RU2159317C1 - Process of sinking and running of horizontal well - Google Patents

Process of sinking and running of horizontal well Download PDF

Info

Publication number
RU2159317C1
RU2159317C1 RU99115044A RU99115044A RU2159317C1 RU 2159317 C1 RU2159317 C1 RU 2159317C1 RU 99115044 A RU99115044 A RU 99115044A RU 99115044 A RU99115044 A RU 99115044A RU 2159317 C1 RU2159317 C1 RU 2159317C1
Authority
RU
Russia
Prior art keywords
well
production
drilling
horizontal
mouth
Prior art date
Application number
RU99115044A
Other languages
Russian (ru)
Inventor
В.В. Кульчицкий
Original Assignee
Кульчицкий Валерий Владимирович
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Кульчицкий Валерий Владимирович filed Critical Кульчицкий Валерий Владимирович
Priority to RU99115044A priority Critical patent/RU2159317C1/en
Application granted granted Critical
Publication of RU2159317C1 publication Critical patent/RU2159317C1/en

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

FIELD: exploitation of hydrocarbon fields with use of horizontal wells, production of oil and gas from deposits located at considerable distance from well-head. SUBSTANCE: process is realized by drilling and consolidation of vertical section of shaft, by drilling and consolidation of obliquely directed section of shaft and horizontal section of well shaft, by drilling and consolidation of vertical, obliquely directed and horizontal sections of second well at layout distance from well-head which is connected to horizontal section of first well forming column intercommunicating two well-heads, by fitting of column with at least one packer installed in clearance at depth of anticipated flooding outline. Running of horizontal section of well is started after completion of fitting of both well-heads, perforation and bringing of well to production. When flooding outline approaches point of installation of packer well clearance of running column is shut off in interval of installation of packer, well-head located at side opposite to direction of movement of flooding outline is used to inject liquid and gaseous agent to maintain seam pressure and opposite well-head is employed for production of hydrocarbons. One of well-heads can be used to conduct technological geophysical investigations in process of production of hydrocarbons from opposite well-head. On termination of running of given element of deposit perforation holes of operational column are sealed and well is employed in the capacity of pipe-line. EFFECT: increased efficiency of exploitation of deposits distant or difficult for installation of drilling and production equipment, exploitation of sea fields. 4 cl, 6 dwg

Description

Изобретение относится к разработке месторождений углеводородов при помощи горизонтальных скважин и может быть использовано для добычи нефти и газа из залежей, расположенных на значительном удалении от устья скважины. The invention relates to the development of hydrocarbon deposits using horizontal wells and can be used for oil and gas production from deposits located at a considerable distance from the wellhead.

Известен способ добычи углеводородов горизонтальными скважинами, включающий бурение и крепление вертикального направления, бурение и крепление наклонно-направленного ствола и горизонтального участка ствола скважины, оборудование устья, перфорацию и освоение скважины. Углеводороды, поступающие из пласта, под действием пластового давления или насосной установки подаются на дневную поверхность (см. Григорян А.М. Вскрытие пластов многозабойными и горизонтальными скважинами, М., Недра, 1969, с. 3-35). A known method of hydrocarbon production by horizontal wells, including drilling and fastening of the vertical direction, drilling and fastening of an inclined directional well and a horizontal section of the wellbore, wellhead equipment, perforation and well development. Hydrocarbons coming from the reservoir, under the influence of reservoir pressure or a pumping unit, are fed to the surface (see Grigoryan A.M. Exploration of reservoirs by multilateral and horizontal wells, M., Nedra, 1969, p. 3-35).

Недостатком указанного способа являются ограничения, накладываемые на длину горизонтального ствола скважины для обеспечения вскрытия продуктивного пласта, удаленного от устья на расстояние, превышающее технические возможности спуска эксплуатационной колонны при создании сжимающих усилий под действием собственного веса эксплуатационной колонны или ее принудительного проталкивания специальными устройствами, например гидравлическими домкратами, установленными на буровой, тогда эксплуатационная колонна продольно изгибается по все длине и волнообразно прижимается к стенкам скважины, затрудняя дальнейшее перемещение вплоть до остановки. Указанный способ не удовлетворяет требованиям эффективной добычи углеводородов для скважин с большим отклонением забоя от устья по причине малого диаметра эксплуатационной колонны. The disadvantage of this method is the restrictions imposed on the length of the horizontal wellbore to ensure the opening of the reservoir remote from the wellhead by a distance exceeding the technical capabilities of lowering the production string when creating compressive forces under the action of the own weight of the production string or forced pushing it with special devices, such as hydraulic jacks installed on the rig, then the production string is longitudinally bent along the sun length and is pressed against the undulating walls of the well, making it difficult to further movement until the stop. The specified method does not satisfy the requirements of effective hydrocarbon production for wells with a large deviation of the bottom from the well due to the small diameter of the production string.

