RU2441833C2 - Device for placing steel cables without interference in the crane with a set of points of suspension - Google Patents

Device for placing steel cables without interference in the crane with a set of points of suspension Download PDF

Info

Publication number
RU2441833C2
RU2441833C2 RU2010102937/11A RU2010102937A RU2441833C2 RU 2441833 C2 RU2441833 C2 RU 2441833C2 RU 2010102937/11 A RU2010102937/11 A RU 2010102937/11A RU 2010102937 A RU2010102937 A RU 2010102937A RU 2441833 C2 RU2441833 C2 RU 2441833C2
Authority
RU
Russia
Prior art keywords
main beam
winches
winch
blocks
bases
Prior art date
Application number
RU2010102937/11A
Other languages
Russian (ru)
Other versions
RU2010102937A (en
Inventor
Вэйюйэ ЛИ (CN)
Вэйюйэ ЛИ
Минь ГУ (CN)
Минь ГУ
Чанхай ИНЬ (CN)
Чанхай ИНЬ
Original Assignee
Далянь Хуажуй Ко., Лтд.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CNU200720013041XU external-priority patent/CN201068366Y/en
Priority claimed from CN200710011936A external-priority patent/CN100581975C/en
Application filed by Далянь Хуажуй Ко., Лтд. filed Critical Далянь Хуажуй Ко., Лтд.
Publication of RU2010102937A publication Critical patent/RU2010102937A/en
Application granted granted Critical
Publication of RU2441833C2 publication Critical patent/RU2441833C2/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

FIELD: civil engineering.
SUBSTANCE: invention is related to a device for placing steel cables without interference in the crane with a set of points of suspension. The unit contains the main beam, moving blocks, fixed blocks and a winch. Over the top of the main beam there is a guide block and winches bases located at the two ends of the upper part of the main beam, herewith, the winches have different height bases, and the guide blocks are located at different heights corresponding to their winches bases. Between the line connecting a vertical centerline of the winch winding drums and the vertical centerline of the guide blocks, and the centerline of the main beam there is a small deflection angle formed, herewith, the deflection angles between the winches and the main beam on the same end of the main beam have the same direction, and between the winches and main beams on the two ends of the main beam they have an opposite direction.
EFFECT: ease of maintenance is attained, as well as effectiveness, safety and reliability.
5 cl, 4 dwg

Description

Область техники, к которой относится изобретениеFIELD OF THE INVENTION

Изобретение относится к устройству для размещения стальных тросов без взаимного влияния в подъемных машинах, в частности в подъемных кранах с множеством точек подвеса для сцепления с блоками морских платформ и множеством подъемных устройств других подъемных кранов того же класса.The invention relates to a device for placing steel cables without mutual influence in hoisting machines, in particular in cranes with many suspension points for coupling with blocks of offshore platforms and many hoisting devices of other cranes of the same class.

Уровень техникиState of the art

К подъемным кранам с множеством точек подвеса, применяемым для соединения блоков морских платформ, предъявляются строгие требования, включая сверхбольшую грузоподъемность (суммарная грузоподъемность достигает 20000 тонн), сверхбольшую высоту подъема (максимальная высота подъема должна достигать 103 м) и большой пролет главной балки (125 м). Для увеличения высоты подъема и снижения стоимости, обусловленной применением высококачественного прочного бетона (С50) для подъемного крана сверхбольшой грузоподъемности, главная балка должна иметь горизонтальную нижнюю полку, а верхняя часть балки должна быть высокой в середине, низкой с двух сторон и иметь малую ширину. Для обеспечения большой грузоподъемности необходимо использование множества подъемных устройств (на каждом конце каждой главной балки расположено по два или более подъемных устройств) и осуществление объединенного подъема.Cranes with multiple suspension points used to connect blocks of offshore platforms are subject to stringent requirements, including extra-large lifting capacity (total lifting capacity up to 20,000 tons), extra-large lifting height (maximum lifting height must reach 103 m) and a large span of the main beam (125 m ) To increase the lifting height and reduce the cost due to the use of high-quality durable concrete (C50) for an extra-heavy lifting crane, the main beam should have a horizontal lower shelf and the upper part of the beam should be high in the middle, low on both sides and small in width. To ensure a large load carrying capacity, it is necessary to use multiple lifting devices (two or more lifting devices are located at each end of each main beam) and to carry out a combined lifting.

