RU2426881C1 RU2009148977/03A RU2009148977A RU2426881C1 RU 2426881 C1 RU2426881 C1 RU 2426881C1 RU 2009148977/03 A RU2009148977/03 A RU 2009148977/03A RU 2009148977 A RU2009148977 A RU 2009148977A RU 2426881 C1 RU2426881 C1 RU 2426881C1
Authority
RU
Russia
Prior art keywords
ore
block
workings
floor
covering
Prior art date
Application number
RU2009148977/03A
Other languages
Russian (ru)
Other versions
RU2009148977A (en
Inventor
Сергей Андреевич Толстунов (RU)
Сергей Андреевич Толстунов
Сергей Петрович Мозер (RU)
Сергей Петрович Мозер
Original Assignee
Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" filed Critical Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)"
Priority to RU2009148977/03A priority Critical patent/RU2426881C1/en
Publication of RU2009148977A publication Critical patent/RU2009148977A/en
Application granted granted Critical
Publication of RU2426881C1 publication Critical patent/RU2426881C1/en

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Cleaning In General (AREA)

Abstract

FIELD: mining.
SUBSTANCE: workings as per thickness of ore body pass at the block corners across body's course. Fans are drilled from them in hanging wall of ore body, parallel to ore body plane, for driving of slot raise. After slot raise breaking the broken ore is drawn through sublevels. Then winches with ropes are mounted in all workings made at corners. Ropes from upper horizon are lowered to level of lower block elevation, and active flexible covering is attached to them. Flexible covering consists of several rows of closed elastic covers connected by compressed air supply pipeline to compressor. Covering is drawn as the erection continues to the slot raise up to upper horizon. Covers are filled with air to working pressure. Flexible covering is stretched with ropes; after that, stopped excavation operations are performed. As the block reserves are being developed, ropes are tightened from time to time; after reserves are developed, air is discharged from covers by means of air pipeline and the covering is stretched to upper or lower horizon.
EFFECT: invention allows using the covering to control the ore drawing process and excluding the probability of the covering damage at blasting.
2 cl, 6 dwg

Description

Изобретение относится к горному делу и может быть использовано при подземной разработке рудных месторождений.The invention relates to mining and can be used in underground mining of ore deposits.

Известен способ перемещения горной массы в камере при разработке руды (а.с. СССР №1786882, E21C 41/22, опубл. 20.09.1999). Способ включает проходку подсечного штрека, отбойку и магазинирование полезного ископаемого между породами висячего и лежачего боков, обрушение потолочины блока и генеральный выпуск полезного ископаемого под разделяющим гибким перекрытием с направляющими элементами. Способ характеризуется тем, что направляющие элементы крепят в подсечном штреке и по мере слоевой отбойки полезного ископаемого навешивают по висячему и лежачему бокам по всей высоте отрабатываемого блока до уровня его потолочины, на указанном уровне направляющие элементы пропускают через края гибкого перекрытия у боковых пород и закрепляют, а при выпуске полезного ископаемого направляющие элементы удерживают у висячего и лежачего боков замагазинированным полезным ископаемым и обрушающимися боковыми породами.A known method of moving rock mass in the chamber during the development of ore (AS USSR No. 1786882, E21C 41/22, publ. 09/20/1999). SUBSTANCE: method involves sinking a drift drift, breaking and mineralizing between the rocks of the hanging and lying sides, collapse of the block ceiling and general release of the mineral under a dividing flexible overlap with guide elements. The method is characterized in that the guide elements are fastened in a slash drift and, as the mineral is cut off in layers, they are hung along the hanging and lying sides along the entire height of the working block to the level of its ceiling, at the indicated level, the guide elements are passed through the edges of the flexible overlap at the side rocks and fixed, and when releasing the mineral, the guiding elements are held at the hanging and lying sides by the stained mineral and collapsing side rocks.

