RU2513954C2 - Method of soil reinforcement - Google Patents

Method of soil reinforcement Download PDF

Info

Publication number
RU2513954C2
RU2513954C2 RU2012137308/03A RU2012137308A RU2513954C2 RU 2513954 C2 RU2513954 C2 RU 2513954C2 RU 2012137308/03 A RU2012137308/03 A RU 2012137308/03A RU 2012137308 A RU2012137308 A RU 2012137308A RU 2513954 C2 RU2513954 C2 RU 2513954C2
Authority
RU
Russia
Prior art keywords
soil
piles
longitudinal hollow
reinforced concrete
reinforcement
Prior art date
Application number
RU2012137308/03A
Other languages
Russian (ru)
Other versions
RU2012137308A (en
Inventor
Сергей Васильевич Якушенко
Original Assignee
Сергей Васильевич Якушенко
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Сергей Васильевич Якушенко filed Critical Сергей Васильевич Якушенко
Priority to RU2012137308/03A priority Critical patent/RU2513954C2/en
Publication of RU2012137308A publication Critical patent/RU2012137308A/en
Application granted granted Critical
Publication of RU2513954C2 publication Critical patent/RU2513954C2/en

Links

Images

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

FIELD: construction.
SUBSTANCE: method of soil reinforcement may be used in strengthening and arrangement of bases with any soil conditions, in particular, weak natural bases and unsteady soils. A contour of reinforced concrete support falsework is defined, within the borders of which they install a set of at least three longitudinal hollow elements that represent a tubular-pillar falsework, and they are submerged into soil. On shore they determine the sufficient quantity of reinforcement zones. Piles are placed in each of specified elements, a reinforcement zone, under different angles to the surface of the specified support and with protrusion of each pile beyond the border of the lower perimeter of the appropriate element with formation of vectors of forces that compensate load at specified soils. Along the formed contour they assemble the falsework that covers upper heads of piles, they fill the longitudinal hollow elements with concrete and form the reinforced concrete support.
EFFECT: increased strength of a soil base due to installation of piles and increased area of their resting against soil with simultaneous reduction of labour intensiveness and material intensity.
3 cl, 3 dwg

Description

Изобретение относится к области строительства, в частности к укреплению грунтовых оснований и может быть использовано при укреплении и обустройстве оснований с любыми грунтовыми условиями, в частности слабых природных оснований и зыбких грунтов, например, при строительстве гидротехнических сооружений в прибрежных водах на глубинах до 2-2,5 метров, а также при строительстве фундаментов в условиях вечной мерзлоты и других зыбких грунтов.The invention relates to the field of construction, in particular to the strengthening of soil bases and can be used to strengthen and equip the bases with any soil conditions, in particular weak natural foundations and unstable soils, for example, when constructing hydraulic structures in coastal waters at depths of up to 2-2 , 5 meters, as well as in the construction of foundations in permafrost and other unsteady soils.

Надежность возводимых фундаментов и различных строительных конструкций во многом определяется жесткостью грунтовых оснований. При возведении различного рода конструкций на структурно-неустойчивых грунтах возможна осадка этих конструкций, которая может происходить из-за сдавливания слабых грунтов. В настоящее время для укрепления и повышения прочности оснований, на которые передается давление от фундамента или любой другой строительной конструкции, применяют различные способы глубинного уплотнения грунтов и устройства свай.The reliability of constructed foundations and various building structures is largely determined by the rigidity of soil foundations. When erecting various kinds of structures on structurally unstable soils, settlement of these structures is possible, which can occur due to compression of weak soils. At present, various methods of deep compaction of soils and piling are used to strengthen and increase the strength of the substrates on which pressure is transmitted from the foundation or any other building structure.

Из уровня техники известен способ упрочнения массива просадочного грунта [а.с. СССР №996623, опубл. 15.02.83], в соответствии с которым бурят скважины с равномерным шагом и заполняют их закрепляющим раствором. Во время заполнения образуют равномерно расположенные по глубине массива упрочненные зоны с увеличенным диаметром путем изменения интенсивности заполнения материала. Данный способ направлен на повышение равнопрочности грунта по глубине, однако не способствует укреплению его в боковом (горизонтальном) направлении.The prior art method for hardening an array of subsidence [a.s. USSR No. 996623, publ. 02.15.83], according to which wells are drilled with an even pitch and filled with a fixing solution. During filling, they form hardened zones with an increased diameter evenly spaced along the array by changing the filling intensity of the material. This method is aimed at increasing the equal strength of the soil in depth, but does not contribute to strengthening it in the lateral (horizontal) direction.

