RU2289655C1 - Method for deep ground compaction - Google Patents
Method for deep ground compaction Download PDFInfo
- Publication number
- RU2289655C1 RU2289655C1 RU2005116780/03A RU2005116780A RU2289655C1 RU 2289655 C1 RU2289655 C1 RU 2289655C1 RU 2005116780/03 A RU2005116780/03 A RU 2005116780/03A RU 2005116780 A RU2005116780 A RU 2005116780A RU 2289655 C1 RU2289655 C1 RU 2289655C1
- Authority
- RU
- Russia
- Prior art keywords
- soil
- layer
- ground
- seasonally frozen
- seasonally
- Prior art date
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
Изобретение относится к строительству и может быть использовано при уплотнении несвязных и малосвязных грунтов на большую глубину под застройку.The invention relates to construction and can be used for compaction of incoherent and loosely coupled soils to a great depth for building.
Известен способ глубинного уплотнения грунта путем воздействия на него в заранее намеченном в плане и по глубине месте ударными (импульсными) нагрузками, которые производят посредством взрывания зарядов взрывчатого вещества [1] или электрических разрядов, осуществляемых электроразрядной установкой [2 и 3]. Недостатком этого способа является неравномерность уплотнения грунта вплоть до образования выбросов грунта на его поверхность и провалов в его уплотняемом объеме.There is a method of deep compaction of soil by acting on it in a predetermined plan and in depth by impact (pulsed) loads, which are produced by detonating explosive charges [1] or electric discharges carried out by an electric-discharge installation [2 and 3]. The disadvantage of this method is the uneven compaction of the soil up to the formation of emissions of soil on its surface and dips in its compacted volume.
Известен способ глубинного уплотнения грунта, по которому ударные нагрузки по заранее намеченным на поверхности грунта местам производят в летнее время тяжелой трамбовкой [4 и 5]. В этом способе грунт уплотняется так же неравномерно с образованием зон разуплотнения и выпора грунта вокруг места удара. При этом зоны разуплотнения наблюдаются между кратерами (местами ударов) на глубину 3-4 метра и на еще большей глубине под кратером в случае перекоса трамбовки [4, с.176-177, рис.4.21].There is a method of deep compaction of the soil, according to which the shock loads at places previously determined on the surface of the soil are produced in summer by heavy tamping [4 and 5]. In this method, the soil is compacted as unevenly with the formation of zones of decompression and outburst of soil around the place of impact. In this case, decompression zones are observed between craters (impact sites) to a depth of 3-4 meters and at an even greater depth below the crater in case of tamping skew [4, p.176-177, Fig.4.21].
Известен способ, аналогичный описанному, в котором дополнительно грунт вокруг места удара трамбовки пригружают массивными бетонными плитами с образованием отверстия под трамбовку [6]. Недостатком этого способа является его недостаточная эффективность из-за того, что ограниченность веса плиты и возможного перекоса трамбовки при ударе предотвращение неравномерности уплотнения ограниченно. При этом перестановка плит с места на место усложняет работы.There is a method similar to that described, in which additionally the soil around the place of impact of the tamper is loaded with massive concrete slabs with the formation of a hole for the tamper [6]. The disadvantage of this method is its lack of effectiveness due to the fact that the limited weight of the plate and the possible misalignment of the rammer upon impact, preventing the unevenness of the seal is limited. At the same time, rearrangement of plates from place to place complicates the work.
Наиболее близким к заявляемому по совокупности существенных признаков принятый нами за прототип является способ глубинного уплотнения грунта, включающий пробивку скважины, послойное ее заполнение местным грунтом и уплотнение каждого слоя посредством трамбователя с плоским торцом, причем в периоды пробивки скважины, заполнения и уплотнения грунта в пределах зоны выпора осуществляют давление на поверхность грунта заданной величины [7].The closest to the claimed, according to the set of essential features, the prototype we adopted for the method is a method of deep compaction of the soil, including punching the well, layer-by-layer filling with local soil and compaction of each layer using a flat end rammer, and during periods of punching, filling and compaction of the soil within the zone the pressure carry out pressure on the soil surface of a given value [7].