Недостатком данного способа является низкая производительность блока, связанная с необходимостью магазинирования руды в блоке, а также высокая вероятность повреждения перекрытия при взрывной отбойке полезного ископаемого.The disadvantage of this method is the low productivity of the block associated with the need to store ore in the block, as well as the high probability of damage to the floor during explosive breaking of the mineral.

Известен способ разработки мощного крутого пласта полезного ископаемого с закладкой выработанного пространства (патент РФ №2283431, Е21С 41/18, опубл. 10.09.2006). Способ включает отработку горизонтального слоя полосами по простиранию механогидравлической отбойкой и транспортировку горной массы с заполнением заходок литой твердеющей закладкой и оставлением в них выработок для последующей подачи в выработанное пространство комбинированной закладки. Отработку пласта ведут полосами в нисходящем порядке с оставлением в нижележащих полосах штрека и печей. Отработку следующей полосы осуществляют гидромонитором, а за гибкое перекрытие в выработанное пространство из бункера с помощью конвейера подают породу, которая пропитывается литой твердеющей закладкой при заполнении подготовительных выработок.There is a method of developing a powerful steep layer of minerals with the laying of the developed space (RF patent No. 2283431, Е21С 41/18, publ. 09/10/2006). The method includes working out the horizontal layer in strips along the strike by mechanohydraulic breaking and transporting the rock mass with filling the castings with a cast hardening bookmark and leaving workings in them for subsequent feeding into the worked out space of the combined bookmark. The development of the formation is carried out in stripes in a descending order, leaving the drift and furnaces in the underlying bands. The development of the next strip is carried out by a hydraulic monitor, and for flexible overlap, a rock is fed into the mined space from the hopper using a conveyor, which is impregnated with a cast hardening tab when filling the preparatory workings.

Недостатком данного способа является возможность повреждения перекрытия при взрывной отбойке полезного ископаемого, а также невозможность использования перекрытия для управления процессом выпуска руды.The disadvantage of this method is the possibility of damage to the floor during the explosive breaking of the mineral, as well as the inability to use the floor to control the process of ore production.

Известен способ разработки мощных крутых угольных пластов (патент РФ №2085739, Е21С 41/18, опубл. 27.07.1997), который включает проведение штреков, монтаж гибкого перекрытия, состоящего из двух параллельных ветвей, составленных из цилиндрических секций. Ветви перекрытия скрепляют между собой через жесткие связи, поверх которых укладывают металлическую сетку. Секции в каждой ветви по торцам соединяют гибкой связью. Перепуск перекрытия осуществляют по мере отработки угля нижележащих подэтажей, а демонтируют на аккумулирующем штреке.A known method of developing powerful steep coal seams (RF patent No. 2085739, E21C 41/18, publ. 07.27.1997), which includes drifts, installation of flexible floors, consisting of two parallel branches, composed of cylindrical sections. The overlapping branches are fastened together through rigid ties, on top of which a metal mesh is laid. Sections in each branch at the ends are connected by a flexible connection. Bypassing the overlap is carried out as the coal mining of the underlying floors, and dismantled on the accumulating drift.

Недостатком данного способа является возможность повреждения перекрытия при взрывной отбойке полезного ископаемого, а также невозможность использования перекрытия для управления процессом выпуска руды.The disadvantage of this method is the possibility of damage to the floor during the explosive breaking of the mineral, as well as the inability to use the floor to control the process of ore production.