Известен, например, способ улучшения массива лессового просадочного грунта в основании зданий и сооружений [а.с. №1294910, опубл. 07.03.1987], включающий последовательное уплотнение поверхности грунта, возведение распределительного несущего элемента по площади основания, образование скважин с равномерным шагом, нагнетание закрепляющего раствора, которое ведут с гидроразрывом грунта. В результате гидроразрыва грунта между скважинами образуются трещины. Эти трещины заполняют закрепляющим раствором, что способствует равномерному его распределению по всему массиву, а следовательно, повышению качества закрепления.Known, for example, is a method of improving the array of loess subsidence soil at the base of buildings and structures [a.s. No. 1294910, publ. 03/07/1987], including sequential compaction of the soil surface, the construction of a distribution bearing element over the base area, the formation of wells with an even pitch, injection of a fixing solution, which is carried out with hydraulic fracturing of the soil. As a result of hydraulic fracturing of the soil, cracks form between the wells. These cracks are filled with a fixing solution, which contributes to its uniform distribution throughout the massif, and, consequently, to an increase in the quality of fixing.

По мнению авторов разработки, данная технология позволяет повысить структурную устойчивость грунта, однако известный способ очень трудоемок, поскольку связан с бурением скважин, и требует большого расхода материала.According to the authors of the development, this technology allows to increase the structural stability of the soil, however, the known method is very time-consuming, since it is associated with drilling wells, and requires a large consumption of material.

Известен также способ [RU 2276710, опубл. 20.05.2006], по которому для возведения фундамента резервуара предварительно проводят работы по укреплению грунтового основания, для чего скважины бурят для вертикальных и наклонных свай и устанавливают в них арматурные каркасы. После этого нагнетают бетонную смесь в наклонные и вертикальные скважины. Этот способ мало пригоден для использования на зыбких, в том числе и илистых грунтах, где из-за водной насыщенности усиление грунта должно быть выполнено на большую глубину.There is also known a method [RU 2276710, publ. 05/20/2006], according to which, to build the foundation of the reservoir, preliminary work is carried out to strengthen the soil foundation, for which wells are drilled for vertical and inclined piles and reinforcement cages are installed in them. After that, the concrete mixture is pumped into deviated and vertical wells. This method is not very suitable for use on unsteady, including silty soils, where, due to water saturation, soil reinforcement must be performed to a greater depth.

Известен способ укрепления водонасыщенных грунтов в основаниях зданий и сооружений по патенту РФ №2204650 (опубл. 20.05.2003), в соответствии с которым укрепление массива водонасыщенного грунта в основаниях зданий и сооружений включает формирование законтурного ряда упрочняющих грунт элементов по периметру укрепляемого массива, создание каркасно-ячеистой структуры из упрочняющих грунт элементов в зоне укрепляемого массива и образование на его поверхности распределительного несущего элемента. Формирование упрочняющих грунт элементов выполняют путем нагнетания в образуемые в грунте скважины твердеющего материала под давлением. При укреплении массива иловатого водонасыщенного грунта формирование упрочняющих грунт элементов в законтурном ряду ведут с образованием противофильтрационного экрана с разомкнутым в зоне отвода воды контуром путем направленной подачи в скважины законтурного ряда твердеющего раствора по продольной оси экрана с одновременным направленным естественным и/или принудительным отводом воды, а в зоне укрепляемого массива заполнение скважин твердеющим материалом ведут по участкам, в пределах которых образуют ряды скважин с расположением рядов параллельно разомкнутому участку контура экрана и перпендикулярно ему, начиная с ряда, наиболее удаленного от разомкнутого участка контура экрана, также с одновременным направленным естественным и/или принудительным отводом воды, при этом скважины выполняют на всю глубину формируемых упрочняющих грунт элементов, соответствующую толщине укрепляемого массива водонасыщенного грунта. Данный известный способ направлен на повышение несущей способности водонасыщенных грунтов в основаниях промышленных сооружений.There is a method of strengthening water-saturated soils in the foundations of buildings and structures according to the patent of the Russian Federation No. 2204650 (publ. 05/20/2003), according to which the strengthening of the array of water-saturated soil in the bases of buildings and structures includes the formation of a contour line of soil strengthening elements around the perimeter of the reinforced massif, creating a frame - a cellular structure of soil reinforcing elements in the area of the array to be strengthened and the formation of a distribution bearing element on its surface. The formation of soil hardening elements is performed by injection into the well formed in the soil hardening material under pressure. When strengthening the mass of silty water-saturated soil, the formation of soil-reinforcing elements in the contour line is carried out with the formation of an anti-filter screen with an open circuit in the water drainage zone by directed supplying to the contour line wells of a hardening solution along the longitudinal axis of the screen with simultaneous directed natural and / or forced water drainage, and in the area of the array to be strengthened, the filling of wells with hardening material is carried out in areas within which rows of wells are located with an arrangement of poisons parallel to the open section of the screen contour and perpendicular to it, starting from the row farthest from the open section of the screen contour, also with simultaneous directed natural and / or forced water drainage, while the wells perform the entire depth of the formed soil strengthening elements corresponding to the thickness of the reinforced massif saturated soil. This known method is aimed at increasing the bearing capacity of water-saturated soils in the foundations of industrial structures.

