RU2203356C1 RU2001123184A RU2001123184A RU2203356C1 RU 2203356 C1 RU2203356 C1 RU 2203356C1 RU 2001123184 A RU2001123184 A RU 2001123184A RU 2001123184 A RU2001123184 A RU 2001123184A RU 2203356 C1 RU2203356 C1 RU 2203356C1
Authority
RU
Russia
Prior art keywords
installation
road
portal
supports
existing
Prior art date
Application number
RU2001123184A
Other languages
Russian (ru)
Inventor
А.А. Корнацкий
Original Assignee
Корнацкий Аркадий Алексеевич
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to RU2001123184A priority Critical patent/RU2203356C1/en
Application filed by Корнацкий Аркадий Алексеевич filed Critical Корнацкий Аркадий Алексеевич
Priority to EA200301013A priority patent/EA004612B1/en
Priority to DK01274103.9T priority patent/DK1384816T3/en
Priority to CNB018233236A priority patent/CN1238607C/en
Priority to EP01274103A priority patent/EP1384816B1/en
Priority to CA002443836A priority patent/CA2443836C/en
Priority to PCT/RU2001/000487 priority patent/WO2002081821A1/en
Priority to US10/473,139 priority patent/US7210183B2/en
Priority to KR1020037013235A priority patent/KR100866106B1/en
Priority to AT01274103T priority patent/ATE545734T1/en
Priority to JP2002579572A priority patent/JP2004522018A/en
Application granted granted Critical
Publication of RU2203356C1 publication Critical patent/RU2203356C1/en
Priority to HK04105606.1A priority patent/HK1064137A1/en
Priority to US11/714,210 priority patent/US7401371B2/en

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

FIELD: technology to build high-speed motor roads and equipment for their building. SUBSTANCE: method includes erection of bearing supports and mounting of span structure with use of mobile set of gantry type. Set to build motor road comes in the form of mobile, preferably, self-propelled gantry with shape of tunnel with control system that ensures passage of road transport going along existing road through it. Upper part of gantry has capability for mounting span structure of high-speed motor road above it. EFFECT: widened technological potential of high-speed motor road build under restricted conditions. 8 cl, 3 dwg

Description

Изобретения относятся к области технологии сооружения скоростных автомобильных дорог, оборудования для сооружения скоростных автомобильных дорог, используемых в качестве дорог - дублеров существующих автомобильных внутригородских и загородных дорог, предназначенных для интенсивного движения автомобильного транспорта. Особое место среди дорожно-транспортных проблем занимают вопросы дорожного строительства и обеспечения нормальной пропускной способности улиц и магистралей городов-мегаполисов, прежде всего - Москвы. Такие же проблемы возникают и на автомобильных дорогах, и, особенно, на пересечениях дорог, связывающих крупные города с их пригородами, например, с местами отдыха или компактного проживания. The invention relates to the field of technology for the construction of high-speed roads, equipment for the construction of high-speed roads used as roads - understudies of existing interurban and suburban roads designed for heavy traffic. A special place among road transport problems is occupied by issues of road construction and ensuring the normal throughput of streets and highways of megalopolises, primarily Moscow. The same problems arise on the roads, and especially at the intersections of roads connecting large cities with their suburbs, for example, places of recreation or compact residence.

Известно, что при реконструкции улиц и дорог традиционными способами неизбежно происходит полное перекрытие или сужение проезжей части, что чрезвычайно усугубляет и без того сложную дорожную обстановку, поскольку транспортные заторы увеличиваются, как на реконструируемых, так и на соседних улицах или дорогах. Кроме того, возникают проблемы, связанные с изъятием земель, вырубкой зеленых насаждений, сносом строений, нарушением инженерных коммуникаций, которые требуют для их решения достаточно больших материальных затрат. It is known that during the reconstruction of streets and roads by traditional methods, the roadway is completely blocked or narrowed, which extremely aggravates the already difficult traffic situation, as traffic congestion increases both on reconstructed and on neighboring streets or roads. In addition, there are problems associated with land acquisition, deforestation, demolition of buildings, disruption of utilities, which require quite large material costs to solve them.