Известен способ слоевой отработки погребенных алмазоносных россыпей с наличием в контурах шахтных полей впадин с алмазосодержащей рудой (патент РФ №2345219, Е21С 41/16, опубл. 27.01.2009). Способ слоевой отработки погребенных алмазоносных россыпей с наличием в контурах шахтных полей впадин с алмазосодержащей рудой включает механизированную отработку верхнего слоя камерами с последующей отработкой опорных целиков и монтажом гибкого перекрытия, отработку системой блочного обрушения нижнего слоя, включающего впадины с алмазосодержащей рудой. Гибкое перекрытие монтируют только над впадинами с алмазосодержащей рудой. Сначала монтируют гибкое перекрытие на почве отрабатываемых камер одновременно с их отработкой, затем - на почве отрабатываемых опорных целиков одновременно с их отработкой, после чего гибкие перекрытия примыкающих камер и опорных целиков соединяют между собой.There is a method of layer mining of buried diamond-bearing placers with the presence in the contours of mine fields of depressions with diamond-containing ore (RF patent No. 2345219, Е21С 41/16, published on January 27, 2009). The method of layer mining of buried diamond-bearing placers with the presence of cavities with diamond-containing ore in the contours of mine fields includes mechanized mining of the upper layer by chambers, followed by working out of the pillars and installation of a flexible ceiling, working out of a block caving system for the lower layer, including hollows with diamond-containing ore. Flexible overlap is mounted only over the hollows with diamond ore. First, a flexible ceiling is mounted on the soil of the processed chambers simultaneously with their development, then - on the soil of the processed support pillars simultaneously with their development, after which the flexible ceilings of adjacent chambers and support pillars are connected to each other.

Недостатком данного способа является возможность повреждения перекрытия при взрывной отбойке полезного ископаемого, а также невозможность использования перекрытия для управления процессом выпуска руды.The disadvantage of this method is the possibility of damage to the floor during the explosive breaking of the mineral, as well as the inability to use the floor to control the process of ore production.

Известен способ разработки крутопадающих рудных залежей малой и средней мощности системой подэтажного обрушения с гибкими разделяющими перекрытиями, принятый за прототип (патент РФ №2301334, Е21С 41/22, опубл. 20.06.2007). Способ включает проведение полевых этажных и подэтажных транспортных штреков, уклона, рампы, заездов к рудному телу и сплошных подсечек на основном горизонте и на подэтажах, проведение отрезных рудных восстающих, которые разделывают в отрезные щели, бурение параллельных скважин и последующую отбойку основных запасов подэтажей. Выпуск руды осуществляют через торцы заездов на каждом подэтаже начиная с верхнего. Перед проведением подготовительных выработок вынимают ниже уровня основного горизонта камеру, объем которой равен объему породы от проходки полевых выработок, и на почву камеры и сплошных подсечек настилают металлическую сетку.There is a method of developing steep-dipping ore deposits of small and medium capacity by a system of sub-floor collapse with flexible dividing floors, adopted as a prototype (RF patent No. 2301334, Е21С 41/22, publ. 20.06.2007). The method includes carrying out field floor and sub-floor transport drifts, a slope, a ramp, races to the ore body and continuous cuts on the main horizon and on the sub-floors, conducting cutting ore risers, which are cut into cutting slots, drilling parallel wells and subsequent breaking of the main reserves of the sub-floors. Ore is discharged through the ends of the races on each sub-floor starting from the top. Before carrying out preparatory workings, a chamber is taken out below the level of the main horizon, the volume of which is equal to the volume of the rock from the sinking of the field workings, and a metal mesh is laid on the soil of the chamber and continuous sweeps.

Недостатком данного способа является возможность повреждения перекрытия при взрывной отбойке полезного ископаемого, а также невозможность использования перекрытия для управления процессом выпуска руды.The disadvantage of this method is the possibility of damage to the floor during the explosive breaking of the mineral, as well as the inability to use the floor to control the process of ore production.

Техническим результатом способа является исключение вероятности повреждения перекрытия при взрывной отбойке полезного ископаемого и использование перекрытия для управления процессом выпуска руды.The technical result of the method is to eliminate the likelihood of damage to the floor during explosive breaking of the mineral and the use of the floor to control the process of ore production.

