RU2235882C1 - Method for well hydraulic extraction of hard mineral resource from slanted bed (variants) - Google Patents

Method for well hydraulic extraction of hard mineral resource from slanted bed (variants) Download PDF

Info

Publication number
RU2235882C1
RU2235882C1 RU2003102570/03A RU2003102570A RU2235882C1 RU 2235882 C1 RU2235882 C1 RU 2235882C1 RU 2003102570/03 A RU2003102570/03 A RU 2003102570/03A RU 2003102570 A RU2003102570 A RU 2003102570A RU 2235882 C1 RU2235882 C1 RU 2235882C1
Authority
RU
Russia
Prior art keywords
well
formation
receiving chamber
bed
mineral
Prior art date
Application number
RU2003102570/03A
Other languages
Russian (ru)
Other versions
RU2003102570A (en
Inventor
В.И. Лунёв (RU)
В.И. Лунёв
В.М. Зыков (RU)
В.М. Зыков
ков Д.А. Анда (RU)
Д.А. Андаяков
нов В.Г. Лукь (RU)
В.Г. Лукьянов
Ю.М. Паровинчак (RU)
Ю.М. Паровинчак
В.С. Скобельский (RU)
В.С. Скобельский
Original Assignee
Томский политехнический университет
Томская горнодобывающая компания
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Томский политехнический университет, Томская горнодобывающая компания filed Critical Томский политехнический университет
Priority to RU2003102570/03A priority Critical patent/RU2235882C1/en
Publication of RU2003102570A publication Critical patent/RU2003102570A/en
Application granted granted Critical
Publication of RU2235882C1 publication Critical patent/RU2235882C1/en

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

FIELD: mining industry.
SUBSTANCE: according to the method, extracting block is placed on quarry shelf and directed in direction of fall of bed of mineral resource. At limit of block in deep section of bed extracting well is drilled up to its exit into bed soil, after which procedure well is cased from mouth to bed ceiling. In mineral resource bed hydrowashing is performed to form receiving chamber, then well is provided with slurry-hoisting equipment. In side of quarry along mineral resource bed one or several extracting wells are drilled, up to their connection to receiving chamber of extracting well, while slanting angle of wells is equal to angle of fall of bed. Extracting wells are provided with hydromonitoring body with side nozzles. Hydro-mining of mineral resource is performed while moving hydromonitoring body in extracting well along raising of bed. Resulting slurry is self-propelled into receiving chamber of removing well, and from there by means of slurry-hoisting equipment is sent to the surface. On basis of amount and relative position of extracting wells in mineral resource bed, two variants of invention may be realized: mineral resource bed is opened by one removing and one extracting wells or one removing and several extracting wells, mouths of which are dispersed along bed length in quarry side, and faces are directed into receiving chamber of removing well.
EFFECT: lesser amounts of drilling operations and simplified control of extracting wells during process of bed extraction as well as simplified process of connecting removing and extracting wells.
3 cl, 3 dwg

Description

Изобретение относится к способам разработки месторождений твердых полезных ископаемых, а именно к способу скважинной гидродобычи полезных ископаемых, и может найти применение при разработке наклонных пластов малой и средней мощности после разработки не глубоко залегающего их крыла открытым способом.The invention relates to methods for developing solid mineral deposits, and in particular to a method for downhole hydraulic mining of minerals, and may find application in the development of inclined formations of small and medium power after developing a wing not deeply buried in an open way.

Известен способ добычи воды из подземных источников с помощью лучевых горизонтальных скважин и способ строительства лучевых водозаборов (Гидрогеологические исследования для устройства лучевых водозаборов и опыт их эксплуатации. Обзор. ВИЭМС Мингеологии СССР. - М., 1997). Способ добычи воды заключается в следующем. С поверхности до водоупорного горизонта проходят водосборный колодец (ствол шахты, шурф большого диаметра), стенки и забой которого закрепляют бетонной крепью. В интервале водоносного пласта в бетонной крепи стенок колодца пробивают окна, через которые осуществляют проходку горизонтальных дренажных скважин, расходящихся лучами от водозаборного колодца. Проходку скважин осуществляют методом задавливания бурового снаряда либо способом вращательного бурения. Скважины оборудуют фильтрами. Протяженность лучевых скважин может достигать 100 и более метров. Через эти скважины вода из водоносного пласта поступает в водосборный колодец, из которого посредством водоподъемного оборудования выдается на поверхность. По аналогии со скважинной гидродобычей твердого полезного ископаемого в этом способе горизонтальные лучевые скважины выполняют роль добычных скважин, а водосборный колодец - выдачной горной выработки.There is a known method of extracting water from underground sources using horizontal horizontal wells and a method of constructing horizontal water intakes (Hydrogeological studies for the construction of radial water intakes and their operational experience. Overview. VIEMS of the USSR Ministry of Geology. - M., 1997). The method of water production is as follows. From the surface to the water-resistant horizon there is a drainage well (shaft of a mine, large-diameter pit), the walls and bottom of which are fixed with concrete support. In the interval of the aquifer in the concrete lining of the walls of the well, windows are punched through which horizontal drainage wells are drilled, diverging in rays from the water well. Wells are drilled by crushing a drill or by rotary drilling. Wells are equipped with filters. The length of beam wells can reach 100 meters or more. Through these wells, water from the aquifer enters the catchment well, from which it is discharged to the surface by means of water-lifting equipment. By analogy with the borehole hydraulic production of solid minerals in this method, horizontal beam wells play the role of production wells, and the catchment well serves as the issuing mine.

