RU2240639C1 - Maintenance method for power network of district, town, or city; maintenance method for power network during erection of development projects thereof; maintenance method for power network during repairs and/or reconstruction of building, structure, complex of buildings, industrial complex projects; and method for power network maintenance during reconstruction and/or erection of transport complex projects in district, town, or city - Google Patents

Maintenance method for power network of district, town, or city; maintenance method for power network during erection of development projects thereof; maintenance method for power network during repairs and/or reconstruction of building, structure, complex of buildings, industrial complex projects; and method for power network maintenance during reconstruction and/or erection of transport complex projects in district, town, or city Download PDF

Info

Publication number
RU2240639C1
RU2240639C1 RU2003112645/09A RU2003112645A RU2240639C1 RU 2240639 C1 RU2240639 C1 RU 2240639C1 RU 2003112645/09 A RU2003112645/09 A RU 2003112645/09A RU 2003112645 A RU2003112645 A RU 2003112645A RU 2240639 C1 RU2240639 C1 RU 2240639C1
Authority
RU
Russia
Prior art keywords
block
input
power
cells
voltage
Prior art date
Application number
RU2003112645/09A
Other languages
Russian (ru)
Other versions
RU2003112645A (en
Original Assignee
Селиванов Вадим Николаевич
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Селиванов Вадим Николаевич filed Critical Селиванов Вадим Николаевич
Priority to RU2003112645/09A priority Critical patent/RU2240639C1/en
Application granted granted Critical
Publication of RU2240639C1 publication Critical patent/RU2240639C1/en
Publication of RU2003112645A publication Critical patent/RU2003112645A/en

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

FIELD: electrical engineering; power supply to various projects.
SUBSTANCE: proposed method includes partial reconstruction of existing power network and/or erection of new local power network by laying power cable lines between at least two independent power supplies located on geographically spaced apart areas and modular distribution center mounted on pre-erected foundation and made in the form of at least one transportable prefabricated module or three-dimensional heated unit accommodating two mutually redundant sections of switching and protective devices, lengths of external opposing pairs of unit walls being of definite proportions. Equipment is mounted at manufacturing plant or at least partially upon installation of three-dimensional unit on foundation; this unit is mounted for reuse by removal from foundation, displacement, and connection to power networks of other projects, including those newly erected or reconstructed in district, town, or city. Power network maintenance method during erection of development projects in district, town, or city includes at least partial reconstruction of existing power network by laying new power cable lines between newly erected development project and at least two independent geographically spaced apart power supplies mounted on pre-erected foundation of modular distribution center. Optimal design of three-dimensional units, optimal proportion of their parameters, and optimal arrangement of equipment in them, considering their functional applications, facilitate maintenance of these units.
EFFECT: enhanced economic efficiency, reliability, and service life of power network.
20 cl, 15 dwg

Description

Изобретение относится к области электротехники, а именно к электроснабжению объектов различного назначения.The invention relates to the field of electrical engineering, namely to the power supply of objects for various purposes.

Известен способ электроснабжения объектов различного назначения, предусматривающий открытое возведение стационарных комплектных распределительных устройств, которые предназначены для одностороннего обслуживания. Камеры разделяют на три отсека. В верхнем отсеке камеры открыто размещают сборные шины и шинный разъединитель, в среднем отсеке - выключатель типа ВМГ или выключатель нагрузки, или предохранители и разъединители, в нижнем - линейный разъединитель, кабельная воронка и трансформаторы тока типа ТЗ. На фасаде камеры располагают верхнюю и нижнюю двери (см., например, КОНЮХОВА Е.А., Электроснабжение объектов, М.: изд-во “Мастерство”, 2002, с.102).A known method of power supply for various purposes, involving the open construction of stationary complete switchgears, which are designed for one-way maintenance. The cameras are divided into three compartments. In the upper compartment of the chamber, busbars and a bus disconnector are openly placed, in the middle compartment - a VMG switch or a load switch, or fuses and disconnectors, in the lower compartment - a linear disconnector, cable funnel and current transformers of the TZ type. The upper and lower doors are located on the facade of the chamber (see, for example, EA KONYUHOVA, Power supply of objects, Moscow: “Mastery” publishing house, 2002, p. 102).

Наиболее близким к изобретению для всех объектов по своей сущности и достигаемому результату является способ электроснабжения объекта, включающий возведение распределительной подстанции, пристраиваемой к существующему промышленному зданию или размещаемой в отдельном помещении внутри существующего объекта, например, между колоннами в цеху, или выполняемой отдельно стоящей с камерами распределительных устройств (там же, с. 114 -116, рис 7.116).Closest to the invention for all objects in essence and the achieved result is a method of power supply to an object, including the construction of a distribution substation that is attached to an existing industrial building or placed in a separate room inside an existing object, for example, between columns in a workshop, or performed separately from cameras distribution devices (ibid., pp. 114 -116, Fig. 7.116).

Задачей настоящего изобретения для всех объектов является повышение экономичности электроснабжения возводимого или реконструируемого сооружения, комплекса сооружений, населенного пункта, микрорайона, района города, промышленного, агропромышленного комплекса, мегаполиса при одновременном обеспечении высокой надежности работы, снижении аварийности и обеспечении бесперебойной работы всех участков электроснабжения, а также снижение трудоемкости монтажа и эксплуатации сети электроснабжения возводимого или реконструируемого сооружения, комплекса сооружений, населенного пункта, микрорайона, района города, промышленного, агропромышленного комплекса, мегаполиса, при одновременном обеспечении надежности и долговечности работы, улучшении условий обслуживания и обеспечении возможности оптимального использования площади для возведения распределительных пунктов различных типоразмеров и подключения в системах электроснабжения других, в том числе возводимых или реконструируемых объектов или замены в аварийных ситуациях таким же объемным блоком.The objective of the present invention for all objects is to increase the cost-effectiveness of power supply to a constructed or reconstructed structure, a complex of structures, a settlement, a microdistrict, a city district, an industrial, agro-industrial complex, and a megalopolis while ensuring high reliability, reducing accident rate and ensuring uninterrupted operation of all power supply sections, and also reducing the complexity of installation and operation of the power supply network of a constructed or reconstructed structure a complex, a complex of buildings, a settlement, a microdistrict, a city district, an industrial, agro-industrial complex, megalopolis, while ensuring reliability and durability, improving service conditions and making it possible to optimally use the area for erecting distribution points of various sizes and connecting others to power systems, including constructed or reconstructed facilities or replacement in emergency situations with the same volume unit.

Поставленная задача в части способа эксплуатации сети электроснабжения района, города, мегаполиса решается за счет того, что он предусматривает, по крайней мере, частичную реконструкцию существующей сети электроснабжения и/или возведение новой региональной сети электроснабжения, которые осуществляют путем подводки питающих кабельных линий от территориально разнесенных, по крайней мере, двух независимых источников питания к устанавливаемому на подготовленный фундамент блочному распределительному пункту в виде, по крайней мере, одного транспортабельного полной заводской готовности модуля - объемного, защищенного от атмосферных воздействий утепленного блока с соотношением длин пар противолежащих наружных стен, составляющим 1,0-1,45, и смонтированными в нем в виде двух взаимно резервирующих секций коммутационной аппаратуры и устройств защиты, причем указанное оборудование монтируют в заводских условиях или, по крайней мере, частично после установки объемного блока на фундамент, при этом объемный блок монтируют с возможностью последующего многократного использования путем снятия с фундамента, перемещения и подключения в сетях электроснабжения других, в том числе возводимых вновь или реконструируемых объектов района, города, мегаполиса.The task in terms of the method of operating the power supply network of a district, city, metropolis is solved due to the fact that it provides for at least a partial reconstruction of the existing power supply network and / or the construction of a new regional power supply network, which is carried out by supplying cable lines from geographically spaced at least two independent power supplies to the block distribution point installed on the prepared foundation in the form of at least one about the transportable complete factory readiness of the module - a volumetric, weatherproofed insulated block with a pair length ratio of opposite external walls of 1.0-1.45, and mounted in it in the form of two mutually redundant sections of switching equipment and protection devices, moreover, the equipment is mounted in the factory or at least partially after the installation of the volume unit on the foundation, while the volume unit is mounted with the possibility of subsequent reuse by removing from the foundation, moving and connecting others, including newly constructed or reconstructed objects of the district, city, metropolis, in the power supply networks.

Блочный распределительный пункт могут выполнять с возможностью подключения, по меньшей мере, к двум дополнительным источникам электроэнергии от резервных центров питания также через соответствующие кабельные линии и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий, в каждой секции последовательно монтируют четыре выводные ячейки, по крайней мере, две вводные ячейки, ячейку под трансформатор собственных нужд и ячейку под трансформатор напряжения для контроля и измерения напряжения на секции и обеспечения работы автоматического ввода резервного питания между секциями, причем выводные и вводные ячейки оборудуют трансформаторами тока для измерения фазного тока и для измерения тока замыкания на землю, вводные, выводные ячейки и ячейки под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал, при этом указанные выше ячейки одного и того же функционального назначения в разных секциях выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей объемного блока, кроме того, в одной из секций размещают ячейку секционного выключателя, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку секционного разъединителя, которую электрически соединяют с ячейкой секционного выключателя, причем ячейки устанавливают в объемном блоке с образованием преимущественно симметричных относительно той же средней вертикальной его плоскости проходов вдоль обращенных к этим ячейкам наружных стен объемного блока, при этом ячейку секционного выключателя выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания, которое содержит элементы отключения ввода питания кабельной линии электропередачи на аварийную секцию с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции ниже определенного уровня в одной, двух или трех фазах, систему блокировки при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию, систему автоматического включения секционного выключателя от блокконтактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию, устройства ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках для обеспечения принципа неразрывности цепи управления секционного выключателя при любом положении тележки отключенного выключателя ввода, причем блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя, замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции, неисправности в оперативных цепях, с обеспечением возможности выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.A block distribution point can be configured to connect to at least two additional sources of electricity from standby power centers also through the corresponding cable lines and to connect at least four cable outlet lines, four output cells are sequentially mounted in each section, each at least two input cells, a cell for an auxiliary transformer and a cell for a voltage transformer to control and measure the voltage on the sections and ensure The automatic input backup power supply between sections, with terminal and input cells being equipped with current transformers for measuring phase current and for measuring earth fault currents, input and output cells and cells for transformers provide maximum current protection against interphase short circuit with independent time delay with action to shutdown, as well as protection against earth faults with an independent time delay with action on the signal, while the above cells of the same functional beginnings in different sections are performed in pairs of the same type and place the same type of cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes of the volumetric block, in addition, in one of the sections place the sectional switch cell, and in the other section symmetrically to this cell relative to the same volumetric plane of the unit, the cell of the sectional disconnector is installed, which is electrically connected to the cell of the sectional switch, and the cells are installed in the volume unit with the formation of passages that are substantially symmetrical with respect to the same average vertical plane along the outer walls of the volumetric unit facing these cells, while the sectional switch cell is made with a device for maximum current protection against interphase short circuit with an independent time delay with a trip action, as well as with an automatic input device backup power supply, which contains elements for disconnecting the power input of the cable power line to the emergency section with adjustable shutter speed change from 0 to 20 s when the voltage disappears or decreases in this section below a certain level in one, two or three phases, the blocking system when the device is used for overcurrent protection of the cable power line power input to the emergency section, the system for automatically turning on the section switch from the input contact block circuit breaker without delay after disconnecting the power input of the cable power line to the emergency section, manual reset devices after automatic tripping, as well as control keys for two positions of automatic input of the backup power supply “input” - “output”, which are installed on the input cells to ensure the principle of continuity of the control circuit of the section switch at any position of the truck disconnected input switch, and the block distribution point is equipped with telemechanization systems, including remote control systems, telealarm systems and telemetry: positions of cable line switches, power transformers and sectional switch spruce, ground faults, on connecting cable lines of higher voltage, voltage on the buses of each section, malfunctions in operational circuits, providing the possibility of executing telecontrol commands by a power switch in each section, including TV switching and TV disconnecting and telemetry systems for load currents cable lines, power transformers and a sectional voltage switch on the sections.

В качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения, преимущественно 10 кВ, в электроэнергию низшего напряжения, преимущественно 0,4 кВ, могут использовать преимущественно сухие трансформаторы мощностью по 40 кВА, каждый напряжением 10 ± 2 × 2,5% / 0,4 кВ.As transformers of their own needs for down-converting energy of higher voltage, mainly 10 kV, into electricity of low voltage, mainly 0.4 kV, they can use mainly dry transformers with a capacity of 40 kVA, each voltage of 10 ± 2 × 2.5% / 0, 4 kV.

Блочный распределительный пункт могут выполнять из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок выполняют преимущественно из металлического каркаса, утепленных наружных стен, утепленного потолка, пола, крыши и, по крайней мере, одной сейфовой металлической двери, а фундамент под каждый объемный блок образуют путем выполнения в грунте по контуру стен объемного блока и, по крайней мере, между одной парой противолежащих наружных стен его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки, на которой бетонируют образующие несущий армопояс железобетонные ленты с последующей установкой на них после набора бетоном требуемой прочности фундаментных блоков шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков на нулевой отметке грунта, обратной засыпкой траншеи, и выполнением по верху фундаментных блоков армированной цементно-песчаной стяжки, после набора прочности которой устанавливают с опиранием на стяжку объемный блок, причем одну из железобетонных лент, образующих армопояс, расположенную параллельно одной паре противолежащих наружных стен объемного блока, размещают по одной из двух средних вертикальных плоскостей объемного блока, а остальные ленты, параллельные этой плоскости, - на равных расстояниях друг от друга, в полу каждого объемного блока образуют, по крайней мере, два технологических проема для пропуска соответствующих кабельных линий, а между фундаментными блоками - подполье, ограниченное его стенами.A block distribution point can be made of two or more transportable modules, each of which is made in the form of a volume unit, the base being prepared for all transportable modules forming a block distribution point, while each volume block is made primarily of a metal frame, insulated external walls, insulated the ceiling, floor, roof and at least one safe metal door, and the foundation for each volume unit is formed by performing in the ground along the contour of the of a volume block and at least between one pair of opposite external walls of its trenches expanding upwards, performing in the trenches a compacted sand cushion on which reinforced concrete belts bearing the armor belt are concreted, followed by installation on them after the concrete has been set up with the required strength of the foundation blocks with a width smaller than the width reinforced concrete tapes, with the top surface of the foundation blocks at zero ground level, backfilling the trench, and the execution of reinforcing foundation blocks on top a cement-sand screed, after the strength has been set, a volume block is installed based on the screed, and one of the reinforced concrete tapes forming an arm belt, parallel to one pair of opposite external walls of the volume block, is placed along one of the two middle vertical planes of the volume block, and the rest tapes parallel to this plane - at equal distances from each other, in the floor of each volume unit form at least two technological openings for passing the corresponding cable x lines and between the foundation blocks - underground, limited its walls.

Наружные стены объемного блока могут выполнять из трехслойных металлических панелей типа “сэндвич” с утеплителем предпочтительно из пенополиуретана, с двусторонней экологически безопасной окраской, а крышу выполняют предпочтительно из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя, причем профилированные металлические листы соединяют между собой комбинированными заклепками.The external walls of the volumetric block can be made of three-layer metal panels of the “sandwich” type with a heater, preferably polyurethane foam, with environmentally friendly two-sided painting, and the roof is preferably made of profiled metal sheets with zinc or aluminum-zinc coating and a layer of non-combustible insulation, and the profiled metal sheets are connected between themselves with combined rivets.

В части способа эксплуатации сети электроснабжения при возведении строительных объектов района, города, мегаполиса поставленная задача решается за счет того, что способ предусматривает, по крайней мере, частичную реконструкцию существующей сети электроснабжения, которую осуществляют путем подводки к возводимому строительному объекту новых питающих кабельных линий от территориально разнесенных, независимых, не менее чем двух источников питания, установки на предварительно подготовленный фундамент блочного распределительного пункта в виде, по крайней мере, одного объемного защищенного от атмосферных осадков утепленного блока полной заводской готовности с соотношением длин пар противолежащих наружных стен, составляющим 1,0-1,45, и смонтированным в нем в заводских условиях электротехническим и вспомогательным оборудованием блочного распределительного пункта или, по крайней мере, часть указанного оборудования монтируют в объемном блоке после установки его на фундаменте, причем указанное оборудование размещают в двух взаимно резервирующих секциях, при этом объемный блок устанавливают на фундаменте с возможностью последующего многократного использования путем снятия с фундамента, перемещения и подключения в сетях электроснабжения других строительных объектов района, города, мегаполиса.Regarding the method of operation of the power supply network during the construction of construction projects of a district, city, metropolis, the problem is solved due to the fact that the method provides for at least a partial reconstruction of the existing power supply network, which is carried out by connecting new cable lines from the territorially constructed construction object spaced, independent, at least two power sources, installation on a previously prepared foundation of a block distribution point and in the form of at least one volumetric, weatherproof, fully prefabricated insulated block with a parity ratio of pairs of opposite external walls of 1.0–1.45, and electrotechnical and auxiliary equipment of a block distribution point mounted in it under factory conditions or at least a part of the specified equipment is mounted in the volume unit after installing it on the foundation, and the specified equipment is placed in two mutually redundant sections, while the volume the block is installed on the foundation with the possibility of subsequent reuse by removing from the foundation, moving and connecting other construction projects of the district, city, metropolis in the power supply networks.