Из уровня техники известно, что были предприняты попытки решения указанных выше проблем на автомобильных дорогах (патент US 3811147, 1974 г.), при которых сооружение или реконструкция автомобильной дороги производилась традиционными технологическими средствами, расположенными под передвижной платформой, по верхнему поясу которой было организовано движение транспортных средств. Для въезда и съезда с платформы служили пандусы, соединенные с ее первой и концевой ее секциями. Секции платформы оснащены гидроцилиндрами для изменения положения секций по высоте, связанными с опорными тележками. По боковым сторонам платформы расположены ограждения, исключающие проникновение посторонних лиц и отвлечение участников движения и в связи с этим, исключающими замедление движения транспортных средств по смежным с платформой полосам движения. Под платформой имеются помещения для размещения ремонтного оборудования. Управление энергетической установкой платформы осуществляется с выносного пульта управления. It is known from the prior art that attempts have been made to solve the above problems on highways (US patent 3811147, 1974), in which the construction or reconstruction of the highway was carried out by traditional technological means located under a mobile platform, along the upper belt of which traffic was organized Vehicle. For entry and exit from the platform, there were ramps connected to its first and final sections. The sections of the platform are equipped with hydraulic cylinders for changing the position of the sections in height, connected with the support trolleys. Fences are located on the sides of the platform, which exclude the penetration of unauthorized persons and distraction of traffic participants and, in this regard, exclude the slowdown of vehicles in lanes adjacent to the platform. Under the platform there are rooms for the placement of repair equipment. The power plant is controlled from the remote control panel.

Однако описанная выше технология и установка для ее реализации, не позволили решить поставленную задачу - расширение технологических возможностей за счет сооружения скоростной автомобильной дороги в стесненных условиях без снижения интенсивности транспортного движения по существующей дороге, поскольку не позволяют возводить скоростную дорогу в виде эстакады над существующей дорогой. However, the technology described above and the installation for its implementation did not allow us to solve the problem - expanding technological capabilities by constructing a high-speed road in cramped conditions without reducing the intensity of traffic on the existing road, since they do not allow the construction of a high-speed road in the form of a flyover over an existing road.

Эти проблемы частично решены, в основном для прямолинейных участков дороги, в установке для сооружения скоростной автомобильной дороги и примененной при этом технологии (RU 18715 U1, 10.04.2001), дальнейшим совершенствованием которой являются настоящие изобретения. Дорогу сооружают, преимущественно в стесненных условиях, способом, при котором, по крайней мере, часть технологических операций по выполнению фундаментной части несущих опор и/или по размещению несущих опор на фундаментной части и/или по установке на несущие опоры ригелей и/или по монтажу пролетного строения выполнены с уровня верхней несущей рабочей поверхности передвижной установки портального типа с обеспечением возможности автомобильного движения по существующей автомобильной дороге. Установку, при этом, размещают, над проезжей частью существующей автомобильной дороги и по продольной ее оси или параллельно ей или под острым углом к ней, что позволяет сооружать в заданном направлении, предпочтительно крытую эстакаду, образованную выполненным на опорах пролетным строением с проезжей частью и имеющую, по крайней мере, один въезд и, по крайней мере, один съезд. These problems have been partially solved, mainly for straight sections of the road, in an installation for the construction of a high-speed road and the technology used in this process (RU 18715 U1, 04/10/2001), which are further improved by the present inventions. The road is constructed, mainly in cramped conditions, by a method in which at least part of the technological operations for the implementation of the foundation part of the bearing supports and / or for the placement of the bearing supports on the foundation part and / or for installing the crossbars on the bearing supports and / or installation spans are made from the level of the upper load-bearing working surface of a portal-type mobile installation with the possibility of automobile traffic on an existing highway. The installation, in this case, is placed above the carriageway of the existing road and along its longitudinal axis or parallel to it or at an acute angle to it, which makes it possible to construct, in a predetermined direction, preferably a covered overpass formed by a span with supports for the carriageway and having a carriageway at least one entry and at least one exit.

Предлагаемые технические решения направлены на кардинальное решение указанных выше проблем, прежде всего, в стесненных условиях существующих застроек и землеотводов, не позволяющих широко использовать существующие дорожно-строительные технологии и оборудование для сооружения скоростных автомобильных дорог, особенно в местах их пересечений, без, хотя бы временного прекращения автомобильного движения по существующей дороге. The proposed technical solutions are aimed at radically solving the above problems, especially in the cramped conditions of existing buildings and land allotments, which do not allow the widespread use of existing road-building technologies and equipment for the construction of high-speed roads, especially at their intersections, without at least temporary stopping car traffic on an existing road.

Таким образом, задачей предлагаемых технических решений является расширение технологических возможностей за счет сооружения скоростной дороги в стесненных условиях, особенно, на пересечениях дорог, без снижения интенсивности транспортного движения, а также создание скоростной автомобильной дороги указанным путем, расположенной над существующей транспортной магистралью, в основном, по ее продольной оси, в процессе строительства которой не создается каких-либо помех движению транспортных средств по существующей дороге. Thus, the objective of the proposed technical solutions is the expansion of technological capabilities through the construction of a highway in cramped conditions, especially at road intersections, without reducing the intensity of traffic, as well as the creation of a high-speed road in this way, located above the existing transport highway, mainly along its longitudinal axis, during the construction of which there is no interference with the movement of vehicles on the existing road.