Традиционный подъемный кран имеет несколько подъемных механизмов и наматывающих устройств, обычно одно или два. Вместо чередующегося расположения может быть реализовано простое плоское расположение. Однако морскую платформу невозможно построить без подъема сверхбольших грузов, что может быть реализовано только с помощью подъемного крана с множеством точек подвеса. Если разместить множество механизмов подъема и устройство намотки стального троса на узкой главной балке, то невозможно осуществить общую компоновку. Для подъема сверхтяжелых грузов обычно используется подъемный кран с множеством точек подвеса. Из-за высоты главной балки и узкого пространства между стенками главной балки размещение множества независимых подъемных устройств может вызвать взаимное влияние между стальными тросами или между стальными тросами и главными балками. Важной задачей является разработка схемы размещения подъемных стальных тросов наматывающих устройств без взаимного влияния друг на друга в подъемном кране с множеством точек подвеса.A traditional crane has several hoisting mechanisms and winders, usually one or two. Instead of an alternating arrangement, a simple flat arrangement can be realized. However, an offshore platform cannot be built without lifting extra-large loads, which can only be realized with a crane with many suspension points. If you place a lot of lifting mechanisms and the winding device of the steel cable on a narrow main beam, then it is impossible to carry out a general layout. For lifting heavy loads, a crane with many suspension points is usually used. Due to the height of the main beam and the narrow space between the walls of the main beam, the placement of many independent lifting devices can cause mutual influence between the steel cables or between the steel cables and the main beams. An important task is to develop a layout of steel hoisting cables for winding devices without mutual influence on each other in a crane with many suspension points.

Раскрытие изобретенияDisclosure of invention

Для решения указанной задачи согласно изобретению опоры лебедок расположены на разной высоте, так чтобы между линией, соединяющей центры намоточных барабанов множества лебедок, расположенных на каждом конце главной балки, и центры направляющих блоков, и осевой линией главной балки был образован небольшой угол. В результате стальные тросы имеют чередующееся расположение в верхней части главной балки. Далее стальной трос наматывается на неподвижные и подвижные блоки после входа в главную балку через маленькое отверстие и прохода через направляющий блок.To solve this problem according to the invention, the winch supports are located at different heights, so that a small angle is formed between the line connecting the centers of the winding reels of the many winches located at each end of the main beam and the centers of the guide blocks, and the axial line of the main beam. As a result, steel cables have an alternating arrangement at the top of the main beam. Next, the steel cable is wound on fixed and movable blocks after entering the main beam through a small hole and passing through the guide block.

Согласно изобретению устройство размещения стальных тросов без взаимного влияния в подъемном кране с множеством точек подвеса содержит главную балку (10), подвижные блоки (3), неподвижные блоки (5) и лебедку (1), над верхней частью главной балки (10) расположены направляющий блок (2) и основания (7) лебедок, удерживающие лебедки (1) на верхней части главной балки на двух ее концах, причем между направляющим блоком (2) и лебедкой (1) со стальным тросом (6) имеется область, характеризующаяся двумя треугольниками ΔАВС и ΔА'В'С' с направляющим блоком (2) при вершине, которые расположены симметрично в противоположных направлениях вдоль граничной линии I-I'. При этом между граничной линией I-I' и осевой линией главной балки образован небольшой угол θ, а главная балка (10) имеет по меньшей мере две лебедки (1), расположенные в двух концах верхней части балки, причем основания (7) лебедок имеют разные высоты, и направляющие блоки (2) расположены на разных высотах, соответствующих высотам оснований (7) лебедок, а занятые стальными тросами области находятся в разных плоскостях. При этом между линией, соединяющей вертикальную осевую линию намоточных барабанов лебедок (1) и вертикальную осевую линию направляющих блоков (2), и осевой линией главной балки (10) образован угол α, причем углы между лебедками и главной балкой в одном и том же конце имеют одинаковое направление, а между лебедками и главными балками в двух концах главной балки имеют противоположное направление. Стальной трос (6) лебедки (1) входит в подвижный блок (5), расположенный внутри главной балки, проходит через неподвижный направляющий блок (2) над верхней частью главной балки (10), а затем через одно выходное/входное отверстие (8) для троса в верхней части главной балки, и наматывается на подвижный блок (3), повторяя наматывание между подвижными и неподвижными блоками, при этом конец (9) стального троса закреплен рядом с неподвижным блоком на главной балке.According to the invention, a device for placing steel cables without mutual influence in a crane with a plurality of suspension points comprises a main beam (10), movable blocks (3), fixed blocks (5) and a winch (1), a guide rail is located above the upper part of the main beam (10) a block (2) and bases (7) of winches holding the winches (1) on the upper part of the main beam at its two ends, and between the guide block (2) and the winch (1) with a steel cable (6) there is an area characterized by two triangles ΔABC and ΔA'B'C 'with the guide block (2) at bus, which are disposed symmetrically in opposite directions along the boundary lines I-I '. Moreover, a small angle θ is formed between the boundary line II 'and the axial line of the main beam, and the main beam (10) has at least two winches (1) located at the two ends of the upper part of the beam, and the bases (7) of the winches have different heights , and the guide blocks (2) are located at different heights corresponding to the heights of the bases (7) of the winches, and the areas occupied by steel cables are in different planes. Moreover, an angle α is formed between the line connecting the vertical axial line of the winch winch drums (1) and the vertical axial line of the guide blocks (2) and the axial line of the main beam (10), and the angles between the winch and the main beam at the same end have the same direction, and between the winches and the main beams at the two ends of the main beam have the opposite direction. The steel cable (6) of the winch (1) enters the movable block (5) located inside the main beam, passes through the fixed guide block (2) above the upper part of the main beam (10), and then through one outlet / inlet (8) for the cable in the upper part of the main beam, and wound on a movable block (3), repeating winding between movable and fixed blocks, while the end (9) of the steel cable is fixed next to the fixed block on the main beam.