Недостатком известного решения является его очень высокая технологическая сложность. Кроме того, как и в вышеперечисленных способах, здесь выполняют бурение скважин, для чего требуется специальное оборудование; каждая скважина должна быть подвергнута определенной технологической обработке, что регламентировано техническими условиями. Скважины должны быть выполнены на всю глубину формируемых упрочняющих грунт элементов, соответствующую толщине укрепляемого массива водонасыщенного грунта, что при указанных грунтах предполагает бурение на достаточно большую глубину и, следовательно, большого расхода бетона. Все это приводит к увеличению длительности работ по укреплению грунтового основания.A disadvantage of the known solution is its very high technological complexity. In addition, as in the above methods, drilling is performed here, which requires special equipment; each well must be subjected to a certain technological treatment, which is regulated by technical conditions. Wells should be made to the entire depth of the formed soil strengthening elements corresponding to the thickness of the strengthened array of water-saturated soil, which with these soils involves drilling to a sufficiently large depth and, consequently, a large consumption of concrete. All this leads to an increase in the duration of work to strengthen the soil base.

Также следует отметить, что для реализации в условиях Северо-Запада, где несжимаемый слабый слой грунта расположен, как правило, на достаточно большой глубине, все перечисленные технические решения при применении их на больших толщах слабых грунтов являются высокотрудоемкими и материалоемкими.It should also be noted that for implementation in the North-West, where an incompressible weak soil layer is located, as a rule, at a sufficiently large depth, all of the listed technical solutions when applied to large thicknesses of weak soils are highly labor-intensive and material-intensive.

Необходимую прочность уплотнения грунта в различных грунтовых условиях можно достичь использованием свай, размещаемых под разным углом к горизонтальной поверхности железобетонного оголовка свай. Например, для укрепления грунтового основания при возведении свайного фундамента на основе вертикальных и наклонных свай по авторскому свидетельству СССР №1596023 (опубл. 30.09.1990) вертикальные сваи размещают в грунте в крайнем со стороны действия горизонтальной нагрузки ряду, а наклонные сваи устанавливают в остальных рядах с наклоном в одну сторону к ряду вертикальных свай. По мере удаления от ряда вертикальных свай в каждом следующем ряду увеличивают угол наклона наклонных свай. Однако при таком размещении свай, когда наклон свай выполняют только в одну сторону к ряду вертикальных свай, векторы сил наклонных свай направлены в одну сторону, что приводит к невысокой степени уплотнения грунта, а также и к неравномерному сдавливанию грунтов, к непрочности и возможному перекосу возводимой на таком основании конструкции.The necessary strength of soil compaction in various soil conditions can be achieved using piles placed at different angles to the horizontal surface of the reinforced concrete head of piles. For example, to strengthen the soil foundation during the construction of the pile foundation on the basis of vertical and inclined piles according to the USSR author's certificate No. 1596023 (publ. 09/30/1990), vertical piles are placed in the soil in the row extreme from the side of the horizontal load, and inclined piles are installed in the remaining rows with an inclination in one direction to a row of vertical piles. As you move away from the row of vertical piles in each next row, the angle of inclination of the inclined piles is increased. However, with this arrangement of piles, when the tilt of the piles is performed only in one direction to the row of vertical piles, the force vectors of the inclined piles are directed in one direction, which leads to a low degree of compaction of the soil, as well as to uneven compression of the soil, to fragility and possible distortion of the constructed on such a basis of construction.

Технической задачей заявляемого технического решения является создание способа армирования грунта, обеспечивающего уплотнение грунта с требуемой прочностью, а также в расширении арсенала технических средств и технологических приемов армирования грунтов.The technical task of the proposed technical solution is to create a method of soil reinforcement, providing soil compaction with the required strength, as well as expanding the arsenal of technical means and technological methods of soil reinforcement.

Технический результат, достигаемый при решении задачи, состоит в повышении прочности грунтового основания за счет устройства свай и увеличения площади их опирания на грунт с одновременным снижением трудоемкости и материалоемкости. В сущности предлагается создать технологию по применению трубно-столбовой опалубки при строительстве гидротехнических сооружений (пирсов, причалов) в прибрежных водах, укреплении береговой полосы, а также технологию армирования зыбких опорных грунтов на суше.The technical result achieved when solving the problem is to increase the strength of the soil base due to the device of piles and increase the area of their support on the ground with a simultaneous decrease in labor and material consumption. In essence, it is proposed to create a technology for the use of pipe and column formwork in the construction of hydraulic structures (piers, moorings) in coastal waters, strengthening the coastal strip, as well as technology for reinforcing unstable ground support on land.