Целью изобретения является разработка месторождений углеводородов, удаленных на десятки километров вовнутрь природоохранных зон и территорий, запрещенных или недоступных для установки бурового и нефтепромыслового оборудования, уменьшение числа буровых и эксплуатационных платформ на морских месторождениях углеводородов и роста добычи углеводородов за счет увеличения проходного сечения эксплуатационной колонны, как минимум, в два раза. The aim of the invention is the development of hydrocarbon deposits remote tens of kilometers inland of conservation zones and territories that are prohibited or inaccessible for the installation of drilling and oilfield equipment, reducing the number of drilling and production platforms at offshore hydrocarbon fields and increasing hydrocarbon production by increasing the cross section of the production string at least twice.

Поставленная цель достигается тем, что в способе сооружения горизонтальной скважины, включающем бурение и крепление вертикального направления, бурение и крепление наклонно-направленного ствола и горизонтального участка ствола скважины, на проектном расстоянии от устья ствола скважины забуривают и крепят второе вертикальное направление, при бурении под кондуктор осуществляют набор зенитного угла в направлении первого устья, после выхода на горизонталь ствол обсаживают технической колонной, диаметр которой равен или больше диаметра технической колонны, спущенной с первого устья, разбуривают башмак технической колонны с выходом и расширением ствола из-под башмака на длину долота со стыкующим приспособлением и компоновкой, включающей телеметрическую систему и стыкующее устройство, и спускают данную компоновку, не доходя до забоя на расстояние не менее длины долота со стыкующим приспособлением, и обеспечивают наведение горизонтального участка ствола, который бурят с первого устья компоновкой с телеметрической системой, обеспечивающей управление траекторией ствола и наведение долота со стыкующим приспособлением на стыкующее устройство, вводят долото со стыкующим приспособлением в стыкующее устройство, присоединяют обсадные трубы эксплуатационной колонны к колонне бурильных труб на первом устье, на втором устье создают растягивающее усилие к нижней части эксплуатационной колонны, которое освобождает колонну от волнообразного прижатия к стенкам скважины, и вытягивают ее ко второму устью, на эксплуатационной колонне устанавливают, как минимум, один заколонный пакер в интервале, соответствующем контуру планируемого заводнения. This goal is achieved by the fact that in the method of constructing a horizontal well, including drilling and securing a vertical direction, drilling and securing an inclined directional well and a horizontal section of the wellbore, at a design distance from the wellhead, a second vertical direction is drilled and secured when drilling under the conductor set the zenith angle in the direction of the first mouth, after reaching the horizontal, the barrel is cased with a technical column whose diameter is equal to or greater than the diameter an engineering column, lowered from the first mouth, drill the shoe of the technical column with the outlet and extension of the barrel from under the shoe to the length of the bit with a connecting device and an arrangement that includes a telemetry system and a connecting device, and lower this arrangement, not reaching the bottom face at a distance of at least the length of the bit with a connecting device, and provide guidance of the horizontal section of the barrel, which is drilled from the first mouth with a telemetry system that provides control of the trunk path and pointing the bit with the joining device to the joining device, introducing the bit with the joining device into the joining device, connecting the casing pipes of the production string to the drill pipe string on the first mouth, creating a tensile force on the second mouth to the bottom of the production string, which frees the string from wave-like pressing to the walls of the well, and pull it to the second wellhead, at least one casing packer is installed on the production casing in the interval corresponding to Contours of the planned flooding.