Диапазон углов θ и α определяются из следующего условия:The range of angles θ and α are determined from the following condition:

При L>а/2 угол θ лежит в диапазоне 0°<θ<90°, а угол α≤ζ, гдеFor L> a / 2, the angle θ lies in the range 0 ° <θ <90 °, and the angle α≤ζ, where

L - длина намоточного барабана,L is the length of the winding drum,

а - ширина верхней части главной балки,a is the width of the upper part of the main beam,

b - длина верхней части главной балки,b is the length of the upper part of the main beam,

ζ - угол наклона выходящих из лебедки тросов.ζ is the angle of inclination of the cables emerging from the winch.

Граничная линия I-I' параллельна линии, соединяющей вертикальную осевую линию намоточного барабана каждой лебедки и вертикальную осевую линию направляющего блока, при этом угол α наклона равен θ, а лебедки на двух концах главной балки расположены с направляющими блоками симметрично.The boundary line I-I 'is parallel to the line connecting the vertical axial line of the winding drum of each winch and the vertical axial line of the guide block, the inclination angle α being equal to θ, and the winch at the two ends of the main beam located symmetrically with the guide blocks.

Подвижные блоки в подъемном устройстве, содержащем лебедки, связаны продольными рейками.The movable blocks in the lifting device containing the winches are connected by longitudinal rails.

Основания лебедок в верхней части на двух концах главной балки распределены пошагово, а направляющие блоки расположены на высотах, соответствующих этим основаниям лебедок.The bases of the winches in the upper part at the two ends of the main beam are distributed stepwise, and the guide blocks are located at heights corresponding to these bases of the winches.

Такая схема размещения стальных тросов без взаимного влияния в подъемном кране с множеством точек подвеса обеспечивает возможность осуществления изобретения с помощью простой конструкции. Устройство для размещения стальных тросов без взаимного влияния друг на друга в подъемном механизме, содержащем множество подъемных устройств, является подходящим решением для подъемного крана с большой высотой подъема, большим пролетом и множеством точек подвеса, в котором используются составные узкие главные балки, в результате чего подъемный кран при подъеме морских платформ и других сверхтяжелых грузов имеет следующие преимущества:Such a layout of steel cables without mutual influence in a crane with a plurality of suspension points makes it possible to carry out the invention with a simple design. A device for accommodating steel cables without interfering with each other in a lifting mechanism comprising a plurality of lifting devices is a suitable solution for a crane with a large lifting height, a large span and a plurality of suspension points, using composite narrow main beams, resulting in a lifting the crane when lifting offshore platforms and other super-heavy loads has the following advantages:

- подъемный механизм подъемного крана с множеством точек подвеса может работать безопасно и надежно;- the crane lifting mechanism with multiple suspension points can operate safely and reliably;

- механизм имеет простую конструкцию, удобен в изготовлении, установке и обслуживании;- the mechanism has a simple design, convenient to manufacture, install and maintain;

- подъемный механизм, содержащий множество подъемных устройств, обладает высокой эффективностью;- a lifting mechanism comprising a plurality of lifting devices is highly efficient;

- главная балка имеет малый собственный вес и является узкой, за счет чего можно снизить стоимость подъемного крана в целом.- the main beam has a low dead weight and is narrow, due to which it is possible to reduce the cost of the crane as a whole.