Технический результат достигается тем, что в способе разработки рудных залежей системой этажного обрушения с активным гибким разделяющим перекрытием, включающем проходку подготовительных и нарезных выработок, монтаж гибкого перекрытия в висячем боку рудного тела, отбойку и торцевой выпуск под ним отбитой руды из блока через подэтажные выработки, согласно изобретению по углам блока проходят выработки по мощности рудного тела вкрест его простирания, после чего бурят из них веерные комплекты скважин в висячем боку рудного тела параллельно плоскости залегания рудного тела для проходки отрезной щели, после отбойки которой производят выпуск отбитой руды через подэтажные выработки, затем во всех выработках, пройденных по углам, монтируют лебедки с тросами, после чего тросы с верхнего горизонта спускают до уровня нижней отметки блока, присоединяют к ним активное гибкое перекрытие, выполненное из нескольких рядов эластичных замкнутых оболочек, соединенных с воздуховодом для подачи сжатого воздуха с компрессором, протягивают перекрытие по мере монтажа в отрезную щель до верхнего горизонта, заполняют оболочки воздухом до рабочего давления, натягивают гибкое перекрытие тросами, после чего производят операции очистной выемки, причем по мере отработки запасов блока тросы периодически подтягивают, после отработки запасов блока воздух из оболочек спускают с помощью воздуховода для сброса воздуха и вытягивают перекрытие на верхний или нижний горизонт.The technical result is achieved by the fact that in the method of developing ore deposits by a system of floor caving with an active flexible dividing overlap, including the excavation of preparatory and threaded workings, installation of a flexible overlap in the hanging side of the ore body, breaking and end release under it of beaten ore from the block through the floor workings, according to the invention, workings are carried out at the block corners according to the power of the ore body across its strike, after which they are drilled out of fan sets of wells in the hanging side of the ore body parallel but the ore body bedding planes for driving a cutting gap, after breaking which produce broken ore through the sub-floor workings, then in all workings passed through the corners, winches with cables are mounted, after which the cables from the upper horizon are lowered to the level of the lower mark of the block, attached to active flexible ceiling made of several rows of elastic closed shells connected to the air duct for supplying compressed air with a compressor, stretch the ceiling as it is mounted in a cutting slot to the top of the horizon, fill the shells with air to working pressure, stretch the flexible overlap with ropes, and then carry out cleaning dredging operations, and as the reserves of the block are exhausted, the ropes are periodically pulled up, after the reserves of the block are exhausted, the air is drained from the shells with the air duct and the ceiling is pulled upper or lower horizon.

Технический результат достигается также тем, что ширину каждого ряда оболочек принимают равной половине ширины подэтажа, причем каждый ряд оболочек имеет свой воздуховод для подачи и сброса давления сжатого воздуха.The technical result is also achieved by the fact that the width of each row of shells is equal to half the width of the sub-floor, and each row of shells has its own duct for supplying and relieving pressure of compressed air.

Способ разработки рудных залежей системой этажного обрушения с активным гибким разделяющим перекрытием поясняется чертежами, на фиг.1 изображен вертикальный разрез блока по линии Б-Б (этап проходки отрезной щели), на фиг.2 изображен разрез блока по линии В-В (этап проходки отрезной щели), на фиг.3 изображен вертикальный разрез блока по линии В-В (этап монтажа активного гибкого перекрытия), на фиг.4 изображен вертикальный разрез блока по линии Г-Г (этап монтажа активного гибкого перекрытия), на фиг.5 изображен вертикальный разрез блока (этап монтажа очистной выемки), на фиг.6 показан общий вид эластичной замкнутой оболочки, где:The method of developing ore deposits by a system of floor caving with an active flexible separating overlap is illustrated by drawings, Fig. 1 shows a vertical section of a block along line BB (step of cutting a cutting gap), Fig. 2 shows a section of a block along line B-B (stage of penetration detachable slit), figure 3 shows a vertical section of the block along the line BB (stage of installation of the active flexible floor), figure 4 shows a vertical section of the block along the line GG (stage of installation of the active flexible floor), figure 5 a vertical section of the block is shown (stage even the cleaning recess), Fig.6 shows a General view of an elastic closed shell, where:

1 - рудное тело, например крутое;1 - ore body, for example steep;

2 - выработки, пройденные по углам блока по мощности рудного тела 1 вкрест его простирания;2 - workings, walked at the corners of the block by the power of the ore body 1 across its strike;