Поставленная задача согласно изобретениям достигается тем, что:
- в части способа сооружения скоростной автомобильной дороги, преимущественно в стесненных условиях застройки города и/или землеотвода пригорода, сооружаемой в виде проходящей, по крайней мере однократно, над пересечением существующих дорог, эстакады, продольную ось которой, по крайней мере, на части ее длины располагают по продольной оси одной из существующих автомобильных дорог или параллельно ей или на отдельных участках под углом к ней, включающий выполнение фундаментной части несущих опор, сооружение несущих опор на фундаментной части и монтаж пролетного строения, по крайней мере часть операций которого осуществляют с передвижной установки портального типа, располагаемой по продольной оси одной из существующих автомобильных дорог или параллельно ей или под углом к ней, при этом высота пролета под установкой в ее рабочем положении достаточна для обеспечения проезда под ней движущегося по существующей дороге автомобильного транспорта, причем над пересечением, например Т-образным или Х-образным, автомобильных дорог устанавливают, по крайней мере одну, дополнительную секцию установки портального типа, с обеспечением возможности проезда под ней автомобильного транспорта в установленных направлениях автомобильного движения на данном перекрестке, над которой осуществляют монтаж пролетного строения без вывода данного участка существующей дороги из пользования. При этом, после окончания монтажа пролетного строения над перекрестком дополнительную секцию перемещают, преимущественно по оси строительства скоростной автомобильной дороги или под углом к ней, например, в одном из направлений дорог, образующих перекресток. Кроме того, рядом и/или на передвижной установке портального типа и/или, по крайней мере, рядом и/или на одной ее секции, по крайней мере, с одной боковой ее стороны устанавливают защитное ограждение, выполненное в виде панели, имеющей со стороны, обращенной внутрь портала, предупреждающую разметку, предпочтительно, освещаемую. При этом, передвижные опоры установки портального типа располагают в пределах существующей автомобильной дороги и/или в пределах ее землеотвода, причем перед размещением передвижных опор определяют достаточность в зоне размещения передвижных опор несущей способности существующей автомобильной дороги или землеотвода, и при недостаточности несущей способности принимают меры к ее повышению или снижают удельную нагрузку на существующую автомобильную дорогу от передвижных опор, например, уменьшая массу установки портального типа и/или размещаемого на ней оборудования или увеличивая количество передвижных опор по длине и/или ширине установки. А монтаж пролетного строения эстакады могут осуществлять путем надвижки предварительно собранных металлических секций с использованием для них в качестве промежуточной опоры передвижной установки портального типа или ее секции;
- в части установки для сооружения скоростной автомобильной дороги, - установка выполнена в виде передвижного, предпочтительно самоходного с системой управления, портала по форме тоннеля, обеспечивающего возможность пропуска внутри него автомобильного транспорта, движущегося по существующей дороге, а верхняя поверхность портала выполнена с возможностью монтажа над ней пролетного строения скоростной автомобильной дороги, а также с возможностью размещения, и/или передвижения, и/или развертывания в рабочее положение на ней технологического, предпочтительно самоходного, оборудования для сооружения или монтажа опор и/или пролетного строения скоростной автомобильной дороги, причем, предпочтительно, для сооружения скоростной автомобильной дороги над пересечениями, предпочтительно автомобильных, дорог установка снабжена, по крайней мере одной, дополнительной, предпочтительно автономной, секцией, выполненной в виде установленного, по крайней мере на двух, передвижных или переставных опорах, портала, образующего тоннель для передвижения транспорта по существующей дороге между опорами портала в требуемом направлении. При этом, для несущей конструкции, по крайней мере портала дополнительной секции, могут быть использованы балки, например полые, или стержневые фермы. А дополнительная секция или дополнительные секции, устанавливаемые над пересечением дорог, выполнены длиной, перекрывающей ширину пересекаемой существующей дороги, предпочтительно, с размещением их опор на участках дороги, не отведенных под проезжую часть.
The task according to the invention is achieved by the fact that:
- in terms of the method of constructing a high-speed highway, mainly in the cramped conditions of city development and / or land acquisition of a suburb, constructed in the form of a flyover passing at least once over the intersection of existing roads, the longitudinal axis of which is at least part of its length placed along the longitudinal axis of one of the existing roads or parallel to it or in separate sections at an angle to it, including the implementation of the foundation part of the bearing supports, the construction of bearing supports on the foundation h spans and installation, at least part of the operations of which are carried out from a portable installation of a portal type located along the longitudinal axis of one of the existing roads or parallel to it or at an angle to it, while the height of the span under the installation in its working position is sufficient to ensure the passage under it of a motor vehicle moving on an existing road, and at least one additional vehicle is installed over an intersection, for example, a T-shaped or an X-shaped, th gantry installation section, to enable passage underneath road transport directions established traffic at this junction, above which carry out installation of the span of the silent portion of the existing road use. In this case, after the installation of the superstructure over the intersection is completed, the additional section is moved, mainly along the axis of construction of the high-speed road or at an angle to it, for example, in one of the directions of the roads forming the intersection. In addition, near and / or on a portable installation of a portal type and / or at least nearby and / or on one of its sections, at least on one side of its side, a protective fence is made, made in the form of a panel having on the side facing the inside of the portal, warning markings, preferably illuminated. Moreover, the mobile supports of the portal-type installation are located within the existing highway and / or within its land allocation, and before placing the mobile supports, the sufficiency of the bearing capacity of the existing road or land allocation in the area of the mobile supports is determined, and if the bearing capacity is insufficient, take measures to increase it or reduce the specific load on the existing road from mobile supports, for example, reducing the mass of the installation of the portal type and / or equipment placed on it or increasing the number of mobile supports along the length and / or width of the installation. And the installation of the span structure of the flyover can be carried out by sliding the pre-assembled metal sections using for them as an intermediate support the portable installation of the portal type or its section;
- in terms of the installation for the construction of a high-speed road, - the installation is made in the form of a mobile, preferably self-propelled, with a control system, a portal in the form of a tunnel, allowing the passage inside it of vehicles moving along an existing road, and the upper surface of the portal is made with the possibility of mounting above span of a high-speed highway, as well as with the possibility of placement, and / or movement, and / or deployment in a working position on it technological of predominantly self-propelled equipment for the construction or installation of supports and / or superstructure of a high-speed road, and preferably for the construction of a high-speed road over intersections, preferably highways, the installation is equipped with at least one additional, preferably autonomous, section made in the form of a portal installed at least on two, movable or movable supports, forming a tunnel for the movement of vehicles on an existing road between the supports of the portal in the desired direction. At the same time, for the supporting structure, at least the portal of the additional section, beams, for example hollow, or rod trusses can be used. And the additional section or additional sections installed above the intersection of roads is made with a length that overlaps the width of the intersected existing road, preferably with the placement of their supports on sections of the road that are not reserved for the carriageway.