Сущность этого способа заключается в том, что при его осуществлении происходит уплотнение грунта за счет внедрения трамбованием в него грунтоподобного материала на глубину, причем без образования зоны выпора грунта у его поверхности. Однако эффективность этого способа недостаточна из-за того, что при создании требуемого давления на поверхность грунта увеличиваются затраты, усложняются работы и снижается производительность. Дополнительно, при ударе плоского торца трамбователя по грунту уплотнение грунта вокруг скважины происходит на весьма ограниченную величину - около одного диаметра пробиваемой скважины [7]. Поэтому объем уплотняемого грунта с одного места трамбования невелик, что не позволяет эффективно достичь равномерного уплотнения грунта в массиве.The essence of this method lies in the fact that during its implementation there is compaction of the soil due to the introduction of tamping soil-like material into it to a depth, and without the formation of a zone of discharge of soil at its surface. However, the effectiveness of this method is insufficient due to the fact that when creating the required pressure on the soil surface, costs increase, work is complicated and productivity decreases. Additionally, when the flat end of the rammer hits the ground, compaction of the soil around the well occurs to a very limited extent - about one diameter of the hole being punched [7]. Therefore, the volume of compacted soil from one tamping place is small, which does not allow to effectively achieve uniform soil compaction in the array.
Задача, на решение которой направлено предлагаемое изобретение, является повышение эффективности глубинного уплотнения грунта. Технический же результат от использования изобретения заключается в упрощении работ по предотвращению выпора грунта вокруг места трамбования при одновременном повышении равномерности уплотнения грунта, увеличении объема вовлечения в уплотнение грунта и в увеличении приращения его плотности с одного места трамбования.The problem to which the invention is directed, is to increase the effectiveness of deep compaction of the soil. The technical result from the use of the invention is to simplify the work to prevent outburst of soil around the place of compaction while increasing the uniformity of compaction of the soil, increasing the volume of involvement in compaction of the soil and increasing the increment of its density from one place of compaction.
Задача решается, а технический результат достигается тем, что в способе глубинного уплотнения грунта, включающем вытрамбовывание скважиноподобного углубления в грунте, находящемся в пригруженном состоянии вокруг места вытрамбовывания, послойное заполнение углубления грунтом и воздействие ударами трамбовки на каждый слой этого грунта, согласно изобретению вытрамбовывание углубления, заполнение его грунтом и воздействие на этот грунт ударами трамбовки осуществляют в зимнее время после образования у поверхности грунта заданной толщины сезонно-мерзлого слоя, обеспечивающего пригружение расположенного под ним талого грунта, при этом перед вытрамбовыванием углубления в намеченном для этого в плане месте в сезонно-мерзлом слое выполняют отверстие, диаметр которого равен диаметру трамбовки или превышает его. Отверстие в сезонно-мерзлом слое грунта выполняют путем удара трамбовки по ослабленному в намеченном в плане месте сезонно-мерзлому слою, воздействие на грунт ударами осуществляют трамбовкой, имеющей вытянутую по высоте форму, при этом ее нижняя часть имеет форму округлую или усеченного конуса и выполнена из чугуна, а заполнение углубления осуществляют дренирующим грунтом или грунтоподобным материалом.The problem is solved, and the technical result is achieved by the fact that in the method of deep compaction of the soil, comprising ramming a bore-like depression in the soil, which is in a loaded state around the tamping place, layer-by-layer filling of the depression with soil and the impact of tampering on each layer of this soil, according to the invention, tamping the depression filling it with soil and impact on this soil with tamping blows is carried out in winter after the formation of a given thickness at the soil surface a seasonally frozen layer, which ensures the loading of thawed soil located beneath it; moreover, a hole is made in the seasonally frozen layer before tamping the recess in the designated plan area in the plan layer, the diameter of which is equal to or greater than the tamper diameter. The hole in the seasonally frozen soil layer is performed by tampering the impact on the seasonally frozen layer weakened in the planned location, impacts on the soil with impacts are performed by a tamper having an elongated shape in height, while its lower part has the shape of a rounded or truncated cone and is made of cast iron, and the filling of the recess is carried out by draining soil or soil-like material.