Блочный распределительный пункт могут выполнять с возможностью подключения, по меньшей мере, к двум дополнительным источникам электроэнергии от резервных центров питания также через соответствующие кабельные линии и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий, в каждой секции последовательно монтируют четыре выводные ячейки, по крайней мере, две вводные ячейки, ячейку под трансформатор собственных нужд и ячейку под трансформатор напряжения для контроля и измерения напряжения на секции и обеспечения работы автоматического ввода резервного питания между секциями, причем выводные и вводные ячейки оборудуют трансформаторами тока для измерения фазного тока и для измерения тока замыкания на землю, вводные, выводные ячейки и ячейки под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал, при этом указанные выше ячейки одного и того же функционального назначения в разных секциях выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей объемного блока, кроме того, в одной из секций размещают ячейку секционного выключателя, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку секционного разъединителя, которую электрически соединяют с ячейкой секционного выключателя, причем ячейки устанавливают в объемном блоке с образованием преимущественно симметричных относительно той же средней вертикальной его плоскости проходов вдоль обращенных к этим ячейкам наружных стен объемного блока, при этом ячейку секционного выключателя выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания, которое содержит элементы отключения ввода питания кабельной линии электропередачи на аварийную секцию с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции ниже определенного уровня в одной, двух или трех фазах, систему блокировки при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию, систему автоматического включения секционного выключателя от блокконтактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию, устройства ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках для обеспечения принципа неразрывности цепи управления секционного выключателя при любом положении тележки отключенного выключателя ввода, причем блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции, неисправности в оперативных цепях, с обеспечением возможности выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.A block distribution point can be configured to connect to at least two additional sources of electricity from standby power centers also through the corresponding cable lines and to connect at least four cable outlet lines, four output cells are sequentially mounted in each section, each at least two input cells, a cell for an auxiliary transformer and a cell for a voltage transformer to control and measure the voltage on the sections and ensure The automatic input backup power supply between sections, with terminal and input cells being equipped with current transformers for measuring phase current and for measuring earth fault currents, input and output cells and cells for transformers provide maximum current protection against interphase short circuit with independent time delay with action to shutdown, as well as protection against earth faults with an independent time delay with action on the signal, while the above cells of the same functional beginnings in different sections are performed in pairs of the same type and place the same type of cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes of the volumetric block, in addition, in one of the sections place the sectional switch cell, and in the other section symmetrically to this cell relative to the same volumetric plane of the unit, the cell of the sectional disconnector is installed, which is electrically connected to the cell of the sectional switch, and the cells are installed in the volume unit with the formation of passages that are substantially symmetrical with respect to the same average vertical plane along the outer walls of the volumetric unit facing these cells, while the sectional switch cell is made with a device for maximum current protection against interphase short circuit with an independent time delay with a trip action, as well as with an automatic input device backup power supply, which contains elements for disconnecting the power input of the cable power line to the emergency section with adjustable shutter speed change from 0 to 20 s when the voltage disappears or decreases in this section below a certain level in one, two or three phases, the blocking system when the device is used for overcurrent protection of the cable power line power input to the emergency section, the system for automatically turning on the section switch from the input contact block circuit breaker without delay after disconnecting the power input of the cable power line to the emergency section, manual reset devices after automatic tripping, as well as control keys for two positions of automatic input of the backup power supply “input” - “output”, which are installed on the input cells to ensure the principle of continuity of the control circuit of the section switch at any position of the truck disconnected input switch, and the block distribution point is equipped with telemechanization systems, including remote control systems, telealarm systems and telemetry: positions of cable line switches, power transformers and sectional switch Firing short circuits to ground, to connecting cable lines of higher voltage, the presence of voltage on the buses of each section, malfunctions in operational circuits, providing the possibility of executing telecontrol commands by a power switch in each section, including TV switching and TV disconnecting and television measurement systems for cable load currents lines, power transformers and sectional voltage switch on the sections.

В качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения, преимущественно 10 кВ, в электроэнергию низшего напряжения, преимущественно 0,4 кВ, могут использовать преимущественно сухие трансформаторы мощностью по 40 кВА, каждый напряжением 10 ± 2 × 2,5% / 0,4 кВ.As transformers of their own needs for down-converting energy of higher voltage, mainly 10 kV, into electricity of low voltage, mainly 0.4 kV, they can use mainly dry transformers with a capacity of 40 kVA, each voltage of 10 ± 2 × 2.5% / 0, 4 kV.

Блочный распределительный пункт могут выполнять из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок выполняют преимущественно из металлического каркаса, утепленных наружных стен, утепленного потолка, пола, крыши и, по крайней мере, одной сейфовой металлической двери, а фундамент под каждый объемный блок образуют путем выполнения в грунте по контуру стен объемного блока и, по крайней мере, между одной парой противолежащих наружных стен его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки, на которой бетонируют образующие несущий армопояс железобетонные ленты с последующей установкой на них после набора бетоном требуемой прочности фундаментных блоков шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков на нулевой отметке грунта, обратной засыпкой траншеи и выполнением по верху фундаментных блоков армированной цементно-песчаной стяжки, после набора прочности которой устанавливают с опиранием на стяжку объемный блок, причем одну из железобетонных лент, образующих армопояс, расположенную параллельно одной паре противолежащих наружных стен объемного блока, размещают по одной из двух средних вертикальных плоскостей объемного блока, а остальные ленты, параллельные этой плоскости, - на равных расстояниях друг от друга, в полу каждого объемного блока образуют, по крайней мере, два технологических проема для пропуска соответствующих кабельных линий, а между фундаментными блоками - подполье, ограниченное его стенами.A block distribution point can be made of two or more transportable modules, each of which is made in the form of a volume unit, the base being prepared for all transportable modules forming a block distribution point, while each volume block is made primarily of a metal frame, insulated external walls, insulated the ceiling, floor, roof and at least one safe metal door, and the foundation for each volume unit is formed by performing in the ground along the contour of the of a volumetric block and at least between one pair of opposite external walls of its trenches expanding upwards, performing in the trenches a compacted sand cushion on which reinforced concrete belts bearing the armor belt are concreted, followed by installation on them after the concrete has been set up with the required strength of the foundation blocks with a width smaller than the width reinforced concrete tapes, with the location of the upper surface of the foundation blocks at zero ground level, backfilling of the trench and the execution of reinforcing foundation blocks on the top a cement-sand screed, after the strength has been set, a volume block is installed based on the screed, and one of the reinforced concrete tapes forming an arm belt, parallel to one pair of opposite external walls of the volume block, is placed along one of the two middle vertical planes of the volume block, and the rest tapes parallel to this plane - at equal distances from each other, in the floor of each volume unit form at least two technological openings for the passage of the corresponding cable x lines, and between the foundation blocks - the underground, limited by its walls.

Наружные стены объемного блока могут выполнять из трехслойных металлических панелей типа “сэндвич” с утеплителем предпочтительно из пенополиуретана, с двусторонней экологически безопасной окраской, а крышу выполняют предпочтительно из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя, причем профилированные металлические листы соединяют между собой комбинированными заклепками.The external walls of the volumetric block can be made of three-layer metal panels of the “sandwich” type with a heater, preferably polyurethane foam, with environmentally friendly two-sided painting, and the roof is preferably made of profiled metal sheets with zinc or aluminum-zinc coating and a layer of non-combustible insulation, and the profiled metal sheets are connected between themselves with combined rivets.

Задача в части способа эксплуатации сети электроснабжения при ремонте и/или реконструкции здания, сооружения, комплекса заданий, сооружений, объектов промышленного комплекса решается за счет того, что, способ предусматривает реконструкцию, по крайней мере, части питающей и распределительной сети электроснабжения ремонтируемого объекта и/или реконструируемого здания, сооружения, комплекса заданий, сооружений, объектов промышленного комплекса, которую осуществляют путем подводки питающих кабельных линий от территориально разнесенных независимых, по крайней мере, двух источников питания к устанавливаемому в зоне ремонтируемого и/или реконструируемого объекта на подготовленный фундамент блочному распределительному пункту в виде, по крайней мере, одного транспортабельного полной заводской готовности модуля - объемного, защищенного от атмосферных воздействий утепленного блока с соотношением длин пар противолежащих наружных стен, составляющим 1,0-1,45, и смонтированными в нем в виде двух взаимно резервирующих секций коммутационной аппаратуры и устройств защиты, причем указанное оборудование монтируют в заводских условиях или, по крайней мере, частично после установки объемного блока на фундамент, при этом объемный блок монтируют с возможностью последующего многократного использования путем снятия с фундамента перемещения и подключения в сетях электроснабжения других, в том числе ремонтируемых и/или реконструируемых объектов.The problem in terms of the method of operation of the power supply network during the repair and / or reconstruction of the building, structure, task complex, structures, objects of the industrial complex is solved due to the fact that the method provides for the reconstruction of at least part of the power supply and distribution network of the power supply of the repaired object and / or reconstructed buildings, structures, tasks, structures, industrial complex facilities, which is carried out by supplying cable lines from geographically spaced independent at least two power sources to the block distribution point installed in the area of the repaired and / or reconstructed object on the prepared foundation in the form of at least one transportable complete factory readiness of the module - a volumetric, weatherproof insulated block with a ratio of lengths pairs of opposite external walls of 1.0-1.45, and mounted in it in the form of two mutually redundant sections of switching equipment and protection devices, and the specified equipment is mounted in the factory or, at least partially, after the volume unit is installed on the foundation, while the volume unit is mounted with the possibility of subsequent reuse by removing from the foundation the movement and connection of others, including those being repaired and / or reconstructed, in the power supply networks objects.

Блочный распределительный пункт могут выполнять с возможностью подключения, по меньшей мере, к двум дополнительным источникам электроэнергии от резервных центров питания также через соответствующие кабельные линии и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий, в каждой секции последовательно монтируют четыре выводные ячейки, по крайней мере, две вводные ячейки, ячейку под трансформатор собственных нужд и ячейку под трансформатор напряжения для контроля и измерения напряжения на секции и обеспечения работы автоматического ввода резервного питания между секциями, причем выводные и вводные ячейки оборудуют трансформаторами тока для измерения фазного тока и для измерения тока замыкания на землю, вводные, выводные ячейки и ячейки под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал, при этом указанные выше ячейки одного и того же функционального назначения в разных секциях выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей объемного блока, кроме того, в одной из секций размещают ячейку секционного выключателя, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку секционного разъединителя, которую электрически соединяют с ячейкой секционного выключателя, причем ячейки устанавливают в объемном блоке с образованием преимущественно симметричных относительно той же средней вертикальной его плоскости проходов вдоль обращенных к этим ячейкам наружных стен объемного блока, при этом ячейку секционного выключателя выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания, которое содержит элементы отключения ввода питания кабельной линии электропередачи на аварийную секцию с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции ниже определенного уровня в одной, двух или трех фазах, систему блокировки при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию, систему автоматического включения секционного выключателя от блокконтактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию, устройства ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках для обеспечения принципа неразрывности цепи управления секционного выключателя при любом положении тележки отключенного выключателя ввода, причем блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции, неисправности в оперативных цепях, с обеспечением возможности выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.A block distribution point can be configured to connect to at least two additional sources of electricity from standby power centers also through the corresponding cable lines and to connect at least four cable outlet lines, four output cells are sequentially mounted in each section, each at least two input cells, a cell for an auxiliary transformer and a cell for a voltage transformer to control and measure the voltage on the sections and ensure The automatic input backup power supply between sections, with terminal and input cells being equipped with current transformers for measuring phase current and for measuring earth fault currents, input and output cells and cells for transformers provide maximum current protection against interphase short circuit with independent time delay with action to shutdown, as well as protection against earth faults with an independent time delay with action on the signal, while the above cells of the same functional beginnings in different sections are performed in pairs of the same type and place the same type of cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes of the volumetric block, in addition, in one of the sections place the sectional switch cell, and in the other section symmetrically to this cell relative to the same volumetric plane of the unit, the cell of the sectional disconnector is installed, which is electrically connected to the cell of the sectional switch, and the cells are installed in the volume unit with the formation of passages that are substantially symmetrical with respect to the same average vertical plane along the outer walls of the volumetric unit facing these cells, while the sectional switch cell is made with a device for maximum current protection against interphase short circuit with an independent time delay with a trip action, as well as with an automatic input device backup power supply, which contains elements for disconnecting the power input of the cable power line to the emergency section with adjustable shutter speed change from 0 to 20 s when the voltage disappears or decreases in this section below a certain level in one, two or three phases, the blocking system when the device is used for overcurrent protection of the cable power line power input to the emergency section, the system for automatically turning on the section switch from the input contact block circuit breaker without delay after disconnecting the power input of the cable power line to the emergency section, manual reset devices after automatic tripping, as well as control keys for two positions of automatic input of the backup power supply “input” - “output”, which are installed on the input cells to ensure the principle of continuity of the control circuit of the section switch at any position of the truck disconnected input switch, and the block distribution point is equipped with telemechanization systems, including remote control systems, telealarm systems and telemetry: positions of cable line switches, power transformers and sectional switch Firing short circuits to ground, to connecting cable lines of higher voltage, the presence of voltage on the buses of each section, malfunctions in operational circuits, providing the possibility of executing telecontrol commands by a power switch in each section, including TV switching and TV disconnecting and television measurement systems for cable load currents lines, power transformers and sectional voltage switch on the sections.

В качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения, преимущественно 10 кВ, в электроэнергию низшего напряжения, преимущественно 0,4 кВ, могут использовать преимущественно сухие трансформаторы мощностью по 40 кВА, каждый напряжением 10 ± 2 × 2,5% / 0,4 кВ.As transformers of their own needs for down-converting energy of higher voltage, mainly 10 kV, into electricity of low voltage, mainly 0.4 kV, they can use mainly dry transformers with a capacity of 40 kVA, each voltage of 10 ± 2 × 2.5% / 0, 4 kV.

Блочный распределительный пункт могут выполнять из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок выполняют преимущественно из металлического каркаса, утепленных наружных стен, утепленного потолка, пола, крыши и, по крайней мере, одной сейфовой металлической двери, а фундамент под каждый объемный блок образуют путем выполнения в грунте по контуру стен объемного блока и, по крайней мере, между одной парой противолежащих наружных стен его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки, на которой бетонируют образующие несущий армопояс железобетонные ленты с последующей установкой на них после набора бетоном требуемой прочности фундаментных блоков шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков на нулевой отметке грунта, обратной засыпкой траншеи и выполнением по верху фундаментных блоков армированной цементно-песчаной стяжки, после набора прочности которой устанавливают с опиранием на стяжку объемный блок, причем одну из железобетонных лент, образующих армопояс, расположенную параллельно одной паре противолежащих наружных стен объемного блока, размещают по одной из двух средних вертикальных плоскостей объемного блока, а остальные ленты, параллельные этой плоскости, - на равных расстояниях друг от друга, в полу каждого объемного блока образуют, по крайней мере, два технологических проема для пропуска соответствующих кабельных линий, а между фундаментными блоками - подполье, ограниченное его стенами.A block distribution point can be made of two or more transportable modules, each of which is made in the form of a volume unit, the base being prepared for all transportable modules forming a block distribution point, while each volume block is made primarily of a metal frame, insulated external walls, insulated the ceiling, floor, roof and at least one safe metal door, and the foundation for each volume unit is formed by performing in the ground along the contour of the of a volumetric block and at least between one pair of opposite external walls of its trenches expanding upwards, performing in the trenches a compacted sand cushion on which reinforced concrete belts bearing the armor belt are concreted, followed by installation on them after the concrete has been set up with the required strength of the foundation blocks with a width smaller than the width reinforced concrete tapes, with the location of the upper surface of the foundation blocks at zero ground level, backfilling of the trench and the execution of reinforcing foundation blocks on the top a cement-sand screed, after the strength has been set, a volume block is installed based on the screed, and one of the reinforced concrete tapes forming an arm belt, parallel to one pair of opposite external walls of the volume block, is placed along one of the two middle vertical planes of the volume block, and the rest tapes parallel to this plane - at equal distances from each other, in the floor of each volume unit form at least two technological openings for the passage of the corresponding cable x lines, and between the foundation blocks - the underground, limited by its walls.

Наружные стены объемного блока могут выполнять из трехслойных металлических панелей типа “сэндвич” с утеплителем предпочтительно из пенополиуретана, с двусторонней экологически безопасной окраской, а крышу выполняют предпочтительно из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя, причем профилированные металлические листы соединяют между собой комбинированными заклепками.The external walls of the volumetric block can be made of three-layer metal panels of the “sandwich” type with a heater, preferably polyurethane foam, with environmentally friendly two-sided painting, and the roof is preferably made of profiled metal sheets with zinc or aluminum-zinc coating and a layer of non-combustible insulation, and the profiled metal sheets are connected between themselves with combined rivets.

В части способа эксплуатации сети электроснабжения при реконструкции и/или возведении объектов транспортного комплекса района, города, мегаполиса поставленная задача решается за счет того, что он предусматривает, по крайней мере, частичную реконструкцию существующей сети электроснабжения реконструируемого объекта и/или возведение новой сети электроснабжения возводимого объекта, которые осуществляют путем подводки питающих кабельных линий от территориально разнесенных, по крайней мере, двух независимых источников питания к устанавливаемому в зоне реконструируемого и/или возводимого объекта на подготовленный фундамент блочному распределительному пункту в виде, по крайней мере, одного транспортабельного полной заводской готовности модуля - объемного, защищенного от атмосферных воздействий утепленного блока с соотношением длин пар противолежащих наружных стен, составляющим 1,0-1,45, и смонтированными в нем в виде двух взаимно резервирующих секций коммутационной аппаратуры и устройств защиты, причем указанное оборудование монтируют в заводских условиях или, по крайней мере, частично после установки объемного блока на фундамент, при этом объемный блок монтируют с возможностью последующего многократного использования путем снятия с фундамента перемещения и подключения в сетях электроснабжения других, в том числе возводимых вновь или реконструируемых объектов транспортного комплекса района, города, мегаполиса.Regarding the method of operating the power supply network during the reconstruction and / or construction of objects of the transport complex of a district, city, metropolis, the problem is solved due to the fact that it provides for at least a partial reconstruction of the existing power supply network of the reconstructed object and / or construction of a new power supply network facilities, which are carried out by connecting supply cable lines from geographically spaced at least two independent power sources to installed a block distribution point to be poured in the area of the reconstructed and / or constructed object onto the prepared foundation in the form of at least one transportable complete factory readiness of the module - a volumetric, weatherproofed insulated block with a ratio of lengths of pairs of opposite external walls of 1.0- 1.45, and mounted in it in the form of two mutually redundant sections of switching equipment and protection devices, and the specified equipment is mounted in the factory or, at the edge At least partially after the installation of the volume unit on the foundation, while the volume unit is mounted with the possibility of subsequent reuse by removing from the foundation the movement and connection of others, including newly constructed or reconstructed objects of the transport complex of the district, city, metropolis.