Недостатки способа: невозможность непосредственного использования при скважинной гидродобыче твердых полезных ископаемых, сложность проходки лучевых скважин в связи со стесненными условиями ведения буровых работ на дне водосборного колодца.The disadvantages of the method: the impossibility of direct use in downhole hydraulic mining of solid minerals, the difficulty of penetrating beam wells due to cramped drilling conditions at the bottom of the drainage well.

Известен способ гидравлического извлечения материалов из продуктивных горизонтов (А.С. №1343018 с приоритетом от 21.03.86, МПК Е 21 С 45/00). Способ состоит в том, что при отработке крутопадающего продуктивного горизонта бурят добычную и выдачную наклонные скважины. Добычную скважину проводят непосредственно у почвы продуктивного горизонта по его падению. Бурение выдачной скважины осуществляют наклонно вкрест простирания продуктивного горизонта под углом, который равен или меньше угла сдвижения налегающих пород при образовании выемочной камеры под выдачной скважиной. Забой выдачной скважины выводят под забой добычной. Затем в добычной скважине размещают скважинный гидромонитор, а в выдачной скважине - пульпоподъемное оборудование. Производят сбойку выдачной и добычной скважин и приступают к гидроотбойке полезного ископаемого. Ее производят из поперечной насадки гидромониторной струей, перемещаемой в секторе, параллельном плоскости сдвижения налегающих пород над выдачной скважиной.A known method of hydraulic extraction of materials from productive horizons (AS No. 1343018 with priority from 03/21/86, IPC E 21 C 45/00). The method consists in the fact that during the development of a steeply falling productive horizon, production and production deviated wells are drilled. A production well is carried out directly at the soil of the productive horizon by its fall. Drilling a producing well is carried out obliquely across the strike of the productive horizon at an angle that is equal to or less than the angle of displacement of the overlying rocks during the formation of a mining chamber under the issuing well. The bottomhole of the production well is withdrawn under the bottomhole of the production well. Then, a downhole hydraulic monitor is placed in the production well, and pulp-lifting equipment is placed in the dispensing well. They produce a failure of the dispensing and production wells and proceed to hydrotesting the mineral. It is produced from a transverse nozzle with a jet stream moving in a sector parallel to the plane of displacement of the overlying rocks above the dispensing well.

Недостаток способа по А.С. № 1343018 - большой объем буровых работ, а также трудность сбойки добычной и выдачной скважин.The disadvantage of the method according to A.S. No. 1343018 - a large amount of drilling work, as well as the difficulty of shutting down production and production wells.