Особенность заявляемого технического решения связана со способом армирования грунтов путем размещения свай в грунте, верхние оголовки которых объединяют железобетонной опорой, при этом перед размещением свай определяют контур опалубки железобетонной опоры, в границах которого размещают набор из, по меньшей мере, трех продольных полых элементов, представляющих собой трубно-столбовую опалубку, с погружением их в грунт, или зон армирования на суше, при этом сваи размещают в каждом из упомянутых продольных полых элементов (зон) под разными углами к поверхности указанной опоры и с выходом каждой сваи за границу нижнего периметра соответствующего продольного полого элемента с образованием векторов сил, компенсирующих нагрузку на указанные грунты; по сформированному контуру собирают опалубку, охватывающую верхние оголовки свай с последующим заполнением упомянутых продольных полых элементов набора бетоном и формированием армированной железобетонной опоры. Размещение свай под разными углами к поверхности железобетонной опоры с выходом в грунт каждой сваи за границу нижнего периметра соответствующего продольного полого элемента увеличивает площадь их опирания на грунт и создает такую пространственную ориентированность свай, которая препятствует горизонтальному перемещению грунта и уменьшает осадку основания.A feature of the claimed technical solution is associated with a method of reinforcing soils by placing piles in the soil, the upper heads of which are joined by a reinforced concrete support, while before placing the piles, the contour of the formwork of the reinforced concrete support is determined, within the boundaries of which a set of at least three longitudinal hollow elements representing a pipe-pillar formwork, with immersion in soil, or reinforcement zones on land, while piles are placed in each of the mentioned longitudinal hollow elements (zones) under different angles to the surface of the indicated support and with the exit of each pile beyond the border of the lower perimeter of the corresponding longitudinal hollow element with the formation of force vectors that compensate for the load on these soils; the formwork is assembled along the formed contour, covering the upper heads of the piles with the subsequent filling of the said longitudinal hollow elements of the set with concrete and the formation of a reinforced reinforced concrete support. The placement of piles at different angles to the surface of the reinforced concrete support with the exit to the soil of each pile beyond the border of the lower perimeter of the corresponding longitudinal hollow element increases the area of their support on the soil and creates such a spatial orientation of the piles that prevents horizontal movement of the soil and reduces the subsidence of the base.

При выполнении армирования грунтов на суше определяется достаточное количество зон армирования, которые формируются погружением в грунт под разными углами достаточного количества свай. Верхние оголовки свай соединяются в общую конструкцию путем формирования объединяющей армированной железобетонной опоры (плиты).When performing soil reinforcement on land, a sufficient number of reinforcement zones are determined, which are formed by immersion in the soil at different angles of a sufficient number of piles. The upper heads of the piles are connected into a common structure by forming a unifying reinforced reinforced concrete support (slab).

Целесообразно при строительстве гидротехнических сооружений для снижения материалоемкости продольный полый элемент выполнить из металлической или полимерной тары, а сваи выполнить из металлопроката.It is advisable in the construction of hydraulic structures to reduce material consumption, the longitudinal hollow element is made of metal or plastic containers, and the piles are made of metal.

При выполнении армирования грунтов на суше могут быть использованы любые технологически применимые сваи в зависимости от решаемых технологических задач.When performing soil reinforcement on land, any technologically applicable piles can be used depending on the technological tasks to be solved.

Кроме того, для повышения прочности грунтового основания количество свай, размещаемых в каждом продольном полом элементе или в зоне армирования, определяют в зависимости от типа грунта.In addition, to increase the strength of the soil base, the number of piles placed in each longitudinal hollow element or in the reinforcement zone is determined depending on the type of soil.

Полученное в результате осуществления заявленного технического решения грунтовое основание обладает повышенной прочностью за счет устройства свай, по сути, хаотично разветвленных, размещаемых под разными углами к горизонтальной поверхности железобетонной опоры, что способствует образованию разнонаправленных векторов сил, компенсирующих нагрузку на грунт, увеличивает площадь их опирания на грунт и способствует созданию прочного устойчивого грунтового массива. При таком уплотнении грунта обеспечивается совместная работа каждого продольного полого элемента и свай, размещаемых под разными углами к горизонту и выходящих за границу нижнего периметра соответствующего продольного полого элемента. Нагрузка передается не только на продольные полые элементы, но и всем сваям и уравновешивается пассивным давлением грунта, что дает возможность получить необходимую прочность уплотненного грунта в различных грунтовых условиях.The soil base obtained as a result of the implementation of the claimed technical solution has increased strength due to the device of piles, which are essentially randomly branched, placed at different angles to the horizontal surface of the reinforced concrete support, which contributes to the formation of multidirectional force vectors that compensate for the load on the soil, increases their bearing area by soil and contributes to the creation of a durable sustainable soil mass. With this compaction of the soil, the joint work of each longitudinal hollow element and piles placed at different angles to the horizon and extending beyond the lower perimeter of the corresponding longitudinal hollow element is ensured. The load is transferred not only to the longitudinal hollow elements, but also to all piles and is balanced by passive soil pressure, which makes it possible to obtain the necessary strength of compacted soil in various soil conditions.