Изобретения поясняются чертежами, где:
- на фиг. 1 представлена схема производства строительных работ по сооружению участка скоростной автомобильной дороги над Т-образным перекрестком (стрелками здесь и далее на фиг.2 и 3 показано направление движения транспорта);
- на фиг. 2 представлена схема размещения установки для строительства скоростной автомобильной дороги и секции установки над Х-образным перекрестком;
- на фиг. 3 представлена схема размещения установки для строительства скоростной автомобильной дороги и секции установки над Т-образным перекрестком.
The invention is illustrated by drawings, where:
- in FIG. 1 shows a diagram of the construction work for the construction of a section of a high-speed road above a T-junction (arrows hereinafter in FIGS. 2 and 3 show the direction of traffic);
- in FIG. 2 shows the layout of the installation for the construction of a high-speed road and the installation section above the X-shaped intersection;
- in FIG. Figure 3 shows the layout of the installation for the construction of a high-speed road and the installation section above the T-junction.

Установка для сооружения скоростной автомобильной дороги выполнена в виде передвижного, предпочтительно самоходного с системой управления, портала 1 по форме тоннеля, обеспечивающего возможность пропуска внутри него автомобильного транспорта 2, движущегося по существующей дороге 3. Верхняя поверхность портала 1 выполнена с возможностью монтажа над ней пролетного строения скоростной автомобильной дороги 4, а также с возможностью размещения, и/или передвижения, и/или развертывания в рабочее положение на ней технологического, предпочтительно самоходного, оборудования 5 для сооружения или монтажа опор 6 и/или балок 7 пролетного строения сооружаемой дороги. Установка для сооружения скоростной автомобильной дороги над пересечениями автомобильных дорог снабжена дополнительной секцией 8, выполненной в виде установленного, по крайней мере на двух, передвижных или переставных опорах 9 портала 10, образующего тоннель для передвижения транспорта по существующей дороге между опорами портала в требуемом направлении (обозначено стрелками на фиг. 1-3). При этом, для несущей конструкции портала 1 и секции 8, могут быть использованы балки, например полые, или стержневые фермы 10 (по типу козловых кранов). А дополнительная секция или дополнительные секции, устанавливаемые над пересечением дорог, выполнены длиной (фиг.1), перекрывающей ширину пересекаемой существующей дороги, предпочтительно, с размещением их опор на участках дороги, не отведенных под проезжую часть. The installation for the construction of a high-speed road is made in the form of a mobile, preferably self-propelled, control system, portal 1 in the form of a tunnel, allowing the passage of automobile vehicles 2 moving along the existing road 3. The upper surface of the portal 1 is made with the possibility of mounting a span above it High-speed highway 4, as well as with the possibility of placement, and / or movement, and / or deployment of a technological position on it, prefer flax of self-propelled equipment 5 for the construction or installation of supports 6 and / or beams 7 of the span of the road under construction. The installation for the construction of a high-speed road above the road intersections is equipped with an additional section 8 made in the form of a portal 10 installed on at least two mobile or movable supports 9, forming a tunnel for moving vehicles along the existing road between the portal supports in the required direction (indicated arrows in Fig. 1-3). At the same time, for the supporting structure of the portal 1 and section 8, beams, for example hollow, or rod trusses 10 (by the type of gantry cranes) can be used. And the additional section or additional sections installed above the intersection of roads is made in length (Fig. 1), overlapping the width of the intersected existing road, preferably with the placement of their supports on road sections that are not reserved for the carriageway.