Известен способ скважинной гидродобычи из пластовых наклонных месторождений полезных ископаемых (А.С. №1180508 с приоритетом от 31.08.82, МПК Е 21 С 45/00). Способ осуществляется следующим образом. Добычной блок ориентируют в направлении падения пласта полезного ископаемого. Проходят выдачную и ряд добычных вертикальных скважин, которые располагают по оси добычного блока, совпадающей с проекцией на горизонтальную плоскость линии падения пласта. При этом выдачную скважину бурят в нижней точке линии пласта при условии входа забоя в почву пласта, а добычные скважины выше по восстанию пласта до почвы пласта. Выдачную скважину обсаживают до кровли пласта и в нижней ее части производят гидроразмыв пласта для образования приемной камеры. После этого производят сбойку добычных скважин с приемной камерой выдачной скважины, в результате чего через весь выемочный блок образуется транспортная выработка, подошвой которой служит почва пласта. Далее производится бурение добычных скважин по всему выемочному блоку по квадратной сетке. Отработку выемочного блока начинают скважинами, расположенными в верхней части пласта по его восстанию, причем сначала производят гидроразмыв полезного ископаемого в скважинах, примыкающих к транспортной выработке, а затем в периферийных скважинах. Под воздействием сил гравитации образующаяся пульпа со всего выемочного блока самотеком доставляется сначала к транспортной выработке, потом по транспортной выработке - в приемную камеру выдачной скважины, откуда с помощью пульпоподъемного оборудования выдается на поверхность.A known method of downhole hydraulic production from reservoir inclined mineral deposits (AS No. 1180508 with priority from 08/31/82, IPC E 21 C 45/00). The method is as follows. The mining block is oriented in the direction of the fall of the mineral layer. The production line and a number of vertical production wells pass along the axis of the production block, which coincides with the projection onto the horizontal plane of the dip line. In this case, the production well is drilled at the lower point of the formation line, provided that the bottom hole enters the formation soil, and production wells are higher in the uprising of the formation to the formation soil. The issuing well is cased to the top of the formation and in its lower part a hydraulic washing of the formation is made to form a receiving chamber. After this, production wells are disrupted with the receiving chamber of the producing well, as a result of which a transport hole is formed through the entire extraction block, the sole of which is the soil of the formation. Next, production wells are drilled throughout the extraction block on a square grid. The mining of the excavation block begins with wells located in the upper part of the formation following its uprising, and first, minerals are hydraulically washed in the wells adjacent to the transport development, and then in the peripheral wells. Under the influence of gravitational forces, the resulting pulp from the entire extraction block by gravity is delivered first to the transport working out, then to the working out of the working out to the receiving chamber of the dispensing well, from where it is pulled out to the surface using pulp-lifting equipment.

Недостатки способа по А.С. №1180508: значительный объем бурения за счет большого количества добычных скважин, сложность проводки транспортной выработки и ее сбойки с выдачной скважиной, сложность управления работой добычных скважин в процессе отработки пласта и полезного ископаемого.The disadvantages of the method according to A.S. No. 1180508: a significant amount of drilling due to the large number of production wells, the difficulty of transporting the production and its disruption with the production well, the difficulty of managing the operation of production wells in the process of developing the formation and mineral.

Известен также способ опробования мощных подземных формаций (А.С. №1318689 с приоритетом от 11.02.86г., МПК Е 21 С 45/00 - прототип). Сущность способа заключается в следующем. Мощную наклонную формацию вскрывают добычной и выдачной скважинами. Добычную скважину проводят наклонной по падению формации у висячего бока последней до нижней границы опробования. В добычной скважине размещают гидромонитор, а в выдачной скважине - пульпоподъемную колонну. У нижней границы опробования производят сбойку добычной и выдачной скважин, а затем приступают к размыву пород формации из добычной скважины с образованием выемочной камеры. Размыв пород осуществляют по восстанию от выдачной скважины, при этом породы размывают располагаемой вкрест падения формации секторообразной заходкой с размещением дуги сектора заводки у лежачего бока формации. По мере размыва пород гидромонитор поднимают по добычной скважине. Размытая горная масса по пульпоподъемной колонне выдается на поверхность.There is also a method of testing powerful underground formations (AS No. 1318689 with a priority of 11/02/86, IPC E 21 C 45/00 - prototype). The essence of the method is as follows. A powerful inclined formation is opened by production and issuing wells. The production well is carried out inclined by the dip of the formation at the hanging side of the latter to the lower boundary of testing. A hydraulic monitor is placed in the production well, and a pulp-lifting column is placed in the production well. At the lower boundary of testing, production and production wells are disrupted, and then the formation rocks are eroded from the production well with the formation of a extraction chamber. The erosion of the rocks is carried out in an uprising from the production well, while the rocks erode the cross-sectional dip of the formation with a sector-shaped approach with the placement of the arc of the winding sector at the lying side of the formation. As the erosion of rocks, the hydraulic monitor is lifted along the production well. The washed-out rock mass is pulled out to the surface along the pulp-lifting column.

Основные недостатки способа по А.С. №1318689: трудность сбойки добычной и выдачной скважин, малая эффективность при промышленной разработке месторождения полезного ископаемого.The main disadvantages of the method according to A.S. No. 1318689: the difficulty of breaking production and production wells, low efficiency in the industrial development of a mineral deposit.

Поставлена задача - при разработке способом скважинной гидродобычи падающего крыла наклонного пласта полезного ископаемого после отработки его восстающего крыла открытым способом:The task is set - during the development by the method of borehole hydraulic production of the falling wing of an inclined layer of minerals after mining its rising wing in an open way:

- сократить объем буровых работ,- reduce the amount of drilling work,

- упростить процесс сбойки добычной и выдачной скважин,- to simplify the process of shutting down production and production wells,

- упростить управление работой добычных скважин в процессе отработки глубокозалегающей части пласта полезного ископаемого.- simplify the management of production wells in the process of mining the deep part of the mineral reservoir.