Блочный распределительный пункт могут выполнять с возможностью подключения, по меньшей мере, к двум дополнительным источникам электроэнергии от резервных центров питания также через соответствующие кабельные линии и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий, в каждой секции последовательно монтируют четыре выводные ячейки, по крайней мере, две вводные ячейки, ячейку под трансформатор собственных нужд и ячейку под трансформатор напряжения для контроля и измерения напряжения на секции и обеспечения работы автоматического ввода резервного питания между секциями, причем выводные и вводные ячейки оборудуют трансформаторами тока для измерения фазного тока и для измерения тока замыкания на землю, вводные, выводные ячейки и ячейки под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал, при этом указанные выше ячейки одного и того же функционального назначения в разных секциях выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей объемного блока, кроме того в одной из секций размещают ячейку секционного выключателя, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку секционного разъединителя, которую электрически соединяют с ячейкой секционного выключателя, причем ячейки устанавливают в объемном блоке с образованием преимущественно симметричных относительно той же средней вертикальной его плоскости проходов вдоль обращенных к этим ячейкам наружных стен объемного блока, при этом ячейку секционного выключателя выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания, которое содержит элементы отключения ввода питания кабельной линии электропередачи на аварийную секцию с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции ниже определенного уровня в одной, двух или трех фазах, систему блокировки при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию, систему автоматического включения секционного выключателя от блокконтактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию, устройства ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках для обеспечения принципа неразрывности цепи управления секционного выключателя при любом положении тележки отключенного выключателя ввода, причем блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции, неисправности в оперативных цепях, с обеспечением возможности выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.A block distribution point can be configured to connect to at least two additional sources of electricity from standby power centers also through the corresponding cable lines and to connect at least four cable outlet lines, four output cells are sequentially mounted in each section, each at least two input cells, a cell for an auxiliary transformer and a cell for a voltage transformer to control and measure the voltage on the sections and ensure The automatic input backup power supply between sections, with terminal and input cells being equipped with current transformers for measuring phase current and for measuring earth fault currents, input and output cells and cells for transformers provide maximum current protection against interphase short circuit with independent time delay with action to shutdown, as well as protection against earth faults with an independent time delay with action on the signal, while the above cells of the same functional the values in different sections are performed in pairs of the same type and place the same type of cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes of the volumetric block, in addition, in one of the sections the cell of the sectional switch is placed, and in the other section symmetrically to this cell relative to the same plane of the volumetric block the cell of the sectional disconnector is installed, which is electrically connected to the cell of the sectional switch, and the cells are installed in the volume unit with the formation of passages symmetrically relatively to the same average vertical plane along the outer walls of the volumetric unit facing these cells, while the sectional switch cell is made with a device for maximum current protection against interphase short circuit with an independent time delay with a trip action, as well as with an automatic input device backup power supply, which contains elements for disconnecting the power input of the cable power line to the emergency section with adjustable shutter speed voltage from 0 to 20 s when the voltage disappears or decreases in this section below a certain level in one, two or three phases, a blocking system when the device is used for overcurrent protection of the cable power line power input to the emergency section, the system for automatically activating the sectional switch from the input contact block circuit breaker without delay after disconnecting the power input of the cable power line to the emergency section, manual reset devices after automatic tripping, as well as control keys for two positions of automatic input of the backup power supply “input” - “output”, which are installed on the input cells to ensure the principle of continuity of the control circuit of the section switch at any position of the truck disconnected input switch, and the block distribution point is equipped with telemechanization systems, including remote control systems, telealarm systems and telemetry: positions of cable line switches, power transformers and sectional switch shorting to ground, on connecting cable lines of higher voltage, voltage on the buses of each section, malfunctions in operational circuits, ensuring the possibility of executing telecontrol commands by a power switch in each section, including TV switching and TV disconnecting and television measurement systems for cable load currents lines, power transformers and sectional voltage switch on the sections.

В качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения, преимущественно 10 кВ, в электроэнергию низшего напряжения, преимущественно 0,4 кВ, могут использовать преимущественно сухие трансформаторы мощностью по 40 кВА, каждый напряжением 10 ± 2 × 2,5% / 0,4 кВ.As transformers of their own needs for down-converting energy of higher voltage, mainly 10 kV, into electricity of low voltage, mainly 0.4 kV, they can use mainly dry transformers with a capacity of 40 kVA, each voltage of 10 ± 2 × 2.5% / 0, 4 kV.

Блочный распределительный пункт могут выполнять из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок выполняют преимущественно из металлического каркаса, утепленных наружных стен, утепленного потолка, пола, крыши и, по крайней мере, одной сейфовой металлической двери, а фундамент под каждый объемный блок образуют путем выполнения в грунте по контуру стен объемного блока и, по крайней мере, между одной парой противолежащих наружных стен его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки, на которой бетонируют образующие несущий армопояс железобетонные ленты с последующей установкой на них после набора бетоном требуемой прочности фундаментных блоков шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков на нулевой отметке грунта, обратной засыпкой траншеи и выполнением по верху фундаментных блоков армированной цементно-песчаной стяжки, после набора прочности которой устанавливают с опиранием на стяжку объемный блок, причем одну из железобетонных лент, образующих армопояс, расположенную параллельно одной паре противолежащих наружных стен объемного блока, размещают по одной из двух средних вертикальных плоскостей объемного блока, а остальные ленты, параллельные этой плоскости, - на равных расстояниях друг от друга, в полу каждого объемного блока образуют, по крайней мере, два технологических проема для пропуска соответствующих кабельных линий, а между фундаментными блоками - подполье, ограниченное его стенами.A block distribution point can be made of two or more transportable modules, each of which is made in the form of a volume unit, the base being prepared for all transportable modules forming a block distribution point, while each volume block is made primarily of a metal frame, insulated external walls, insulated the ceiling, floor, roof and at least one safe metal door, and the foundation for each volume unit is formed by performing in the ground along the contour of the of a volumetric block and at least between one pair of opposite external walls of its trenches expanding upwards, performing in the trenches a compacted sand cushion on which reinforced concrete belts bearing the armor belt are concreted, followed by installation on them after the concrete has been set up with the required strength of the foundation blocks with a width smaller than the width reinforced concrete tapes, with the location of the upper surface of the foundation blocks at zero ground level, backfilling of the trench and the execution of reinforcing foundation blocks on the top a cement-sand screed, after the strength has been set, a volume block is installed based on the screed, and one of the reinforced concrete tapes forming an arm belt, parallel to one pair of opposite external walls of the volume block, is placed along one of the two middle vertical planes of the volume block, and the rest tapes parallel to this plane - at equal distances from each other, in the floor of each volume unit form at least two technological openings for the passage of the corresponding cable x lines, and between the foundation blocks - the underground, limited by its walls.

Наружные стены объемного блока могут выполнять из трехслойных металлических панелей типа “сэндвич” с утеплителем, предпочтительно из пенополиуретана, с двусторонней экологически безопасной окраской, а крышу выполняют предпочтительно из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя, причем профилированные металлические листы соединяют между собой комбинированными заклепками.The external walls of the volumetric block can be made of three-layer metal panels of the “sandwich” type with insulation, preferably polyurethane foam, with environmentally friendly bilateral painting, and the roof is preferably made of profiled metal sheets with zinc or aluminum-zinc coating and a layer of non-combustible insulation, and profiled metal sheets interconnected by combined rivets.

Технический результат, обеспечиваемый всеми объектами изобретения, состоит в повышении экономичности энергоснабжения при одновременном обеспечении надежности и долговечности работы и упрощения обслуживания за счет оптимального конструирования объемных блоков, выполнения оптимального соотношения их параметров и оптимального размещения в них оборудования с учетом их функционального назначения, принятой системы и последовательности монтажа, а также последовательности и взаимного расположения ячеек в объемных блоках, компактности распределительного пункта и ускорения ввода его в эксплуатацию за счет сокращения объемов работ, производимых на месте возведения, в том числе и за счет оптимизации конструкции фундамента, на который объемный блок устанавливают.The technical result provided by all objects of the invention is to increase the efficiency of energy supply while ensuring reliability and durability and simplifying maintenance due to the optimal design of volume units, the optimal ratio of their parameters and the optimal placement of equipment in them, taking into account their functional purpose, adopted system and installation sequence, as well as the sequence and relative position of cells in the volume units, compactness aspredelitelnogo point and accelerate its commissioning by reducing the amount of work produced on the site of the construction, including by optimizing the design of the foundation on which the room unit is set.

Сущность изобретения поясняется чертежами, гдеThe invention is illustrated by drawings, where

на фиг.1 изображен блочный распределительный пункт в плане;figure 1 shows a block distribution point in the plan;

на фиг.2 - то же, вид по А-А на фиг.1;figure 2 is the same, a view along aa in figure 1;

на фиг.3 - то же, вид по Б-Б на фиг.1;figure 3 is the same, a view along BB in figure 1;

на фиг.4 - то же, принципиальная схема электроснабжения;figure 4 is the same circuit diagram of the power supply;

на фиг.5 - то же, план раскладки кабелей;figure 5 is the same, the layout of the cables;

на фиг.6 - то же, заземление;figure 6 is the same, grounding;

на фиг.7 - то же, схема расположения фундамента в плане;Fig.7 is the same, the layout of the foundation in the plan;

на фиг.8 - разрез по В-В на фиг.7;Fig.8 is a section along BB in Fig.7;

на фиг.9 - разрез по Г-Г на фиг.8;in Fig.9 is a section along G-G in Fig.8;

на фиг.10 - узел Д на фиг.8 и фиг.9;figure 10 - node D in Fig.8 and Fig.9;

на фиг.11 - схема расположения армопояса в плане;figure 11 - layout of the armo-belt in the plan;

на фиг.12 - разрез Е-Е на фиг.11;in Fig.12 - section EE in Fig.11;

на фиг.13 - схема расположения фундаментных блоков в плане;on Fig - arrangement of the foundation blocks in the plan;

на фиг.14 - схема расположения в плане армированной цементно-песчаной стяжки;on Fig - layout in terms of reinforced cement-sand screed;

на фиг.15 - разрез Ж-Ж на фиг.14.on Fig - section FJ in Fig.14.

Блочный распределительный пункт выполнен на базе, по крайней мере, одного транспортабельного модуля в виде объемного блока 1.The block distribution point is made on the basis of at least one transportable module in the form of a volume unit 1.

Одна пара противолежащих наружных стен 2 объемного блока 1 в пределах этого блока имеет длину, составляющую 1,0-1,45 длины противолежащих наружных стен 3 другой пары.One pair of opposing outer walls 2 of the volume unit 1 within this block has a length of 1.0-1.45 of the length of the opposing outer walls 3 of the other pair.

По крайней мере, в одном объемном блоке 1 смонтированы, по крайней мере, две секции 4 и 5 ячеек 6-23 с коммутационной аппаратурой и устройствами защиты. Указанное оборудование включает размещенные в ячейках 4 и 5 соответственно выводные 6-9 и15-18и вводные 10, 11 и 19, 20 ячейки, ячейки 12, 13, и 21, 22 под трансформаторы. Указанные ячейки последовательно сгруппированы в каждой секции 4 и 5 однонаправленно, начиная от торцов 24 секций 4 и 5, обращенных к одному и тому же торцу 25 объемного блока 1.At least one volume unit 1 is mounted at least two sections 4 and 5 cells 6-23 with switching equipment and protection devices. The specified equipment includes located in cells 4 and 5, respectively, output 6-9 and 15-18 and input 10, 11 and 19, 20 cells, cells 12, 13, and 21, 22 for transformers. These cells are sequentially grouped in each section 4 and 5 unidirectionally, starting from the ends of 24 sections 4 and 5, facing the same end 25 of the volume unit 1.

Указанные выше ячейки одного и того же функционального назначения выполнены в разных секциях 4 и 5 попарно однотипными и размещены зеркально симметрично относительно одной из двух средних вертикальных плоскостей 26 объемного блока 1.The above cells of the same functional purpose are made in different sections 4 and 5 in the same type and placed mirror symmetrically with respect to one of the two middle vertical planes 26 of the volume unit 1.

В зоне, обращенной к противолежащему торцу 27 объемного блока 1, в одной секции 4 размещена ячейка 14 секционного выключателя.In the area facing the opposite end 27 of the volume unit 1, in one section 4 there is a cell 14 of a sectional switch.

В другой секции 5 симметрично ячейке 14 секционного выключателя относительно той же плоскости 26 размещена электрически соединенная с ячейкой 14 секционного выключателя ячейка 23 секционного разъединителя.In another section 5, symmetrically to the cell 14 of the sectional switch relative to the same plane 26, the cell 23 of the sectionalizer is electrically connected to the cell 14 of the sectional switch.

Секции ячеек смонтированы с образованием преимущественно симметричных относительно той же плоскости объемного блока 1 проходов 28 вдоль обращенных к ним наружных стен 2 объемного блока 1.Cell sections are mounted with the formation of passages 28, mainly symmetrical with respect to the same plane of the volume block 1, along the outer walls 2 of the volume block 1 facing them.

В секции 4 торца 25 объемного блока смонтированы клеммный шкаф телемеханики 29, панель 30 освещения, обогрева и вентиляции, шкаф питания собственных нужд 31, цепи сигнализации и устройство для отыскания “земли” 32, а у стены 2 объемного блока 1 установлены устройство телемеханизации 33 и телефонный аппарат 34.In the section 4 of the end face 25 of the volume unit, a telemechanics terminal box 29, a lighting, heating and ventilation panel 30, auxiliary supply cabinet 31, alarm circuits and a device for finding the “earth” 32 are mounted, and a telemechanization device 33 and telephone set 34.

В секции 5 у торца 25 объемного блока 1 установлены шкафы учета 35.In section 5, at the end face 25 of the volume unit 1, metering cabinets 35 are installed.

Ячейки 6-23 выполнены с кабельными приставками 36.Cells 6-23 are made with cable consoles 36.

Блочный распределительный пункт подключен, по меньшей мере, к двум источникам 37 энергии постоянного электроснабжения через соответствующие кабельные линии 38 и выполнен с возможностью подключения, по меньшей мере, четырех отводящих кабельных линий 39.The block distribution point is connected to at least two sources of energy 37 constant power supply through the corresponding cable lines 38 and is configured to connect at least four outlet cable lines 39.

Блочный распределительный пункт выполнен с возможностью подключения, по меньшей мере, к двум дополнительным источникам 40 электроэнергии от резервных центров питания через соответствующие кабельные линии 41.The block distribution point is configured to connect to at least two additional sources of electricity 40 from the backup power centers through the corresponding cable lines 41.

Блочный распределительный пункт может быть выполнен на базе двух или более транспортабельных модулей, каждый из которых выполнен в виде объемного блока 1.A block distribution point can be made on the basis of two or more transportable modules, each of which is made in the form of a volume unit 1.

Выводные ячейки соответственно 6-9 и 15-18, вводные ячейки соответственно 10, 11 и 19, 20, ячейки 12 и 21 под трансформатор собственных нужд и ячейки 13 и 22 под трансформатор напряжения для контроля и измерения напряжения на секции 4 и 5 и обеспечения работы автоматического ввода 42 резервного питания между секциями 4 и 5 смонтированы в секциях последовательно.The output cells are 6–9 and 15–18, respectively, the input cells are 10, 11 and 19, 20, respectively, cells 12 and 21 for the auxiliary transformer and cells 13 and 22 for the voltage transformer for monitoring and measuring the voltage on sections 4 and 5 and providing automatic input operation 42 backup power between sections 4 and 5 are mounted in sections in series.

Выводные 6-9 и 15-18 и вводные ячейки 10, 11 и 19, 20 оборудованы трансформаторами тока 43 для измерения фазного тока и для измерения тока замыкания на землю.Output 6-9 and 15-18 and input cells 10, 11 and 19, 20 are equipped with current transformers 43 for measuring phase current and for measuring the earth fault current.

Вводные 10, 11 и 19, 20, выводные 6-9 и 15-18 ячейки и ячейки 12, 13 и 21, 22 под трансформаторы снабжены максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал (не показаны).Input 10, 11 and 19, 20, output 6-9 and 15-18 cells and cells 12, 13 and 21, 22 for transformers are equipped with maximum current protection against interphase short circuit with independent time delay with shutdown action, as well as protection against earth faults with an independent time delay with an action on the signal (not shown).

Ячейка 14 секционного выключателя выполнена с устройством (не показано) максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода 42 резервного питания.The cell 14 of the sectional switch is made with a device (not shown) for maximum current protection against interphase short circuit with an independent time delay with a trip effect, as well as with an automatic input 42 backup power supply.

Устройство автоматического ввода 42 резервного питания содержит элементы (не показаны) отключения ввода питания кабельной линии электропередачи на аварийную секцию с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции ниже определенного уровня в одной, двух или трех фазах, систему блокировки (не показана) при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию. Также устройство автоматического ввода 42 резервного питания содержит систему (не показана) автоматического включения секционного выключателя 44 от блокконтактов вводного выключателя (не показан) без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию 4 или 5, устройства (не показаны) ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления (не показаны) на два положения автоматического ввода резервного питания “введен” - “выведен”, установленные на вводных ячейках 10, 11 и 19, 20 для обеспечения принципа неразрывности цепи управления секционного выключателя 44 при любом положении тележки отключенного выключателя ввода (не показано).The automatic backup power input device 42 contains elements (not shown) for disconnecting the power input of the cable power line to the emergency section with an adjustable time delay from 0 to 20 s when the voltage disappears or decreases below a certain level in one, two or three phases, the system blocking (not shown) during operation of the overcurrent protection device for power input of the cable power line to the emergency section. Also, the automatic input device 42 of the backup power supply includes a system (not shown) for automatically turning on the sectional switch 44 from the contact contacts of the input switch (not shown) without delay after disconnecting the power input of the cable power line to emergency section 4 or 5, devices (not shown) for manual reset to the initial position after automatic operation, as well as control keys (not shown) for two positions of automatic input of backup power “entered” - “displayed”, installed cells on input 10, 11 and 19, 20 for ensuring the continuity at any position of the principle of the control circuit section switch trolley 44 disconnected input switch (not shown).

Системы телемеханизации 33 включают системы телеуправления, телесигнализации и телеизмерения.Telemechanization systems 33 include telecontrol, tele-alarm and telemetry systems.

Телесигнализация обеспечивает положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя, замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции, неисправности в оперативных цепях.The telealarm system provides the positions of the cable line switches, power transformers and the section switch, ground faults, the connection of higher voltage cable lines, the presence of voltage on the buses of each section, and malfunctions in operational circuits.

Телеуправление обеспечивает возможность выполнения команд силовым выключателем в каждой секции, в том числе телевключение и телеотключение, и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.Telecontrol provides the ability to execute commands with a power switch in each section, including TV and TV shutdowns, and telemetry systems for load currents of cable lines, power transformers and a sectional voltage switch on the sections.

В качестве трансформаторов для понизительного преобразования энергии высшего напряжения, преимущественно 10 кВ, в электроэнергию низшего напряжения, преимущественно 0,4 кВ, используют преимущественно сухие трансформаторы мощностью по 40 кВА, каждый напряжением 10 ± 2 × 2,5% / 0,4 кВ.Preferably dry transformers with a capacity of 40 kVA, each with a voltage of 10 ± 2 × 2.5% / 0.4 kV, are used as transformers for down-converting high-voltage energy, mainly 10 kV, to low-voltage electricity, mainly 0.4 kV.

Объемный блок 1 смонтирован на фундаменте 45. Фундамент 45 выполнен в виде заглубленного в грунт, расположенного в расширяющейся кверху траншее 46 на уплотненной песчаной подушке 47 несущего армопояса 48, образованного железобетонными лентами 49, расположенными по периметру наружных стен 2, 3 объемного блока 1 и параллельно, по крайней мере, одной паре 3 противолежащих из них, а также установленных на армопоясе 48 также заглубленных в грунт фундаментных блоков 50 шириной, меньшей ширины армопояса 48, и выполненной по верху фундаментных блоков 50 на отметке дневной поверхности армированной цементно-песчаной стяжки 51.The volumetric block 1 is mounted on the foundation 45. The foundation 45 is made in the form of a buried in soil located in a trench 46 expanding upward on a compacted sand cushion 47 of a load-bearing arm belt 48 formed by reinforced concrete tapes 49 located along the perimeter of the outer walls 2, 3 of volumetric block 1 and in parallel of at least one pair of 3 opposite of them, as well as of foundation blocks 50, which are also buried in the ground, and are also buried in the ground foundation blocks 50 with a width smaller than the width of armopoyas 48 and made on top of the foundation blocks 50 etke day surface of reinforced cement-sand screed 51.

