RU2333883C1 - Tower crane and method of its mounting and dismantling - Google Patents
Tower crane and method of its mounting and dismantling Download PDFInfo
- Publication number
- RU2333883C1 RU2333883C1 RU2006144644/11A RU2006144644A RU2333883C1 RU 2333883 C1 RU2333883 C1 RU 2333883C1 RU 2006144644/11 A RU2006144644/11 A RU 2006144644/11A RU 2006144644 A RU2006144644 A RU 2006144644A RU 2333883 C1 RU2333883 C1 RU 2333883C1
- Authority
- RU
- Russia
- Prior art keywords
- tower
- crane
- building
- wall
- dismantling
- Prior art date
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Jib Cranes (AREA)
Abstract
Description
Изобретение относится к грузоподъемной технике, в частности к башенным кранам, применяемым для высотного строительства в качестве приставных к зданию башенных кранов с использованием настенных опор, связывающих башню крана со строящимся зданием. По существу данный башенный кран предназначен для строительства высотных зданий.The invention relates to lifting equipment, in particular to tower cranes used for high-rise construction as tower cranes attached to the building using wall supports connecting the crane tower to the building under construction. In essence, this tower crane is designed for the construction of high-rise buildings.
Известен башенный кран КБ-676, включающий установленные на башне стрелу с грузоподъемным крюком, оголовок, противовесную консоль, установленный в верхней части башни механизм поворота стрелы, установленную на башне под механизмом поворота средство (стойку) для наращивания башни, закрепленные на башне и здании связи для использования крана при высотном строительстве в качестве приставного крана, расположенное на кране средство перемещения связей во время их монтажа и демонтажа, при этом средство перемещения связей имеет гибкую приводную тягу с захватом [1].Known tower crane KB-676, including an arrow mounted on a tower with a lifting hook, a head, a counterweight console, an arrow rotation mechanism installed in the upper part of the tower, a means (rack) for building the tower mounted on the tower under the rotation mechanism, mounted on the tower and communication building for using the crane in high-rise construction as an attached crane, a means for moving the links located on the crane during installation and dismantling, the means for moving the links has a flexible drive traction with capture [1].
В этом источнике информации связями названы настенные опоры, а средство перемещения связей названо приспособлением для монтажа настенных опор. Приспособление состоит из рамы, закрепленной на нижней плоскости монтажной стойки и несущей балансирные ролики, в которых перемещается монорельс, причем по внутренним полкам монорельса перемещается кошка (захват), несущая канатный блок. Перемещение монорельса и кошки осуществляется канатной тягой при помощи ручной лебедки.In this information source, the connections are called wall supports, and the means of moving the connections is called a device for mounting wall supports. The device consists of a frame mounted on the lower plane of the mounting rack and bearing balancing rollers in which the monorail moves, and a cat (grab) carrying the cable block moves along the internal shelves of the monorail. The monorail and the cat are moved by cable traction using a manual winch.
Конструкция данного крана является сравнительно сложной вследствие сложности приспособления для монтажа и демонтажа настенных опор, при этом данное приспособление является маломощным.The design of this crane is relatively complex due to the complexity of the device for mounting and dismounting the wall supports, while this device is low-power.
Кран КБ-676 предусматривает способ его монтажа и демонтажа, включающего монтаж и демонтаж настенных опор или связей «башня-здание» с помощью приспособления для монтажа и демонтажа настенных опор, при этом во время монтажа и демонтажа крана производится монтаж верхней части крана на башне, затем наращивание башни посредством монтажной стойки и после этого соединяют башню крана со зданием связями или настенными опорами во время монтажа крана и наращивания башни, причем при демонтаже крана настенные опоры с башни и здания снимают.The KB-676 crane provides a method for its installation and dismantling, including mounting and dismounting wall supports or tower-building connections using a device for mounting and dismounting wall supports, while during installation and dismantling of the crane the upper part of the crane is mounted on the tower, then building up the tower by means of the mounting rack, and then connecting the tower of the crane to the building with ties or wall supports during installation of the crane and building the tower, and when dismantling the crane, the wall supports from the tower and the building are removed.