3 - однобарабанные лебедки с троса для подтяжки перекрытия по мере отработки запасов блока;3 - single-drum winches with a cable for tightening the floor as the block reserves are exhausted;

4 - тросы, соединяющие лебедки 3 с активным гибким перекрытием 5;4 - cables connecting winches 3 with active flexible overlap 5;

5 - активное гибкое перекрытие, выполненное из нескольких рядов эластичных замкнутых оболочек 7;5 - active flexible overlap made of several rows of elastic closed shells 7;

6 - наклонный съезд;6 - inclined exit;

7 - эластичная замкнутая оболочка;7 - elastic closed shell;

8 - доставочный штрек;8 - delivery drift;

9 - вентиляционный штрек;9 - ventilation drift;

10 - сбойки наклонного съезда 6 с подэтажными буродоставочными штреками 11;10 - failures of inclined exit 6 with sub-floor drift drifts 11;

11 - подэтажный буродоставочный орт;11 - sub-floor drilling delivery unit;

12 - взрывные скважины для проходки отрезной щели в висячем боку рудного тела 1;12 - blast holes for sinking a cutting gap in the hanging side of the ore body 1;

13 - взрывные скважины для отбойки запасов блока;13 - blast holes for breaking block stocks;

14 - воздуховод для нагнетания воздуха, соединенный с рядами эластичных замкнутых оболочек 7;14 - duct for air injection, connected to the rows of elastic closed shells 7;

15 - воздуховод для сброса воздуха, соединенный с рядами эластичных замкнутых оболочек 7;15 - duct for venting, connected to the rows of elastic closed shells 7;

16 - обрушенные породы висячего бока;16 - collapsed rocks of the hanging side;

17 - отбитая руда;17 - broken ore;

hбл - высота блока, м;h bl - block height, m;

Lбл -длина блока, м;L bl - block length, m;

m - мощность рудного тела 1;m is the thickness of the ore body 1;

α - угол падения рудного тела, градусы.α is the angle of incidence of the ore body, degrees.