В траншее 46 поверх песчаной подушки 47 расположена грунтовая засыпка 52 до уровня низа фундаментных блоков 50, а между фундаментными блоками 50 образовано подполье 53 со стенами 54.In a trench 46, a soil backfill 52 is located on top of the sand cushion 47 to the bottom of the foundation blocks 50, and underground 53 with the walls 54 is formed between the foundation blocks 50.

Одна из железобетонных лент 49, образующих армопояс 48, расположенная параллельно одной паре противолежащих стен 3 объемного блока 1, размещена по одной из двух средних вертикальных плоскостей 55 объемного блока 1, а остальные ленты 49 параллельные этой плоскости 55 - на равных расстояниях друг от друга.One of the reinforced concrete tapes 49 forming armopoyas 48 located parallel to one pair of opposing walls 3 of the volume unit 1 is placed along one of the two middle vertical planes 55 of the volume unit 1, and the remaining tapes 49 parallel to this plane 55 are at equal distances from each other.

Каждый объемный блок 1 состоит преимущественно из металлического каркаса (не показан), утепленных наружных стен 2 и 3, утепленного потолка 56, пола 57, крыши 58 и, по крайней мере, одной сейфовой металлической двери 59.Each volume unit 1 consists mainly of a metal frame (not shown), insulated outer walls 2 and 3, insulated ceiling 56, floor 57, roof 58 and at least one safe metal door 59.

Наружные стены выполнены из трехслойных металлических панелей типа “сэндвич” с утеплителем (не показаны), предпочтительно из пенополиуретана, с двусторонней экологически безопасной окраской.The external walls are made of three-layer metal panels of the “sandwich” type with insulation (not shown), preferably polyurethane foam, with environmentally friendly two-sided painting.

Крыша выполнена предпочтительно из профилированных металлических листов (не показано) с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя (не показано).The roof is preferably made of profiled metal sheets (not shown) with a zinc or aluminum-zinc coating and a layer of non-combustible insulation (not shown).

Профилированные металлические листы соединены между собой комбинированными заклепками (не показаны).Profiled metal sheets are interconnected by combined rivets (not shown).

Способ эксплуатации сети электроснабжения района, города, мегаполиса осуществляют следующим образом:The method of operation of the electricity network of the district, city, metropolis is as follows:

При, по крайней мере, частичной реконструкции существующей сети электроснабжения и/или возведении новой региональной сети электроснабжения осуществляют подводку питающих кабельных линий 38 от территориально разнесенных, по крайней мере, двух независимых источников 37 питания к устанавливаемому на подготовленный фундамент 45 блочному распределительному пункту. Блочный распределительный пункт выполняют в виде, по крайней мере, одного транспортабельного полной заводской готовности модуля - объемного, защищенного от атмосферных воздействий утепленного блока 1 с соотношением длин пар противолежащих наружных стен 2 и 3, составляющим соответственно 1,0-1,45.With at least partial reconstruction of the existing power supply network and / or the construction of a new regional power supply network, supply cable lines 38 from at least two independent power sources 37 to the block distribution point installed on the prepared foundation 45 are connected. A block distribution point is made in the form of at least one transportable complete factory readiness of the module - a volumetric, weatherproofed insulated block 1 with a ratio of the lengths of pairs of opposite external walls 2 and 3, respectively 1.0-1.45.

В объемном блоке 1 смонтированы, по крайней мере, две секции 4 и 5 ячеек с обеспечивающей равномерное распределение нагрузки потребителей по секциям коммутационной аппаратурой и устройствами защиты. Или, по крайней мере, часть указанного оборудования монтируют после установки объемного блока 1 на фундамент 45.In the volume unit 1, at least two sections of 4 and 5 cells are mounted with a uniform load distribution of consumers across sections of switching equipment and protection devices. Or, at least part of the specified equipment is mounted after installing the volume unit 1 on the foundation 45.

Объемный блок 1 монтируют с возможностью последующего многократного использования путем снятия с фундамента 45, перемещения и подключения в сетях электроснабжения других, в том числе возводимых вновь или реконструируемых объектов района, города, мегаполиса.The volume unit 1 is mounted with the possibility of subsequent reuse by removing from the foundation 45, moving and connecting others, including newly constructed or reconstructed objects of the district, city, metropolis, in the power supply networks.

Блочный распределительный пункт выполняют с возможностью подключения, по меньшей мере, к двум дополнительным источникам 40 электроэнергии от резервных центров питания также через соответствующие кабельные линии 41 и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий 39.The block distribution point is configured to connect to at least two additional sources of electric power 40 from the backup power centers also through the corresponding cable lines 41 and to connect at least four cable outlet lines 39.

В каждой секции 4 и 5 последовательно монтируют четыре выводные ячейки 6-9 и15-18 соответственно, по крайней мере, две вводные ячейки соответственно 10, 11 и 19, 20, ячейку 12 и 21 под трансформатор собственных нужд и ячейку 13 и 23 под трансформатор напряжения для контроля и измерения напряжения на секции 4 или 5 и обеспечения работы автоматического ввода 42 резервного питания между секциями 4 и 5.In each section 4 and 5, four output cells 6–9 and 15–18 are mounted in series, respectively, at least two input cells, respectively 10, 11 and 19, 20, cell 12 and 21 for the auxiliary transformer and cell 13 and 23 for the transformer voltage for monitoring and measuring voltage on sections 4 or 5 and ensuring the operation of automatic input 42 backup power between sections 4 and 5.

Выводные 6-9 и 15-18 и вводные 10, 11 и 19, 20 ячейки оборудуют трансформаторами тока 43 для измерения фазного тока и для измерения тока замыкания на землю. Вводные 10, 11 и 19, 20, выводные 6-9 и 15-18 ячейки и ячейки 12, 21 и 13, 23 под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал (не показано).Output 6-9 and 15-18 and input 10, 11 and 19, 20 cells are equipped with current transformers 43 for measuring phase current and for measuring the earth fault current. Input 10, 11 and 19, 20, output 6-9 and 15-18 cells and cells 12, 21 and 13, 23 for transformers provide maximum current protection against interphase short circuit with independent time delay with shutdown action, as well as protection against earth faults with an independent time delay with action on the signal (not shown).

Указанные выше ячейки одного и того же функционального назначения в разных секциях 4 и 5 выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей 26 объемного блока 1.The above-mentioned cells of the same functional purpose in different sections 4 and 5 are performed in pairs of the same type and place the same type of cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes 26 of the volumetric block 1.

В одной из секций размещают ячейку 14 секционного выключателя 44, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку 23 секционного разъединителя, которую электрически соединяют с ячейкой 14 секционного выключателя 44.In one of the sections, the cell 14 of the sectional switch 44 is placed, and in the other section symmetrically to this cell relative to the same plane of the volumetric block, the cell 23 of the sectionalizer is installed, which is electrically connected to the cell 14 of the sectional switch 44.

Ячейки 6-23 устанавливают в объемном блоке 1 с образованием преимущественно симметричных относительно той же средней вертикальной его плоскости 26 проходов 28 вдоль обращенных к этим ячейкам наружных стен 2 объемного блока 1.Cells 6-23 are installed in the volumetric block 1 with the formation of passages 28 predominantly symmetrical with respect to the same average vertical plane 26 thereof along the outer walls 2 of the volumetric block 1 facing these cells.

Ячейку 14 секционного выключателя 44 выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания.The cell 14 of the sectional switch 44 is performed with a device of maximum current protection against interphase short circuit with an independent time delay with a trip effect, as well as with a device for automatically entering backup power.

Устройство автоматического ввода резервного питания содержит элементы (не показано) отключения ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5 с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции 4 и 5 ниже определенного уровня в одной, двух или трех фазах.The automatic backup power input device contains elements (not shown) for disconnecting the power input of the cable power line to the emergency section 4 and 5 with adjustable time delay from 0 to 20 s when the voltage disappears or decreases in this section 4 and 5 below a certain level in one, two or three phases.

Также устройство автоматического ввода резервного питания содержит систему блокировки (не показано) при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5, систему автоматического включения секционного выключателя 44 от блокконтактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5.The automatic backup power input device also contains a blocking system (not shown) during operation of the overcurrent protection device for the cable power line power input for the emergency section 4 and 5, the system for automatically turning on the section switch 44 from the contact contacts of the power switch without delaying after disconnecting the cable power input power transmission to emergency section 4 and 5.

Также имеются устройства (не показано) ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления (не показано) на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках 10, 11 и 19, 20 для обеспечения принципа неразрывности цепи управления секционного выключателя 44 при любом положении тележки отключенного выключателя ввода.There are also devices (not shown) for manual reset to the initial position after automatic operation, as well as control keys (not shown) for two positions of automatic input of the backup power supply “input” - “output”, which are installed on input cells 10, 11 and 19, 20 to ensure the principle of continuity of the control circuit of the sectional switch 44 at any position of the trolley of the disconnected input switch.

Блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции 4 и 5, неисправности в оперативных цепях. Обеспечивается возможность выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.The block distribution point is equipped with telemechanization systems, including remote control, tele-signaling and telemetry systems: the positions of the cable line switches, power transformers and the sectional ground circuit breaker, the connection of higher voltage cable lines, the voltage on the buses of each section 4 and 5, malfunctions in operational circuits. It is possible to execute telecontrol commands by a power switch in each section, including TV and TV shutdowns and telemetry systems for load currents of cable lines, power transformers and a sectional voltage switch on sections.

В качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения, преимущественно 10 кВ, в электроэнергию низшего напряжения, преимущественно 0,4 кВ используют преимущественно сухие трансформаторы мощностью по 40 кВА, каждый напряжением 10 ± 2 × 2,5% / 0,4 кВ.As auxiliary transformers for down-converting high-voltage energy, mainly 10 kV, into low-voltage electricity, mainly 0.4 kV, dry transformers with a power of 40 kVA are used, each with a voltage of 10 ± 2 × 2.5% / 0.4 kV .

Блочный распределительный пункт выполняют из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока 1, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок 1 выполняют преимущественно из металлического каркаса (не показано), утепленных наружных стен 2 и 3, утепленного потолка 56, пола 57, крыши 58 и, по крайней мере, одной сейфовой металлической двери 59.A block distribution point is made of two or more transportable modules, each of which is in the form of a volume unit 1, the base being prepared for all transportable modules forming a block distribution point, while each volume block 1 is mainly made of a metal frame (not shown), insulated outer walls 2 and 3, insulated ceiling 56, floor 57, roof 58 and at least one safe metal door 59.

Фундамент 45 под каждый объемный блок образуют путем выполнения в грунте по контуру стен 2 и 3 объемного блока 1 и, по крайней мере, между одной парой противолежащих наружных стен 3 его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки 47, на которой бетонируют образующие несущий армопояс 48 железобетонные ленты 49. После набора бетоном требуемой прочности на них устанавливают фундаментные блоки 50 шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков 50 на нулевой отметке грунта.The foundation 45 for each volume unit is formed by performing in the soil along the contour of the walls 2 and 3 of the volume unit 1 and at least between one pair of opposite external walls 3 of its trenches expanding upwards, performing compacted sand cushion 47 in the trenches, on which the generators are concreted reinforcing belt 48 reinforced concrete tapes 49. After the concrete has set the required strength, foundation blocks 50 with a width smaller than the width of reinforced concrete tapes are installed on them, with the upper surface of the foundation blocks 50 being at zero from ground label.

Затем производят обратную засыпку 52 траншеи 46 и выполнением по верху фундаментных блоков 50 армированной цементно-песчаной стяжки 51. После набора прочности цементно-песчаной стяжки 51 устанавливают с опиранием на нее объемный блок 1.Then, backfill 52 of the trench 46 is carried out and reinforced cement-sand screed 51 is formed on top of the foundation blocks 50. After the cement-sand screed 51 has set strength, a volume block 1 is mounted on it.

Одну из железобетонных лент 49, образующую армопояс 48, расположенную параллельно одной паре противолежащих наружных стен 3 объемного блока 1, размещают по одной из двух средних вертикальных плоскостей 55 объемного блока 1. Остальные ленты 49, параллельные этой плоскости 55, - на равных расстояниях друг от друга. В полу каждого объемного блока 1 образуют, по крайней мере, два технологических проема 60 для пропуска соответствующих кабельных линий. Между фундаментными блоками 50 образуют подполье, ограниченное стенами 2 и 3 объемного блока 1.One of the reinforced concrete tapes 49, forming armopoyas 48, located parallel to one pair of opposite external walls 3 of the volume unit 1, is placed along one of the two middle vertical planes 55 of the volume unit 1. The remaining tapes 49, parallel to this plane 55, are at equal distances from friend. At least two technological openings 60 are formed in the floor of each volume unit 1 for passing through the corresponding cable lines. Between the foundation blocks 50 form an underground limited by the walls 2 and 3 of the volume block 1.

Наружные стены 2 и 3 объемного блока 1 выполняют из трехслойных металлических панелей типа “сэндвич” с утеплителем (не показано), предпочтительно из пенополиуретана, с двусторонней экологически безопасной окраской. Крышу 58 выполняют предпочтительно из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя (на чертежах не показано). Причем профилированные металлические листы соединяют между собой комбинированными заклепками (не показано).The outer walls 2 and 3 of the volume unit 1 are made of three-layer metal panels of the “sandwich” type with a heater (not shown), preferably polyurethane foam, with environmentally friendly two-sided painting. The roof 58 is preferably made of profiled metal sheets with zinc or aluminum-zinc coating and a layer of non-combustible insulation (not shown in the drawings). Moreover, the profiled metal sheets are interconnected by combined rivets (not shown).

Способ эксплуатации сети электроснабжения при возведении строительных объектов района, города, мегаполиса осуществляют следующим образом:The method of operation of the power supply network during the construction of construction facilities of the district, city, metropolis is as follows:

При, по крайней мере, частичной реконструкции существующей сети электроснабжения осуществляют подводку к возводимому строительному объекту новых питающих кабельных линий 38 от территориально разнесенных, независимых, не менее чем двух источников 37 питания.In case of at least partial reconstruction of the existing power supply network, new supply cable lines 38 are supplied from the territorially spaced, independent, at least two power sources 37 to the constructed construction site.

На предварительно подготовленный фундамент 45 устанавливают блочный распределительный пункт в виде, по крайней мере, одного объемного защищенного от атмосферных осадков утепленного блока 1 полной заводской готовности с соотношением длин одной 2 и другой пар 3 противолежащих наружных стен, составляющим 1,0-1,45.On the previously prepared foundation 45, a block distribution point is installed in the form of at least one volumetric fully weatherproof insulated block 1 of complete factory readiness with a ratio of the lengths of one 2 and the other pairs 3 of opposing outer walls of 1.0-1.45.

В объемном блоке смонтировано в заводских условиях электротехническое и вспомогательное оборудование блочного распределительного пункта. Или, по крайней мере, часть указанного оборудования монтируют в объемном блоке 1 после установки его на фундаменте 45. Указанное оборудование размещают в двух взаимно резервирующих секциях 4 и 5. Объемный блок 1 устанавливают на фундаменте 45 с возможностью последующего многократного использования путем снятия с фундамента 45, перемещения и подключения в сетях электроснабжения других строительных объектов района, города, мегаполиса.The electrical unit and auxiliary equipment of the block distribution point are mounted in the volume unit in the factory. Or, at least part of the specified equipment is mounted in the volumetric block 1 after installing it on the foundation 45. The specified equipment is placed in two mutually redundant sections 4 and 5. The volumetric block 1 is installed on the foundation 45 with the possibility of subsequent reuse by removal from the foundation 45 , moving and connecting to the power supply networks of other construction projects of the district, city, metropolis.

Блочный распределительный пункт выполняют с возможностью подключения, по меньшей мере, к двум дополнительным источникам 40 электроэнергии от резервных центров питания также через соответствующие кабельные линии 41 и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий 39.The block distribution point is configured to connect to at least two additional sources of electric power 40 from the backup power centers also through the corresponding cable lines 41 and to connect at least four cable outlet lines 39.

В каждой секции 4 и 5 последовательно монтируют четыре выводные ячейки 6-9 и 15-18 соответственно, по крайней мере, две вводные ячейки соответственно 10, 11 и 19, 20, ячейку 12 и 21 под трансформатор собственных нужд и ячейку 13 и 23 под трансформатор напряжения для контроля и измерения напряжения на секции 4 или 5 и обеспечения работы автоматического ввода 42 резервного питания между секциями 4 и 5.In each section 4 and 5, four output cells 6–9 and 15–18 are successively mounted, respectively, at least two input cells, respectively 10, 11 and 19, 20, cell 12 and 21 for the auxiliary transformer and cell 13 and 23 under voltage transformer for monitoring and measuring voltage on sections 4 or 5 and ensuring the operation of automatic input 42 backup power between sections 4 and 5.

Выводные 6-9 и 15-18 и вводные 10, 11 и 19, 20 ячейки оборудуют трансформаторами тока 43 для измерения фазного тока и для измерения тока замыкания на землю. Вводные 10, 11 и 19, 20, выводные 6-9 и15-18 ячейки и ячейки 12, 21 и 13, 23 под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал (не показано).Output 6-9 and 15-18 and input 10, 11 and 19, 20 cells are equipped with current transformers 43 for measuring phase current and for measuring the earth fault current. Input 10, 11 and 19, 20, output 6-9 and 15-18 cells and cells 12, 21 and 13, 23 for transformers provide maximum current protection against interphase short circuit with an independent time delay with a trip effect, as well as protection against short circuits to earth with an independent time delay with an action on the signal (not shown).

Указанные выше ячейки одного и того же функционального назначения в разных секциях 4 и 5 выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей 26 объемного блока 1.The above-mentioned cells of the same functional purpose in different sections 4 and 5 are performed in pairs of the same type and place the same type of cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes 26 of the volumetric block 1.

В одной из секций размещают ячейку 14 секционного выключателя 44, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку 23 секционного разъединителя, которую электрически соединяют с ячейкой 14 секционного выключателя 44.In one of the sections, the cell 14 of the sectional switch 44 is placed, and in the other section symmetrically to this cell relative to the same plane of the volumetric block, the cell 23 of the sectionalizer is installed, which is electrically connected to the cell 14 of the sectional switch 44.

Ячейки 6-23 устанавливают в объемном блоке 1 с образованием преимущественно симметричных относительно той же средней вертикальной его плоскости 26 проходов 28 вдоль обращенных к этим ячейкам наружных стен 2 объемного блока 1.Cells 6-23 are installed in the volumetric block 1 with the formation of passages 28 predominantly symmetrical with respect to the same average vertical plane 26 thereof along the outer walls 2 of the volumetric block 1 facing these cells.