Также поставленная цель достигается тем, что в способе эксплуатации горизонтальной скважины, включающем вскрытие продуктивного пласта горизонтальным стволом и его крепление обсадной эксплуатационной колонной, оборудование устья, перфорацию и освоение скважины, после установки оборудования для отбора углеводородов на втором устье скважину осваивают и начинают добычу из устьев, и при приближении контура заводнения к месту установки пакера внутритрубное пространство эксплуатационной колонны в интервале установки пакера перекрывают, например, полимерным тампоном, и устье, расположенное на стороне, противоположной направлению перемещения контура заводнения, используют для нагнетания жидкого или газообразного агента с целью поддержания пластового давления, а противоположное устье - для добычи углеводородов. The goal is also achieved by the fact that in the method of operating a horizontal well, including opening a productive formation with a horizontal wellbore and securing it with a casing production string, equipment of the wellhead, perforation and development of the well, after installing the hydrocarbon extraction equipment at the second wellhead, the well is mastered and production begins from the wellheads , and when the waterflood circuit approaches the place of installation of the packer, the in-pipe space of the production string in the interval of installation of the packer is closed, for example, with a polymer swab, and the mouth located on the side opposite to the direction of movement of the waterflood circuit is used to pump a liquid or gaseous agent to maintain reservoir pressure, and the opposite mouth is used to produce hydrocarbons.

Также поставленная цель достигается тем, что одно из устьев скважины используют для проведения промысловых геофизических исследований в процессе добычи углеводородов из противоположного устья. The goal is also achieved by the fact that one of the wellheads is used to conduct field geophysical research in the process of hydrocarbon production from the opposite wellhead.

Также поставленная цель достигается тем, что после прекращения эксплуатации данного элемента месторождения перфорационные отверстия эксплуатационной колонны герметизируют и скважину используют в качестве трубопровода. The goal is also achieved by the fact that after the termination of the operation of this element of the field, the perforation holes of the production string are sealed and the well is used as a pipeline.

На фиг. 1 показана конструкция горизонтальной скважины во время ее эксплуатации; на фиг. 2 представлена схема сооружения горизонтальной скважины, включающей бурение и крепление вертикального направления, бурение и крепление наклонно-направленного ствола и горизонтального участка, бурение второго вертикального направления, второго наклонно-направленного ствола и второго горизонтального участка на проектном расстоянии от первого устья, разбуривание башмака второй технической колонны, спуск туда компоновки с телеметрической системой, обеспечивающей наведение горизонтального участка ствола, который бурят с первого устья компоновкой с телеметрической системой для управления траекторией ствола и наведения долота со стыкующим приспособлением на стыкующее устройство. На фиг. 3 изображено состояние эксплуатационной колонны в процессе ее спуска при создании растягивающего усилия, приложенного к нижней части колонны буровым станком со стороны второго устья. In FIG. 1 shows the design of a horizontal well during its operation; in FIG. 2 is a diagram of the construction of a horizontal well, including drilling and securing a vertical direction, drilling and securing an inclined directional trunk and a horizontal section, drilling a second vertical direction, a second inclined directional shaft and a second horizontal section at a design distance from the first wellhead, drilling a second technical shoe columns, descent there layout with a telemetric system, providing guidance of the horizontal section of the trunk, which is drilled from the first mouth an arrangement with a telemetric system for controlling the path of the barrel and pointing the bit with a jig to a jig. In FIG. 3 shows the state of the production casing during its descent when creating a tensile force applied to the bottom of the casing by the drilling rig from the side of the second mouth.

На фиг.4 показана схема разработки месторождения углеводородов горизонтальными скважинами, на фиг. 5 представлена схема разработки месторождения углеводородов горизонтальной скважиной в режиме нагнетания воды или газа через одно устье и добычи углеводородов через второе устье; на фиг. 6 - использование горизонтальной скважины после прекращения эксплуатации данного элемента месторождения. FIG. 4 shows a diagram of the development of a hydrocarbon field by horizontal wells; FIG. 5 is a diagram of the development of a hydrocarbon field by a horizontal well in the mode of pumping water or gas through one wellhead and hydrocarbon production through the second wellhead; in FIG. 6 - the use of a horizontal well after the cessation of operation of this element of the field.

Добычу углеводородов горизонтальными скважинами осуществляют следующим образом. Hydrocarbon production by horizontal wells is as follows.