Краткое описание чертежейBrief Description of the Drawings

На фиг.1 показана структурная схема согласно изобретению;Figure 1 shows a structural diagram according to the invention;

на фиг.2 - кран согласно изобретению, вид спереди;figure 2 - crane according to the invention, front view;

на фиг.3 - главная балка согласно изобретению, вид сверху;figure 3 - the main beam according to the invention, a top view;

на фиг.4 - схема конструкции наматывающего устройства для стального троса согласно изобретению.4 is a structural diagram of a winding device for a steel cable according to the invention.

Список позиций на фигурах:The list of positions in the figures:

1 - Лебедка1 - Winch

2 - Направляющий блок2 - Guide block

3 - Подвижный блок3 - Movable unit

4 - Соединительная рейка4 - Connecting rail

5 - Неподвижный блок5 - Fixed block

6 - Стальной трос6 - Steel cable

7 - Основание лебедки7 - Winch base

8 - Отверстие для выхода/входа одного троса8 - hole for the exit / entry of one cable

9 - Закрепленный конец9 - Fastened end

10 - Главная балка10 - Main beam

11 - Верхняя часть балки11 - The upper part of the beam

Осуществление изобретенияThe implementation of the invention

На фиг.1-4 показано устройство для размещения стальных тросов без взаимного влияния в подъемном кране с множеством точек подвеса, предназначенном для подъема морских платформ и других сверхтяжелых грузов. Подъемный кран, используемый обычно для подъема сверхбольших грузов, имеет высокую главную балку и узкое пространство между стенками главной балки. Обычно он содержит множество подъемных устройств. Каждое подъемное устройство содержит лебедку 1, направляющий блок 2, подвижные блоки 3, соединительные рейки 4, расположенные между подвижными блоками, неподвижные блоки 5, стальной трос 6 и основание 7 лебедки. Обычно каждое подъемное устройство содержит четыре подвижных блока, каждый из которых управляет одной точкой подвеса. Лебедка 1 содержит намоточный барабан (включая зажим стального троса), редуктор, тормоз, передачу, муфту, подвижный вал, то есть полный приводной механизм от соединенной с двигателем муфты до последней ступени тормоза. Область, расположенная между направляющим блоком 2 и лебедкой 1 со стальным тросом 6, может характеризоваться двумя треугольниками ΔАВС и ΔA'B'C' с направляющим блоком 2 при вершине. Как показано на фиг.4, при L>а/2 (L - длина намоточного барабана, а - ширина верхней части главной балки, b - длина верхней части главной балки, ζ - угол наклона выходящего из лебедки троса), т.е. когда вершины А и А' двух верхних треугольников пересекаются, то возможно влияние тросов друг на друга, которое не может быть устранено с помощью традиционной механической схемы для подъемного крана большой грузоподъемности. Согласно изобретению два треугольника расположены симметрично и в противоположных направлениях вдоль граничной линии I-I', при этом между граничной линией I-I' и осевой линией главной балки образован небольшой угол θ, находящийся в диапазоне 0°<θ<90°.Figure 1-4 shows a device for placing steel cables without mutual influence in a crane with many suspension points, designed to lift offshore platforms and other heavy loads. The crane, usually used for lifting extra-large loads, has a high main beam and a narrow space between the walls of the main beam. Usually it contains many lifting devices. Each lifting device comprises a winch 1, a guide block 2, movable blocks 3, connecting rails 4 located between the movable blocks, fixed blocks 5, a steel cable 6 and the base 7 of the winch. Typically, each lifting device comprises four movable units, each of which controls a single suspension point. The winch 1 comprises a winding drum (including a steel cable clamp), a gearbox, a brake, a transmission, a clutch, a movable shaft, i.e. a four-wheel drive mechanism from a clutch connected to the engine to the last brake stage. The area located between the guide block 2 and the winch 1 with the steel cable 6, can be characterized by two triangles ΔABC and ΔA'B'C 'with the guide block 2 at the apex. As shown in Fig. 4, for L> a / 2 (L is the length of the winding drum, a is the width of the upper part of the main beam, b is the length of the upper part of the main beam, ζ is the angle of inclination of the cable coming out of the winch), i.e. when the vertices A and A 'of the two upper triangles intersect, then the influence of the ropes on each other is possible, which cannot be eliminated with the help of the traditional mechanical scheme for a heavy lifting crane. According to the invention, two triangles are located symmetrically and in opposite directions along the boundary line I-I ', while between the boundary line I-I' and the axial line of the main beam, a small angle θ is formed in the range 0 ° <θ <90 °.