Дополнительно, сезонно-мерзлый слой грунта может быть ослаблен, например, следующим образом:Additionally, the seasonally frozen soil layer can be weakened, for example, as follows:
- путем проходки скважины, диаметр которой превышает диаметр трамбовки, а глубина скважины - половину толщины сезонно-мерзлого слоя;- by driving a well whose diameter exceeds the diameter of the tamper, and the depth of the well is half the thickness of the seasonally frozen layer;
- путем проходки скважин, размещенных рассосредоточенно по контуру круга, диаметр которого превышает диаметр трамбовки;- by sinking wells spaced out along the contour of a circle whose diameter exceeds the diameter of the tamper;
- путем выполнения в летнее время ямы и ее заполнение маловлажным зернистым материалом или влажной высококальциевой золой, взятой непосредственно из золоуловителя котельной установки;- by making a pit in summer and filling it with damp granular material or wet high-calcium ash taken directly from the ash collector of a boiler plant;
- путем покрытия в летнее время намеченного в плане места теплоизоляционным материалом, который в зимнее время перед трамбованием убирают, а в сезонно-мерзлом слое отрывают приямок, в котором размещают заряд взрывчатого вещества и производят его взрывание одновременно с первым ударом трамбовки.- by covering in the summer time the location plan outlined in the plan in terms of heat-insulating material, which is removed in the winter before tamping, and a pit is removed in the seasonally frozen layer in which an explosive charge is placed and it is blown up simultaneously with the first tamper strike.
Сущность предлагаемого технического решения заключается прежде всего в том, что глубинное уплотнение грунта осуществляют в зимнее (зимне-весеннее) время, после того как у поверхности грунта образовался слой сезонно-мерзлого грунта заданной толщины, который без затрат качественно пригрузил нижележащий талый грунт. Это позволяет использовать тяжелую или сверхтяжелую трамбовку, коническая форма которой позволяет эффективно втрамбовывать под сезонно-мерзлый слой дренирующий грунтоподобный материал во все стороны, за счет чего и достигается ранее указанный технический результат. Этот результат может быть дополнительно повышен другими известными приемами, такими как воздействие на грунт во время трамбования вибрацией [6] или применением двухмассной трамбовки [8].The essence of the proposed technical solution consists primarily in the fact that deep soil compaction is carried out in winter (winter-spring) time, after a layer of seasonally frozen soil of a given thickness has formed at the soil surface, which has qualitatively loaded the underlying thawed soil. This allows you to use heavy or superheat tamper, the conical shape of which allows you to effectively ram the draining soil-like material in all directions under the seasonally frozen layer, due to which the previously indicated technical result is achieved. This result can be further enhanced by other well-known techniques, such as exposure to soil during tamping by vibration [6] or by using a two-mass tamper [8].
Предлагаемый способ глубинного уплотнения грунта поясняется чертежами, представленными на фиг.1-6, где на фиг.1 изображен план, иллюстрирующий намеченные места воздействия ударами трамбовки; на фиг.2 - сечение, иллюстрирующее вытрамбовывание скважиноподобного углубления и втрамбовывание под сезонно-мерзлый слой дренирующего грунтоподобного материала; на фиг.3 - сечение, иллюстрирующее ослабление сезонно-мерзлого слоя путем проходки скважины, диаметр которой превышает диаметр трамбовки; на фиг.4 - сечение, иллюстрирующее ослабление сезонно-мерзлого слоя путем проходки скважин, размещенных рассосредоточенно по контуру круга; на фиг.5 - сечение, иллюстрирующее ослабление сезонно-мерзлого слоя путем выполнения в летнее время ямы; на фиг.6 - сечение, иллюстрирующее ослабление сезонно-мерзлого слоя путем покрытия в летнее время намеченного в плане места теплоизоляционным материалом.The proposed method of deep compaction of the soil is illustrated by the drawings shown in figures 1-6, where figure 1 shows a plan illustrating the intended places of impact shocks; figure 2 is a cross section illustrating the tamping of a borehole-like depression and tamping under a seasonally frozen layer of a draining soil-like material; figure 3 is a cross section illustrating the weakening of the seasonally frozen layer by driving a well whose diameter exceeds the diameter of the tamper; figure 4 is a cross section illustrating the weakening of the seasonally frozen layer by sinking wells placed dispersed along the contour of the circle; figure 5 is a cross section illustrating the weakening of the seasonally frozen layer by performing in the summer of the pit; Fig.6 is a cross section illustrating the weakening of the seasonally frozen layer by coating in the summer time outlined in terms of the place of the insulating material.
Способ осуществляют следующим образом.The method is as follows.