Месторождение 1 находится между противоположными границами 2 и 3 территории, где возможна установка бурового и нефтепромыслового оборудования. Месторождение или его часть разбивают на эксплуатационные элементы 4. Рабочая часть 5 горизонтального ствола 6 в продуктивном пласте 7 находится внутри элемента 4 и обеспечивает оптимальную выработку залежи. На границе 2 с первого устья 8 забуривают вертикальное направление 9, при бурении под кондуктор 10 осуществляют набор зенитного угла в азимуте, направленном на второе устье 12. При бурении под техническую колонну 11 выходят на горизонталь и бурят на длину, позволяющую преодолеть сопротивление движению колонны обсадных труб 11. На проектном расстоянии от устья 8 с устья 12 забуривают и крепят второе вертикальное направление 13, при бурении под кондуктор 14 осуществляют набор зенитного угла в направлении устья 8. После выхода на горизонталь ствол обсаживают технической колонной 15, диаметр которой равен или больше диаметра обсадных труб 11, разбуривают башмак технической колонны 15 с выходом и расширением ствола из-под башмака на длину долота 20 со стыкующим приспособлением и компоновки, включающей телеметрическую систему 18 и стыкующее устройство 17, и спускают данную компоновку, не доходя до забоя на расстояние не менее длины долота 20 со стыкующим приспособлением, и обеспечивают наведение горизонтального ствола 6, который бурят с первого устья 8 компоновкой с телеметрической системой 19, обеспечивающей управление траекторией ствола 6 и наведение долота 20 со стыкующим приспособлением на стыкующее устройство 17. Вводят долото 20 со стыкующим приспособлением в стыкующее устройство 17, присоединяют обсадные трубы эксплуатационной колонны 22 к колонне бурильных труб 21 на устье 8. На устье 12 создают растягивающее усилие Pраст к нижней части эксплуатационной колонны 22, которое освобождает колонну от волннообразного прижатия к стенкам скважины, в отличие от нагружения колонны труб сжимающей силой Pсж при ее спуске, и вытягивают колонну 22 к устью 12. На эксплуатационной колонне 22 устанавливают, как минимум, один заколонный пакер 23 в интервале, соответствующем контуру 25 планирующего заводнения.Field 1 is located between the opposite boundaries 2 and 3 of the territory where the installation of drilling and oilfield equipment is possible. The field or a part thereof is divided into operational elements 4. The working part 5 of the horizontal wellbore 6 in the reservoir 7 is located inside the element 4 and ensures optimal development of the deposit. At the boundary 2, from the first wellhead 8, the vertical direction 9 is drilled, while drilling under the conductor 10, a zenith angle is set in azimuth directed to the second wellhead 12. When drilling under the technical casing 11, they are horizontal and drilled to a length that overcomes the resistance to movement of the casing string pipes 11. At the design distance from the mouth 8 from the mouth 12, a second vertical direction 13 is drilled and fastened, while drilling under the conductor 14, a zenith angle is set in the direction of the mouth 8. After reaching the horizontal, the trunk is the technical column 15, the diameter of which is equal to or greater than the diameter of the casing pipe 11, is drilled, the shoe of the technical column 15 is drilled with the shaft extending and expanding from under the shoe to the length of the bit 20 with a connecting device and an arrangement including a telemetry system 18 and a connecting device 17, and lowered this arrangement, not reaching the bottom face at a distance of not less than the length of the bit 20 with a connecting device, and provide guidance of the horizontal shaft 6, which is drilled from the first mouth 8 layout with a telemetry system 19, providing control of the trajectory of the barrel 6 and guidance of the bit 20 with the joining device to the joining device 17. Insert the bit 20 with the joining device into the joining device 17, connecting the casing of the production string 22 to the string of drill pipes 21 at the mouth 8. At the mouth 12 create a tensile force P stretch to the bottom of production casing 22, which frees the casing from wave-like pressing against the walls of the well, in contrast to loading the pipe string with compressive force P cr during its descent, and pull the stake onna 22 to the mouth 12. At least one casing packer 23 is installed on the production casing 22 in the interval corresponding to the contour 25 of the planning flooding.