Ячейку 14 секционного выключателя 44 выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания.The cell 14 of the sectional switch 44 is performed with a device of maximum current protection against interphase short circuit with an independent time delay with a trip effect, as well as with a device for automatically entering backup power.

Устройство автоматического ввода резервного питания содержит элементы (не показано) отключения ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5 с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции 4 и 5 ниже определенного уровня в одной, двух или трех фазах.The automatic backup power input device contains elements (not shown) for disconnecting the power input of the cable power line to the emergency section 4 and 5 with adjustable time delay from 0 to 20 s when the voltage disappears or decreases in this section 4 and 5 below a certain level in one, two or three phases.

Также устройство автоматического ввода резервного питания содержит систему блокировки (не показано) при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5, систему автоматического включения секционного выключателя 44 от блокконтактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5.The automatic backup power input device also contains a blocking system (not shown) during operation of the overcurrent protection device for the cable power line power input for the emergency section 4 and 5, the system for automatically turning on the section switch 44 from the contact contacts of the power switch without delaying after disconnecting the cable power input power transmission to emergency section 4 and 5.

Также имеются устройства (не показано) ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления (не показано) на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках 10, 11 и 19, 20 для обеспечения принципа неразрывности цепи управления секционного выключателя 44 при любом положении тележки отключенного выключателя ввода.There are also devices (not shown) for manual reset to the initial position after automatic operation, as well as control keys (not shown) for two positions of automatic input of the backup power supply “input” - “output”, which are installed on input cells 10, 11 and 19, 20 to ensure the principle of continuity of the control circuit of the sectional switch 44 at any position of the trolley of the disconnected input switch.

Блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции 4 и 5, неисправности в оперативных цепях. Обеспечивается возможность выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.The block distribution point is equipped with telemechanization systems, including remote control, tele-signaling and telemetry systems: the positions of the cable line switches, power transformers and the sectional ground circuit breaker, the connection of higher voltage cable lines, the voltage on the buses of each section 4 and 5, malfunctions in operational circuits. It is possible to execute telecontrol commands by a power switch in each section, including TV and TV shutdowns and telemetry systems for load currents of cable lines, power transformers and a sectional voltage switch on sections.

В качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения, преимущественно 10 кВ, в электроэнергию низшего напряжения, преимущественно 0,4 кВ, используют преимущественно сухие трансформаторы мощностью по 40 кВА, каждый напряжением 10 ± 2 × 2,5% / 0,4 кВ.As auxiliary transformers for down-converting high-voltage energy, mainly 10 kV, into low-voltage electricity, mainly 0.4 kV, dry transformers with a power of 40 kVA each, with a voltage of 10 ± 2 × 2.5% / 0.4 are used kV

Блочный распределительный пункт выполняют из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока 1, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок 1 выполняют преимущественно из металлического каркаса (не показано), утепленных наружных стен 2 и 3, утепленного потолка 56, пола 57, крыши 58 и, по крайней мере, одной сейфовой металлической двери 59.A block distribution point is made of two or more transportable modules, each of which is in the form of a volume unit 1, the base being prepared for all transportable modules forming a block distribution point, while each volume block 1 is mainly made of a metal frame (not shown), insulated outer walls 2 and 3, insulated ceiling 56, floor 57, roof 58 and at least one safe metal door 59.

Фундамент 45 под каждый объемный блок образуют путем выполнения в грунте по контуру стен 2 и 3 объемного блока 1 и, по крайней мере, между одной парой противолежащих наружных стен 3 его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки 47, на которой бетонируют образующие несущий армопояс 48 железобетонные ленты 49.The foundation 45 for each volume unit is formed by performing in the soil along the contour of the walls 2 and 3 of the volume unit 1 and at least between one pair of opposite external walls 3 of its trenches expanding upwards, performing compacted sand cushion 47 in the trenches, on which the generators are concreted armor-bearing 48 reinforced concrete belts 49.

После набора бетоном требуемой прочности на них устанавливают фундаментные блоки 50 шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков 50 на нулевой отметке грунта. Затем производят обратную засыпку 52 траншеи 46 и выполнением по верху фундаментных блоков 50 армированной цементно-песчаной стяжки 51. После набора прочности цементно-песчаной стяжки 51 устанавливают с опиранием на нее объемный блок 1.After the concrete has set the required strength, foundation blocks 50 with a width smaller than the width of reinforced concrete strips are installed on them, with the top surface of the foundation blocks 50 located at the ground zero. Then, backfill 52 of the trench 46 is carried out and reinforced cement-sand screed 51 is formed on top of the foundation blocks 50. After the cement-sand screed 51 has set strength, a volume block 1 is mounted on it.

Одну из железобетонных лент 49, образующих армопояс 48, расположенную параллельно одной паре противолежащих наружных стен 3 объемного блока 1, размещают по одной из двух средних вертикальных плоскостей 55 объемного блока 1. Остальные ленты 49, параллельные этой плоскости 55, - на равных расстояниях друг от друга. В полу каждого объемного блока 1 образуют, по крайней мере, два технологических проема 60 для пропуска соответствующих кабельных линий. Между фундаментными блоками 50 образуют подполье, ограниченное стенами 2 и 3 объемного блока 1.One of the reinforced concrete tapes 49 forming armopoyas 48, located parallel to one pair of opposite external walls 3 of the volume unit 1, is placed along one of the two middle vertical planes 55 of the volume unit 1. The remaining tapes 49, parallel to this plane 55, are at equal distances from friend. At least two technological openings 60 are formed in the floor of each volume unit 1 for passing through the corresponding cable lines. Between the foundation blocks 50 form an underground limited by the walls 2 and 3 of the volume block 1.

Наружные стены 2 и 3 объемного блока 1 выполняют из трехслойных металлических панелей типа “сэндвич” с утеплителем (не показано), предпочтительно из пенополиуретана, с двусторонней экологически безопасной окраской. Крышу 58 выполняют предпочтительно из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя (на чертежах не показано). Причем профилированные металлические листы соединяют между собой комбинированными заклепками (не показано).The outer walls 2 and 3 of the volume unit 1 are made of three-layer metal panels of the “sandwich” type with a heater (not shown), preferably polyurethane foam, with environmentally friendly two-sided painting. The roof 58 is preferably made of profiled metal sheets with zinc or aluminum-zinc coating and a layer of non-combustible insulation (not shown in the drawings). Moreover, the profiled metal sheets are interconnected by combined rivets (not shown).

Способ эксплуатации сети электроснабжения при ремонте и/или реконструкции здания, сооружения, комплекса заданий, сооружений, объектов промышленного комплекса осуществляют следующим образом:The method of operation of the power supply network during the repair and / or reconstruction of a building, structure, complex of tasks, structures, objects of the industrial complex is as follows:

Производят реконструкцию, по крайней мере, части питающей и распределительной сети электроснабжения ремонтируемого объекта и/или реконструируемого здания, сооружения, комплекса заданий, сооружений, объектов промышленного комплекса. При этом осуществляют подводку питающих кабельных линий 38 от территориально разнесенных независимых, по крайней мере, двух источников 37 питания к устанавливаемому в зоне ремонтируемого и/или реконструируемого объекта на подготовленный фундамент 45 блочному распределительному пункту.At least part of the power supply and distribution network of the power supply of the repaired object and / or the reconstructed building, structure, task complex, structure, industrial complex is reconstructed. At the same time, supply cable lines 38 are supplied from territorially spaced independent at least two power sources 37 to a block distribution point installed in the area of the repaired and / or reconstructed object onto the prepared foundation 45.

Блочный распределительный пункт выполняют в виде, по крайней мере, одного транспортабельного полной заводской готовности модуля - объемного, защищенного от атмосферных воздействий утепленного блока 1 с соотношением длин пар противолежащих наружных стен 2 и 3, составляющим 1,0-1,45. В нем смонтированы в виде двух взаимно резервирующих секций 4 и 5 коммутационной аппаратуры и устройств защиты. Указанное оборудование монтируют в заводских условиях или, по крайней мере, частично после установки объемного блока 1 на фундамент 45.A block distribution point is made in the form of at least one transportable complete factory readiness of the module - a volumetric, weatherproofed insulated block 1 with a parity of lengths of pairs of opposite external walls 2 and 3 of 1.0-1.45. It is mounted in the form of two mutually redundant sections 4 and 5 of switching equipment and protection devices. The specified equipment is mounted in the factory or, at least partially, after the installation of the volume unit 1 on the foundation 45.

Объемный блок 1 монтируют с возможностью последующего многократного использования путем снятия с фундамента 45 перемещения и подключения в сетях электроснабжения других, в том числе ремонтируемых и/или реконструируемых объектов.The volume unit 1 is mounted with the possibility of subsequent reuse by removing from the foundation 45 the movement and connection in the power supply networks of other, including repaired and / or reconstructed objects.

Блочный распределительный пункт выполняют с возможностью подключения, по меньшей мере, к двум дополнительным источникам 40 электроэнергии от резервных центров питания также через соответствующие кабельные линии 41 и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий 39.The block distribution point is configured to connect to at least two additional sources of electric power 40 from the backup power centers also through the corresponding cable lines 41 and to connect at least four cable outlet lines 39.

В каждой секции 4 и 5 последовательно монтируют четыре выводные ячейки 6-9 и 15-18 соответственно, по крайней мере, две вводные ячейки соответственно 10, 11 и 19, 20, ячейку 12 и 21 под трансформатор собственных нужд и ячейку 13 и 23 под трансформатор напряжения для контроля и измерения напряжения на секции 4 или 5 и обеспечения работы автоматического ввода 42 резервного питания между секциями 4 и 5.In each section 4 and 5, four output cells 6–9 and 15–18 are successively mounted, respectively, at least two input cells, respectively 10, 11 and 19, 20, cell 12 and 21 for the auxiliary transformer and cell 13 and 23 under voltage transformer for monitoring and measuring voltage on sections 4 or 5 and ensuring the operation of automatic input 42 backup power between sections 4 and 5.

Выводные 6-9 и 15-18 и вводные 10, 11 и 19, 20 ячейки оборудуют трансформаторами тока 43 для измерения фазного тока и для измерения тока замыкания на землю. Вводные 10, 11 и 19, 20, выводные 6-9 и 15-18 ячейки и ячейки 12, 21 и 13, 23 под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал (не показано).Output 6-9 and 15-18 and input 10, 11 and 19, 20 cells are equipped with current transformers 43 for measuring phase current and for measuring the earth fault current. Input 10, 11 and 19, 20, output 6-9 and 15-18 cells and cells 12, 21 and 13, 23 for transformers provide maximum current protection against interphase short circuit with independent time delay with shutdown action, as well as protection against earth faults with an independent time delay with action on the signal (not shown).

Указанные выше ячейки одного и того же функционального назначения в разных секциях 4 и 5 выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей 26 объемного блока 1.The above-mentioned cells of the same functional purpose in different sections 4 and 5 are performed in pairs of the same type and place the same type of cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes 26 of the volumetric block 1.

В одной из секций размещают ячейку 14 секционного выключателя 44, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку 23 секционного разъединителя, которую электрически соединяют с ячейкой 14 секционного выключателя 44.In one of the sections, the cell 14 of the sectional switch 44 is placed, and in the other section symmetrically to this cell relative to the same plane of the volumetric block, the cell 23 of the sectionalizer is installed, which is electrically connected to the cell 14 of the sectional switch 44.

Ячейки 6-23 устанавливают в объемном блоке 1 с образованием преимущественно симметричных относительно той же средней вертикальной его плоскости 26 проходов 28 вдоль обращенных к этим ячейкам наружных стен 2 объемного блока 1.Cells 6-23 are installed in the volumetric block 1 with the formation of passages 28 predominantly symmetrical with respect to the same average vertical plane 26 thereof along the outer walls 2 of the volumetric block 1 facing these cells.

Ячейку 14 секционного выключателя 44 выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания.The cell 14 of the sectional switch 44 is performed with a device of maximum current protection against interphase short circuit with an independent time delay with a trip effect, as well as with a device for automatically entering backup power.

Устройство автоматического ввода резервного питания содержит элементы (не показано) отключения ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5 с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции 4 и 5 ниже определенного уровня в одной, двух или трех фазах.The automatic backup power input device contains elements (not shown) for disconnecting the power input of the cable power line to the emergency section 4 and 5 with adjustable time delay from 0 to 20 s when the voltage disappears or decreases in this section 4 and 5 below a certain level in one, two or three phases.

Также устройство автоматического ввода резервного питания содержит систему блокировки (не показано) при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5, систему автоматического включения секционного выключателя 44 от блокконтактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5.The automatic backup power input device also contains a blocking system (not shown) during operation of the overcurrent protection device for the cable power line power input for the emergency section 4 and 5, the system for automatically turning on the section switch 44 from the contact contacts of the power switch without delaying after disconnecting the cable power input power transmission to emergency section 4 and 5.

Также имеются устройства (не показано) ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления (не показано) на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках 10, 11 и 19, 20 для обеспечения принципа неразрывности цепи управления секционного выключателя 44 при любом положении тележки отключенного выключателя ввода.There are also devices (not shown) for manual reset to the initial position after automatic operation, as well as control keys (not shown) for two positions of automatic input of the backup power supply “input” - “output”, which are installed on input cells 10, 11 and 19, 20 to ensure the principle of continuity of the control circuit of the sectional switch 44 at any position of the trolley of the disconnected input switch.

Блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции 4 и 5, неисправности в оперативных цепях. Обеспечивается возможность выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.The block distribution point is equipped with telemechanization systems, including remote control, tele-signaling and telemetry systems: the positions of the cable line switches, power transformers and the sectional ground circuit breaker, the connection of higher voltage cable lines, the voltage on the buses of each section 4 and 5, malfunctions in operational circuits. It is possible to execute telecontrol commands by a power switch in each section, including TV and TV shutdowns and telemetry systems for load currents of cable lines, power transformers and a sectional voltage switch on sections.

В качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения, преимущественно 10 кВ, в электроэнергию низшего напряжения, преимущественно 0,4 кВ, используют преимущественно сухие трансформаторы мощностью по 40 кВА, каждый напряжением 10 ± 2 × 2,5% / 0,4 кВ.As auxiliary transformers for down-converting high-voltage energy, mainly 10 kV, into low-voltage electricity, mainly 0.4 kV, dry transformers with a power of 40 kVA each, with a voltage of 10 ± 2 × 2.5% / 0.4 are used kV

Блочный распределительный пункт выполняют из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока 1, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок 1 выполняют преимущественно из металлического каркаса (не показано), утепленных наружных стен 2 и 3, утепленного потолка 56, пола 57, крыши 58 и, по крайней мере, одной сейфовой металлической двери 59.A block distribution point is made of two or more transportable modules, each of which is in the form of a volume unit 1, the base being prepared for all transportable modules forming a block distribution point, while each volume block 1 is mainly made of a metal frame (not shown), insulated outer walls 2 and 3, insulated ceiling 56, floor 57, roof 58 and at least one safe metal door 59.

Фундамент 45 под каждый объемный блок образуют путем выполнения в грунте по контуру стен 2 и 3 объемного блока 1 и, по крайней мере, между одной парой противолежащих наружных стен 3 его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки 47, на которой бетонируют образующие несущий армопояс 48 железобетонные ленты 49.The foundation 45 for each volume unit is formed by performing in the soil along the contour of the walls 2 and 3 of the volume unit 1 and at least between one pair of opposite external walls 3 of its trenches expanding upwards, performing compacted sand cushion 47 in the trenches, on which the generators are concreted armor-bearing 48 reinforced concrete belts 49.

После набора бетоном требуемой прочности на них устанавливают фундаментные блоки 50 шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков 50 на нулевой отметке грунта. Затем производят обратную засыпку 52 траншеи 46 и выполнением по верху фундаментных блоков 50 армированной цементно-песчаной стяжки 51. После набора прочности цементно-песчаной стяжки 51 устанавливают с опиранием на нее объемный блок 1.After the concrete has set the required strength, foundation blocks 50 with a width smaller than the width of reinforced concrete strips are installed on them, with the top surface of the foundation blocks 50 located at the ground zero. Then, backfill 52 of the trench 46 is carried out and reinforced cement-sand screed 51 is formed on top of the foundation blocks 50. After the cement-sand screed 51 has set strength, a volume block 1 is mounted on it.

Одну из железобетонных лент 49, образующих армопояс 48, расположенную параллельно одной паре противолежащих наружных стен 3 объемного блока 1, размещают по одной из двух средних вертикальных плоскостей 55 объемного блока 1. Остальные ленты 49, параллельные этой плоскости 55, - на равных расстояниях друг от друга. В полу каждого объемного блока 1 образуют, по крайней мере, два технологических проема 60 для пропуска соответствующих кабельных линий. Между фундаментными блоками 50 образуют подполье, ограниченное стенами 2 и 3 объемного блока 1.One of the reinforced concrete tapes 49 forming armopoyas 48, located parallel to one pair of opposite external walls 3 of the volume unit 1, is placed along one of the two middle vertical planes 55 of the volume unit 1. The remaining tapes 49, parallel to this plane 55, are at equal distances from friend. At least two technological openings 60 are formed in the floor of each volume unit 1 for passing through the corresponding cable lines. Between the foundation blocks 50 form an underground limited by the walls 2 and 3 of the volume block 1.

Наружные стены 2 и 3 объемного блока 1 выполняют из трехслойных металлических панелей типа “сэндвич” с утеплителем (не показано), предпочтительно из пенополиуретана, с двусторонней экологически безопасной окраской. Крышу 58 выполняют предпочтительно из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя (на чертежах не показано). Причем профилированные металлические листы соединяют между собой комбинированными заклепками (не показано).The outer walls 2 and 3 of the volume unit 1 are made of three-layer metal panels of the “sandwich” type with a heater (not shown), preferably polyurethane foam, with environmentally friendly two-sided painting. The roof 58 is preferably made of profiled metal sheets with zinc or aluminum-zinc coating and a layer of non-combustible insulation (not shown in the drawings). Moreover, the profiled metal sheets are interconnected by combined rivets (not shown).

Способ эксплуатации сети электроснабжения при реконструкции и/или возведении объектов транспортного комплекса района, города, мегаполиса осуществляют следующим образом:The method of operation of the electricity network during the reconstruction and / or construction of transport facilities of the district, city, metropolis is as follows:

Осуществляют, по крайней мере, частичную реконструкцию существующей сети электроснабжения реконструируемого объекта и/или возведение новой сети электроснабжения возводимого объекта, путем подводки питающих кабельных линий 38 от территориально разнесенных, по крайней мере, двух независимых источников 37 питания к устанавливаемому в зоне реконструируемого и/или возводимого объекта на подготовленный фундамент 45 блочному распределительному пункту.At least partial reconstruction of the existing power supply network of the reconstructed facility and / or construction of a new power supply network of the facility under construction is carried out by supplying cable lines 38 from at least two independent sources 37 of territorially spaced to the installed in the area of the reconstructed and / or the object being built on the prepared foundation 45 block distribution point.