Лебедка 1 расположена в верхней части главной балки 10. Каждая главная балка содержит две или более лебедок, расположенных на двух концах в верхней части каждой главной балки. Стальной трос 6 каждой лебедки проходит над верхней частью главной балки через неподвижный направляющий блок 2, а затем через единственное выходное/входное отверстие для троса в верхней части главной балки входит в неподвижный блок 5, расположенный внутри главной балки, затем наматывается на подвижный блок 3, повторяет намотку между подвижными и неподвижными блоками, как показано на фиг.4, и крепится концом 9 около неподвижного блока на главной балке.Winch 1 is located at the top of the main beam 10. Each main beam contains two or more winches located at two ends in the upper part of each main beam. The steel cable 6 of each winch passes over the upper part of the main beam through the fixed guide block 2, and then through the single outlet / inlet for the cable in the upper part of the main beam enters the fixed block 5 located inside the main beam, then wraps on the movable block 3, repeats the winding between the movable and fixed blocks, as shown in figure 4, and is attached by the end 9 near the fixed block on the main beam.

На двух концах главной балки каждая лебедка расположена на основании 7 разной высоты, чтобы высоты прохождения стальных тросов 6 отличались для намоточных барабанов разных лебедок, а занятая стальными тросами область не находилась в одной плоскости. При этом основания 7 лебедок в верхней части на двух концах главной балки 10 распределены пошагово, а направляющий блок 2 установлен на той высоте, которая соответствует основанию 7 лебедки, как показано на фиг.3. Между линией, соединяющей вертикальную осевую линию намоточного барабана каждой лебедки 1 и вертикальную осевую линию направляющего блока 2, и осевой линией главной балки 10 образован небольшой угол α≤ζ, где ζ - диапазон углов наклона прохождения троса лебедки, который не превышает 2°.At the two ends of the main beam, each winch is located on a base of 7 different heights, so that the passage heights of steel cables 6 differ for winding drums of different winches, and the area occupied by steel cables is not in the same plane. In this case, the bases of 7 winches in the upper part at the two ends of the main beam 10 are distributed stepwise, and the guide unit 2 is installed at the height that corresponds to the base 7 of the winch, as shown in FIG. 3. Between the line connecting the vertical axial line of the winding drum of each winch 1 and the vertical axial line of the guide block 2, and the axial line of the main beam 10, a small angle α≤ζ is formed, where ζ is the range of inclination angles of the winch cable passage, which does not exceed 2 °.

Граничная линия I-I' параллельна линии, соединяющей вертикальную осевую линию намоточного барабана каждой лебедки 1 и вертикальную осевую линию направляющего блока 2, а угол α равен углу θ. Лебедки и их направляющие блоки расположены симметрично на двух концах главной балки. Углы наклона между каждой лебедкой 1 и главной балкой 10 имеют одинаковое направление. Таким образом, стальной трос 6 имеет чередующееся расположение в пространстве, что позволяет избежать взаимного влияния между стальными тросами и между стальными тросами и главной балкой и обеспечивает соответствие стандарту угла наклона между стальным тросом, намоточным барабаном лебедки и блоком. Кроме того, подвижные блоки 3 в каждом подъемном устройстве, содержащем лебедку 1, связаны с помощью соединительных реек 4.The boundary line I-I 'is parallel to the line connecting the vertical center line of the winding drum of each winch 1 and the vertical center line of the guide unit 2, and the angle α is equal to the angle θ. Winches and their guide blocks are located symmetrically at the two ends of the main beam. The angles between each winch 1 and the main beam 10 have the same direction. Thus, the steel cable 6 has an alternating arrangement in space, which avoids the mutual influence between the steel cables and between the steel cables and the main beam and ensures compliance with the standard angle of inclination between the steel cable, the winding drum of the winch and the unit. In addition, the movable blocks 3 in each lifting device containing the winch 1 are connected by means of connecting rails 4.

В качестве примера будет рассмотрена главная балка с размещенными на ней шестью подъемными устройствами. На главной балке 10 должно быть размещено шесть лебедок 1. Чтобы угол наклона стального троса между намоточным барабаном и блоком не превышал стандартного значения, на каждом конце расположено три лебедки 1. Верхняя часть главной балки имеет длину b=130 м и ширину а=4 м. Подъемный механизм обеспечивает угол ζ наклона стального троса, не превышающий 2°. Угол θ принимается равным 1,04° на основании эмпирической формулы. Небольшой угол α наклона (1,04°) также образован между линией, соединяющей вертикальную осевую линию намоточного барабана каждой лебедки 1 и вертикальную осевую линию направляющего блока 2, и осевой линией главной балки 10 для обеспечения симметричности и параллельности.As an example, the main beam with six lifting devices placed on it will be considered. Six winches 1 must be placed on the main beam 10. To ensure that the angle of inclination of the steel cable between the winding drum and the block does not exceed the standard value, three winches 1 are located at each end. The upper part of the main beam has a length of b = 130 m and a width of a = 4 m The lifting mechanism provides an angle ζ of inclination of the steel cable not exceeding 2 °. The angle θ is taken to be 1.04 ° based on an empirical formula. A small inclination angle α (1.04 °) is also formed between the line connecting the vertical axial line of the winding drum of each winch 1 and the vertical axial line of the guide unit 2, and the axial line of the main beam 10 to ensure symmetry and parallelism.