При работе установки реализуется способ сооружения скоростной автомобильной дороги, преимущественно в стесненных условиях застройки города и/или землеотвода пригорода. Начало строительства скоростной автомобильной дороги осуществляется обустройством въездных путей к установленной по оси существующей дороги секции. Непосредственно на верхней несущей рабочей поверхности размещается необходимое для принятой технологии производства работ оборудование - монтажный кран или экскаватор с буровым оборудованием, которые производят сооружение автомобильной скоростной дороги "сверху вниз", выполняя со второго яруса работы на уровне и ниже уровня существующей проезжей части дороги. Сооружаемая дорога в виде эстакады проходит, по крайней мере однократно, над пересечением существующих дорог 3. Продольную ось эстакады, по крайней мере, на части ее длины располагают по продольной оси одной из существующих автомобильных дорог 3 или параллельно ей или на отдельных участках под углом к ней. Способ сооружения включает выполнение фундаментной части 11 несущих опор 12, сооружение несущих опор 12 на фундаментной части и монтаж пролетного строения. По крайней мере часть из указанных операций осуществляют с передвижной установки портального типа, располагаемой по продольной оси одной из существующих автомобильных дорог 3 или параллельно ей или под углом к ней, при этом высота пролета под установкой в ее рабочем положении достаточна для обеспечения проезда под ней движущегося по существующей дороге автомобильного транспорта, причем над пересечением, например Т-образным или Х-образным, автомобильных дорог устанавливают, по крайней мере одну, дополнительную секцию установки портального типа, с обеспечением возможности проезда под ней автомобильного транспорта 2 в установленных направлениях автомобильного движения на данном перекрестке, над которой осуществляют монтаж пролетного строения без вывода данного участка существующей дороги из пользования. При этом, после окончания монтажа пролетного строения над перекрестком дополнительную секцию перемещают, преимущественно по оси строительства скоростной автомобильной дороги или под углом к ней, например, в одном из направлений дорог, образующих перекресток. Кроме того, рядом и/или на передвижной установке портального типа и/или, по крайней мере, рядом и/или на одной ее секции, по крайней мере, с одной боковой ее стороны устанавливают защитное ограждение 13, выполненное в виде панели, имеющей со стороны, обращенной внутрь портала, предупреждающую разметку, предпочтительно, освещаемую. При этом, передвижные опоры установки портального типа располагают в пределах существующей автомобильной дороги и/или в пределах ее землеотвода, причем перед размещением передвижных опор определяют достаточность в зоне размещения передвижных опор несущей способности существующей автомобильной дороги или землеотвода, и при недостаточности несущей способности принимают меры к ее повышению (упрочняют грунт, засыпают щебнем кюветы, укладывают дорожные плиты и т.п.) или снижают удельную нагрузку на существующую автомобильную дорогу от передвижных опор, например, уменьшая массу установки портального типа и/или размещаемого на ней оборудования или увеличивая количество передвижных опор по длине и/или ширине установки. А монтаж пролетного строения эстакады могут осуществлять путем надвижки предварительно собранных металлических секций с использованием для них в качестве промежуточной опоры передвижной установки портального типа или ее секции. When the installation is working, a method of constructing a high-speed road is implemented, mainly in the cramped conditions of the city's development and / or land allocation of the suburbs. The beginning of the construction of a high-speed road is carried out by arranging access roads to the section installed along the axis of the existing road. The equipment necessary for the adopted production technology is located directly on the upper bearing work surface - an installation crane or an excavator with drilling equipment that constructs the highway from top to bottom, performing work from the second tier at and below the level of the existing carriageway. The road being constructed in the form of a flyover passes, at least once, over the intersection of existing roads 3. The longitudinal axis of the flyover, at least on a part of its length, is located along the longitudinal axis of one of the existing roads 3 or parallel to it or in separate sections at an angle to her. The method of construction includes the implementation of the foundation part 11 of the bearing supports 12, the construction of the bearing supports 12 on the foundation part and the installation of the span. At least part of these operations is carried out with a mobile installation of the portal type, located along the longitudinal axis of one of the existing roads 3 or parallel to it or at an angle to it, while the height of the span under the installation in its working position is sufficient to ensure that the moving underneath along the existing road of motor transport, and at least one additional installation section of the portal is installed over the intersection, for example, T-shaped or X-shaped, of roads of the second type, with the possibility of automobile transport 2 passing under it in the established directions of automobile traffic at this intersection, over which the superstructure is being installed without taking this section of the existing road out of use. Moreover, after the installation of the superstructure over the intersection is completed, the additional section is moved, mainly along the axis of construction of the high-speed road or at an angle to it, for example, in one of the directions of the roads forming the intersection. In addition, near and / or on a portable installation of a portal type and / or at least nearby and / or on one of its sections, at least on one side of it, a protective fence 13 is formed, made in the form of a panel having side facing the inside of the portal, warning markings, preferably illuminated. Moreover, the mobile supports of the portal type installation are located within the existing highway and / or within its land allocation, and before placing the mobile supports, the sufficiency in the area of the mobile supports of the bearing capacity of the existing road or land acquisition is determined, and if the bearing capacity is insufficient, take measures to its increase (harden the soil, fill the ditch with crushed stone, lay road plates, etc.) or reduce the specific load on the existing road from mobile supports, for example, reducing the mass of the gantry type installation and / or equipment placed on it, or increasing the number of mobile supports along the length and / or width of the installation. And the installation of the span structure of the flyover can be carried out by sliding the pre-assembled metal sections using for them as an intermediate support the portable installation of the portal type or its section.