Данный способ является трудоемким, малонадежным и опасным, поскольку при демонтаже связей или настенных опор не всегда используются стреловые краны, предусмотренные условиями безопасности для выполнения этих видов работ. При этом средства демонтажа связей на кране КБ-676 имеют недостаточный вылет и малую грузоподъемность, что не позволяет их использовать для монтажа и демонтажа связей, имеющих массу до 2,8 т и длину до 23 м.This method is time-consuming, unreliable and dangerous, because when dismantling ties or wall supports, jib cranes are not always used, provided for by the safety conditions for performing these types of work. At the same time, the means for dismantling the connections on the KB-676 crane have insufficient reach and low carrying capacity, which does not allow them to be used for installation and dismantling of connections having a mass of up to 2.8 tons and a length of up to 23 m.
Известен башенный кран КБ-474 с установленным на его нижней неповоротной раме опорно-поворотного устройства консольным телескопическим монтажным краном, применяемым для монтажа и демонтажа настенных опор в частности [2].Known tower crane KB-474 with mounted on its lower non-rotary frame of the support-rotary device, a cantilever telescopic mounting crane used for mounting and dismounting wall supports in particular [2].
Недостатком данного башенного крана является малый вылет монтажного крана, вследствие чего отсутствует возможность передачи настенной опоры во время ее демонтажа на крюк башенного крана, причем монтажный кран является маломощным. Он не может быть использован для монтажа и демонтажа настенных опор с вышеуказанными весом и длиной.The disadvantage of this tower crane is the small overhang of the mounting crane, as a result of which there is no possibility of transferring the wall support during its dismantling to the hook of the tower crane, and the mounting crane is low-power. It cannot be used for mounting and dismounting wall supports with the above weight and length.
Ближайшим аналогом данного изобретения является башенный кран, включающий установленные на башне верхнюю часть крана - стрелу с грузоподъемным крюком, оголовком и противовесной консолью, механизм поворота стрелы, установленную подвижно вдоль башни обойму для наращивания башни, которая расположена под механизмом поворота стрелы, настенные опоры, один конец каждой из которых связан с башней, а другой конец каждой настенной опоры связан со зданием, расположенное на кране средство монтажа и демонтажа настенных опор, имеющее приводную тягу с грузоподъемным органом на конце тяги [2].The closest analogue of this invention is a tower crane, including the upper part of the crane mounted on the tower - an arrow with a lifting hook, a head and a counterweight console, an arrow rotation mechanism, a clip for moving the tower that is located movably along the tower, which is located under the arrow rotation mechanism, wall supports, one the end of each of which is connected to the tower, and the other end of each wall support is connected to the building, a means of mounting and dismounting wall supports located on a crane, having a drive rod with a lifting body at the end of the rod [2].
Данное техническое решение предусматривает способ монтажа и демонтажа башенного крана, включающий операции монтажа верхней части крана на башне, последовательное наращивание башни ее секциями, последовательное присоединение к башне крана и строящемуся зданию настенных опор, для чего настенные опоры перемещают краном от земли к месту их установки в рабочее положение и поддерживают их грузоподъемным крюком крана во время соединения с башней и зданием, а также операции демонтажа крана - последовательный съем настенных опор с башни и здания, для чего настенные опоры с помощью другого средства отсоединяют от здания и башни и опускают на землю, а затем уменьшают высоту башни путем демонтажа ее секций.This technical solution provides a method of mounting and dismantling a tower crane, including mounting the upper part of the crane on the tower, sequentially expanding the tower in sections, sequentially connecting the tower supports to the tower and the building under construction, for which the wall supports are moved by the crane from the ground to the place of their installation in working position and support them with a crane lifting hook during connection with the tower and the building, as well as crane dismantling operations - sequential removal of wall supports from the tower and the building which, for this reason, the wall supports are disconnected from the building and tower by another means and lowered to the ground, and then reduce the height of the tower by dismantling its sections.
Решаемой технической задачей является повышение производительности крана путем сокращения времени и трудоемкости его монтажа и демонтажа, а также безопасности выполнения этих работ.The technical problem to be solved is to increase the productivity of the crane by reducing the time and laboriousness of its installation and dismantling, as well as the safety of performing these works.