После установки оборудования 26 для отбора углеводородов на устьях 8 и 12 скважину осваивают и начинают добычу из эксплуатационного элемента 4. After the installation of equipment 26 for the selection of hydrocarbons at the mouths 8 and 12, the well is developed and production begins from production element 4.

При необходимости одно из устьев скважины 8 или 12 используют для проведения промысловых геофизических исследований в процессе добычи углеводородов из противоположного устья. If necessary, one of the wellheads 8 or 12 is used to conduct field geophysical surveys during hydrocarbon production from the opposite wellhead.

При приближении контура заводнения 25 к месту установки пакера 23 внутритрубное пространство эксплуатационной колонны 22 в интервале установки пакера 23 перекрывают, например, полимерным тампоном 24, и устье 8, расположенное на стороне, противоположной направлению перемещения контура заводнения, используют для нагнетания жидкого или газообразного агента с целью поддержания пластового давления, а устье 12 - для добычи углеводородов. When the waterflood circuit 25 approaches the installation site of the packer 23, the in-pipe space of the production casing 22 in the interval of installation of the packer 23 is closed, for example, with a polymer swab 24, and the mouth 8, located on the side opposite to the direction of movement of the waterflood, is used to pump a liquid or gaseous agent with the purpose of maintaining reservoir pressure, and the mouth 12 - for the production of hydrocarbons.

После прекращения эксплуатации элемента 4 месторождения 1 перфорационные отверстия эксплуатационной колонны 22 герметизируют и скважину используют в качестве трубопровода, например, в сложной ледовой обстановке с морской платформы 27 на берег перекачивание углеводородов или транспортировка с берега на морскую платформу горюче-смазочных материалов для производственных и хозяйственных нужд. After the termination of the operation of the element 4 of the field 1, the perforations of the production casing 22 are sealed and the well is used as a pipeline, for example, in difficult ice conditions from the offshore platform 27 to the shore, pumping hydrocarbons or transporting fuels and lubricants from the shore to the offshore platform for industrial and household needs .

Благодаря такому осуществлению способа добычи углеводородов с помощью горизонтальной скважины обеспечивается разработка ранее недоступных для установки бурового и нефтепромыслового оборудования месторождений, удаленных на десятки километров вовнутрь природоохранных зон и территорий, запрещенных или недоступных для установки бурового и нефтепромыслового оборудования (на шельфе моря со сложной ледовой обстановкой, в Обской и Тазовской губе и др. ), уменьшение числа кустовых оснований, буровых и эксплуатационных платформ на морских месторождениях; повышение добычи углеводородов за счет увеличения проходного сечения эксплуатационной колонны, как минимум, в два раза; использование одного из устьев скважины для поддержания пластового давления или проведения промысловых геофизических исследований в процессе добычи углеводородов из противоположного устья, использование скважины, соединяющей берег с морской платформой после прекращения эксплуатации данного элемента месторождения в качестве трубопровода. Thanks to this method of hydrocarbon production using a horizontal well, the development of fields previously inaccessible for installation of drilling and oilfield equipment, tens of kilometers inland of nature protection zones and territories prohibited or inaccessible for installation of drilling and oilfield equipment (on the sea shelf with difficult ice conditions, is ensured) in the Ob and Taz Bay, etc.), a decrease in the number of bush bases, drilling and production platforms on sea m births; an increase in hydrocarbon production due to an increase in the cross section of the production casing by at least two times; the use of one of the wellheads to maintain reservoir pressure or to conduct field geophysical studies in the process of hydrocarbon production from the opposite wellhead; the use of the well connecting the shore with the offshore platform after the termination of the operation of this element of the field as a pipeline.

Claims (4)