Сущность предложенного изобретения заключается в следующем. Выемочный блок располагают на уступе карьера и ориентируют в направлении падения пласта полезного ископаемого (ПИ). На границе блока в глубокозалегающей части пласта бурят выдачную скважину до входа ее в почву пласта, после чего скважину обсаживают от устья до кровли пласта. В пласте ПИ производят гидроразмыв для образования приемной камеры, скважину оснащают пульпоподъемным оборудованием. В борту карьера по пласту ПИ бурят одну или несколько добычных скважин до сбойки их с приемной камерой выдачной скважины, причем угол наклона добычных скважин равен углу падения пласта ПИ. Добычную скважину оборудуют гидромониторным снарядом с боковыми насадками. Гидроотбойку ПИ производят в процессе перемещения гидромониторного снаряда в добычной скважине по восстанию пласта. Образующаяся пульпа самотеком поступает в приемную камеру выдачной скважины, а из нее с помощью пульпоподъемного оборудования выдается на поверхность.The essence of the proposed invention is as follows. The excavation block is located on the ledge of the quarry and is oriented in the direction of the dip of the mineral layer (PI). A production well is drilled at the block boundary in the deep part of the formation until it enters the soil of the formation, after which the well is cased from the mouth to the roof of the formation. In the PI formation, hydraulic washing is performed to form the receiving chamber, the well is equipped with pulp-lifting equipment. Onboard the quarry, one or more production wells are drilled through the PI formation until they fail with the receiving chamber of the production well, and the inclination angle of the production wells is equal to the dip angle of the PI formation. The production well is equipped with a hydromonitor projectile with side nozzles. Hydraulic breakdown of PI is carried out in the process of moving a hydraulic monitoring projectile in a production well following a formation uprising. The resulting pulp by gravity enters the receiving chamber of the dispensing well, and from it is pulled out to the surface with the help of pulp-lifting equipment.

Исходя из количества и взаимного расположения добычных скважин в пласте ПИ предлагаемое изобретение может быть реализовано в двух вариантах:Based on the number and relative position of production wells in the PI formation, the invention can be implemented in two versions:

Вариант 1. Пласт ПИ вскрывается одной выдачной и одной добычной скважинами.Option 1. The PI layer is opened by one issuing and one production wells.

Вариант 2. Пласт ПИ вскрывается одной выдачной и несколькими добычными скважинами, траектории которых (в плане) представляют собой лучи, идущие от борта карьера и сходящиеся в приемной камере выдачной скважины.Option 2. The PI layer is opened by one issuing and several production wells, the trajectories of which (in plan) are rays coming from the side of the quarry and converging in the receiving chamber of the issuing well.

Далее сущность изобретения поясняется чертежами, на которых изображено:Further, the invention is illustrated by drawings, which depict:

на фиг.1 - план расположения выдачной и добычной скважин в выемочном блоке (вариант 1);figure 1 is a plan of the location of the issuing and production wells in the extraction block (option 1);

- на фиг.2 - разрез выемочного блока по оси добычной скважины в вертикальной плоскости по варианту 1 (по А-А);- figure 2 is a section of the extraction block along the axis of the production well in a vertical plane according to option 1 (AA);

- на фиг.3 - план расположения выдачной и добычных скважин в выемочном блоке (вариант 2).- figure 3 is a plan of the location of the issuing and production wells in the extraction block (option 2).

Вариант 1.Option 1.

Выемочный блок 1 с длиной сторон от 100 до 600 метров располагают на уступе карьера и ориентируют в направлении падения пласта 2 ПИ таким образом, что проекция оси блока на пласт совпадает с линией его падения (фиг.1, 2). На границе 3 выемочного блока 1 в падающем крыле пласта, т.е. в глубокозалегающей его части, бурят вертикальную или наклонную (в зависимости от угла падения пласта) выдачную скважину 4 до входа ее в почву 5 пласта (фиг.2). Диаметр скважины составляет 250-300 мм. Скважина проходится вращательным способом, сплошным забоем, с промывкой глинистым раствором. После проходки скважина крепится до кровли пласта обсадными трубами, в скважину опускается гидромониторный снаряд с боковыми насадками и в пласте 2 производится гидроразмыв с целью формирования приемной камеры 6. Скважину оснащают пульподъемным оборудованием (эрлифтом, землесосом, гидроэлеватором).The excavation unit 1 with a side length of 100 to 600 meters is located on the ledge of the quarry and is oriented in the direction of fall of the formation 2 PI so that the projection of the axis of the block onto the formation coincides with its fall line (Figs. 1, 2). At the border 3 of the excavation block 1 in the falling wing of the formation, i.e. in its deep-lying part, they drill a vertical or inclined (depending on the angle of incidence of the formation) delivery well 4 until it enters the soil 5 of the formation (Fig. 2). The diameter of the well is 250-300 mm. The well is drilled in a rotational manner, with a continuous face, with washing with a clay solution. After penetration, the well is fastened to the roof of the formation by casing pipes, a hydraulic monitor with side nozzles is lowered into the well and hydraulic erosion is performed in formation 2 in order to form the receiving chamber 6. The well is equipped with pulp-lifting equipment (airlift, dredger, hydraulic elevator).