Для этого в башенном кране, включающем установленные на башне верхнюю часть крана - стрелу с грузоподъемным крюком, оголовком и противовесной консолью, механизм поворота стрелы, установленную подвижно вдоль башни обойму для наращивания башни, которая расположена под механизмом поворота стрелы, настенные опоры, один конец каждой из которых связан с башней, а другой конец каждой настенной опоры связан со зданием, расположенное на кране средство монтажа и демонтажа настенных опор, имеющее приводную тягу с грузоподъемным органом на конце тяги, средство монтажа и демонтажа закреплено на обойме для наращивания башни, выполнено в виде поворотной относительно обоймы в горизонтальной плоскости консоли, которая установлена на обойме таким образом, что при повороте ее грузозахватный орган расположен или в зоне действия крюка башенного крана, или в зоне расположения концов настенных опор, которые расположены вблизи башни крана.To do this, in a tower crane, including the upper part of the crane installed on the tower - an arrow with a lifting hook, a head and a counterweight console, a boom swing mechanism, a clip for moving the tower, which is located under the boom rotation mechanism, wall supports, one end of each of which is connected to the tower, and the other end of each wall support is connected to the building, the crane mounting and dismounting means for the wall supports located on the crane, having a drive rod with a load-lifting member at the end of the rod and, the mounting and dismounting tool is mounted on a clip for building the tower, made in the form of a cantilever rotary relative to the clip in the horizontal plane of the console, which is mounted on the clip in such a way that when it is rotated, its load-gripping member is located either in the zone of operation of the tower crane hook or in the location zone ends of wall supports, which are located near the tower crane.
Для достижения указанного технического результата в способе монтажа и демонтажа башенного крана, включающем операции монтажа верхней части крана на башне, последовательное наращивание башни ее секциями, последовательное присоединение к башне крана и строящемуся зданию настенных опор, для чего настенные опоры перемещают краном от земли к месту их установки в рабочее положение и поддерживают их грузоподъемным крюком крана во время соединения с башней и зданием, а также операции демонтажа крана - последовательный съем настенных опор с башни и здания, для чего настенные опоры с помощью другого средства отсоединяют от здания и башни и опускают на землю, а затем уменьшают высоту башни путем демонтажа ее секций, стрелу крана располагают вдоль здания перед съемом настенных опор с крана и здания и перед отсоединением каждой настенной опоры от башни крана и здания, затем с первой, закрепленной на здании тягой, соединяют обращенный к зданию конец настенной опоры, а со второй, закрепленной на кране тягой, соединяют обращенный к башне конец настенной опоры, далее освобождают концы настенной опоры от башни и здания и после этого первой тягой опускают соответствующий конец настенной опоры до его крайнего нижнего положения, при котором настенная опора оказывается в подвешенном на второй тяге положении, затем второй тягой настенную опору перемещают в горизонтальной плоскости в сторону крюка крана, далее перевешивают настенную опору со второй тяги на крюк крана, опускают настенную опору на землю крюком крана, а затем описанный цикл демонтажа крана повторяют.To achieve the specified technical result in the method of installation and dismantling of the tower crane, including the installation of the upper part of the crane on the tower, the successive extension of the tower by sections, the serial connection to the tower of the crane and the building under construction of the wall supports, for which the wall supports are moved by a crane from the ground to their place installation in the working position and support them with a crane lifting hook during connection with the tower and the building, as well as crane dismantling operations - sequential removal of wall supports from the ba shnini and buildings, for which the wall supports are disconnected from the building and the tower by another means and lowered to the ground, and then the tower height is reduced by dismantling its sections, the crane boom is placed along the building before removing the wall supports from the crane and the building and before disconnecting each wall supports from the tower of the crane and the building, then with the first rod fixed to the building, connect the end of the wall support facing the building, and with the second rod fixed on the crane, connect the end of the wall support facing the tower, then free the ends to the wall support from the tower and the building, and then the first end lower the corresponding end of the wall support to its lowest position, in which the wall support is suspended from the second link, then the second link the wall support is moved in a horizontal plane towards the crane hook, then outweigh the wall support from the second link to the crane hook, lower the wall support to the ground with the crane hook, and then the described crane dismantling cycle is repeated.