Блочный распределительный пункт выполняют в виде, по крайней мере, одного транспортабельного полной заводской готовности модуля - объемного, защищенного от атмосферных воздействий утепленного блока 1 с соотношением длин пар противолежащих наружных стен 2 и 3, составляющим 1,0-1,45. В нем смонтированы в виде двух взаимно резервирующих секций 4 и 5 коммутационной аппаратуры и устройств защиты. Указанное оборудование монтируют в заводских условиях или, по крайней мере, частично после установки объемного блока 1 на фундамент 45.A block distribution point is made in the form of at least one transportable complete factory readiness of the module - a volumetric, weatherproofed insulated block 1 with a parity of lengths of pairs of opposite external walls 2 and 3 of 1.0-1.45. It is mounted in the form of two mutually redundant sections 4 and 5 of switching equipment and protection devices. The specified equipment is mounted in the factory or, at least partially, after the installation of the volume unit 1 on the foundation 45.

Объемный блок 1 монтируют с возможностью последующего многократного использования путем снятия с фундамента 45 перемещения и подключения в сетях электроснабжения других, в том числе возводимых вновь или реконструируемых объектов транспортного комплекса района, города, мегаполиса.The volume unit 1 is mounted with the possibility of subsequent reuse by removing from the foundation 45 the movement and connection of others, including newly constructed or reconstructed objects of the transport complex of the district, city, metropolis.

Блочный распределительный пункт выполняют с возможностью подключения, по меньшей мере, к двум дополнительным источникам 40 электроэнергии от резервных центров питания также через соответствующие кабельные линии 41 и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий 39.The block distribution point is configured to connect to at least two additional sources of electric power 40 from the backup power centers also through the corresponding cable lines 41 and to connect at least four cable outlet lines 39.

В каждой секции 4 и 5 последовательно монтируют четыре выводные ячейки 6-9 и 15-18 соответственно, по крайней мере, две вводные ячейки соответственно 10, 11 и 19, 20, ячейку 12 и 21 под трансформатор собственных нужд и ячейку 13 и 23 под трансформатор напряжения для контроля и измерения напряжения на секции 4 или 5 и обеспечения работы автоматического ввода 42 резервного питания между секциями 4 и 5.In each section 4 and 5, four output cells 6–9 and 15–18 are successively mounted, respectively, at least two input cells, respectively 10, 11 and 19, 20, cell 12 and 21 for the auxiliary transformer and cell 13 and 23 under voltage transformer for monitoring and measuring voltage on sections 4 or 5 and ensuring the operation of automatic input 42 backup power between sections 4 and 5.

Выводные 6-9 и 15-18 и вводные 10, 11 и 19, 20 ячейки оборудуют трансформаторами тока 43 для измерения фазного тока и для измерения тока замыкания на землю. Вводные 10, 11 и 19, 20, выводные 6-9 и 15-18 ячейки и ячейки 12, 21 и 13, 23 под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал (не показано).Output 6-9 and 15-18 and input 10, 11 and 19, 20 cells are equipped with current transformers 43 for measuring phase current and for measuring the earth fault current. Input 10, 11 and 19, 20, output 6-9 and 15-18 cells and cells 12, 21 and 13, 23 for transformers provide maximum current protection against interphase short circuit with independent time delay with shutdown action, as well as protection against earth faults with an independent time delay with action on the signal (not shown).

Указанные выше ячейки одного и того же функционального назначения в разных секциях 4 и 5 выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей 26 объемного блока 1.The above-mentioned cells of the same functional purpose in different sections 4 and 5 are performed in pairs of the same type and place the same type of cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes 26 of the volumetric block 1.

В одной из секций размещают ячейку 14 секционного выключателя 44, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку 23 секционного разъединителя, которую электрически соединяют с ячейкой 14 секционного выключателя 44.In one of the sections, the cell 14 of the sectional switch 44 is placed, and in the other section symmetrically to this cell relative to the same plane of the volumetric block, the cell 23 of the sectionalizer is installed, which is electrically connected to the cell 14 of the sectional switch 44.

Ячейки 6-23 устанавливают в объемном блоке 1 с образованием преимущественно симметричных относительно той же средней вертикальной его плоскости 26 проходов 28 вдоль обращенных к этим ячейкам наружных стен 2 объемного блока 1.Cells 6-23 are installed in the volumetric block 1 with the formation of passages 28 predominantly symmetrical with respect to the same average vertical plane 26 thereof along the outer walls 2 of the volumetric block 1 facing these cells.

Ячейку 14 секционного выключателя 44 выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания.The cell 14 of the sectional switch 44 is performed with a device of maximum current protection against interphase short circuit with an independent time delay with a trip effect, as well as with a device for automatically entering backup power.

Устройство автоматического ввода резервного питания содержит элементы (не показано) отключения ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5 с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции 4 и 5 ниже определенного уровня в одной, двух или трех фазах.The automatic backup power input device contains elements (not shown) for disconnecting the power input of the cable power line to the emergency section 4 and 5 with adjustable time delay from 0 to 20 s when the voltage disappears or decreases in this section 4 and 5 below a certain level in one, two or three phases.

Также устройство автоматического ввода резервного питания содержит систему блокировки (не показано) при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5, систему автоматического включения секционного выключателя 44 от блокконтактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию 4 и 5.The automatic backup power input device also contains a blocking system (not shown) during operation of the overcurrent protection device for the cable power line power input for the emergency section 4 and 5, the system for automatically turning on the section switch 44 from the contact contacts of the power switch without delaying after disconnecting the cable power input power transmission to emergency section 4 and 5.

Также имеются устройства (не показано) ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления (не показано) на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках 10, 11 и 19, 20 для обеспечения принципа неразрывности цепи управления секционного выключателя 44 при любом положении тележки отключенного выключателя ввода.There are also devices (not shown) for manual reset to the initial position after automatic operation, as well as control keys (not shown) for two positions of automatic input of the backup power supply “input” - “output”, which are installed on input cells 10, 11 and 19, 20 to ensure the principle of continuity of the control circuit of the sectional switch 44 at any position of the trolley of the disconnected input switch.

Блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции 4 и 5, неисправности в оперативных цепях. Обеспечивается возможность выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.The block distribution point is equipped with telemechanization systems, including remote control, tele-signaling and telemetry systems: the positions of the cable line switches, power transformers and the sectional ground circuit breaker, the connection of higher voltage cable lines, the voltage on the buses of each section 4 and 5, malfunctions in operational circuits. It is possible to execute telecontrol commands by a power switch in each section, including TV and TV shutdowns and telemetry systems for load currents of cable lines, power transformers and a sectional voltage switch on sections.

В качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения, преимущественно 10 кВ, в электроэнергию низшего напряжения, преимущественно 0,4 кВ, используют преимущественно сухие трансформаторы мощностью по 40 кВА, каждый напряжением 10 ± 2 × 2,5% / 0,4 кВ.As auxiliary transformers for down-converting high-voltage energy, mainly 10 kV, into low-voltage electricity, mainly 0.4 kV, dry transformers with a power of 40 kVA each, with a voltage of 10 ± 2 × 2.5% / 0.4 are used kV

Блочный распределительный пункт выполняют из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока 1, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок 1 выполняют преимущественно из металлического каркаса (не показано), утепленных наружных стен 2 и 3, утепленного потолка 56, пола 57, крыши 58 и, по крайней мере, одной сейфовой металлической двери 59.A block distribution point is made of two or more transportable modules, each of which is in the form of a volume unit 1, the base being prepared for all transportable modules forming a block distribution point, while each volume block 1 is mainly made of a metal frame (not shown), insulated outer walls 2 and 3, insulated ceiling 56, floor 57, roof 58 and at least one safe metal door 59.

Фундамент 45 под каждый объемный блок образуют путем выполнения в грунте по контуру стен 2 и 3 объемного блока 1 и, по крайней мере, между одной парой противолежащих наружных стен 3 его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки 47, на которой бетонируют образующие несущий армопояс 48 железобетонные ленты 49.The foundation 45 for each volume unit is formed by performing in the soil along the contour of the walls 2 and 3 of the volume unit 1 and at least between one pair of opposite external walls 3 of its trenches expanding upwards, performing compacted sand cushion 47 in the trenches, on which the generators are concreted armor-bearing 48 reinforced concrete belts 49.

После набора бетоном требуемой прочности на них устанавливают фундаментные блоки 50 шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков 50 на нулевой отметке грунта. Затем производят обратную засыпку 52 траншеи 46 и выполнением по верху фундаментных блоков 50 армированной цементно-песчаной стяжки 51. После набора прочности цементно-песчаной стяжки 51 устанавливают с опиранием на нее объемный блок 1.After the concrete has set the required strength, foundation blocks 50 with a width smaller than the width of reinforced concrete strips are installed on them, with the top surface of the foundation blocks 50 located at the ground zero. Then, backfill 52 of the trench 46 is carried out and reinforced cement-sand screed 51 is formed on top of the foundation blocks 50. After the cement-sand screed 51 has set strength, a volume block 1 is mounted on it.

Одну из железобетонных лент 49, образующих армопояс 48, расположенную параллельно одной паре противолежащих наружных стен 3 объемного блока 1, размещают по одной из двух средних вертикальных плоскостей 55 объемного блока 1. Остальные ленты 49, параллельные этой плоскости 55, - на равных расстояниях друг от друга. В полу каждого объемного блока 1 образуют, по крайней мере, два технологических проема 60 для пропуска соответствующих кабельных линий. Между фундаментными блоками 50 образуют подполье, ограниченное стенами 2 и 3 объемного блока 1.One of the reinforced concrete tapes 49 forming armopoyas 48, located parallel to one pair of opposite external walls 3 of the volume unit 1, is placed along one of the two middle vertical planes 55 of the volume unit 1. The remaining tapes 49, parallel to this plane 55, are at equal distances from friend. At least two technological openings 60 are formed in the floor of each volume unit 1 for passing through the corresponding cable lines. Between the foundation blocks 50 form an underground limited by the walls 2 and 3 of the volume block 1.

Наружные стены 2 и 3 объемного блока 1 выполняют из трехслойных металлических панелей типа “сэндвич” с утеплителем (не показано), предпочтительно из пенополиуретана, с двусторонней экологически безопасной окраской. Крышу 58 выполняют предпочтительно из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя (на чертежах не показано). Причем профилированные металлические листы соединяют между собой комбинированными заклепками (не показано).The outer walls 2 and 3 of the volume unit 1 are made of three-layer metal panels of the “sandwich” type with a heater (not shown), preferably polyurethane foam, with environmentally friendly two-sided painting. The roof 58 is preferably made of profiled metal sheets with zinc or aluminum-zinc coating and a layer of non-combustible insulation (not shown in the drawings). Moreover, the profiled metal sheets are interconnected by combined rivets (not shown).

Claims (20)