В борту 7 карьера по пласту 2 ПИ до сбойки с приемной камерой 6 бурится добычная скважина 8 диаметром 150-200 мм. Угол наклона скважины равен углу падения пласта ПИ. Добычная скважина проходится вращательным способом, сплошным забоем, с промывкой жидкостью или продувкой воздухом. После того как скважина пробурена и сбита с приемной камерой 6, ее оснащают гидромониторным снарядом с боковыми насадками. Гидроотбойку ПИ производят в процессе перемещения гидромониторного снаряда в добычной скважине 8 по восстанию пласта 2 ПИ, т.е. в направлении к борту 7 карьера. Образовавшаяся пульпа самотеком поступает в приемную камеру 6, а из нее - с помощью пульпоподъемного оборудования подается на поверхность.Onboard the 7th open pit, along the PI 2 stratum, up to the failure with the receiving chamber 6, a production well 8 is drilled with a diameter of 150-200 mm. The angle of inclination of the well is equal to the dip angle of the PI formation. A production well is drilled in a rotational manner, with a continuous face, flushed with a liquid or purged with air. After the well is drilled and knocked down with a receiving chamber 6, it is equipped with a hydraulic monitor with side nozzles. Hydraulic breakdown of PI is carried out in the process of moving a hydromonitor projectile in a production well 8 along the uprising of formation PI 2, i.e. in the direction of the board 7 quarry. The resulting pulp by gravity enters the receiving chamber 6, and from it - with the help of pulp-lifting equipment is fed to the surface.

В процессе отработки пласта ПИ могут быть применены следующие системы отработки: панелями (столбами) с оставлением целиков, с оставлением временных целиков и закладкой выработанного пространства, с обрушением кровли. В первых двух системах расстояние между параллельными добычными скважинами в пласте ПИ составляет 40-50 метров, в третьей системе - 20-25 метров.In the process of mining the PI layer, the following mining systems can be applied: with panels (pillars) with the pillar left, with the left pillar of the pillars and the laying of the worked out space, with the roof collapsing. In the first two systems, the distance between parallel production wells in the PI formation is 40-50 meters, in the third system - 20-25 meters.

Предлагаемый способ Томской горнодобывающей компанией планируется использовать в процессе разработки глубокозалегающей части пластов ПИ Таловского буроугольного месторождения и Георгиевского месторождения цирконильменитовых песков (Томская область) после отработки их восстающего крыла открытым способом. Условие использования способа - уклон почвы пласта ПИ должен составлять не менее 4%.The proposed method by the Tomsk mining company is planned to be used in the process of developing the deep-seated part of the PI Talovskoye brown coal deposit and Georgievskoye zirconilmenite sands deposit (Tomsk region) after working out their rising wing by the open method. The condition for using the method is the slope of the soil of the PI layer should be at least 4%.