1. Способ сооружения горизонтальной скважины, включающий бурение и крепление вертикального направления, бурение и крепление наклонно-направленного ствола и горизонтального участка ствола скважины, отличающийся тем, что на проектном расстоянии от устья ствола скважины забуривают и крепят второе вертикальное направление, при бурении под кондуктор осуществляют набор зенитного угла в направлении первого устья, после выхода на горизонталь ствол обсаживают технической колонной, диаметр которой равен или больше диаметра технической колонны, спущенной с первого устья, разбуривают башмак технической колонны с выходом и расширением ствола из-под башмака на длину долота со стыкующим приспособлением и компоновкой, включающей телеметрическую систему и стыкующее устройство, и спускают данную компоновку, не доходя до забоя на расстояние не менее длины долота со стыкующим приспособлением, и обеспечивают наведение горизонтального участка ствола, который бурят с первого устья компоновкой с телеметрической системой, обеспечивающей управление траекторией ствола и наведение долота со стыкующим приспособлением на стыкующее устройство, вводят долото со стыкующим приспособлением в стыкующее устройство, присоединяют обсадные трубы эксплуатационной колонны к колонне бурильных труб на первом устье, на втором устье создают растягивающее усилие к нижней части эксплуатационной колонны,
которое освобождает колонну от волнообразного прижатия к стенкам скважины, и вытягивает ее к второму устью, на эксплуатационной колонне устанавливают как минимум один заколонный пакер в интервале, соответствующем контуру планируемого заводнения.
1. A method of constructing a horizontal well, including drilling and securing a vertical direction, drilling and securing an inclined directional well and a horizontal section of a wellbore, characterized in that a second vertical direction is drilled and secured at a design distance from the wellbore, and when drilling under a conductor, a set of zenith angle in the direction of the first mouth, after reaching the horizontal, the barrel is cased with a technical column whose diameter is equal to or greater than the diameter of the technical columns s, lowered from the first mouth, drill the shoe of the technical column with the exit and extension of the barrel from under the shoe to the length of the bit with a connecting device and an arrangement including a telemetry system and a connecting device, and lower this arrangement, not reaching the bottom face a distance of at least a length bits with a connecting device, and provide guidance of the horizontal section of the barrel, which is drilled from the first mouth with a telemetry system that provides control of the path of the barrel and guidance of the bits with the junction device at the junction of the device is introduced with the junction bit device in the junction device, the casing is attached to the production casing drill string at the first mouth, the second mouth creates a tensile force to the bottom of the production tubing,
which releases the casing from wave-like pressing against the walls of the well and pulls it to the second wellhead, at least one casing packer is installed on the production casing in the interval corresponding to the contour of the planned waterflooding.
2. Способ эксплуатации горизонтальной скважины, включающий вскрытие продуктивного пласта горизонтальным стволом и его крепление обсадной эксплуатационной колонной, оборудование устья, перфорацию и освоение скважины, отличающийся тем, что после установки оборудования для отбора углеводородов на втором устье скважину осваивают и начинают добычу из устьев и при приближении контура заводнения к месту установки пакера внутритрубное пространство эксплуатационной колонны в интервале установки пакера перекрывают, например, полимерным тампоном и устье, расположенное на стороне, противоположной направлению перемещения контура заводнения, используют для нагнетания жидкого или газообразного агента с целью поддержания пластового давления, а противоположное устье - для добычи углеводородов. 2. A method of operating a horizontal well, including opening a productive formation with a horizontal wellbore and securing it with a casing production string, wellhead equipment, perforation and well development, characterized in that after installing hydrocarbon extraction equipment at the second wellhead, the well is mastered and production starts from the wellheads and when the waterflood circuit approaches the packer installation site, the in-pipe space of the production string in the packer installation interval is closed, for example, with polymer oxazolidinone and the mouth located on the side opposite the direction of movement of waterflooding circuit is used to discharge a liquid or gaseous agent in order to maintain the reservoir pressure, while the opposite mouth - for the production of hydrocarbons. 3. Способ по п.2, отличающийся тем, что одно из устьев скважины используют для проведения промысловых геофизических исследований в процессе добычи углеводородов из противоположного устья. 3. The method according to claim 2, characterized in that one of the wellheads is used to conduct field geophysical studies in the process of hydrocarbon production from the opposite wellhead. 4. Способ по п.2, отличающийся тем, что после прекращения эксплуатации данного элемента месторождения перфорационные отверстия эксплуатационной колонны герметизируют и скважину используют в качестве трубопровода. 4. The method according to claim 2, characterized in that after the cessation of operation of this element of the field, the perforation holes of the production string are sealed and the well is used as a pipeline.
RU99115044A 1999-07-19 1999-07-19 Process of sinking and running of horizontal well RU2159317C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU99115044A RU2159317C1 (en) 1999-07-19 1999-07-19 Process of sinking and running of horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU99115044A RU2159317C1 (en) 1999-07-19 1999-07-19 Process of sinking and running of horizontal well