В летнее время участок грунта 1 планируют и на нем в плане намечают места трамбования 2 на расстоянии "a" друг от друга (фиг.1). В зимнее время у поверхности 3 грунта 1 (фиг.2-6) естественным путем образуется сезонно-мерзлый слой 4 заданной толщины "b", величину которой обычно принимают 100-200 сантиметров. После чего в намеченных местах трамбования 2, в которых сезонно-мерзлый слой 4 ослаблен, например, одним из нижеописанных способов, иллюстрированных на фиг.3-6, трамбовкой 5 вытрамбовывают скважиноподобное углубление 6 (фиг.2). Верхняя часть углубления 6 образует в сезонно-мерзлом слое 4 отверстие 7, диаметр До которого равен диаметру Дт трамбовки 5 или превышает его, а нижняя часть углубления расположена ниже сезонно-мерзлого слоя 4 в талой части грунта 1. Трамбовка 5 сбрасывается с высоты до 20 и более метров посредством механизма сбрасывания 8 (фиг.3) базовой грузоподъемной машины, снабженной системой наведения (не показана) трамбовки 5.In the summer, a plot of soil 1 is planned and on it in the plan outline the places of tamping 2 at a distance "a" from each other (figure 1). In winter, at the
Ослабление сезонно-мерзлого слоя 4 в местах трамбования 2 может быть осуществлено, например, одним из следующих способов.The weakening of the seasonally frozen
1. В зимнее время проходят скважину 9 (фиг.3), диаметр Дск которой превышает диаметр Дт трамбовки 5 на 20-40 сантиметров, а ее глубина "с" - половину толщины "b" сезонно-мерзлого слоя 4. Оставшуюся часть толщины слоя 4, равную b-c, разрушают первым же ударом трамбовки 5.1. In winter, a well 9 passes (FIG. 3), the diameter D ck of which exceeds the diameter D t of tamper 5 by 20–40 centimeters, and its depth “c” is half the thickness “b” of the seasonally frozen
2. В зимнее время на полную толщину b сезонно-мерзлого слоя 4 проходят скважины 10 (фиг.4), которые размещают по контуру круга, диаметр Dк которого превышает диаметр трамбовки Dт. Ослабленное скважинами 10 место в сезонно-мерзлом слое 4 разрушают первым же ударом трамбовки 5.2. During winter time full thickness b seasonally frozen
3. В летнее время выполняют яму 11 (фиг.5), которую заполняют маловлажным зернистым материалом 12 или высококальциевой золой 13, взятой непосредственно из золоуловителя котельной установки - зола сухого отбора. Заполненную яму покрывают теплоизоляционным материалом, например котельным шлаком 14. В зимнее время как сыпучемерзлый грунт 12, так и слабопрочный золобетон 13, находящийся за счет тепла реакции гидратации под слоем шлака 14 в талом состоянии, разрушают первым же ударом трамбовки 5.3. In the summer, a
4. В летнее время место трамбования 2 (фиг.1) покрывают теплоизоляционным материалом 15 (фиг.6), который в зимнее время непосредственно перед трамбованием убирают, а в тонкой части 16 сезонно-мерзлого слоя 4 отрывают приямок 17, в котором размещают заряд 18 взрывчатого вещества и производят его взрывание одновременно с первым ударом трамбовки 5. За счет совместного действия заряда 18 взрывчатого вещества и трамбовки 5 на ослабленный теплоизоляционным материалом 15 сезонно-мерзлый слой 4 последний в месте удара трамбовки 5 разрушается.4. In the summer, the tamping place 2 (FIG. 1) is covered with heat-insulating material 15 (FIG. 6), which is removed in the winter just before tamping, and in the
При производстве ударов тяжелой (сверхтяжелой) трамбовкой 5 (фиг.2) по поверхности 3 ослабленного сезонно-мерзлого слоя 4 в местах трамбования 2 происходит вытрамбовывание скважиноподобного углубления 6, дно 19 которого в процессе трамбования опускается ниже сезонно-мерзлого слоя 4 в талую часть грунта 1. После чего углубление 6 от уровня дна 19 до уровня 20 заполняют дренирующим грунтом или грунтоподобным материалом 21, например песком, гравием, щебнем, котельным шлаком и др. Такой слой дренирующего материала 21 ударами трамбовки 5 втрамбовывают под сезонно-мерзлый слой 4, после чего заполнение углубления 6 дренирующим материалом 21 и его втрамбовывание под сезонно-мерзлую плиту 4 повторяют. В результате дренирующий материал 21 образует в грунте 1 объемную приемную часть дренажа 22 - его отводящая часть на чертеже не показана.When producing impacts with a heavy (superheavy) tamper 5 (Fig. 2) on the