Выполненная таким образом скоростная автомобильная дорога представляет собой крытую эстакаду, сооруженную без дополнительного землеотвода над существующей автомобильной дорогой, интенсивность движения по которой на период строительства скоростной автомобильной дороги практически не снижается. Пропускная способность в комплексе автомобильных дорог возрастет более, чем в два раза, за счет разгрузки существующей дороги, разделения по скорости автомобильных потоков и увеличения скорости движения автомобильного потока, направляемого по эстакаде сооруженной автомобильной дороги. Следует отметить, что при таком расположении скоростной автомобильной дороги очевидна целесообразность использования ее в качестве платной дороги для легкового автомобильного транспорта, поскольку альтернативная автомобильная дорога расположена непосредственно под ней. The high-speed highway made in this way is a covered overpass constructed without additional land allocation over the existing highway, the traffic intensity on which during the construction period of the high-speed highway is practically not reduced. The capacity in the complex of roads will more than double due to the unloading of the existing road, separation by the speed of automobile flows and an increase in the speed of the automobile stream directed along the overpass of the constructed highway. It should be noted that with such an arrangement of a high-speed road, the feasibility of using it as a toll road for passenger cars is obvious, since an alternative road is located directly below it.

Claims (8)

1. Способ сооружения скоростной автомобильной дороги, преимущественно в стесненных условиях застройки города и/или землеотвода пригорода, сооружаемой в виде проходящей, по крайней мере однократно, над пересечением существующих дорог, эстакады, продольную ось которой, по крайней мере, на части ее длины располагают по продольной оси одной из существующих автомобильных дорог или параллельно ей, или на отдельных участках под углом к ней, включающий выполнение фундаментной части несущих опор, сооружение несущих опор на фундаментной части и монтаж пролетного строения, по крайней мере, часть операций которого осуществляют с передвижной установки портального типа, располагаемой по продольной оси одной из существующих автомобильных дорог или параллельно ей, или под углом к ней, при этом высота пролета под установкой в ее рабочем положении достаточна для обеспечения проезда под ней движущегося по существующей дороге автомобильного транспорта, причем над пересечением, например Т-образным или Х-образным, автомобильных дорог устанавливают, по крайней мере, одну дополнительную секцию установки портального типа, с обеспечением возможности проезда под ней автомобильного транспорта в установленных направлениях автомобильного движения на данном перекрестке, над которой осуществляют монтаж пролетного строения без вывода данного участка существующей дороги из пользования. 1. A method of constructing a high-speed road, mainly in the cramped conditions of city development and / or land allocation of a suburb, constructed in the form of a flyover, passing at least once over the intersection of existing roads, the longitudinal axis of which is at least part of its length along the longitudinal axis of one of the existing roads or parallel to it, or in separate sections at an angle to it, including the implementation of the foundation part of the bearing supports, the construction of bearing supports on the foundation part and m the floor of the span, at least part of the operations of which are carried out from a mobile installation of the portal type, located along the longitudinal axis of one of the existing roads or parallel to it, or at an angle to it, while the height of the span under the installation in its working position is sufficient to ensure the passage under it of a motor vehicle moving along an existing road, and at least one additional sec is set over an intersection, for example, a T-shaped or an X-shaped, This is a portal-type installation, with the possibility of road transport under it in the established directions of automobile traffic at this intersection, over which the superstructure is being installed without taking this section of the existing road out of use. 2. Способ сооружения скоростной автомобильной дороги по п.1, в котором после окончания монтажа пролетного строения над перекрестком дополнительную секцию перемещают, преимущественно по оси строительства скоростной автомобильной дороги или под углом к ней, например, в одном из направлений дорог, образующих перекресток. 2. The method of constructing a high-speed road according to claim 1, in which after the installation of the superstructure over the intersection, the additional section is moved, mainly along the axis of construction of the high-speed road or at an angle to it, for example, in one of the directions of the roads forming the intersection. 3. Способ сооружения скоростной автомобильной дороги по п.1, в котором рядом и/или на передвижной установке портального типа и/или, по крайней мере, рядом и/или на одной ее секции, по крайней мере, с одной боковой ее стороны устанавливают защитное ограждение, выполненное в виде панели, имеющий со стороны, обращенной внутрь портала, предупреждающую разметку, предпочтительно, освещаемую. 3. The method of constructing a high-speed road according to claim 1, in which near and / or on a mobile installation of a portal type and / or at least nearby and / or on one of its sections, at least one side of it is installed a protective fence made in the form of a panel having, from the side facing the inside of the portal, a warning marking, preferably illuminated. 