Вариант 2.Option 2

Выемочный блок 1 с длиной сторон от 100 до 600 метров располагают на уступе карьера и ориентируют в направлении падения пласта 2 ПИ таким образом, что проекция оси блока на пласт совпадает с линией его падения (фиг.1, 2, 3). На границе 3 выемочного блока 1 в падающем крыле пласта, т.е. в его глубокозалегающей части, бурят вертикальную или наклонную (в зависимости от угла падения пласта) выдачную скважину 4 до входа ее в почву 5 пласта (фиг.2). Диаметр скважины составляет 250-300 мм. Скважина проходится вращательным способом, сплошным забоем, с промывкой глинистым раствором. После проходки скважина крепится до кровли пласта обсадными трубами, в скважину опускается гидромониторный снаряд с боковыми насадками и в пласте 2 производится гидроразмыв с целью формирования приемной камеры 6. Скважину оснащают пульподъемным оборудованием (эрлифтом, землесосом, гидроэлеватором).The excavation unit 1 with a side length of 100 to 600 meters is located on the ledge of the quarry and is oriented in the direction of fall of the formation 2 PI so that the projection of the axis of the block onto the formation coincides with its fall line (Figs. 1, 2, 3). At the border 3 of the excavation block 1 in the falling wing of the formation, i.e. in its deep-seated part, a vertical or inclined (depending on the angle of incidence of the formation) production well 4 is drilled before it enters the soil 5 of the formation (Fig. 2). The diameter of the well is 250-300 mm. The well is drilled in a rotational manner, with a continuous face, with washing with a clay solution. After penetration, the well is fastened to the roof of the formation by casing pipes, a hydraulic monitor with side nozzles is lowered into the well and hydraulic erosion is performed in formation 2 in order to form the receiving chamber 6. The well is equipped with pulp-lifting equipment (airlift, dredger, hydraulic elevator).

В борту 7 карьера по пласту 2 ПИ до сбойки с приемной камерой 6 выдачной скважины 4 бурятся несколько добычных скважин 8 диаметром 150-200 мм. Устья добычных скважин рассредоточивают по борту карьера вдоль пласта 2 ПИ (фиг.3), причем направление скважинам задают в сторону приемной камеры 6. Таким образом, траектории добычных скважин представляют собой лучи, исходящие из борта 7 карьера и сходящиеся в приемной камере 6 выданной скважины. По аналогии с конструкцией лучевого водозабора эти скважины можно называть лучевыми скважинами. Расстояние между устьями добычных скважин по борту карьера зависит от системы разработки пласта ПИ (с обрушением кровли пласта, с оставлением целиков и др.) и составляет от 20-30 до 50-60 метров. Угол наклона скважин к горизонту равен углу падения пласта ПИ. Добычные скважины 8 проходят вращательным способом, сплошным забоем, с промывкой жидкостью или продувкой воздухом. После того как скважины пробурены, их оснащают гидромониторным снарядом с боковыми насадками. Гидроотбойку ПИ производят в процессе перемещения гидромониторного снаряда в добычных скважинах 8 по восстанию пласта 2 ПИ, т.е. по направлению к борту 7 карьера (фиг.2). Образующаяся пульпа самотеком поступает в приемную камеру 6 выдачной скважины 4, а из нее с помощью пульпоподъемного оборудования выдается на поверхность.In board 7 of the open pit, in the formation 2 PI before failure with the receiving chamber 6 of the dispensing well 4, several production wells 8 are drilled with a diameter of 150-200 mm. The mouths of the production wells are dispersed along the quarry along the PI formation 2 (Fig. 3), and the direction of the wells is set towards the receiving chamber 6. Thus, the trajectories of the production wells are rays emanating from the side 7 of the quarry and converging in the receiving chamber 6 of the issued well . By analogy with the design of the beam intake, these wells can be called beam wells. The distance between the mouths of production wells on the side of the quarry depends on the PI formation development system (with collapse of the roof of the formation, leaving pillars, etc.) and ranges from 20-30 to 50-60 meters. The angle of inclination of the wells to the horizon is equal to the dip angle of the PI formation. Production wells 8 are rotational, continuous slaughter, flushing with liquid or blowing air. After the wells have been drilled, they are equipped with a hydraulic monitor with side nozzles. Hydraulic breakdown of PI is carried out in the process of moving a hydromonitor projectile in production wells 8 along the uprising of PI formation 2, i.e. towards the side 7 of the quarry (figure 2). The resulting pulp flows by gravity into the receiving chamber 6 of the dispensing well 4, and from it is pulled out to the surface with the help of pulp-lifting equipment.

Предлагаемый способ Томской горнодобывающей компанией планируется использовать в процессе разработки глубокозалегающей части пластов ПИ Таловского буроугольного месторождения и Георгиевского месторождения цирконильменитовых песков (Томская область) после отработки их восстающего крыла открытым способом. Условие использования способа - уклон почвы пласта ПИ должен быть не менее 6%.The proposed method by the Tomsk mining company is planned to be used in the process of developing the deep-seated part of the PI Talovskoye brown coal deposit and Georgievskoye zirconilmenite sands deposit (Tomsk region) after working out their rising wing by the open method. The condition for using the method is the slope of the soil of the PI layer should be at least 6%.