Способ разработки рудных залежей системой этажного обрушения с активным гибким разделяющим перекрытием осуществляют следующим образом. Рудное тело 1 подготавливают необходимыми подготовительными и нарезными выработками. Проходят доставочный штрек 8. Из доставочного штрека 8 проходят наклонный съезд 6, сбиваемый с вентиляционным штреком 9 вышележащего горизонта. Из наклонного съезда 6 проходят сбойки 10, а из них - подэтажные буродоставочные орты 11. Из доставочного штрека 8 проходят по углам блока по мощности m рудного тела 1 вкрест его простирания (до висячего бока рудного тела 1), ограниченного Lбл - длиной блока и высотой блока hбл, выработки 2. Также из выработок 2 бурят восходящие и нисходящие веера скважин 12. Веера скважин 12 для проходки отрезной щели бурят параллельно плоскости залегания рудного тела в соответствии с его углом падения α в непосредственной близости от висячего бока рудного тела 1. После обуривания вееров скважин 12 параллельно плоскости залегания рудного тела 1 по простиранию в соответствии с паспортом буровзрывных работ, построенным по одной из известных методик, осуществляют заряжание взрывчатым веществом (гранулированным или патронированным) и взрывание. После этого производят выпуск отбитой руды через подэтажные буродоставочные орты 11. Выпуск ведут следующим образом. Погрузочно-доставочная машина (не показана) заезжает в подэтажный буродоставочный орт 11, зачерпывает разрыхленную руду и транспортирует ее по подэтажу до ближайшего рудоспуска (не показан). После выпуска отбитой руды в образованную отрезную щель устанавливают активное гибкое перекрытие 5 в следующей последовательности. Во всех выработках 2 блока монтируют однобарабанные лебедки 3, к которым присоединяют тросы 4. Затем тросы 4 с верхнего горизонта спускают до отметки нижнего горизонта. После этого на натяжные тросы 4 крепят эластичные замкнутые оболочки 7, соединенные между собой, например, с помощью обрезиненных тросов, образующие активное гибкое перекрытие 5, и по мере монтажа затягивают перекрытие 5 в отрезную щель. После протяжки активного гибкого перекрытия 5 его фиксируют в верхней части блока и производят заполнение эластичных замкнутых оболочек 7 сжатым воздухом от компрессора (не показан) до рабочего давления по воздуховоду 15 для нагнетания сжатого воздуха. После этого под защитой активного гибкого перекрытия 5 производят отработку запасов блока. Обуривают в соответствии с паспортом буровзрывных работ взрывные скважины 13 для отбойки запасов блока, взрывают их, проветривают блок и производят выпуск отбитой руды 17 из блока через подэтажные буродоставочные орты 11 под защитой активного гибкого перекрытия 5, которое по мере отработки запасов блока периодически подтягивают. Активное гибкое перекрытие 5 предотвращает разубоживание отбитой руды обрушенными породами 16 висячего бока. Для ликвидации негабаритов ширину каждого ряда оболочек 7 принимают равной половине ширины подэтажа, причем каждый ряд оболочек 7 имеет свои воздуховоды 14 и 15 для подачи и сброса давления сжатого воздуха. В случае небольшого размера куска негабарита его извлекают путем кратковременной подачи сжатого воздуха до максимального давления и сброса его по воздуховодам 14 и 15. Такая операция позволит выдавить небольшие куски негабарита и продолжить очистную выемку. В этом заключается "активность" перекрытия 5, которое можно использовать для управления процессом выпуска руды. Соблюдение данных условий позволит сбрасывать давление сжатого воздуха с помощью воздуховода 15 и извлекать негабарит или дробить его. Затем ряд оболочек 7 снова заполняют сжатым воздухом до рабочего давления по воздуховоду 14 и продолжают отработку запасов блока. При большей ширине ряда оболочек 7 возможны трудности, связанные с извлечением негабарита. После отработки запасов блока воздух из оболочек 7 с помощью воздуховода 15 для сброса воздуха выпускают и активное гибкое перекрытие 5 извлекают для повторного использования.The method of developing ore deposits by a system of floor caving with active flexible separating overlap is as follows. The ore body 1 is prepared with the necessary preparatory and rifled workings. Pass the drift 8. From the delivery drift 8 pass an inclined exit 6, knocked down with a ventilation drift 9 of an overlying horizon. Faults 10 pass from inclined exit 6, and of these, sub-floor drilling delivery channels 11. From the delivery drift, 8 pass along the block corners by the thickness m of the ore body 1 across its extension (to the hanging side of the ore body 1), limited by L bl - the block length and block height h bl , workings 2. Also, from the workings 2, ascending and descending fans of boreholes are drilled 12. Fans of boreholes 12 are drilled to drill a cutting slot parallel to the ore body bedding plane in accordance with its angle of incidence α in the immediate vicinity of the hanging side of ore body 1. By le oburivaniya fans 12 parallel wells bedding plane of the ore body 1 along the strike according to the passport blasting constructed by one of the known techniques, the explosive loading is carried out (granular or patron) and blasting. After this, the output of the beaten ore is carried out through the sub-floor drilling delivery unit 11. Release is as follows. A loading and delivery machine (not shown) calls into the sub-floor borodostavochny ort 11, scoops up the loosened ore and transports it along the sub-floor to the nearest ore pass (not shown). After the release of the beaten ore, an active flexible overlap 5 is installed in the formed cutting slot in the following sequence. In all the workings of the 2nd block, single-drum winches 3 are mounted, to which the cables 4 are connected. Then the cables 4 from the upper horizon are lowered to the level of the lower horizon. After that, elastic closed shells 7 are connected to the tension cables 4, interconnected, for example, by means of rubberized cables, forming an active flexible ceiling 5, and during installation they tighten the ceiling 5 into a cutting slot. After drawing active flexible floor 5, it is fixed in the upper part of the block and elastic closed shells 7 are filled with compressed air from a compressor (not shown) to working pressure through duct 15 to pump compressed air. After that, under the protection of the active flexible floor 5, the block reserves are mined. Blast holes 13 are drilled in accordance with the drilling and blasting certificate for blasting the block reserves, blasting them, ventilating the block and releasing the broken ore 17 from the block through the underfloor drilling deliveries 11 under the protection of active flexible overlap 5, which is periodically tightened as the block reserves are exhausted. Active flexible overlap 5 prevents dilution of the broken ore with collapsed rocks 16 of the hanging side. To eliminate oversized dimensions, the width of each row of shells 7 is taken equal to half the width of the sub-floor, and each row of shells 7 has its own air ducts 14 and 15 for supplying and relieving pressure of compressed air. In the case of a small size of an oversized piece, it is removed by briefly supplying compressed air to maximum pressure and dumping it through the air ducts 14 and 15. Such an operation will allow squeezing out small pieces of oversized and continuing the cleaning recess. This is the “activity” of floor 5, which can be used to control the ore production process. Observance of these conditions will allow to relieve the pressure of compressed air using the duct 15 and to remove oversized or crush it. Then, a number of shells 7 are again filled with compressed air to the working pressure through the duct 14 and mining of the block reserves is continued. With a larger width of the row of shells 7, difficulties associated with the extraction of oversized are possible. After exhausting the reserves of the block, air is released from the shells 7 using the air duct 15 for venting and the active flexible floor 5 is removed for reuse.