4. Способ сооружения скоростной автомобильной дороги по п.1, в котором передвижные опоры установки портального типа располагают в пределах существующей автомобильной дороги и/или в пределах ее землеотвода, причем перед размещением передвижных опор определяют достаточность в зоне размещения передвижных опор несущей способности существующей автомобильной дороги или землеотвода, и при недостаточности несущей способности принимают меры к ее повышению или снижают удельную нагрузку на существующую автомобильную дорогу от передвижных опор, например, уменьшая массу установки портального типа и/или размещаемого на ней оборудования или увеличивая количество передвижных опор по длине и/или ширине установки. 4. The method of constructing a high-speed road according to claim 1, in which the mobile supports of the portal type installation are located within the existing road and / or within its land allocation, and before placing the mobile supports, the sufficiency in the area of the mobile supports of the bearing capacity of the existing road is determined or land allocation, and in case of insufficient bearing capacity, take measures to increase it or reduce the specific load on the existing road from mobile support For example, reducing the weight of the installation gantry and / or placeable thereon equipment or increasing the number of mobile supports along the length and / or width of the installation. 5. Способ сооружения скоростной автомобильной дороги по любому из пп. 1-4, при котором монтаж пролетного строения эстакады осуществляют путем надвижки предварительно собранных металлических секций с использованием для них в качестве промежуточной опоры передвижной установки портального типа или ее секции. 5. A method of constructing a high-speed road according to any one of paragraphs. 1-4, in which the installation of the span structure of the flyover is carried out by sliding the pre-assembled metal sections using for them as an intermediate support a portable installation of the portal type or its section. 6. Установка для сооружения скоростной автомобильной дороги, выполненная в виде передвижного, предпочтительно самоходного с системой управления, портала по форме тоннеля, обеспечивающего возможность пропуска внутри него автомобильного транспорта, движущегося по существующей дороге, а верхняя поверхность портала выполнена с возможностью монтажа над ней пролетного строения скоростной автомобильной дороги, а также с возможностью размещения и/или передвижения, и/или развертывания в рабочее положение на ней технологического, предпочтительно самоходного, оборудования для сооружения или монтажа опор и/или пролетного строения скоростной автомобильной дороги, причем, предпочтительно, для сооружения скоростной автомобильной дороги над пересечениями, предпочтительно автомобильных дорог установка снабжена, по крайней мере, одной, дополнительной, предпочтительно автономной, секцией, выполненной в виде установленного, по крайней мере на двух, передвижных или переставных опорах, портала, образующего тоннель для передвижения транспорта по существующей дороге между опорами портала в требуемом направлении. 6. Installation for the construction of a high-speed road, made in the form of a mobile, preferably self-propelled, with a control system, a portal in the form of a tunnel, allowing the passage of automobile transport moving along an existing road inside it, and the upper surface of the portal is made with the possibility of mounting a superstructure over it high-speed road, as well as with the possibility of placement and / or movement, and / or deployment of a technological position on it, prefer flax of self-propelled equipment for the construction or installation of supports and / or the span of a high-speed road, and preferably for the construction of a high-speed road above intersections, preferably highways, the installation is equipped with at least one additional, preferably autonomous, section made in the form of a portal installed at least on two, movable or movable supports, forming a tunnel for moving vehicles along the existing road between the supports along mercury in the desired direction. 7. Установка для сооружения скоростной автомобильной дороги по п.6, в которой для несущей конструкции, по крайней мере портала дополнительной секции, использованы балки, например полые, или стержневые фермы. 7. Installation for the construction of high-speed road according to claim 6, in which for the supporting structure, at least the portal of the additional section, beams are used, for example hollow or core trusses. 8. Установка для сооружения скоростной автомобильной дороги по п.6 или 7, в которой дополнительная секция или дополнительные секции, устанавливаемые над пересечением дорог, выполнены длиной, перекрывающей ширину пересекаемой существующей дороги, предпочтительно, с размещением их опор на участках дороги, не отведенных под проезжую часть. 8. Installation for the construction of high-speed road according to claim 6 or 7, in which the additional section or additional sections installed above the intersection of roads are made with a length that overlaps the width of the intersected existing road, preferably with the placement of their supports on road sections not reserved roadway.
RU2001123184A 2001-04-10 2001-08-20 Method and set to build high-speed motor road RU2203356C1 (en)