Преимущества предлагаемого способа:The advantages of the proposed method:

- сокращается объем буровых работ за счет проходки добычных скважин по пласту ПИ,- reduced the amount of drilling due to the sinking of production wells in the PI formation,

- упрощается процесс сбойки добычных и выдачной скважин благодаря исключению транспортной горной выработки, служащей связующим звеном между добычными и выдачными скважинами,- simplifies the process of shutting down production and production wells due to the exclusion of transport mining, which serves as a link between production and production wells,

- упрощается управление работой добычных скважин в процессе отработки пласта ПИ,- simplified management of production wells in the process of mining the PI formation,

- снижается себестоимость добычных работ.- the cost of mining is reduced.

Claims (2)

1. Способ скважинной гидродобычи твердого полезного ископаемого из наклонного пласта, заключающийся в том, что на границе выемочного блока в падающем крыле пласта полезного ископаемого бурят выдачную скважину до входа в почву пласта, ствол которой до кровли пласта крепят обсадными трубами, оснащают выдачную скважину пульпоподъемным оборудованием, бурят добычную скважину по падению наклонного пласта полезного ископаемого, образуют связанную с выдачной скважиной приемную камеру посредством гидроразмыва пласта, затем производят гидроотбойку полезного ископаемого путем перемещения гидромониторного снаряда с боковыми насадками вдоль добычной скважины в направлении от приемной камеры, при этом образовавшаяся пульпа самотеком поступает в приемную камеру, откуда с помощью пульпоподъемного оборудования пульпа по выдачной скважине выдается на поверхность, отличающийся тем, что после отработки восстающего крыла наклонного пласта полезного ископаемого открытым способом с образованием карьера, добычную скважину бурят в борту карьера по пласту полезного ископаемого до сбойки ее с приемной камерой выдачной скважины, которую образуют в призабойной зоне выдачной скважины посредством гидроразмыва, а гидроотбойку полезного ископаемого осуществляют путем перемещения гидромониторного снаряда вдоль добычной скважины в направлении от приемной камеры к борту карьера.1. The method of downhole hydraulic production of solid minerals from an inclined formation, which consists in the fact that at the boundary of the extraction block in the falling wing of the mineral formation, a delivery well is drilled before entering the formation soil, the trunk of which is secured with casing pipes to the roof of the formation, and the delivery well is equipped with slurry lifting equipment drill a production well by the dip of an inclined mineral formation, form a receiving chamber connected to a production well by means of a hydraulic washing of the formation, then hydro the striking of the mineral by moving the hydro-monitor with side nozzles along the production well in the direction from the receiving chamber, while the resulting pulp flows by gravity into the receiving chamber, from where, using pulp lifting equipment, the pulp is discharged to the surface through the dispensing well, characterized in that after working out the rising wing open-pit inclined mineral formation with the formation of a quarry; a production well is drilled in the quarry along the mineral reservoir until Sat it is washed with the receiving chamber of the issuing well, which is formed in the bottomhole zone of the issuing well by means of hydraulic washing, and the hydraulic breaking of the mineral is carried out by moving the hydro-monitor along the production well in the direction from the receiving chamber to the open pit. 2. Способ скважинной гидродобычи твердого полезного ископаемого из наклонного пласта, заключающийся в том, что на границе выемочного блока в падающем крыле пласта полезного ископаемого бурят выдачную скважину до входа в почву пласта, ствол которой до кровли пласта крепят обсадными трубами, оснащают выдачную скважину пульпоподъемным оборудованием, бурят добычную скважину по падению наклонного пласта полезного ископаемого, образуют связанную с выдачной скважиной приемную камеру посредством гидроразмыва пласта, затем производят гидроотбойку полезного ископаемого путем перемещения гидромониторного снаряда с боковыми насадками вдоль добычной скважины в направлении от приемной камеры, при этом образовавшаяся пульпа самотеком поступает в приемную камеру, откуда с помощью пульпоподъемного оборудования пульпа по выдачной скважине выдается на поверхность, отличающийся тем, что после отработки восстающего крыла наклонного пласта полезного ископаемого открытым способом с образованием карьера, бурят в борту карьера по пласту полезного ископаемого добычные скважины, устья которых рассредотачивают по простиранию пласта полезного ископаемого, до сбойки их с приемной камерой выдачной скважины, которую образуют в призабойной зоне выдачной скважины посредством гидроразмыва, а гидроотбойку полезного ископаемого осуществляют путем перемещения гидромониторного снаряда вдоль каждой добычной скважины в направлении от приемной камеры к борту карьера.2. The method of downhole hydraulic production of solid minerals from an inclined formation, which consists in the fact that at the boundary of the extraction block in the falling wing of the mineral formation, a delivery well is drilled before entering the formation soil, the trunk of which is secured with casing pipes to the roof of the formation, and the delivery well is equipped with pulp-lifting equipment drill a production well by the dip of an inclined mineral formation, form a receiving chamber connected to a production well by means of a hydraulic washing of the formation, then hydro the striking of the mineral by moving the hydro-monitor with side nozzles along the production well in the direction from the receiving chamber, while the resulting pulp flows by gravity into the receiving chamber, from where, using pulp lifting equipment, the pulp is discharged to the surface through the dispensing well, characterized in that after working out the rising wing open pit inclined mineral formation with the formation of a quarry; drilled in the quarry along the mineral reservoir production wells, mouth which are dispersed along the strike of the mineral reservoir, until they collapse with the receiving chamber of the production well, which is formed in the bottomhole zone of the production well by hydraulic washing, and hydraulic breaking of the mineral is carried out by moving a hydraulic monitoring projectile along each production well in the direction from the receiving chamber to the pit side.
RU2003102570/03A 2003-01-30 2003-01-30 Method for well hydraulic extraction of hard mineral resource from slanted bed (variants) RU2235882C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2003102570/03A RU2235882C1 (en) 2003-01-30 2003-01-30 Method for well hydraulic extraction of hard mineral resource from slanted bed (variants)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2003102570/03A RU2235882C1 (en) 2003-01-30 2003-01-30 Method for well hydraulic extraction of hard mineral resource from slanted bed (variants)