Количество наборов полых продольных элементов и расстояние между ними при строительстве гидротехнических сооружений, а также количество зон армирования грунтов на суше определяют в зависимости от вида грунтового основания и вида возводимой строительной конструкции.The number of sets of hollow longitudinal elements and the distance between them during the construction of hydraulic structures, as well as the number of zones of soil reinforcement on land are determined depending on the type of soil base and the type of building structure being constructed.

Таким образом, технический результат заявляемого технического решения достигается новой совокупностью существенных признаков, как вновь введенных, так и известных, следовательно, заявляемый способ соответствует критерию патентоспособности «изобретательский уровень».Thus, the technical result of the claimed technical solution is achieved by a new set of essential features, both newly introduced and well-known, therefore, the claimed method meets the patentability criterion of "inventive step".

Сущность заявляемого технического решения поясняется фигурами, на которых представлены:The essence of the proposed technical solution is illustrated by the figures, which represent:

фиг.1 - показан этап армирования грунта - определение контура опалубки железобетонной опоры, в границах которого размещен набор, имеющий в своем составе шесть продольных полых элементов (а), девять продольных полых элементов (б), семь продольных полых элементов (в);figure 1 - shows the stage of soil reinforcement - determining the contour of the formwork of the reinforced concrete support, within the boundaries of which is placed a set comprising six longitudinal hollow elements (a), nine longitudinal hollow elements (b), seven longitudinal hollow elements (c);

фиг.2 - представлен продольный профиль укрепляемого грунтового основания с устроенными в нем продольными полыми элементами и с размещенными в указанных продольных полых элементах сваями;figure 2 - presents a longitudinal profile of a reinforced soil base with longitudinal hollow elements arranged in it and with piles placed in said longitudinal hollow elements;

фиг.3 - представлен продольный профиль укрепляемого грунтового основания на суше, показаны зоны армирования опорных грунтов.figure 3 - presents a longitudinal profile of the reinforced soil base on land, shows the zone of reinforcement of the supporting soil.

На фигурах 1-3 обозначены:In figures 1-3 are indicated:

1 - контур опалубки железобетонной опоры, контур выполнен в виде1 - contour of the formwork of reinforced concrete supports, the circuit is made in the form

- фиг.1а - равнобедренного треугольника,- figa - isosceles triangle,

- фиг.1б - квадрата,- figb - square,

- фиг.1в - окружности;- figv - circles;

2 - железобетонная опора;2 - reinforced concrete support;

3 - продольный полый элемент (трубно-столбовая опалубка);3 - longitudinal hollow element (pipe-pillar formwork);

4 - сваи;4 - piles;

5 - зоны армирования опорного грунта на суше.5 - zones of reinforcement of support soil on land.

Способ армирования грунтового основания осуществляют следующим образом. На грунтовом основании определяют контур 1 (фиг.1а, б, в) опалубки будущей железобетонной опоры 2 (фиг.2). В границах контура 1 размещают набор из продольных полых элементов 3. Каждый продольный полый элемент 3, погружаемый в грунт на небольшую глубину (достаточно глубины илистого слоя), может быть выполнен с использованием металлической тары (например, бочки диаметром 0,6 м и высотой 0,9 м) или тары из полимерных материалов. Продольные полые элементы 3 скрепляют между собой, например, скобой (на чертежах не показано). Затем в каждом продольном полом элементе 3 (фиг.2) размещают сваи 4 на глубину, определяемую и зависящую от свойств грунта. В качестве свай 4 целесообразно использовать сортовой прокат, например стальной уголок с полкой 70 мм. Погружение свай 4 выполняют с применением портативного пневмоэлектровиброударного оборудования (на чертеже не показано).The method of reinforcing the soil base is as follows. On a soil base determine the circuit 1 (figa, b, c) of the formwork of the future reinforced concrete support 2 (Fig.2). Within the boundaries of circuit 1, a set of longitudinal hollow elements 3 is placed. Each longitudinal hollow element 3, immersed in the ground at a shallow depth (a mud layer is sufficient), can be made using metal containers (for example, barrels with a diameter of 0.6 m and a height of 0 , 9 m) or containers made of polymeric materials. The longitudinal hollow elements 3 are fastened together, for example, with a bracket (not shown in the drawings). Then, in each longitudinal hollow element 3 (figure 2), piles 4 are placed to a depth that is determined and depends on the properties of the soil. As piles 4, it is advisable to use long products, for example, a steel corner with a shelf of 70 mm. The immersion of the piles 4 is performed using portable pneumatic electro-shock equipment (not shown in the drawing).