Лебедки 1 расположены на основаниях 7 различной высоты для того, чтобы стальные тросы чередовались друг с другом. При этом подвижные блоки 3 в каждом подъемном устройстве, содержащем лебедку 1, связаны соединительными рейками 4, чтобы между подвижными блоками 3 в подъемном устройстве было сохранено фиксированное расстояние, что позволит избежать влияния между стальными тросами в верхней части балки. Изменение пространственного положения направляющего блока 2 и неподвижных блоков 5 при таком расположении гарантирует, что угол наклона между стальным тросом и блоком в главной балке соответствует необходимым требованиям и позволяет избежать взаимного влияния между стальными тросами. В одном подъемном устройстве стальной трос 6 выходит из лебедки 1, проходит через направляющий блок 2, достигает неподвижного блока 5, затем подвижного блока 3, повторяя намотку между подвижными и неподвижными блоками, а затем концом 9 крепится рядом с неподвижным блоком на главной балке. Независимо от того, какая точка подвеса действует, взаимного влияния между стальными тросами происходить не будет.Winches 1 are located on the bases 7 of different heights so that the steel cables alternate with each other. In this case, the movable blocks 3 in each lifting device containing the winch 1 are connected by connecting rails 4 so that a fixed distance is maintained between the moving blocks 3 in the lifting device, which will avoid the influence between the steel cables in the upper part of the beam. Changing the spatial position of the guide block 2 and the fixed blocks 5 with this arrangement ensures that the angle of inclination between the steel cable and the block in the main beam meets the necessary requirements and avoids the mutual influence between the steel cables. In one lifting device, the steel cable 6 exits the winch 1, passes through the guide block 2, reaches the fixed block 5, then the movable block 3, repeating the winding between the movable and fixed blocks, and then the end 9 is attached next to the fixed block on the main beam. No matter what suspension point is in effect, there will be no mutual influence between the steel cables.

Выше описан предпочтительный вариант осуществления изобретения. Однако специалистом в данной области техники в изобретение могут быть внесены изменения, не выходя за рамки изобретения.The preferred embodiment of the invention is described above. However, a person skilled in the art may make changes to the invention without departing from the scope of the invention.

Claims (5)