Применение предлагаемого способа разработки рудных залежей системой этажного обрушения с гибкими разделяющими перекрытиями обеспечивает следующие преимущества:The application of the proposed method for the development of ore deposits by a system of floor caving with flexible dividing floors provides the following advantages:

- снижение вероятности повреждения перекрытия в период очистной выемки;- reducing the likelihood of damage to the floor during the period of treatment excavation;

- снижение трудоемкости проведения операций по монтажу гибкого перекрытия;- reducing the complexity of the installation of flexible flooring;

- снижение разубоживания при отработке камерных запасов.- reduction of dilution when mining chamber reserves.

Claims (2)

1. Способ разработки рудных залежей системой этажного обрушения с активным гибким разделяющим перекрытием, включающий проходку подготовительных и нарезных выработок, монтаж гибкого перекрытия в висячем боку рудного тела отбойку и торцевой выпуск под ним отбитой руды из блока через подэтажные выработки, отличающийся тем, что по углам блока проходят выработки по мощности рудного тела вкрест его простирания, после чего бурят из них веерные комплекты скважин в висячем боку рудного тела параллельно плоскости залегания рудного тела для проходки отрезной щели, после отбойки которой производят выпуск отбитой руды через подэтажные выработки, затем во всех выработках, пройденных по углам, монтируют лебедки с тросами, после чего тросы с верхнего горизонта спускают до уровня нижней отметки блока, присоединяют к ним активное гибкое перекрытие, выполненное из нескольких рядов эластичных замкнутых оболочек, соединенных с воздуховодом для подачи сжатого воздуха с компрессором, протягивают перекрытие по мере монтажа в отрезную щель до верхнего горизонта, заполняют оболочки воздухом до рабочего давления, натягивают гибкое перекрытие тросами, после чего производят операции очистной выемки, причем по мере отработки запасов блока тросы периодически подтягивают, после отработки запасов блока воздух из оболочек спускают с помощью воздуховода для сброса воздуха и вытягивают перекрытие на верхний или нижний горизонт.1. A method of developing ore deposits by a system of floor caving with active flexible dividing overlapping, including sinking of preparatory and rifled workings, installation of a flexible overlap in the hanging side of the ore body, breaking and end release under it of beaten ore from the block through the floor workings, characterized in that in the corners of the block, workings are carried out according to the capacity of the ore body across its strike, after which they are drilled with fan sets of wells in the hanging side of the ore body parallel to the bedding surface of the ore body for passing a cut-out slab, after breaking which produce the broken ore through the sub-floor workings, then in all workings passed through the corners, winches with cables are mounted, after which the cables are lowered from the upper horizon to the level of the lower elevation of the block, an active flexible overlap is made to them, made from several rows of elastic closed shells connected to the air duct for supplying compressed air with a compressor, the overlap is stretched as it is mounted in the cutting slot to the upper horizon, the shells are filled with air to the working pressure, stretch the flexible ceiling with the ropes, after which the cleaning dredging operations are performed, and as the reserves of the block are exhausted, the cables are periodically pulled up, after the reserves are exhausted, the air is drained from the shells with the air duct and the ceiling is pulled to the upper or lower horizon. 2. Способ по п.1, отличающийся тем, что ширину каждого ряда оболочек принимают равной половине ширины подэтажа, причем каждый ряд оболочек имеет свой воздуховод для подачи и сброса давления сжатого воздуха. 2. The method according to claim 1, characterized in that the width of each row of shells is taken equal to half the width of the sub-floor, and each row of shells has its own duct for supplying and relieving pressure of compressed air.
RU2009148977/03A 2009-12-28 2009-12-28 Development method of ore deposits with block caving system with active flexible separating covering RU2426881C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2009148977/03A RU2426881C1 (en) 2009-12-28 2009-12-28 Development method of ore deposits with block caving system with active flexible separating covering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2009148977/03A RU2426881C1 (en) 2009-12-28 2009-12-28 Development method of ore deposits with block caving system with active flexible separating covering