Погружаемые в грунт сваи 4 располагают разнонаправленно под разными углами к горизонту поверхности. Количество свай 4, используемых на единицу площади, т.е. на один продольный полый элемент 3, может меняться в зависимости от характера донных/поверхностных грунтов и определяется текстурой фунтов (слоистая, сложная и др.). Каждую сваю 4 забивают таким образом, что за границу нижнего периметра продольного полого элемента 3 (фиг.2) она входит в грунт на глубину не менее 1,5 м. Предлагаемое формирование свай обеспечивает их пространственную ориентированность, уподобляемую растениям с разнонаправленным расположением корневой системы, благодаря чему создается грунтовое основание повышенной прочности.Piles 4 immersed in the soil are arranged in different directions at different angles to the surface horizon. The number of piles 4 used per unit area, i.e. for one longitudinal hollow element 3, can vary depending on the nature of the bottom / surface soils and is determined by the texture of pounds (layered, complex, etc.). Each pile 4 is hammered in such a way that beyond the boundary of the lower perimeter of the longitudinal hollow element 3 (Fig. 2), it enters the soil to a depth of at least 1.5 m. The proposed formation of piles ensures their spatial orientation, which is similar to plants with a multidirectional arrangement of the root system, due to which a soil foundation of increased strength is created.

Далее по сформированному контуру 1 собирают опалубку железобетонной опоры 2, охватывающую верхние оголовки свай 4, заполняют продольные полые элементы 3 с размещенными в них сваями 4 бетоном и формируют железобетонную опору 2. Для повышения прочности опоры ее дополнительно армируют горизонтальной арматурой (на чертеже не показано), имеющей форму контура опалубки. Верхние надземные / надводные части свай 4 становятся частью армированной железобетонной опоры 2 (фиг.2), которая связывает все подготовленное свайное поле в единую опорную конструкцию, гарантирующую смонтированную на ней железобетонную армированную опору от смещений, погружений, отклонения от вертикальных осей.Then, along the formed contour 1, the formwork of the reinforced concrete support 2 is assembled, covering the upper ends of the piles 4, the longitudinal hollow elements 3 with the piles 4 placed in them are filled with concrete and the reinforced concrete support 2 is formed. To increase the strength of the support, it is additionally reinforced with horizontal reinforcement (not shown in the drawing) having the shape of the formwork contour. The upper above-ground / surface parts of piles 4 become part of a reinforced concrete support 2 (Fig. 2), which connects the entire prepared pile field into a single support structure, which guarantees that the reinforced concrete reinforced support mounted on it from displacement, immersion, deviation from vertical axes.

При выполнении армирования грунтов на суше (фиг.5), определяется достаточное количество зон 5 армирования опорного грунта на суше, которые формируются погружением в грунт под разными углами достаточного количества свай 4. Верхние оголовки свай 4 соединяются в общую конструкцию путем формирования объединяющей армированной железобетонной опоры 2, выполненной, например, в виде монолитной плиты.When performing soil reinforcement on land (Fig. 5), a sufficient number of land reinforcement zones 5 on land are determined, which are formed by immersion in the soil at different angles of a sufficient number of piles 4. The upper tips of the piles 4 are connected into a common structure by forming a unifying reinforced concrete support 2, made, for example, in the form of a monolithic plate.

Предлагаемый к реализации способ может быть использован при укреплении и обустройстве оснований с любыми грунтовыми условиями, в том числе на слабых водонасыщенных грунтах, при возведении, например, сооружений в прибрежных водах на глубинах до 2-2,5 метров, укреплении береговой полосы, а также укреплении опорных грунтов в условиях вечной мерзлоты и других слабых зыбких опорных грунтов.The method proposed for implementation can be used in the strengthening and arrangement of foundations with any soil conditions, including on weak water-saturated soils, when erecting, for example, structures in coastal waters at depths of up to 2-2.5 meters, strengthening the coastal strip, and strengthening of supporting soils in permafrost and other weak unstable supporting soils.

Пример.Example.

При возведении пирса для укрепления грунтового основания размечали контур 1 (фиг.1а) опалубки железобетонной опоры 2 и в илистое дно погружали продольные полые элементы 3, скрепляя их между собой и формируя, таким образом, трубно-столбовую опалубку. В качестве продольных полых элементов 3 опалубки использовали 6 пластиковых труб с диаметром 0,6 м, размещая их по периметру треугольника со стороной 1,8 м. Из внутренней полости каждого продольного полого элемента 3 выкачивали воду. Затем в каждый продольный полый элемент 3 забивали сваи 4 (оптимальное количество свай 4 для каждого элемента составило 4), причем глубина забивки определялась глубиной донного грунта. Затем каждый продольный полый элемент 3 с размещенными в нем сваями 4 заполняли бетоном. Для дополнительного укрепления грунтового основания и возводимой строительной конструкции при формировании железобетонной опоры 2 выпуски вертикальных оголовков свай 4 объединяли опалубкой, выполняли прошивку дополнительной горизонтальной арматурой (на чертеже не показано) в надводной части, при этом форма арматуры повторяла форму контура опалубки (в примере реализации - равнобедренный треугольник).When erecting a pier to strengthen the soil base, we marked out the contour 1 (Fig. 1a) of the formwork of the reinforced concrete support 2, and longitudinal hollow elements 3 were immersed in the muddy bottom, fastening them together and thus forming a tube-column formwork. As the longitudinal hollow elements of 3 formwork, 6 plastic pipes with a diameter of 0.6 m were used, placing them along the perimeter of the triangle with a side of 1.8 m. Water was pumped from the inner cavity of each longitudinal hollow element 3. Then, piles 4 were driven into each longitudinal hollow element 3 (the optimal number of piles 4 for each element was 4), and the driving depth was determined by the depth of the bottom soil. Then, each longitudinal hollow element 3 with piles 4 placed in it was filled with concrete. To further strengthen the soil foundation and the building structure under construction when forming the reinforced concrete support 2, the outlets of the vertical pile heads 4 were combined with the formwork, additional horizontal reinforcement (not shown) was flashed in the surface part, while the shape of the reinforcement repeated the shape of the formwork contour (in the implementation example, isosceles triangle).