1. Устройство для размещения стальных тросов без взаимного влияния в подъемном кране с множеством точек подвеса, содержащее главную балку (10), подвижные блоки (3), неподвижные блоки (5) и лебедку (1), над верхней частью главной балки (10) расположены направляющий блок (2) и основания (7) лебедок, удерживающие лебедки (1) на двух концах верхней части главной балки; причем область для стального троса (6), образованная между направляющим блоком (2) и лебедкой (1), имеет вид двух треугольников ΔАВС и ΔА'В'С” с направляющим блоком (2) при вершине, которые расположены симметрично в противоположных направлениях вдоль граничной линии I-I'; при этом между граничной линией I-I' и осевой линией главной балки имеется небольшой угол θ, а главная балка (10) имеет две или более лебедок (1), расположенных на двух концах в верхней части главной балки, причем основания (7) лебедок имеют разные высоты, а направляющие блоки (2) расположены на разных высотах, соответствующих высотам оснований (7) лебедок, при этом занятые стальными тросами области находятся в разных плоскостях, а между линией, соединяющей вертикальную осевую линию намоточных барабанов лебедок (1) и вертикальную осевую линию направляющих блоков (2), и осевой линией главной балки (10) образован небольшой угол α, причем углы наклона между лебедками и главной балкой на одном и том же конце главной балки имеют одинаковое направление, а между лебедками и главными балками на двух концах главной балки имеют противоположное направление; стальной трос (6) лебедки (1) входит в подвижный блок (5), расположенный внутри главной балки, проходя через неподвижный направляющий блок (2) над верхней частью главной балки (10), а затем через одно выходное/входное отверстие (8) для троса в верхней части главной балки, наматываясь на подвижный блок (3) и повторяя наматывание между подвижными и неподвижными блоками, при этом конец (9) стального троса закреплен рядом с неподвижным блоком на главной балке.1. A device for placing steel cables without mutual influence in a crane with many suspension points, containing the main beam (10), movable blocks (3), fixed blocks (5) and a winch (1), above the upper part of the main beam (10) the guide block (2) and the base (7) of the winches are located, holding the winches (1) at the two ends of the upper part of the main beam; moreover, the area for the steel cable (6), formed between the guide block (2) and the winch (1), has the form of two triangles ΔАВС and ΔА'В'С ”with the guide block (2) at the apex, which are located symmetrically in opposite directions along boundary line I-I '; there is a small angle θ between the boundary line II 'and the axial line of the main beam, and the main beam (10) has two or more winches (1) located at two ends in the upper part of the main beam, and the bases (7) of the winches have different heights, and guide blocks (2) are located at different heights corresponding to the heights of the bases (7) of the winches, while the areas occupied by steel cables are in different planes, and between the line connecting the vertical axial line of the winch drums of the winch (1) and the vertical axial line direction units (2), and the axial line of the main beam (10) forms a small angle α, and the inclination angles between the winches and the main beam at the same end of the main beam have the same direction, and between the winches and the main beams at the two ends of the main beam have the opposite direction; the steel cable (6) of the winch (1) enters the movable block (5) located inside the main beam, passing through the fixed guide block (2) above the upper part of the main beam (10), and then through one outlet / inlet (8) for the cable in the upper part of the main beam, winding on the movable block (3) and repeating winding between the movable and fixed blocks, while the end (9) of the steel cable is fixed next to the fixed block on the main beam. 2. Устройство по п.1, в котором при L>a/2 угол θ лежит в диапазоне 0°<θ<90°, а α≤ζ, где L - длина намоточного барабана, а - ширина верхней части главной балки, b - длина верхней части главной балки, ζ - угол наклона выходящих из лебедки тросов.2. The device according to claim 1, in which when L> a / 2, the angle θ lies in the range 0 ° <θ <90 °, and α≤ζ, where L is the length of the winding drum, and is the width of the upper part of the main beam, b is the length of the upper part of the main beam, ζ is the angle of inclination of the cables emerging from the winch. 3. Устройство по любому из пп.1 или 2, в котором граничная линия I-I' параллельна линии, соединяющей вертикальную осевую линию намоточного барабана каждой лебедки (1) и вертикальную осевую линию направляющего блока (2), а α=θ, при этом лебедки в двух концах главной балки симметрично расположены с направляющими блоками.3. The device according to any one of claims 1 or 2, in which the boundary line II 'is parallel to the line connecting the vertical axial line of the winding drum of each winch (1) and the vertical axial line of the guide block (2), and α = θ, while the winch at the two ends of the main beam symmetrically located with the guide blocks. 4. Устройство по п.1, в котором подвижные блоки в подъемном устройстве, содержащем лебедки, соединены соединительными рейками.4. The device according to claim 1, in which the movable blocks in a lifting device containing winches are connected by connecting rails. 5. Устройство по п.1, в котором основания (7) лебедок в верхней части на двух концах главной балки (10) распределены пошагово, а направляющие блоки (2) расположены на высотах, соответствующих этим основаниям (7) лебедок. 5. The device according to claim 1, in which the bases (7) of the winches in the upper part at the two ends of the main beam (10) are distributed step by step, and the guide blocks (2) are located at heights corresponding to these bases (7) of the winches.
RU2010102937/11A 2007-06-29 2007-12-03 Device for placing steel cables without interference in the crane with a set of points of suspension RU2441833C2 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CNU200720013041XU CN201068366Y (en) 2007-06-29 2007-06-29 Space interference-resistant arrangement for multiple hanging points crane hoisting wire rope
CN200710011936A CN100581975C (en) 2007-06-29 2007-06-29 Space interference-resistant arrangement for multiple hanging points crane hoisting wire rope
CN200720013041.X 2007-06-29
CN200710011936.4 2007-06-29

Publications (2)

Publication Number Publication Date
RU2010102937A RU2010102937A (en) 2011-08-10
RU2441833C2 true RU2441833C2 (en) 2012-02-10

Family

ID=40225701

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010102937/11A RU2441833C2 (en) 2007-06-29 2007-12-03 Device for placing steel cables without interference in the crane with a set of points of suspension

Country Status (4)