Publications (1)

Publication Number Publication Date
RU2159317C1 true RU2159317C1 (en) 2000-11-20

Family

ID=20222517

Family Applications (1)

Application Number Title Priority Date Filing Date
RU99115044A RU2159317C1 (en) 1999-07-19 1999-07-19 Process of sinking and running of horizontal well

Country Status (1)

Country Link
RU (1) RU2159317C1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2456426C1 (en) * 2011-02-07 2012-07-20 Открытое акционерное общество "Газпром" Construction method of multibranch well
RU2580862C1 (en) * 2015-01-12 2016-04-10 Общество с ограниченной ответственностью "ТюменНИИгипрогаз" Design of coastal multi-hole intelligent gas well for development of offshore deposit
RU2669974C2 (en) * 2013-12-23 2018-10-17 Хэллибертон Энерджи Сервисиз, Инк. Method and system for magnetic ranging and geosteering
CN109899071A (en) * 2019-04-04 2019-06-18 四川盐业地质钻井大队 The horizontal well group lubricating pad control device for picking of well mine salt and technique

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ГРИГОРЯН А.М. Вскрытие пластов многозабойными и горизонтальными скважинами. - М.: Недра, 1969, с.3-35. *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2456426C1 (en) * 2011-02-07 2012-07-20 Открытое акционерное общество "Газпром" Construction method of multibranch well
RU2669974C2 (en) * 2013-12-23 2018-10-17 Хэллибертон Энерджи Сервисиз, Инк. Method and system for magnetic ranging and geosteering
US10294773B2 (en) 2013-12-23 2019-05-21 Halliburton Energy Services, Inc. Method and system for magnetic ranging and geosteering
RU2580862C1 (en) * 2015-01-12 2016-04-10 Общество с ограниченной ответственностью "ТюменНИИгипрогаз" Design of coastal multi-hole intelligent gas well for development of offshore deposit
CN109899071A (en) * 2019-04-04 2019-06-18 四川盐业地质钻井大队 The horizontal well group lubricating pad control device for picking of well mine salt and technique

Similar Documents

Publication Publication Date Title
US8287050B2 (en) Method of increasing reservoir permeability
US7934563B2 (en) Inverted drainholes and the method for producing from inverted drainholes
RU2259480C2 (en) Method for horizontal drainage system forming in gas production, method for drain hole forming and method for gas recovery from coal bed (variants)
US7819187B2 (en) System and method for producing fluids from a subterranean formation
AU2006314601B2 (en) Wellbore system
MXPA05000550A (en) Wellbore plug system and method.
US20110005762A1 (en) Forming Multiple Deviated Wellbores
WO2008064305A3 (en) Recovery of bitumen by hydraulic excavation
MXPA05000551A (en) Wellbore sealing system and method.
US7493951B1 (en) Under-balanced directional drilling system
GB2327964A (en) System for drilling and completing multilateral wells
CN109057757B (en) Natural gas hydrate exploitation method and device
US20150218886A1 (en) Penetrating A Subterranean Formation
EP1220972B1 (en) Underbalanced perforation
RU2159317C1 (en) Process of sinking and running of horizontal well
US7000711B2 (en) Horizontal bore cryogenic drilling method
RU2320843C1 (en) Method for well with remote bottom construction
RU2097563C1 (en) Method of hydraulic borehole mining of coal formation
Hertfelder et al. Are Swelling-Elastomer Technology, Preperforated Liner; and Intelligent-Well Technology Suitable Alternatives to Conventional Completion Architecture?
Toma et al. [9] 2 Long and Ultrashort Turning Radius of Horizontal Wells Predictions of Future Production Based on Today’s Experience
US11685604B2 (en) Underground energy storage systems
Ammirante Innovative drilling technology
PRASAD et al. REVIEW ON OPEN HOLE AND CASED HOLE WELL COMPELTION SYSTEMS IN OIL AND GAS WELLS
Samedov et al. Improving well casing technology by drilling with expandable casing string
Eng II et al. Ministry of Higher Education and Scientific Research Misan University College of Engineering Petroleum Engineering Dep.

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20130720