На фиг.1 показан башенный кран в процессе строительства с обоймой для наращивания башни и настенными опорами,Figure 1 shows a tower crane during construction with a clip for building towers and wall supports,
на фиг.2 - показан башенный кран при его демонтаже после окончания строительства с установленной вдоль здания стрелой,figure 2 - shows a tower crane when it is dismantled after construction with an arrow installed along the building,
на фиг.3 - вид А на фиг.2,figure 3 is a view a in figure 2,
на фиг.4 - сечение Б-Б на фиг.2,figure 4 is a section bB in figure 2,
на фиг.5 - обойма башни с закрепленной на ней консолью,figure 5 - clip tower with a console mounted on it,
на фиг.6 - сечение В-В на фиг.5,figure 6 - section bb in figure 5,
на фиг.7 - вид Г на фиг.5,Fig.7 is a view of G in Fig.5,
на фиг.8 - схема соединения настенной опоры с монтажной вспомогательной тягой,on Fig - connection diagram of a wall support with mounting auxiliary rod,
на фиг.9 - схема отсоединения настенной опоры от здания и башни крана,Fig.9 is a diagram of the disconnection of the wall support from the building and the tower of the crane,
на фиг.10 - схема перемещения настенной опоры монтажной вспомогательной тягой.figure 10 is a diagram of the movement of the wall support mounting auxiliary rod.
Башенный кран (фиг.1) включает установленные на башне 1 верхнюю часть крана - стрелу 2 с грузоподъемным крюком 3, оголовком 4 и противовесной консолью 5, механизм 6 поворота стрелы, установленную подвижно вдоль башни обойму 7 для наращивания башни. Обойма 7 расположена под механизмом 6 поворота стрелы.The tower crane (Fig. 1) includes the upper part of the crane installed on the tower 1 - an arrow 2 with a
Башенный кран имеет настенные опоры 8, каждая из которых одним своим концом связана со зданием 9, а другим концом связана с башней 1. На башенном кране расположено средство монтажа и демонтажа настенных опор 8. Это средство представляет собой поворотно закрепленную на обойме 7 консоль 10 (фиг.5, 6), которая установлена на обойме 7 с возможностью поворота в горизонтальной плоскости. Консоль 10 имеет приводной грузоподъемный крюк 11, подвижно установленную в ее направляющих 12 каретку 13, на которой закреплена ручная таль 14. Грузоподъемный крюк 11 является рабочим органом ручной тали. Каретка соединена противоположными ее сторонами с концами тяги 15, связанной с механизмом перемещения каретки в направляющих 12 консоли 10. В качестве привода перемещения каретки 13 использован червячный редуктор 16, имеющий звездочку 17, охватываемую тягой 15. Звездочка 17 установлена на корпусе редуктора 16, который жестко закреплен на консоли 10.The tower crane has wall supports 8, each of which is connected at one end to the
Консоль 10 установлена на обойме 7 крана таким образом (фиг.6), что при ее повороте крюк 11 расположен или в зоне действия крюка 3 башенного крана, или в зоне расположения концов настенных опор, которые расположены вблизи башни крана (фиг.8-10).The
Для этого консоль посредством подшипниковых опор 18 (фиг.6) установлена на одной из угловых частей обоймы 7, в частности на левой угловой части 19 или на правой угловой части 20 обоймы.To do this, the console through the bearings 18 (Fig.6) is installed on one of the corner parts of the
Башня 1 крана выполнена из множества отдельных соединенных между собой секций 21 и связана со зданием 9 соединенными с секциями 21 настенными опорами 8 (фиг.8-10). Одни концы 22 настенных опор 8 шарнирно пальцами 23 соединены с секциями 21 башни 1, другие концы 24 настенных опор 8 шарнирно пальцами 23 соединены с несущими нагрузку элементами 25 здания 9. Каждая настенная опора для удобства ее установки может быть выполнена из двух состыкованных частей фланцевым соединением 26 (или другим известным соединением).The
Кран при его монтаже и демонтаже работает следующим образом.The crane during its installation and dismantling works as follows.