Наличие в укрепляемом грунтовом основании продольных полых элементов 3, упрочненных сваями 4, которые размещают не только по всей длине продольного полого элемента 3, но и забивают на глубину донных грунтов с выходом каждой сваи 4 за периметр продольного полого элемента 3, повышает несущую способность грунта благодаря созданию жесткой и прочной структуры.The presence in the strengthened soil base of longitudinal hollow elements 3, reinforced with piles 4, which are placed not only along the entire length of the longitudinal hollow element 3, but are also clogged to the depth of the bottom soil with the exit of each pile 4 beyond the perimeter of the longitudinal hollow element 3, increases the bearing capacity of the soil due to creating a tough and durable structure.

Достоинством предлагаемого технического решения является то, что обеспечивается устойчивость сооружений, возводимых на армированных предлагаемым способом опорных грунтах, так как даже при неизбежной деформации дна, нагрузка на грунтовое основание будет равномерно распределена, даст возможность избежать просадки фундаментов или перекоса конструкций и обеспечит долговечность этих сооружений.The advantage of the proposed technical solution is that the stability of structures erected on the supporting soils reinforced by the proposed method is ensured, since even with the inevitable deformation of the bottom, the load on the soil base will be evenly distributed, will make it possible to avoid subsidence of foundations or skew structures and ensure the durability of these structures.

Предлагаемый способ армирования обладает таким важным преимуществом, как возможность его использования практически для любых грунтовых условий; строительные конструкции, возводимые на опорных грунтах, укрепленных предлагаемым способом, обладают высокой степенью устойчивости, большей несущей способностью. Особенно целесообразно его использовать в условиях Северо-Запада, где прочные грунты залегают на большой глубине.The proposed method of reinforcement has such an important advantage as the possibility of its use for almost any soil conditions; building structures erected on supporting soils, fortified by the proposed method, have a high degree of stability, greater bearing capacity. It is especially advisable to use it in the conditions of the North-West, where strong soils occur at great depths.

Claims (3)

1. Способ армирования грунтов путем размещения свай в грунте, верхние оголовки которых объединяют железобетонной опорой, отличающийся тем, что перед размещением свай определяют контур опалубки железобетонной опоры, в границах которого размещают набор из, по меньшей мере, трех продольных полых элементов, представляющих собой трубно-столбовую опалубку, с погружением их в грунт, или зон армирования на суше, при этом сваи размещают в каждом из упомянутых продольных полых элементов (зон) под разными углами к поверхности указанной опоры и с выходом каждой сваи за границу нижнего периметра соответствующего продольного полого элемента с образованием векторов сил, компенсирующих нагрузку на указанные грунты, по сформированному контуру собирают опалубку, охватывающую верхние оголовки свай с последующим заполнением упомянутых продольных полых элементов бетоном и формированием армированной железобетонной опоры.1. The method of reinforcing soils by placing piles in the soil, the upper heads of which are joined by a reinforced concrete support, characterized in that before placing the piles, the formwork profile of the reinforced concrete support is determined, within the boundaries of which a set of at least three longitudinal hollow elements, which are pipe - column formwork, with their immersion in soil, or reinforcement zones on land, while piles are placed in each of the aforementioned longitudinal hollow elements (zones) at different angles to the surface of the indicated support and from House each pile abroad bottom perimeter of the corresponding longitudinal hollow element to form vectors forces compensating load to said primers, for the contour formed was collected formwork, covering the upper pile heads followed by filling of said longitudinal tubular members forming a reinforced concrete and reinforced concrete support. 2. Способ по п.1, в котором продольный полый элемент выполняют из металлической или полимерной тары, а сваи выполняют из металлопроката.2. The method according to claim 1, in which the longitudinal hollow element is made of metal or polymer containers, and the piles are made of metal. 3. Способ по п.1 или 2, в котором количество свай, размещаемых в каждом продольном полом элементе или зоне армирования, определяют в зависимости от типа грунта. 3. The method according to claim 1 or 2, in which the number of piles placed in each longitudinal hollow element or reinforcement zone is determined depending on the type of soil.
RU2012137308/03A 2012-08-22 2012-08-22 Method of soil reinforcement RU2513954C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012137308/03A RU2513954C2 (en) 2012-08-22 2012-08-22 Method of soil reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012137308/03A RU2513954C2 (en) 2012-08-22 2012-08-22 Method of soil reinforcement