Publications (2)

Publication Number Publication Date
RU2003102570A RU2003102570A (en) 2004-07-20
RU2235882C1 true RU2235882C1 (en) 2004-09-10

Family

ID=33433449

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2003102570/03A RU2235882C1 (en) 2003-01-30 2003-01-30 Method for well hydraulic extraction of hard mineral resource from slanted bed (variants)

Country Status (1)

Country Link
RU (1) RU2235882C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2499140C2 (en) * 2011-04-27 2013-11-20 Юрий Викторович Пономаренко Method of well hydromining at excavation with preliminary drying of minerals
RU2807619C2 (en) * 2022-02-16 2023-11-17 Общество с ограниченной ответственностью (ООО) "Морские платформы" (ООО "Морские платформы") Method of borehole hydraulic mining of minerals and a device for its implementation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2499140C2 (en) * 2011-04-27 2013-11-20 Юрий Викторович Пономаренко Method of well hydromining at excavation with preliminary drying of minerals
RU2807619C2 (en) * 2022-02-16 2023-11-17 Общество с ограниченной ответственностью (ООО) "Морские платформы" (ООО "Морские платформы") Method of borehole hydraulic mining of minerals and a device for its implementation

Similar Documents

Publication Publication Date Title
CN102505963B (en) Stope face roof water pre-drainage construction method
CN105804754B (en) A kind of coal seam is Main aquifer pitshaft method for uncovering coal
CN104975868A (en) Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling
CN111827878A (en) Method for quickly and accurately probing hidden water inrush channel of coal seam floor
US20130106166A1 (en) Horizontal Borehole Mining System and Method
WO2012009759A1 (en) Hydraulic mining system for tabular orebodies utilising directional drilling techniques
RU2447290C1 (en) Method for degassing of coal beds
RU2235882C1 (en) Method for well hydraulic extraction of hard mineral resource from slanted bed (variants)
RU2235881C1 (en) Method for extraction of slanted bed of hard mineral resource by means of method of well hydro-extraction (variants)
RU2664281C1 (en) Method for developing kimberlite deposits
CN114233383B (en) Construction method of water storage system of open pit coal mine
CN114278372A (en) Guiding arrangement method for underground directional drilling area of ultra-thick water-rich layer
RU2315867C2 (en) Method for thick steeply inclined coal seam excavation
RU2078209C1 (en) Method of mining mineral deposits and superstructure for its embodiment
RU2640611C2 (en) Hydraulic bore mining of minerals
RU2361083C2 (en) Procedure of borehole hydraulic extraction of minerals
CN111749694B (en) Collaborative mining method capable of mining under pressure
RU2340774C2 (en) Method of hydraulic borehole mining of minerals
RU1793056C (en) Method of hole hydraulic mining of mineral resources from inclined seams
RU2097563C1 (en) Method of hydraulic borehole mining of coal formation
RU2499140C2 (en) Method of well hydromining at excavation with preliminary drying of minerals
SU1444525A1 (en) Method of extracting minerals from producing beds
RU2109949C1 (en) Process of borehole hydraulicking of minerals and aggregate for its implementation
CN111894671B (en) Ground water pumping hole pumping and draining method aiming at working face top plate separation layer water damage
RU2097560C1 (en) Process of well hydraulic mining

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20050131