Сначала на строительной площадке устанавливают одну на другую несколько секций 21 башни в вертикальном положении (фиг.1), которые известным образом соединяют между собой. Затем на установленные в вертикальное положение секции 21 башни или на часть башни стреловым краном устанавливают обойму 7 и верхнюю часть крана, приводят кран в рабочее состояние и используют по прямому назначению для возведения этажей строящегося здания.First, at the construction site,
По мере роста здания осуществляют последовательное наращивание башни ее секциями 21 с помощью обоймы 7 и осуществляют последовательное присоединение к башне 1 крана и строящемуся зданию 9 настенных опор 8 с целью обеспечения устойчивости или прочности крана. При этом повышается уровень расположения верхней части крана таким образом, что стрела 2 всегда находится выше строящегося здания 9 (фиг.1).As the building grows, the tower is sequentially built up in
Монтаж настенных опор осуществляют следующим образом. Сначала поднимают крюком 3 башенного крана настенные опоры 8 до уровня соединения с башней крана и зданием, а затем с ними шарнирно соединяют опоры 8 пальцами 23 по схеме, показанной на фиг.8. При этом стрелу 2 башенного крана располагают над строящимся зданием так, как это показано на фиг.1, что обеспечивает возможность плоскопараллельного перемещения настенных опор 8 к местам присоединения в проемах 27 здания (фиг.8, 10). Такое перемещение настенных опор обеспечивает грузовая тележка (не показана) башенного крана, которая подвижно установлена на стреле 2 крана и связана с его крюком 3.Installation of wall supports is as follows. First, the
После соединения пальцами 23 настенных опор 8 с башней крана и зданием используют башенный кран по его прямому назначению, причем стрела 2 крана постоянно находится выше здания 9.After the
Следует отметить, что для повышения верхней части крана при увеличении высоты крана в процессе монтажа настенные опоры перемещают крюком крана от земли к месту установки, а после опоры 8 поддерживают крюком крана во время их соединения с башней и зданием.It should be noted that to increase the upper part of the crane with increasing crane height during installation, the wall supports are moved by the crane hook from the ground to the installation site, and after the
При демонтаже башенного крана высоту крана уменьшают, для чего с помощью обоймы 7 последовательно извлекают через проем (не показан) обоймы 7 каждую отдельную секцию 21 башни 1, предварительно отсоединив ее от смежных секций башни. При уменьшении высоты крана его стрелу 2 устанавливают вдоль здания (фиг.2, 3).When dismantling the tower crane, the height of the crane is reduced, for which, with the help of the
Далее осуществляют последовательный съем настенных опор 8 с башни 1 и здания 9. Для этого каждую настенную опору 8 с помощью крюка 11 консоли 10 отсоединяют от здания и башни (фиг.9), поворачивают опору 8 консолью 10 в зону действия крюка 3 крана (фиг.10), перевешивают опору 8 на крюк 3 крана и опускают опору 8 крюком 3 крана на землю. Затем уменьшают высоту башни путем демонтажа ее секций.Then, the wall supports 8 are sequentially removed from the
Операции съема каждой настенной опоры 8 с башни 1 крана и здания 9 и отсоединение каждой настенной опоры от башни крана и здания также осуществляют при расположенной вдоль здания стреле 2 крана. При этом используют вспомогательные тяги (фиг.8). С первой вспомогательной тягой 28, закрепленной на здании 9, соединяют обращенный к зданию конец 24 настенной опоры 8, а со второй вспомогательной тягой 29, закрепленной на башне крана, в частности на крюке 11 консоли 10, соединяют обращенный к башне конец 22 настенной опоры 8. Далее освобождают концы 22 и 24 настенной опоры 8 от башни и здания, для чего из их проушин вынимают пальцы 23 (фиг.9), и после этого первой вспомогательной тягой 28 опускают конец 24 настенной опоры 8 до его крайнего нижнего положения (фиг.10), при котором настенная опора 8 оказывается в подвешенном положении на второй вспомогательной тяге 29. Затем второй вспомогательной тягой 29 и крюком 11 консоли 10 настенную опору 8 перемещают в горизонтальной плоскости в сторону крюка 3 крана. Далее перевешивают настенную опору 8 со второй вспомогательной тяги 29 на крюк 3 башенного крана и опускают настенную опору 8 на землю крюком 3 крана. Затем описанный цикл демонтажа крана повторяют.The removal of each
Источники информацииInformation sources
1. Кран башенный универсальный КБ-676, Техническое описание и инструкция по эксплуатации, КБ-676.00.00.000.ТО, лист 254, рис.70. Никопольский краностроительный завод, 1980.1. Universal tower crane KB-676, Technical description and operating instructions, KB-676.00.00.000.TO, sheet 254, Fig. 70. Nikopol Crane Construction Plant, 1980.