Publications (2)

Publication Number Publication Date
RU2012137308A RU2012137308A (en) 2014-02-27
RU2513954C2 true RU2513954C2 (en) 2014-04-20

Family

ID=50151751

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012137308/03A RU2513954C2 (en) 2012-08-22 2012-08-22 Method of soil reinforcement

Country Status (1)

Country Link
RU (1) RU2513954C2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU549548A1 (en) * 1974-08-30 1977-03-05 Специализированный Проектно-Изыскательский И Экспериментально-Конструкторский Институт "Гидроспецпроект" Pile foundation
SU988983A1 (en) * 1981-06-05 1983-01-15 Ордена Октябрьской Революции Всесоюзный Государственный Проектно-Изыскательский И Научно-Исследовательский Институт Энергетических Систем И Электрических Сетей "Энергосетьпроект" Foundation for pillar supports
SU1596023A1 (en) * 1988-11-05 1990-09-30 Львовское Отделение Всесоюзного Государственного Научно-Исследовательского Института "Теплоэлектропроект" Piles foundation
US6665990B1 (en) * 2000-03-06 2003-12-23 Barr Engineering Co. High-tension high-compression foundation for tower structures
RU53312U1 (en) * 2006-01-10 2006-05-10 Общество с ограниченной ответственностью "Институт "Проектмостореконструкция" BRIDGE OF BRIDGE SUPPORT
RU2357046C1 (en) * 2007-11-20 2009-05-27 Амир Зуфарович Сафин Foundation for high-rise buildings

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU549548A1 (en) * 1974-08-30 1977-03-05 Специализированный Проектно-Изыскательский И Экспериментально-Конструкторский Институт "Гидроспецпроект" Pile foundation
SU988983A1 (en) * 1981-06-05 1983-01-15 Ордена Октябрьской Революции Всесоюзный Государственный Проектно-Изыскательский И Научно-Исследовательский Институт Энергетических Систем И Электрических Сетей "Энергосетьпроект" Foundation for pillar supports
SU1596023A1 (en) * 1988-11-05 1990-09-30 Львовское Отделение Всесоюзного Государственного Научно-Исследовательского Института "Теплоэлектропроект" Piles foundation
US6665990B1 (en) * 2000-03-06 2003-12-23 Barr Engineering Co. High-tension high-compression foundation for tower structures
RU53312U1 (en) * 2006-01-10 2006-05-10 Общество с ограниченной ответственностью "Институт "Проектмостореконструкция" BRIDGE OF BRIDGE SUPPORT
RU2357046C1 (en) * 2007-11-20 2009-05-27 Амир Зуфарович Сафин Foundation for high-rise buildings

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ГАНИЧЕВ И.А. Устройство искусственных оснований и фундаментов, Москва, Стройиздат, 1973, с. 371-384 *

Also Published As

Publication number Publication date
RU2012137308A (en) 2014-02-27

Similar Documents

Publication Publication Date Title
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN104818711A (en) Anti-liquefaction three-dimensional drainage rigid pile and construction method thereof
CN111749288B (en) Load-reducing heightening structure of existing retaining wall and construction method thereof
CN211200426U (en) Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall
KR100975988B1 (en) The Method for Constructing Underwater Structure
RU2331736C1 (en) Method for improving massive of loessial collapsible soil in base of buildings and structures
CN102493439A (en) Building fundamental pile constructional element
RU2456408C1 (en) Method to erect pile foundation
RU2513954C2 (en) Method of soil reinforcement
CN114263187B (en) Foundation pit bottom plate force transmission structure and construction method thereof
CN205276289U (en) Prestressed concrete beam formula double row pile struts system
CN208309592U (en) Foundation pit supporting structure
CN108278036A (en) A kind of correction scheme tilting ancient masonry pagoda
RU129522U1 (en) INJECTION PILING FOR WEAK CLAY SOILS
CN112627188A (en) Deep foundation pit supporting structure and construction method thereof
CN206607595U (en) A kind of T-shaped pattern foundation pit supporting structure
JP2016030901A (en) Wall-shape foundation and construction method therefor
NL2007685C2 (en) Method for installing a reinforcement into a ground.
RU2728052C1 (en) Method for reinforcement of pile foundation
CN215367385U (en) Cantilever type retaining wall of non-excavation construction
KR101058628B1 (en) Retaining wall construction structure using landscape stones
RU2573145C1 (en) Method of protection of pile foundation of bearing support against soil frost heave forces
RU2807350C1 (en) Constructive and technological solution for foundation of intermediate support of high pile work type constructed in temporary enclosing structure
RU2281997C2 (en) Injection pile and retaining wall built of pile foundation

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20150823