Country Link
JP (1) JP5426541B2 (en)
KR (1) KR101115837B1 (en)
RU (1) RU2441833C2 (en)
WO (1) WO2009003332A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057468B (en) * 2018-09-10 2024-05-28 刘国辉 Lifting mechanism driven by screw rod
JP7182732B2 (en) 2020-01-07 2022-12-02 日本碍子株式会社 Electrically heated carrier and exhaust gas purification device
CN111268457B (en) * 2020-03-20 2023-08-04 大连华锐重工集团股份有限公司 Quick overhead hoist of storehouse machine
CN113879975B (en) * 2021-10-22 2024-01-26 合肥市春华起重机械有限公司 Double-girder multi-hoisting-point crane and working method thereof
CN116853944B (en) * 2023-08-01 2024-06-04 东营文涛建设工程有限公司 Hoisting device for lifting materials used on construction site

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8002900A (en) * 1980-05-20 1981-12-16 Ihc Holland Nv LIFTING YUKE.
JPS61105393U (en) * 1984-12-18 1986-07-04
JP2552419B2 (en) * 1992-11-27 1996-11-13 株式会社神戸製鋼所 Wheel crane winch mounting structure
JP3196393B2 (en) * 1993-01-18 2001-08-06 石川島播磨重工業株式会社 Stage suspension mechanism
FI102957B (en) * 1996-08-09 1999-03-31 Kci Kone Cranes Internat Oy Control system for a lingripscope
JPH10316360A (en) * 1997-05-16 1998-12-02 Taisei Corp Device and method for hoisting long object
JP2003267660A (en) 2002-03-19 2003-09-25 Mitsui Eng & Shipbuild Co Ltd Container positioning device for gantry crane
CN2564526Y (en) * 2002-08-13 2003-08-06 宗胜琪 150 ton multi-lifting point slings
CN2632145Y (en) * 2003-05-03 2004-08-11 郝尽海 Hoist opening/shutting apparatus with double hanging poins
CN2683728Y (en) * 2004-03-17 2005-03-09 上海市第一建筑有限公司 Integral hoisting system for giant-scale girder
JP4504848B2 (en) * 2005-03-16 2010-07-14 株式会社日立製作所 Elevator hoist brake cover
CN2804043Y (en) * 2005-03-29 2006-08-09 大连华锐股份有限公司 Electromagnetic hanging beam crane

Also Published As

Publication number Publication date
RU2010102937A (en) 2011-08-10
JP5426541B2 (en) 2014-02-26
WO2009003332A1 (en) 2009-01-08
KR20100023973A (en) 2010-03-04
KR101115837B1 (en) 2012-03-09
JP2010531794A (en) 2010-09-30

Similar Documents

Publication Publication Date Title
JP7038704B2 (en) How to make a monopile upright as the basis of a wind turbine
CN102341336B (en) Elevator arrangement and method
RU2441833C2 (en) Device for placing steel cables without interference in the crane with a set of points of suspension
CN101549835B (en) Lattice mast crane and lattice mast boom
US7389888B2 (en) Mobile crane with ballasting
CN113502924A (en) Method for constructing steel beam in high-rise closed core cylinder
US20230174346A1 (en) Construction Elevator Device
US6651961B1 (en) Multiple load blocks for a crane
CN101613057B (en) Hoisting mechanism of multi-lifting-point joint crane
KR101682482B1 (en) Hoist apparatus for crane and Trolley system using the same
CN105401733B (en) Channel and its construction method of a kind of contact Core Walls Structure and peripheral steel construction
CN100581975C (en) Space interference-resistant arrangement for multiple hanging points crane hoisting wire rope
JP2013036287A (en) Device and method for lifting floor unit
CN204057812U (en) The two reel wiring system of duplex
CN201433064Y (en) Lifting mechanism for a multiple-lifting-lug hoisting machine
CN201686458U (en) Movable operating platform used for quickly processing welding seam at end opening of steel box girder
RU2442743C2 (en) Double-girder crane with number of supports
US20230183041A1 (en) Transport system for vertically transporting goods and persons on an above ground construction site
CN216141120U (en) A hoist device for assembled coincide beam slab
CN218620047U (en) Large-scale steel reinforcement cage continuous lowering device
CN217264459U (en) Pulley block hoisting equipment
CN201068366Y (en) Space interference-resistant arrangement for multiple hanging points crane hoisting wire rope
CN108265987A (en) A kind of installation method of Large Span Spatial Truss
KR102071625B1 (en) Climbing crane apparatus for transmission tower construction
CN215160770U (en) Construction elevator for loading and unloading without dismantling steel wire rope firstly

Legal Events

Date Code Title Description
PC41 Official registration of the transfer of exclusive right

Effective date: 20120625