1. Способ эксплуатации сети электроснабжения района, города, мегаполиса, характеризующийся тем, что он предусматривает, по крайней мере, частичную реконструкцию существующей сети электроснабжения и/или возведение новой региональной сети электроснабжения, которые осуществляют путем подводки питающих кабельных линий от территориально разнесенных, по крайней мере, двух независимых источников питания к устанавливаемому на подготовленный фундамент блочному распределительному пункту в виде, по крайней мере, одного транспортабельного полной заводской готовности модуля - объемного, защищенного от атмосферных воздействий утепленного блока с соотношением длин пар противолежащих наружных стен, составляющим 1,0-1,45, и смонтированными в нем в виде двух взаимно резервирующих секций коммутационной аппаратуры и устройств защиты, причем указанное оборудование монтируют в заводских условиях или, по крайней мере, частично после установки объемного блока на фундамент, при этом объемный блок монтируют с возможностью последующего многократного использования путем снятия с фундамента, перемещения и подключения в сетях электроснабжения других, в том числе возводимых вновь или реконструируемых объектов района, города, мегаполиса.1. A method of operating an electric power network of a district, city, megalopolis, characterized in that it provides for at least a partial reconstruction of an existing electric power network and / or the construction of a new regional electric power network, which are carried out by supplying cable lines from geographically spaced, at least at least two independent power supplies to the block distribution point installed on the prepared foundation in the form of at least one transportable floor factory readiness of the module - a volumetric, weatherproofed insulated unit with a length ratio of pairs of opposite external walls of 1.0-1.45, and mounted in it in the form of two mutually redundant sections of switching equipment and protection devices, and these equipment are mounted in the factory or at least partially after installing the volume unit on the foundation, while the volume unit is mounted with the possibility of subsequent reuse by removal from the foundation , moving and connecting to the power supply networks of others, including newly constructed or reconstructed objects of the district, city, metropolis. 2. Способ по п.1, отличающийся тем, что блочный распределительный пункт выполняют с возможностью подключения, по меньшей мере, к двум дополнительным источникам электроэнергии от резервных центров питания также через соответствующие кабельные линии и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий, в каждой секции последовательно монтируют четыре выводные ячейки, по крайней мере, две вводные ячейки, ячейку под трансформатор собственных нужд и ячейку под трансформатор напряжения для контроля и измерения напряжения на секции и обеспечения работы автоматического ввода резервного питания между секциями, причем выводные и вводные ячейки оборудуют трансформаторами тока для измерения фазного тока и для измерения тока замыкания на землю, вводные, выводные ячейки и ячейки под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал, при этом указанные выше ячейки одного и того же функционального назначения в разных секциях выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей объемного блока, кроме того в одной из секций размещают ячейку секционного выключателя, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку секционного разъединителя, которую электрически соединяют с ячейкой секционного выключателя, причем ячейки устанавливают в объемном блоке с образованием, преимущественно, симметричных относительно той же средней вертикальной его плоскости проходов вдоль обращенных к этим ячейкам наружных стен объемного блока, при этом ячейку секционного выключателя выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания, которое содержит элементы отключения ввода питания кабельной линии электропередачи на аварийную секцию с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции ниже определенного уровня в одной, двух или трех фазах, систему блокировки при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию, систему автоматического включения секционного выключателя от блок-контактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию, устройства ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках для обеспечения принципа неразрывности цепи управления секционного выключателя при любом положении тележки отключенного выключателя ввода, причем блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя, замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции, неисправности в оперативных цепях, с обеспечением возможности выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.2. The method according to claim 1, characterized in that the block distribution point is configured to connect to at least two additional power sources from the backup power centers also through the corresponding cable lines and the ability to connect at least four cable outlets , in each section four output cells are mounted in series, at least two input cells, a cell for an auxiliary transformer and a cell for a voltage transformer for monitoring and measuring voltage section, and ensure the operation of automatic input of backup power between the sections, the output and input cells are equipped with current transformers for measuring the phase current and for measuring the earth fault current, the input, output cells and cells for the transformers provide maximum current protection against interphase short circuit with independent time delay with a trip action, as well as protection against earth faults with an independent time delay with a signal effect, while the above cells are one about the same functional purpose in different sections, they perform the same type in pairs and place the same type cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes of the volumetric block, in addition, the sectional switch cell is placed in one of the sections, and the cell is symmetrical in the other section with respect to the cell of the sectional disconnector is installed on the same plane of the volume unit, which is electrically connected to the cell of the sectional switch, the cells being installed in a removable unit with the formation of passages mainly symmetrical with respect to the same average vertical plane along the outer walls of the volumetric unit facing these cells, wherein the cell of the sectional switch is configured with a maximum current protection against interphase short circuit with an independent time delay with a shutdown action, as well as with an automatic backup power input device, which contains elements for disconnecting the power input of the cable power line to the emergency section ju with adjustable time delay from 0 to 20 s when the voltage disappears or decreases in this section below a certain level in one, two or three phases, a blocking system during operation of the overcurrent protection device for inputting power to the cable power line to the emergency section, automatic sectional turn-on system switch from the block contacts of the input switch without time delay after disconnecting the power input of the cable power line to the emergency section, manual reset devices the position after automatic operation, as well as the control keys to the two positions of the automatic input of the backup power supply “input” - “output”, which are installed on the input cells to ensure the principle of continuity of the control circuit of the section switch at any position of the truck disconnected input switch, and the block distribution point supply telemechanization systems, including remote control systems, telealarm systems and telemetry: the position of the cable line switches, power transf rmators and a sectional switch, ground faults, on connecting cable lines of higher voltage, voltage on the buses of each section, malfunctions in operational circuits, with the possibility of executing telecontrol commands by a power switch in each section, including TV switching and TV disconnecting and systems Telemeasurement of load currents of cable lines, power transformers and sectional voltage switch on sections. 3. Способ по п.2, отличающийся тем, что в качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения 10 кВ в электроэнергию низшего напряжения 0,4 кВ используют сухие трансформаторы мощностью по 40 кВА каждый напряжением (10±2)×2,5% / 0,4 кВ.3. The method according to claim 2, characterized in that dry transformers with a capacity of 40 kVA each with a voltage of (10 ± 2) × 2 are used as auxiliary transformers for down-converting high-voltage energy of 10 kV to low-voltage electricity of 0.4 kV, 5% / 0.4 kV. 4. Способ по п.1, отличающийся тем, что блочный распределительный пункт выполняют из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок выполняют преимущественно из металлического каркаса, утепленных наружных стен, утепленного потолка, пола, крыши и, по крайней мере, одной сейфовой металлической двери, а фундамент под каждый объемный блок образуют путем выполнения в грунте по контуру стен объемного блока и, по крайней мере, между одной парой противолежащих наружных стен его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки, на которой бетонируют образующие несущий армопояс железобетонные ленты с последующей установкой на них после набора бетоном требуемой прочности фундаментных блоков шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков на нулевой отметке грунта, обратной засыпкой траншеи и выполнением по верху фундаментных блоков армированной цементно-песчаной стяжки, после набора прочности которой устанавливают с опиранием на стяжку объемный блок, причем одну из железобетонных лент, образующих армопояс, расположенную параллельно одной паре противолежащих наружных стен объемного блока, размещают по одной из двух средних вертикальных плоскостей объемного блока, а остальные ленты, параллельные этой плоскости, - на равных расстояниях друг от друга, в полу каждого объемного блока образуют, по крайней мере, два технологических проема для пропуска соответствующих кабельных линий, а между фундаментными блоками - подполье, ограниченное его стенами.4. The method according to claim 1, characterized in that the block distribution point is made of two or more transportable modules, each of which is made in the form of a volume unit, the base being prepared for all transportable modules forming a block distribution point, each volume block mainly made of metal frame, insulated external walls, insulated ceiling, floor, roof and at least one safe metal door, and the foundation for each volume unit is formed by fillings in the soil along the contour of the walls of the volumetric block and at least between one pair of opposite external walls of its trenches expanding upwards, performing in the trenches a compacted sand cushion on which reinforced concrete belts forming the bearing armoponton are concreted with subsequent installation of the required strength on them after concrete has been set foundation blocks with a width smaller than the width of reinforced concrete strips, with the top surface of the foundation blocks at zero ground, backfilling the trench and performing rkhu of foundation blocks of a reinforced cement-sand screed, after gaining strength, a volume block is installed based on the screed, and one of the reinforced concrete tapes forming an arm belt, parallel to one pair of opposite external walls of the volume block, is placed along one of the two middle vertical planes of the volume block and the remaining tapes parallel to this plane - at equal distances from each other, in the floor of each volume unit form at least two technological openings for prop the wire of the corresponding cable lines, and between the foundation blocks there is an underground limited by its walls. 5. Способ по п.4, отличающийся тем, что наружные стены объемного блока выполняют из трехслойных металлических панелей типа “сэндвич” с утеплителем из пенополиуретана, с двусторонней экологически безопасной окраской, а крышу выполняют из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя, причем профилированные металлические листы соединяют между собой комбинированными заклепками.5. The method according to claim 4, characterized in that the outer walls of the volumetric block are made of three-layer metal panels of the “sandwich” type with polyurethane foam insulation, with environmentally friendly two-sided coloring, and the roof is made of profiled metal sheets with zinc or aluminum-zinc coating and a layer from non-combustible insulation, and profiled metal sheets are interconnected by combined rivets. 6. Способ эксплуатации сети электроснабжения при возведении строительных объектов района, города, мегаполиса, характеризующийся тем, что он предусматривает, по крайней мере, частичную реконструкцию существующей сети электроснабжения, которую осуществляют путем подводки к возводимому строительному объекту новых питающих кабельных линий от территориально разнесенных, независимых не менее чем двух источников питания, установки на предварительно подготовленный фундамент блочного распределительного пункта в виде, по крайней мере, одного объемного защищенного от атмосферных осадков утепленного блока полной заводской готовности с соотношением длин пар противолежащих наружных стен, составляющим 1,0-1,45, и смонтированным в нем в заводских условиях электротехническим и вспомогательным оборудованием блочного распределительного пункта или, по крайней мере, часть указанного оборудования монтируют в объемном блоке после установки его на фундаменте, причем указанное оборудование размещают в двух взаимно резервирующих секциях, при этом объемный блок устанавливают на фундаменте с возможностью последующего многократного использования путем снятия с фундамента, перемещения и подключения в сетях электроснабжения других строительных объектов района, города, мегаполиса.6. The method of operating the power supply network during the construction of construction projects in a district, city, metropolis, characterized in that it provides for at least a partial reconstruction of the existing power supply network, which is carried out by connecting new supply cable lines from geographically spaced independent at least two power sources, installation on a previously prepared foundation of a block distribution point in the form of at least one of a fully prefabricated insulated block protected from atmospheric precipitation with a parity of lengths of pairs of opposite external walls of 1.0–1.45 and installed in it under factory conditions by electrical and auxiliary equipment of a block distribution point or at least a part of the specified equipment mounted in the volume unit after installing it on the foundation, and the specified equipment is placed in two mutually redundant sections, while the volume unit is installed on the foundation those with the possibility of subsequent reuse by removing from the foundation, moving and connecting in the power supply networks of other construction projects of the district, city, metropolis. 7. Способ по п.6, отличающийся тем, что блочный распределительный пункт выполняют с возможностью подключения, по меньшей мере, к двум дополнительным источникам электроэнергии от резервных центров питания через соответствующие кабельные линии и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий, в каждой секции последовательно монтируют четыре выводные ячейки, по крайней мере, две вводные ячейки, ячейку под трансформатор собственных нужд и ячейку под трансформатор напряжения для контроля и измерения напряжения на секции и обеспечения работы автоматического ввода резервного питания между секциями, причем выводные и вводные ячейки оборудуют трансформаторами тока для измерения фазного тока и для измерения тока замыкания на землю, вводные, выводные ячейки и ячейки под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал, при этом указанные выше ячейки одного и того же функционального назначения в разных секциях выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей объемного блока, кроме того, в одной из секций размещают ячейку секционного выключателя, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку секционного разъединителя, которую электрически соединяют с ячейкой секционного выключателя, причем ячейки устанавливают в объемном блоке с образованием, преимущественно, симметричных относительно той же средней вертикальной его плоскости проходов вдоль обращенных к этим ячейкам наружных стен объемного блока, при этом ячейку секционного выключателя выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания, которое содержит элементы отключения ввода питания кабельной линии электропередачи на аварийную секцию с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции ниже определенного уровня в одной, двух или трех фазах, систему блокировки при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию, систему автоматического включения секционного выключателя от блок-контактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию, устройства ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках для обеспечения принципа неразрывности цепи управления секционного выключателя при любом положении тележки отключенного выключателя ввода, причем блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции, неисправности в оперативных цепях, с обеспечением возможности выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.7. The method according to claim 6, characterized in that the block distribution point is configured to connect to at least two additional power sources from the backup power centers via the corresponding cable lines and to connect at least four cable outlet lines, in each section, four output cells, at least two input cells, a cell for an auxiliary transformer and a cell for a voltage transformer for monitoring and measuring voltage are successively mounted and the sections and ensure the operation of automatic input of backup power between the sections, the output and input cells are equipped with current transformers for measuring the phase current and for measuring the earth fault current, the input, output cells and cells for the transformers provide maximum current protection against interphase short circuit with independent time delay with the effect of shutdown, as well as protection against earth faults with an independent time delay with the action on the signal, while the above cells are the same The functional purpose in different sections is performed in pairs of the same type and the cells of the same type are placed in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes of the volumetric block, in addition, in one of the sections a sectional switch cell is placed, and in the other section symmetrically to this cell relative to that on the same plane of the volumetric block, the cell of the sectional disconnector is installed, which is electrically connected to the cell of the sectional switch, and the cells are installed in volumetric m block with the formation of passages predominantly symmetrical with respect to the same average vertical plane along the outer walls of the volumetric block facing these cells, while the cell of the sectional switch is made with the device of maximum current protection against interphase short circuit with an independent time delay with the effect of shutdown, and also with an automatic backup power input device, which contains elements for disconnecting the power input of the cable power line to the emergency section with p adjustable time delay from 0 to 20 s when the voltage disappears or decreases in this section below a certain level in one, two or three phases, a blocking system when the device is used for overcurrent protection of the cable power line power input to the emergency section, the system of automatic switching on of the sectional switch from block contacts of the input switch without time delay after disconnecting the power input of the cable power line to the emergency section, manual reset devices after automatic operation, as well as control keys for two positions of automatic input of the backup power supply “input” - “output”, which are installed on the input cells to ensure the principle of continuity of the control circuit of the sectional switch at any position of the trolley of the disconnected input switch, and the block distribution point is provided telemechanization systems, including remote control systems, telealarm systems and telemetry: the position of the cable line switches, power transformers ditch and sectional circuit breaker for ground fault, for connecting cable lines of higher voltage, the presence of voltage on the buses of each section, malfunctions in operational circuits, providing the possibility of executing telecontrol commands by a power switch in each section, including television switching and TV disconnecting and television measurement systems load currents of cable lines, power transformers and sectional voltage circuit breakers in sections. 8. Способ по п.7, отличающийся тем, что в качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения 10 кВ в электроэнергию низшего напряжения 0,4 кВ используют сухие трансформаторы мощностью по 40 кВА, каждый напряжением (10±2)×2,5%/0,4 кВ.8. The method according to claim 7, characterized in that dry transformers with a capacity of 40 kVA, each with a voltage of (10 ± 2) × 2, are used as auxiliary transformers for down-converting high-voltage energy of 10 kV to low-voltage electricity of 0.4 kV , 5% / 0.4 kV. 9. Способ по п.6, отличающийся тем, что блочный распределительный пункт выполняют из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок выполняют преимущественно из металлического каркаса, утепленных наружных стен, утепленного потолка, пола, крыши и, по крайней мере, одной сейфовой металлической двери, а фундамент под каждый объемный блок образуют путем выполнения в грунте по контуру стен объемного блока и, по крайней мере, между одной парой противолежащих наружных стен его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки, на которой бетонируют образующие несущий армопояс железобетонные ленты с последующей установкой на них после набора бетоном требуемой прочности фундаментных блоков шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков на нулевой отметке грунта, обратной засыпкой траншеи и выполнением по верху фундаментных блоков армированной цементно-песчаной стяжки, после набора прочности которой устанавливают с опиранием на стяжку объемный блок, причем одну из железобетонных лент, образующих армопояс, расположенную параллельно одной паре противолежащих наружных стен объемного блока, размещают по одной из двух средних вертикальных плоскостей объемного блока, а остальные ленты, параллельные этой плоскости, - на равных расстояниях друг от друга, в полу каждого объемного блока образуют, по крайней мере, два технологических проема для пропуска соответствующих кабельных линий, а между фундаментными блоками - подполье, ограниченное его стенами.9. The method according to claim 6, characterized in that the block distribution point is made of two or more transportable modules, each of which is made in the form of a volume block, the base being prepared for all transportable modules forming a block distribution point, each volume block mainly made of metal frame, insulated external walls, insulated ceiling, floor, roof and at least one safe metal door, and the foundation for each volume unit is formed by fillings in the soil along the contour of the walls of the volumetric block and at least between one pair of opposite external walls of its trenches expanding upwards, performing in the trenches a compacted sand cushion on which reinforced concrete belts forming the bearing armoponton are concreted with subsequent installation of the required strength on them after concrete has been set foundation blocks with a width smaller than the width of reinforced concrete strips, with the top surface of the foundation blocks at zero ground, backfilling the trench and performing rkhu of foundation blocks of a reinforced cement-sand screed, after gaining strength, a volume block is installed based on the screed, and one of the reinforced concrete tapes forming an arm belt, parallel to one pair of opposite external walls of the volume block, is placed along one of the two middle vertical planes of the volume block and the remaining tapes parallel to this plane - at equal distances from each other, in the floor of each volume unit form at least two technological openings for prop the wire of the corresponding cable lines, and between the foundation blocks there is an underground limited by its walls. 10. Способ по п.9, отличающийся тем, что наружные стены объемного блока выполняют из трехслойных металлических панелей типа “сэндвич” с утеплителем из пенополиуретана, с двусторонней экологически безопасной окраской, а крышу выполняют из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя, причем профилированные металлические листы соединяют между собой комбинированными заклепками.10. The method according to claim 9, characterized in that the outer walls of the volumetric block are made of three-layer metal panels of the “sandwich” type with polyurethane foam insulation, with environmentally friendly two-sided coloring, and the roof is made of profiled metal sheets with zinc or aluminum-zinc coating and an interlayer from non-combustible insulation, and profiled metal sheets are interconnected by combined rivets. 11. Способ эксплуатации сети электроснабжения при ремонте и/или реконструкции здания, сооружения, комплекса зданий, сооружений, объектов промышленного комплекса, характеризующийся тем, что он предусматривает реконструкцию, по крайней мере, части питающей и распределительной сети электроснабжения ремонтируемого объекта и/или реконструируемого здания, сооружения, комплекса зданий, сооружений, объектов промышленного комплекса, которую осуществляют путем подводки питающих кабельных линий от территориально разнесенных независимых, по крайней мере, двух источников питания к устанавливаемому в зоне ремонтируемого и/или реконструируемого объекта на подготовленный фундамент блочному распределительному пункту в виде, по крайней мере, одного транспортабельного, полной заводской готовности модуля - объемного, защищенного от атмосферных воздействий утепленного блока с соотношением длин пар противолежащих наружных стен, составляющим 1,0-1,45, и смонтированными в нем в виде двух взаимно резервирующих секций коммутационной аппаратуры и устройств защиты, причем указанное оборудование монтируют в заводских условиях или, по крайней мере, частично после установки объемного блока на фундамент, при этом объемный блок монтируют с возможностью последующего многократного использования путем снятия с фундамента перемещения и подключения в сетях электроснабжения других, в том числе ремонтируемых и/или реконструируемых объектов.11. The method of operation of the power supply network during the repair and / or reconstruction of the building, structure, complex of buildings, structures, objects of the industrial complex, characterized in that it provides for the reconstruction of at least part of the power supply and distribution network of the power supply of the renovated object and / or reconstructed building , structures, a complex of buildings, structures, objects of an industrial complex, which is carried out by supplying cable lines from territorially spaced independent at least two power sources for a block distribution point installed in the area of a repaired and / or reconstructed object on a prepared foundation in the form of at least one transportable, fully factory-ready module - a volumetric, weatherproof insulated block with a ratio of opposite lengths of pairs external walls, constituting 1.0-1.45, and mounted in it in the form of two mutually redundant sections of switching equipment and protection devices, and the specified equipment The assembly is mounted in the factory or at least partially after the installation of the volume unit on the foundation, while the volume unit is mounted with the possibility of subsequent reuse by removing from the foundation the movement and connecting other, including repaired and / or reconstructed objects in the power supply networks . 12. Способ по п.11, отличающийся тем, что блочный распределительный пункт выполняют с возможностью подключения, по меньшей мере, к двум дополнительным источникам электроэнергии от резервных центров питания также через соответствующие кабельные линии и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий, в каждой секции последовательно монтируют четыре выводные ячейки, по крайней мере, две вводные ячейки, ячейку под трансформатор собственных нужд и ячейку под трансформатор напряжения для контроля и измерения напряжения на секции и обеспечения работы автоматического ввода резервного питания между секциями, причем выводные и вводные ячейки оборудуют трансформаторами тока для измерения фазного тока и для измерения тока замыкания на землю, вводные, выводные ячейки и ячейки под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал, при этом указанные выше ячейки одного и того же функционального назначения в разных секциях выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей объемного блока, кроме того, в одной из секций размещают ячейку секционного выключателя, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку секционного разъединителя, которую электрически соединяют с ячейкой секционного выключателя, причем ячейки устанавливают в объемном блоке с образованием, преимущественно, симметричных относительно той же средней вертикальной его плоскости проходов вдоль обращенных к этим ячейкам наружных стен объемного блока, при этом ячейку секционного выключателя выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания, которое содержит элементы отключения ввода питания кабельной линии электропередачи на аварийную секцию с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции ниже определенного уровня в одной, двух или трех фазах, систему блокировки при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию, систему автоматического включения секционного выключателя от блок-контактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию, устройства ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках для обеспечения принципа неразрывности цепи управления секционного выключателя при любом положении тележки отключенного выключателя ввода, причем блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции, неисправности в оперативных цепях, с обеспечением возможности выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения, и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.12. The method according to claim 11, characterized in that the block distribution point is configured to connect to at least two additional power sources from the backup power centers also through the corresponding cable lines and the ability to connect at least four cable outlets , in each section four output cells are mounted in series, at least two input cells, a cell for an auxiliary transformer and a cell for a voltage transformer for monitoring and measuring voltage live sections and ensure the operation of automatic input of backup power between the sections, with the output and input cells equipped with current transformers for measuring the phase current and for measuring the earth fault current, the input, output cells and cells for the transformers provide maximum current protection against interphase short circuit with independent time delay with a trip effect, as well as protection against earth faults with an independent time delay with a signal effect, while the above cells are one of the same functional purpose in different sections perform the same type in pairs and place the same type cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes of the volumetric block, in addition, in one of the sections place the sectional switch cell, and in the other section symmetrically this cell relative to the same plane of the volumetric block, a cell of a sectional disconnector is installed, which is electrically connected to a cell of a sectional switch, and the cells are installed in a removable unit with the formation of passages mainly symmetrical with respect to the same average vertical plane along the outer walls of the volumetric unit facing these cells, wherein the cell of the sectional switch is configured with a maximum current protection against interphase short circuit with an independent time delay with a shutdown action, as well as with an automatic backup power input device, which contains elements for disconnecting the power input of a cable power line for emergency a section with adjustable time delay from 0 to 20 s when the voltage disappears or decreases in this section below a certain level in one, two or three phases, a blocking system during operation of the overcurrent protection device for inputting power to the cable power line to the emergency section, automatic sectional turn-on system switch from the block contacts of the input switch without time delay after disconnecting the power input of the cable power line to the emergency section, manual reset devices e position after automatic operation, as well as control keys for two positions of automatic input of the backup power supply “input” - “output”, which are installed on the input cells to ensure the principle of continuity of the control circuit of the sectional switch at any position of the trolley of the disconnected input switch, and the block distribution point equip telemechanization systems, including remote control systems, telealarm systems and telemetry: the position of the cable line switches, power trans formatters and sectional circuit breaker for ground fault, for connecting cable lines of higher voltage, the presence of voltage on the buses of each section, malfunctions in operational circuits, with the possibility of executing telecontrol commands of the power switch in each section, including television switching and TV disconnecting, and systems Telemeasurement of load currents of cable lines, power transformers and sectional voltage switch on sections. 13. Способ по п.12, отличающийся тем, что в качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения 10 кВ в электроэнергию низшего напряжения 0,4 кВ используют сухие трансформаторы мощностью по 40 кВА, каждый напряжением (10±2)×2,5% / 0,4 кВ.13. The method according to p. 12, characterized in that dry transformers with a capacity of 40 kVA, each with a voltage of (10 ± 2) × 2, are used as auxiliary transformers for down-converting high-voltage energy of 10 kV to low-voltage electricity of 0.4 kV , 5% / 0.4 kV. 14. Способ по п.11, отличающийся тем, что блочный распределительный пункт выполняют из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок выполняют преимущественно из металлического каркаса, утепленных наружных стен, утепленного потолка, пола, крыши и, по крайней мере, одной сейфовой металлической двери, а фундамент под каждый объемный блок образуют путем выполнения в грунте по контуру стен объемного блока и, по крайней мере, между одной парой противолежащих наружных стен его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки, на которой бетонируют образующие несущий армопояс железобетонные ленты с последующей установкой на них после набора бетоном требуемой прочности фундаментных блоков шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков на нулевой отметке грунта, обратной засыпкой траншеи и выполнением по верху фундаментных блоков армированной цементно-песчаной стяжки, после набора прочности которой устанавливают с опиранием на стяжку объемный блок, причем одну из железобетонных лент, образующих армопояс, расположенную параллельно одной паре противолежащих наружных стен объемного блока, размещают по одной из двух средних вертикальных плоскостей объемного блока, а остальные ленты, параллельные этой плоскости, - на равных расстояниях друг от друга, в полу каждого объемного блока образуют, по крайней мере, два технологических проема для пропуска соответствующих кабельных линий, а между фундаментными блоками - подполье, ограниченное его стенами.14. The method according to claim 11, characterized in that the block distribution point is made of two or more transportable modules, each of which is made in the form of a volume block, the base being prepared for all transportable modules forming a block distribution point, each volume block mainly made of metal frame, insulated external walls, insulated ceiling, floor, roof and at least one safe metal door, and the foundation for each volume unit is formed by filling in the soil along the contour of the walls of the volumetric block and at least between one pair of opposite external walls of its trenches expanding upwards, performing in the trenches a compacted sand cushion on which reinforced concrete belts bearing the armor belt are concreted with subsequent installation of the required strength foundation blocks with a width smaller than the width of reinforced concrete tapes, with the top surface of the foundation blocks at zero ground, backfilling the trench and performing On top of the foundation blocks of a reinforced cement-sand screed, after gaining strength, a volume block is installed based on the screed, and one of the reinforced concrete tapes forming an arm belt, parallel to one pair of opposite external walls of the volume block, is placed along one of the two middle vertical planes of the volume block and the remaining tapes parallel to this plane - at equal distances from each other, in the floor of each volume unit form at least two technological openings for start-up of the corresponding cable lines, and between the foundation blocks there is an underground limited by its walls. 15. Способ по п.14, отличающийся тем, что наружные стены объемного блока выполняют из трехслойных металлических панелей типа “сэндвич” с утеплителем, предпочтительно из пенополиуретана, с двусторонней экологически безопасной окраской, а крышу выполняют предпочтительно из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя, причем профилированные металлические листы соединяют между собой комбинированными заклепками.15. The method according to 14, characterized in that the outer walls of the volumetric block are made of three-layer metal panels of the "sandwich" type with insulation, preferably polyurethane foam, with environmentally friendly two-sided coloring, and the roof is preferably made of profiled metal sheets with zinc or aluminum-zinc coating and a layer of non-combustible insulation, and profiled metal sheets are interconnected by combined rivets. 16. Способ эксплуатации сети электроснабжения при реконструкции и/или возведении объектов транспортного комплекса района, города, мегаполиса, характеризующийся тем, что он предусматривает, по крайней мере, частичную реконструкцию существующей сети электроснабжения реконструируемого объекта и/или возведение новой сети электроснабжения возводимого объекта, которые осуществляют путем подводки питающих кабельных линий от территориально разнесенных, по крайней мере, двух независимых источников питания к устанавливаемому в зоне реконструируемого и/или возводимого объекта на подготовленный фундамент блочному распределительному пункту в виде, по крайней мере, одного транспортабельного, полной заводской готовности модуля - объемного, защищенного от атмосферных воздействий утепленного блока с соотношением длин пар противолежащих наружных стен, составляющим 1,0 -1,45, и смонтированными в нем в виде двух взаимно резервирующих секций коммутационной аппаратуры и устройств защиты, причем указанное оборудование монтируют в заводских условиях или, по крайней мере, частично после установки объемного блока на фундамент, при этом объемный блок монтируют с возможностью последующего многократного использования путем снятия с фундамента перемещения и подключения в сетях электроснабжения других, в том числе возводимых вновь или реконструируемых объектов транспортного комплекса района, города, мегаполиса.16. The method of operation of the power supply network during the reconstruction and / or construction of objects of the transport complex of a district, city, metropolis, characterized in that it provides for at least a partial reconstruction of the existing power supply network of the reconstructed object and / or the construction of a new power supply network for the facility under construction, which carried out by connecting supply cable lines from geographically spaced at least two independent power sources to the reconstruction installed in the zone an object to be monitored and / or erected on a prepared foundation for a block distribution point in the form of at least one transportable, full factory readiness of the module - a volumetric, weatherproofed insulated block with a pair length ratio of opposing external walls of 1.0 -1, 45, and mounted therein in the form of two mutually redundant sections of switching equipment and protection devices, moreover, the specified equipment is mounted in the factory or at least partially after installation of the volume unit on the foundation, while the volume unit is mounted with the possibility of subsequent reuse by removing from the foundation the movement and connection of others, including newly constructed or reconstructed objects of the transport complex of the district, city, metropolis. 17. Способ по п.16, отличающийся тем, что блочный распределительный пункт выполняют с возможностью подключения, по меньшей мере, к двум дополнительным источникам электроэнергии от резервных центров питания также через соответствующие кабельные линии и возможностью подключения, по меньшей мере, четырех отводящих кабельных линий, в каждой секции последовательно монтируют четыре выводные ячейки, по крайней мере, две вводные ячейки, ячейку под трансформатор собственных нужд и ячейку под трансформатор напряжения для контроля и измерения напряжения на секции и обеспечения работы автоматического ввода резервного питания между секциями, причем выводные и вводные ячейки оборудуют трансформаторами тока для измерения фазного тока и для измерения тока замыкания на землю, вводные, выводные ячейки и ячейки под трансформаторы снабжают максимальной токовой защитой от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также защитой от замыканий на землю с независимой выдержкой времени с действием на сигнал, при этом указанные выше ячейки одного и того же функционального назначения в разных секциях выполняют попарно однотипными и размещают однотипные ячейки в объемном блоке зеркально симметрично относительно одной из двух средних вертикальных плоскостей объемного блока, кроме того, в одной из секций размещают ячейку секционного выключателя, а в другой секции симметрично этой ячейке относительно той же плоскости объемного блока устанавливают ячейку секционного разъединителя, которую электрически соединяют с ячейкой секционного выключателя, причем ячейки устанавливают в объемном блоке с образованием, преимущественно, симметричных относительно той же средней вертикальной его плоскости проходов вдоль обращенных к этим ячейкам наружных стен объемного блока, при этом ячейку секционного выключателя выполняют с устройством максимальной токовой защиты от межфазного короткого замыкания с независимой выдержкой времени с действием на отключение, а также с устройством автоматического ввода резервного питания, которое содержит элементы отключения ввода питания кабельной линии электропередачи на аварийную секцию с регулируемой выдержкой времени от 0 до 20 с при исчезновении или снижении напряжения на этой секции ниже определенного уровня в одной, двух или трех фазах, систему блокировки при работе устройства максимальной токовой защиты ввода питания кабельной линии электропередачи на аварийную секцию, систему автоматического включения секционного выключателя от блок-контактов вводного выключателя без выдержки времени после отключения ввода питания кабельной линии электропередачи на аварийную секцию, устройства ручного возврата в исходное положение после автоматического срабатывания, а также ключи управления на два положения автоматического ввода резервного питания “введен” - “выведен”, которые устанавливают на вводных ячейках для обеспечения принципа неразрывности цепи управления секционного выключателя при любом положении тележки отключенного выключателя ввода, причем блочный распределительный пункт снабжают системами телемеханизации, включающими системы телеуправления, телесигнализации и телеизмерения: положения выключателей кабельных линий, силовых трансформаторов и секционного выключателя замыкания на “землю”, на присоединения кабельных линий высшего напряжения, наличия напряжения на шинах каждой секции, неисправности в оперативных цепях, с обеспечением возможности выполнения команд телеуправления силовым выключателем в каждой секции, в том числе телевключения и телеотключения и системами телеизмерения токов нагрузки кабельных линий, силовых трансформаторов и секционного выключателя напряжения на секциях.17. The method according to clause 16, wherein the block distribution point is configured to connect to at least two additional power sources from the backup power centers also through the corresponding cable lines and the ability to connect at least four cable outlets , in each section four output cells are mounted in series, at least two input cells, a cell for an auxiliary transformer and a cell for a voltage transformer for monitoring and measuring voltage live sections and ensure the operation of automatic input of backup power between the sections, with the output and input cells equipped with current transformers for measuring the phase current and for measuring the earth fault current, the input, output cells and cells for the transformers provide maximum current protection against interphase short circuit with independent time delay with a trip effect, as well as protection against earth faults with an independent time delay with a signal effect, while the above cells are one of the same functional purpose in different sections perform the same type in pairs and place the same type cells in the volumetric block mirror symmetrically with respect to one of the two middle vertical planes of the volumetric block, in addition, in one of the sections place the sectional switch cell, and in the other section symmetrically this cell relative to the same plane of the volumetric block, a cell of a sectional disconnector is installed, which is electrically connected to a cell of a sectional switch, and the cells are installed in a removable unit with the formation of passages mainly symmetrical with respect to the same average vertical plane along the outer walls of the volumetric unit facing these cells, wherein the cell of the sectional switch is configured with a maximum current protection against interphase short circuit with an independent time delay with a shutdown action, as well as with an automatic backup power input device, which contains elements for disconnecting the power input of the cable power line to the emergency a function with adjustable time delay from 0 to 20 s when the voltage disappears or decreases in this section below a certain level in one, two or three phases, a blocking system during operation of the overcurrent protection device for inputting power supply of the cable power line to the emergency section, automatic section switching system switch from the block contacts of the input switch without time delay after disconnecting the power input of the cable power line to the emergency section, manual reset devices the position after automatic operation, as well as the control keys to the two positions of the automatic input of the backup power supply “input” - “output”, which are installed on the input cells to ensure the principle of continuity of the control circuit of the sectional switch at any position of the trolley of the disconnected input switch, and the block distribution point is provided telemechanization systems, including telecontrol, tele-alarm and telemetry systems: positions of cable line switches, power trans ormators and sectional circuit breaker for ground fault, for connecting cable lines of higher voltage, the presence of voltage on the buses of each section, malfunctions in operational circuits, with the possibility of executing telecontrol commands by a power switch in each section, including television switching and TV disconnecting and television measurement systems load currents of cable lines, power transformers and sectional voltage circuit breakers in sections. 18. Способ по п.17, отличающийся тем, что в качестве трансформаторов собственных нужд для понизительного преобразования энергии высшего напряжения 10 кВ в электроэнергию низшего напряжения 0,4 кВ используют, сухие трансформаторы мощностью по 40 кВА, каждый напряжением (10±2)×2,5%/ 0,4 кВ.18. The method according to claim 17, characterized in that dry transformers with a capacity of 40 kVA each with a voltage of (10 ± 2) × are used as auxiliary transformers for down-converting high-voltage energy of 10 kV to low-voltage electricity of 0.4 kV 2.5% / 0.4 kV. 19. Способ по п.16, отличающийся тем, что блочный распределительный пункт выполняют из двух или более транспортабельных модулей, каждый из которых выполняют в виде объемного блока, причем основание подготавливают под все транспортабельные модули, образующие блочный распределительный пункт, при этом каждый объемный блок выполняют из металлического каркаса, утепленных наружных стен, утепленного потолка, пола, крыши и, по крайней мере, одной сейфовой металлической двери, а фундамент под каждый объемный блок образуют путем выполнения в грунте по контуру стен объемного блока и, по крайней мере, между одной парой противолежащих наружных стен его расширяющихся кверху траншей, выполнения в траншеях уплотненной песчаной подушки, на которой бетонируют образующие несущий армопояс железобетонные ленты с последующей установкой на них после набора бетоном требуемой прочности фундаментных блоков шириной, меньшей ширины железобетонных лент, с расположением верхней поверхности фундаментных блоков на нулевой отметке грунта, обратной засыпкой траншеи и выполнением по верху фундаментных блоков армированной цементно-песчаной стяжки, после набора прочности которой устанавливают с опиранием на стяжку объемный блок, причем одну из железобетонных лент, образующих армопояс, расположенную параллельно одной паре противолежащих наружных стен объемного блока, размещают по одной из двух средних вертикальных плоскостей объемного блока, а остальные ленты, параллельные этой плоскости, - на равных расстояниях друг от друга, в полу каждого объемного блока образуют, по крайней мере, два технологических проема для пропуска соответствующих кабельных линий, а между фундаментными блоками - подполье, ограниченное его стенами.19. The method according to clause 16, wherein the block distribution point is made of two or more transportable modules, each of which is made in the form of a volume unit, the base being prepared for all transportable modules forming a block distribution point, each volume block made of a metal frame, insulated outer walls, insulated ceiling, floor, roof and at least one safe metal door, and the foundation for each volume unit is formed by performing in the ground along the contour of the walls of the volumetric block and at least between one pair of opposite external walls of its trenches expanding upward, performing in the trenches a compacted sand cushion on which reinforced concrete belts bearing the armor belt are concreted, followed by installation of the required strength of the base blocks with concrete , smaller than the width of reinforced concrete tapes, with the top surface of the foundation blocks at zero ground level, backfilling the trench and performing foundation on top x blocks of reinforced cement-sand screed, after gaining strength, a volume block is installed based on the screed, and one of the reinforced concrete tapes forming an arm belt, parallel to one pair of opposing outer walls of the volume block, is placed along one of the two middle vertical planes of the volume block, and the remaining tapes parallel to this plane - at equal distances from each other, in the floor of each volume unit form at least two technological openings for skipping respectively cable lines, and between the foundation blocks there is an underground limited by its walls. 20. Способ по п.19, отличающийся тем, что наружные стены объемного блока выполняют из трехслойных металлических панелей типа “сэндвич” с утеплителем из пенополиуретана, с двусторонней экологически безопасной окраской, а крышу выполняют из профилированных металлических листов с цинковым или алюмоцинковым покрытием и прослойкой из негорючего утеплителя, причем профилированные металлические листы соединяют между собой комбинированными заклепками.20. The method according to claim 19, characterized in that the outer walls of the volumetric block are made of three-layer metal panels of the “sandwich” type with polyurethane foam insulation, with environmentally friendly two-sided coloring, and the roof is made of profiled metal sheets with zinc or aluminum-zinc coating and a layer from non-combustible insulation, and profiled metal sheets are interconnected by combined rivets.
RU2003112645/09A 2003-04-30 2003-04-30 Maintenance method for power network of district, town, or city; maintenance method for power network during erection of development projects thereof; maintenance method for power network during repairs and/or reconstruction of building, structure, complex of buildings, industrial complex projects; and method for power network maintenance during reconstruction and/or erection of transport complex projects in district, town, or city RU2240639C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2003112645/09A RU2240639C1 (en) 2003-04-30 2003-04-30 Maintenance method for power network of district, town, or city; maintenance method for power network during erection of development projects thereof; maintenance method for power network during repairs and/or reconstruction of building, structure, complex of buildings, industrial complex projects; and method for power network maintenance during reconstruction and/or erection of transport complex projects in district, town, or city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2003112645/09A RU2240639C1 (en) 2003-04-30 2003-04-30 Maintenance method for power network of district, town, or city; maintenance method for power network during erection of development projects thereof; maintenance method for power network during repairs and/or reconstruction of building, structure, complex of buildings, industrial complex projects; and method for power network maintenance during reconstruction and/or erection of transport complex projects in district, town, or city