При высокой влажности грунта 1 во время трамбования происходит его разжижение, сопровождаемое во время удара акустической кавитацией в поровой воде, увеличивающей ее водопроходимость в грунте [6 и 8]. При этом сезонно-мерзлый слой 4 грунта 1 работает как массивная и большеразмерная плита. В таких условиях в грунте обеспечивается проявление "поршневого эффекта", а наличие дренажа 22 - эффективный отвод воды из грунта 1. Последнее имеет важное значение так же для консолидации грунта в случае возведения на нем высокой насыпи - не показана. Все это, а также выполнение тяжелой конической формы трамбовки весом до 200 кН и более в существенной мере способствуют повышению ранее указанного технического результата, а именно: упрощение работ по предотвращению выпора грунта вокруг места трамбования при одновременном повышении равномерности уплотнения грунта и в приращении его плотности с одного места трамбования 2, расстояние "а" между которыми достигает 1000 сантиметров и более.At high soil moisture 1 during tamping, it liquefies, accompanied by acoustic cavitation in the pore water during impact, increasing its water permeability in the soil [6 and 8]. At the same time, the seasonally frozen
После такого глубинного уплотнения грунта 1, осуществленного в зимнее время, в летнее время производят уплотнение грунта 1, находящегося у его поверхности 3 в неуплотненном естественном состоянии (грунт слоя 4), например, трамбовкой средней тяжести с развитой ударной поверхностью при ограниченной высоте сбрасывания. Такое трамбование целесообразно производить по местам 23, расположенным между местами трамбования 2 и показанным на фиг.1 пунктиром. Затем поверхность 3 грунта 1, деформированную в процессе трамбования, выравнивают и доуплотняют катком.After such a deep compaction of the soil 1, carried out in the winter, in the summer, compaction of the soil 1 located at its
Такое сочетание глубинного уплотнения грунта, выполненного по предложенному способу, и поверхностное уплотнение грунта, выполненное по одному из известных способов, позволяет качественно подготовить участок под застройку.This combination of deep soil compaction, performed by the proposed method, and surface soil compaction, made by one of the known methods, allows you to qualitatively prepare the site for development.
Источники информацииInformation sources
1. Иванов П.Л. Уплотнение малосвязных грунтов взрывами. М.: Недра, 1983.1. Ivanov P.L. Compaction of loose soil by explosions. M .: Nedra, 1983.
2. Ломизе Г.М., Мещеряков А.Н., Гильман Я.Д. и Федоров Б.С. Уплотнение песчаных грунтов электрическими разрядами //Гидротехническое строительство. 1963. №7.2. Lomize G.M., Meshcheryakov A.N., Gilman Ya.D. and Fedorov B.S. Compaction of sandy soils with electric discharges // Hydrotechnical construction. 1963. No. 7.
3. Патент Российской Федерации №2193002, кл. В 65 G 3/00, опубл. 20.11.2002.3. Patent of the Russian Federation No. 2193002, cl. In 65
4. Зарецкий Ю.К., Гарицелов М.Ю. Глубинное уплотнение грунтов ударными нагрузками. М.: Энергоатомиздат, 1989.4. Zaretsky Yu.K., Garitselov M.Yu. Deep compaction of soils by shock loads. M .: Energoatomizdat, 1989.
5. Уплотнение просадочных грунтов сверхтяжелой трамбовкой на строительстве больничного комплекса /И.Г.Рабинович, Ю.А.Багдасаров, Н.И.Руденко и др. //Основания, фундаменты и механика грунтов. 1991. №1.5. Compaction of subsidence soils by super-heavy tamping at the construction of a hospital complex / I. G. Rabinovich, Yu. A. Bagdasarov, N. I. Rudenko and others // Foundations, foundations and soil mechanics. 1991. No1.