Publications (2)

Publication Number Publication Date
RU2009148977A RU2009148977A (en) 2011-07-10
RU2426881C1 true RU2426881C1 (en) 2011-08-20

Family

ID=44739908

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2009148977/03A RU2426881C1 (en) 2009-12-28 2009-12-28 Development method of ore deposits with block caving system with active flexible separating covering

Country Status (1)

Country Link
RU (1) RU2426881C1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184694A (en) * 2018-09-05 2019-01-11 巴彦淖尔西部铜业有限公司 A kind of pre- anchor sublevel drilling stage open stope afterwards filling mining method of upper disk

Also Published As

Publication number Publication date
RU2009148977A (en) 2011-07-10

Similar Documents

Publication Publication Date Title
RU2475647C2 (en) Mining method of thick steep ore bodies
RU2405109C1 (en) Method of developing thick ore deposits by underground mining with interchamber pillars support
RU2398966C1 (en) Method for mining thick steeply inclined and steep coal beds
RU2309253C1 (en) Method for kimberlite pipe cutting in layers in upward direction along with goaf filling
RU2283431C1 (en) Method for thick steep mineral seam mining along with goaf filling
RU2563857C1 (en) Method of development of inclined ore deposits in range of bedding angles 15-35 degrees and thickness of ore bodies 15-30 meters with caving of ore and surrounding rocks
RU2322583C2 (en) Development method for steep and inclined deposit having low and medium thickness
RU2648371C1 (en) Method to mine thick steep deposits of unstable ore
RU2502872C1 (en) Development method of thick steeply dipping ore bodies
RU2352780C1 (en) Method of ore bodies development
RU2325529C1 (en) Mining method for steep ore bodies
US3900226A (en) Hydraulic mining method
RU2426881C1 (en) Development method of ore deposits with block caving system with active flexible separating covering
RU2341657C1 (en) Method of prevention of development entries in coal bed areas
RU2086773C1 (en) Method for degassing of follower-seam
RU2444625C1 (en) Development method of tube-like and thick ore bodies
RU2407892C1 (en) Protection method of development drifts
RU2490454C1 (en) Method for open-underground mining of thick steep coal bed
RU2472932C1 (en) Development method of flat and inclined thick ore bodies
RU2563003C1 (en) Method of excavation of thick flat coal beds
RU2424432C1 (en) Ore body mining method
RU2648133C1 (en) Method of open-underground development of steeply pitching coal
RU2607131C1 (en) Thick flat dipping ore deposits at big depths development method
RU2367794C1 (en) Recovery method of minerals
RU2481473C1 (en) Method for layered development of kimberlitic pipe with backfilling