Publications (2)

Publication Number Publication Date
RU2240639C1 true RU2240639C1 (en) 2004-11-20
RU2003112645A RU2003112645A (en) 2004-11-20

Family

ID=34310800

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2003112645/09A RU2240639C1 (en) 2003-04-30 2003-04-30 Maintenance method for power network of district, town, or city; maintenance method for power network during erection of development projects thereof; maintenance method for power network during repairs and/or reconstruction of building, structure, complex of buildings, industrial complex projects; and method for power network maintenance during reconstruction and/or erection of transport complex projects in district, town, or city

Country Status (1)

Country Link
RU (1) RU2240639C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2461937C1 (en) * 2011-09-30 2012-09-20 Валерий Николаевич Карнаушенко Distribution system and method of distribution system maintenance
WO2022174985A1 (en) * 2021-02-16 2022-08-25 Sms Group Gmbh Industrial building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
КОНЮХОВА Е.А. Электроснабжение объектов. - М.: Мастерство, 2002, с.114-116. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2461937C1 (en) * 2011-09-30 2012-09-20 Валерий Николаевич Карнаушенко Distribution system and method of distribution system maintenance
WO2022174985A1 (en) * 2021-02-16 2022-08-25 Sms Group Gmbh Industrial building

Similar Documents

Publication Publication Date Title
CN206727507U (en) One kind is based on new energy booster stations modular transformer substation
CN211530520U (en) Modular box transformer substation of power distribution device
RU2240639C1 (en) Maintenance method for power network of district, town, or city; maintenance method for power network during erection of development projects thereof; maintenance method for power network during repairs and/or reconstruction of building, structure, complex of buildings, industrial complex projects; and method for power network maintenance during reconstruction and/or erection of transport complex projects in district, town, or city
RU2240638C1 (en) Method for power supply to structure or complex thereof being erected or reconstructed; method for power supply to settlement, location, district of town, industrial or agroindustrial complex, or city; power network of erected or reconstructed structure or complex of structures; power supply to settlement, location, district of town, industrial or agroindustrial complex, or city
RU2219631C1 (en) Modular distribution transformer substation
RU33467U1 (en) Block distribution point and block distribution point module
RU2219630C1 (en) Method for erecting modular distribution transformer substation
RU132629U1 (en) COMPLETE DISTRIBUTION DEVICE FOR OUTDOOR INSTALLATION OF MOBILE EXECUTION
RU36920U1 (en) POWER SUPPLY NETWORK (OPTIONS)
RU2003112645A (en) METHOD FOR OPERATING NETWORK POWER district, city, metropolis, a method for operating the grid system in the construction of building objects district, city, metropolis, a method for operating the grid system in the repair and / or reconstruction of buildings, the complex of buildings, structures, industrial complexes and methods for network operation ELECTRICAL SUPPLIES DURING RECONSTRUCTION AND / OR CONSTRUCTION OF OBJECTS OF THE TRANSPORT COMPLEX OF THE AREA, CITY, MEGAPOLIS
RU2003112644A (en) WAY POWER erected or renovated STRUCTURES, COMPLEX STRUCTURES, METHOD FOR POWER settlements, neighborhoods, areas of the city, and agricultural industries, metropolis, NETWORK POWER erected or renovated STRUCTURES, COMPLEX STRUCTURES AND NETWORK POWER settlements, neighborhoods, DISTRICT, INDUSTRIAL, AGRICULTURE COMPLEX, MEGAPOLIS
RU2219629C1 (en) Method for power supply to hydraulic structures
RU2219628C1 (en) High-voltage distribution center section of modular distribution transformer substation
Lusby Fundamental concepts in substation design
Simburger et al. Engineering design for a central station photovoltaic power plant
Sider et al. Study of converting the electrical network in the city of Yatta from (33 kV) to (11 kV)
RU45055U1 (en) LOCAL RESERVATION ITEM OF LINEAR CONSUMERS (KRUN-PMR)
Zimmermann et al. Comparison of GIS and AIS systems for urban supply networks
Page et al. Lessons from the installation and commissioning of novel power electronics for active response
RU2003112643A (en) METHOD FOR ESTABLISHING A BLOCK DISTRIBUTION POINT
Žegarac et al. Comparative analysis of 35/10 kV/kV high voltage substation reconstruction alternatives
Al-Qasrawi et al. Design Distribution Substation
Takalkar Design, engineering & construction of ehv air insulated swithyards-techno economic considerations
Hauss The Power Distribution System at Bell Telephone Laboratories, Holmdel, NJ
Bayliss An overall description of the operation of fixed equipment power supplies and electrical systems

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20050501

NF4A Reinstatement of patent

Effective date: 20080310

MM4A The patent is invalid due to non-payment of fees

Effective date: 20090501