6. Патент Российской Федерации №2149238, кл. Е 02 D 3/046, опубл. 20.05.2000.6. Patent of the Russian Federation No. 2149238, cl. E 02
7. Авторское свидетельство СССР №1477837, кл. Е 02 D 3/046, опубл. 07.05.89.7. Copyright certificate of the USSR No. 1477837, cl. E 02
8. Ягин В.П. Новое объяснение поведения водонасыщенных грунтов при сильных сотрясениях. //Основание, фундаменты и механика грунтов. 2000. №6.8. Yagin V.P. A new explanation of the behavior of water-saturated soils during strong shocks. // Base, foundations and soil mechanics. 2000. No.6.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2005116780/03A RU2289655C1 (en) | 2005-06-01 | 2005-06-01 | Method for deep ground compaction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2005116780/03A RU2289655C1 (en) | 2005-06-01 | 2005-06-01 | Method for deep ground compaction |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2289655C1 true RU2289655C1 (en) | 2006-12-20 |
Family
ID=37666842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2005116780/03A RU2289655C1 (en) | 2005-06-01 | 2005-06-01 | Method for deep ground compaction |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2289655C1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102251514A (en) * | 2011-06-15 | 2011-11-23 | 谢开生 | Multi-section type variable cross-section dynamic compaction method |
CN113931161A (en) * | 2021-10-29 | 2022-01-14 | 贵州建工集团第一建筑工程有限责任公司 | Dynamic compaction treatment method for karst landform foundation |
CN114657970A (en) * | 2022-04-21 | 2022-06-24 | 北京瑞明建筑设计院有限公司 | In-hole deep dynamic compaction method and system based on filler threshold value as quality control |
-
2005
- 2005-06-01 RU RU2005116780/03A patent/RU2289655C1/en not_active IP Right Cessation
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102251514A (en) * | 2011-06-15 | 2011-11-23 | 谢开生 | Multi-section type variable cross-section dynamic compaction method |
CN113931161A (en) * | 2021-10-29 | 2022-01-14 | 贵州建工集团第一建筑工程有限责任公司 | Dynamic compaction treatment method for karst landform foundation |
CN114657970A (en) * | 2022-04-21 | 2022-06-24 | 北京瑞明建筑设计院有限公司 | In-hole deep dynamic compaction method and system based on filler threshold value as quality control |
CN114657970B (en) * | 2022-04-21 | 2023-10-24 | 北京瑞明建筑设计院有限公司 | Deep dynamic compaction method and system in hole based on filling threshold as quality control |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Greenwood et al. | Specialist ground treatment by vibratory and dynamic methods | |
Smoltczyk | Geotechnical Engineering Handbook, Procedures | |
CN103074882A (en) | Construction method for reinforcing island-type perennial frozen-soil foundation by adopting gravel piles | |
WO2017083969A1 (en) | Method for forming a stable foundation ground | |
CN105040692B (en) | A kind of construction method of precast concrete pile body carrier pile | |
CN104746505A (en) | Method for treating miscellaneous fill foundation combing dynamic consolidation and compaction grouting | |
RU2289655C1 (en) | Method for deep ground compaction | |
CN102296591A (en) | Rapid drainage solidifying treatment method of soft soil foundation | |
Slocombe | Dynamic compaction | |
Mishra | A study on ground improvement techniques and its applications | |
RU2601630C2 (en) | Method of pile drive device | |
EP1792018B1 (en) | A pyrotechnic method for the stabilisation of low bearing capacity subsoil | |
RU2536538C1 (en) | Method for reduction of deformations of motor and railway roads on permafrost soils that thaw out in process of operation | |
Wehr et al. | Deep vibro techniques | |
RU2249082C1 (en) | Method for erecting shallow and surface foundations in thawed ground located above underlying permafrost or rock grounds | |
RU2346111C2 (en) | Method for deep compaction of soil | |
CN204530683U (en) | A kind of pile making device ramming expansion CFG stake for spiral pore-forming | |
CN115198735B (en) | Construction method of SDDC (Standard data Console) slide-resistant pile in disordered backfill region of open-pit mining | |
Yee et al. | Interactive geotechnical design in karst and ex-mining ground in Malaysia | |
CN116876276A (en) | Treatment method for settlement and displacement of high-grade highway subgrade and retaining wall | |
Moffat | Soil remediation techniques for reduction of earthquake-induced liquefaction | |
SU1652431A1 (en) | Method for construction of cast-in-place pile | |
CN115354541A (en) | Construction method of waste soil yard subgrade | |
Bogdanova | Soil improvement by the method of microblasting | |
SU48435A1 (en) | The method of installation of the base under the clothes of non-road roads |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20070602 |