2. Кран башенный КБ-474. Руководство по эксплуатации, Альбом 1, листы 65 и 70-73, ОАО «Ржевский краностроительный завод», 2001 - прототип.2. Tower crane KB-474. Operation manual,
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2006144644/11A RU2333883C1 (en) | 2006-12-15 | 2006-12-15 | Tower crane and method of its mounting and dismantling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2006144644/11A RU2333883C1 (en) | 2006-12-15 | 2006-12-15 | Tower crane and method of its mounting and dismantling |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2333883C1 true RU2333883C1 (en) | 2008-09-20 |
Family
ID=39867895
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2006144644/11A RU2333883C1 (en) | 2006-12-15 | 2006-12-15 | Tower crane and method of its mounting and dismantling |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2333883C1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103922232A (en) * | 2014-04-14 | 2014-07-16 | 南通庞源机械工程有限公司 | Self-elevating tower crane descending process |
CN108975177A (en) * | 2018-10-08 | 2018-12-11 | 焦卫宁 | A kind of New Type Construction Hoist |
CN114671358A (en) * | 2022-03-03 | 2022-06-28 | 中核华兴达丰机械工程有限公司 | Tower crane is attached to ann and is torn open hoisting accessory |
-
2006
- 2006-12-15 RU RU2006144644/11A patent/RU2333883C1/en not_active IP Right Cessation
Non-Patent Citations (1)
Title |
---|
Башенный кран КБ-474. 2005. [найдено в Интернет 22.11.2007] http://www.um-2.ru/equipment/cranes/kb474/. * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103922232A (en) * | 2014-04-14 | 2014-07-16 | 南通庞源机械工程有限公司 | Self-elevating tower crane descending process |
CN103922232B (en) * | 2014-04-14 | 2016-09-14 | 南通庞源机械工程有限公司 | A kind of tower crane fall tower process |
CN108975177A (en) * | 2018-10-08 | 2018-12-11 | 焦卫宁 | A kind of New Type Construction Hoist |
CN114671358A (en) * | 2022-03-03 | 2022-06-28 | 中核华兴达丰机械工程有限公司 | Tower crane is attached to ann and is torn open hoisting accessory |
CN114671358B (en) * | 2022-03-03 | 2024-05-24 | 中核华兴达丰机械工程有限公司 | Tower crane attachment, installation and disassembly lifting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201971572U (en) | Movable arm type tower crane with suspension arm possible of being folded for dismounting | |
CN103086279B (en) | Vertical transportation construction method for building construction | |
CN103848360B (en) | A kind of group tower tower crane being provided with packaged type balance weight system | |
CN205114894U (en) | Manual formula wall type swing crane; derrick | |
CN205653092U (en) | Tower crane of band plate material bracket | |
CN205387439U (en) | Mast hoisting accessory | |
CN105692470A (en) | Internal climbing tower crane and operating method thereof | |
CN201485194U (en) | 60T walking type full-swing erecting crane | |
CN103754775A (en) | Arm disassembling method and auxiliary disassembling device of swing arm tower crane | |
RU2333883C1 (en) | Tower crane and method of its mounting and dismantling | |
CN107720569B (en) | A kind of dismounting inner climbing crane tower is hung with masts type roofing | |
CN201250058Y (en) | Improved lifting trolley | |
CN202449763U (en) | Simple pneumatic crane | |
JP2014047479A (en) | Method for lifting demolishing heavy machine to building to be demolished | |
CN205653077U (en) | Tower crane for building site of band shift dynamic formula scaffold frame | |
CN202296899U (en) | Corner climbing pole crane | |
CN204529154U (en) | Cement brick hoisting machine | |
CN205114897U (en) | That climbs formula braced system in tower built -in is put has bad luck device certainly | |
CN211366784U (en) | Integral hoisting system in narrow space | |
CN105836633A (en) | Fixed type intelligent crane device | |
CN203474321U (en) | Tower crane used for constructing and erecting electric transmission line iron towers | |
CN207209840U (en) | A kind of Multifunctional suspension bracket | |
CN203922508U (en) | A kind of Portable crane device | |
CN205151579U (en) | Two horizontal arm hoists | |
CN205419582U (en) | Floor hoist |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20081216 |