar Documents

Publication Publication Date Title
CN104405437A (en) Mining method employing solid filling and fully-mechanized coal mining hybrid working face
RU2558051C1 (en) Method of open development of deposits of solid mineral resources
AU2015200304B2 (en) A System for the Reduction in Applied Energy, Improved Efficiencies and Reduced Costs in Open Pit Mining
CN109458181A (en) A kind of filling mining method of metallic ore across pitch full-seam mining
RU2601660C1 (en) Method of solid minerals deposits development
RU2394157C1 (en) Procedure for open pit development of mineral deposits
AU2015100065A4 (en) A System for the Reduction in Applied Energy, Improved Efficiencies and Reduced Costs in Open Pit Mining
RU2559262C1 (en) Method of open development of deposits with use of combined transport
Kolesnikov et al. Using of wide stopes in coalless zones mined by shovels and backhoes
RU2524716C1 (en) Strip mining of minerals including working of ore bodies in contact between ore and capping in sub-benches
RU2439321C1 (en) Open-underground method of bedded deposits mining
RU2376471C1 (en) Method of steep trench performance
CN204552746U (en) A kind of Ferrous metal mines surface mining production system
RU2712848C1 (en) Underground mining method of mineral deposits
Kolesnikov Methods and schemes of opening-up the quarry fields at various bedding conditions of deposits
RU2177548C1 (en) Method of mining the tailings dumps
RU2685590C1 (en) Method for open development of steeply-dipping deposits of round shape with internal dumping
RU2691032C1 (en) Method for kimberlite pipe
RU2630023C1 (en) Method for steeply-dipping solid mineral deposits development
Kolesnikov et al. Methods and schemes of quarry fields opening-up under various conditions of deposits occurrence
RU2570067C1 (en) Mining of bedded deposits
Rakishev et al. Typification of the Mining Technological Complexes at the Quarries
RU2365753C1 (en) Method of minerals excavation from pillars
RU2278261C1 (en) Method of combined open-cut and underground steeply pitching deposit development
SU806864A1 (en) Method of open-cast mining of horizontal and gently sloping mineral bed bodies

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20160618