Priority Applications (13)

Application Number Priority Date Filing Date Title
RU2001123184A RU2203356C1 (en) 2001-08-20 2001-08-20 Method and set to build high-speed motor road
KR1020037013235A KR100866106B1 (en) 2001-04-10 2001-11-15 Method and installation for building a highway and a highway
CNB018233236A CN1238607C (en) 2001-04-10 2001-11-15 Method and installation for building highway and highway
EP01274103A EP1384816B1 (en) 2001-04-10 2001-11-15 Method and installation for building a highway
CA002443836A CA2443836C (en) 2001-04-10 2001-11-15 A method and installation for constructing an expressway, and an expressway
PCT/RU2001/000487 WO2002081821A1 (en) 2001-04-10 2001-11-15 Method and installation for building a highway and a highway
EA200301013A EA004612B1 (en) 2001-04-10 2001-11-15 Method and installation for building a highway and a highway
DK01274103.9T DK1384816T3 (en) 2001-04-10 2001-11-15 Method and plant for building a road
AT01274103T ATE545734T1 (en) 2001-04-10 2001-11-15 METHOD AND SYSTEM FOR CONSTRUCTION OF A ROAD
JP2002579572A JP2004522018A (en) 2001-04-10 2001-11-15 Expressway construction method and apparatus, and expressway
US10/473,139 US7210183B2 (en) 2001-04-10 2001-11-15 Method and installation for building a highway and a highway
HK04105606.1A HK1064137A1 (en) 2001-04-10 2004-07-28 Method and installation for building a highway
US11/714,210 US7401371B2 (en) 2001-04-10 2007-03-06 Method and installation for constructing an expressway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2001123184A RU2203356C1 (en) 2001-08-20 2001-08-20 Method and set to build high-speed motor road

Publications (1)

Publication Number Publication Date
RU2203356C1 true RU2203356C1 (en) 2003-04-27

Family

ID=20252734

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001123184A RU2203356C1 (en) 2001-04-10 2001-08-20 Method and set to build high-speed motor road

Country Status (1)

Country Link
RU (1) RU2203356C1 (en)

Similar Documents

Publication Publication Date Title
KR100866106B1 (en) Method and installation for building a highway and a highway
CN112727134A (en) Construction method for rebuilding and expanding main structure of existing overhead operation subway station building
CN108035203A (en) Steel construction space framework unit, steel construction solid group frame and its application
CN112727132B (en) Method for dismantling existing canopy of overhead operation subway station
RU2203356C1 (en) Method and set to build high-speed motor road
CN116427281A (en) Pier column, capping beam and T beam integrated bridge girder erection machine installation construction method
RU30764U1 (en) MULTIFUNCTIONAL COMPLEX OF STRUCTURES ABOUT CROSSING OF TRANSPORT, PREFERREDLY, RADIAL AND RING, CITY VEHICLES
JP3954905B2 (en) Three-dimensional crossing method of plane intersection and viaduct
RU2181396C1 (en) Method and unit for construction of expressway and expressway
RU2380474C1 (en) Method of vehicle motion and device to this end (versions)
CN207862713U (en) Steel construction space framework unit and steel construction solid group frame
RU18715U1 (en) INSTALLATION FOR CONSTRUCTION OF A SPEED CAR ROAD AND A SPEED CAR ROAD
RU2192514C1 (en) Process of erection of building, structure above highways crossing
RU2136803C1 (en) Ring highway of megapolice and method for its reconstruction
CN111663815A (en) Tunnel type stereo garage under road and construction method thereof
RU2286416C2 (en) Pedestrian, traffic and railroad flow divider assembly installed at motor-road and railroad crossing
RU2198976C2 (en) Overhead motor road of megapolis transport complex and method of control and relief of passenger, passenger-and-freight and freight traffic flows
Kumar et al. A Review on Hong Kong-Zhuhai-Macao under Go Bridge
JP2004308225A (en) Work method and overhead bypass road
JP3682247B2 (en) Construction method of elevated traffic route
JP4037855B2 (en) Road bridge erection method
RU20521U1 (en) INSTALLATION FOR CONSTRUCTION OF A SPEED CAR ROAD AND A SPEED CAR ROAD
RU2198977C2 (en) Motor road and method of operation of megapolis highway
JP3619515B2 (en) Split-bridge type traffic road and method for constructing split-bridge type traffic road
RU2175365C2 (en) Road interchange