Hydroelectric power plant Download PDFInfo
- Publication number
- RU2157870C2 RU2157870C2 RU96104436/13A RU96104436A RU2157870C2 RU 2157870 C2 RU2157870 C2 RU 2157870C2 RU 96104436/13 A RU96104436/13 A RU 96104436/13A RU 96104436 A RU96104436 A RU 96104436A RU 2157870 C2 RU2157870 C2 RU 2157870C2
- Authority
- RU
- Russia
- Prior art keywords
- river
- pressure hole
- hydroelectric power
- bypass channel
- tank
- Prior art date
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
Abstract
Description
Изобретение относится к строительству гидроэлектростанций и предназначено для выработки электроэнергии с помощью течения реки. The invention relates to the construction of hydroelectric power plants and is intended to generate electricity using a river.
Известна низконапорная гидроэлектростанция, содержащая сборную плотину с погружными гидроузлами, собранными из отдельных блоков с использованием пространства над турбинами в качестве водоводов из бычков, перекрытых верхней и нижней плитами /см. а.с. СССР N 135028, 1959/. Known low-pressure hydroelectric power station containing a prefabricated dam with submersible waterworks assembled from separate blocks using the space above the turbines as pipelines from gobies blocked by upper and lower plates / cm. A.S. USSR N 135028, 1959 /.
Наиболее близкой к изобретению является гидроэлектростанция в которой роль плотины играет берег реки, параллельно русла которой выполнен закрытый обводной канал, сообщенный с рекой наклонными поперечными трубами, вода из которых попадает на турбины /см. Журнал "Техника молодежи" N 8, стр.6, за 1995 год/. Closest to the invention is a hydroelectric power station in which the river plays the role of a dam, parallel to the channel of which a closed bypass channel is made, connected to the river by inclined transverse pipes, from which water flows to the turbines / cm. Journal "Technology of Youth" N 8, p. 6, 1995.
Однако эти гидроэлектростанции имеют недостатки, к которым относятся необходимость перегораживания реки плотиной и малая мощность, обусловленная течением реки. However, these hydroelectric power stations have drawbacks, which include the need to block the river with a dam and low power due to the course of the river.
Цель изобретения - упрощение конструкции, увеличение мощности. The purpose of the invention is to simplify the design, increase power.
Эта цель достигается тем, что закрытый обводной канал укладывается на дно реки, верхняя часть которого служит для забора воды, а нижняя часть соединена с напорным резервуаром, выполненным в виде вертикальной емкости с отверстием, расположенным ниже уровня верхней части канала, причем отверстие соединено водоводом с турбиной. This goal is achieved by the fact that the closed bypass channel is laid on the bottom of the river, the upper part of which serves to draw water, and the lower part is connected to a pressure tank made in the form of a vertical tank with an opening located below the level of the upper part of the channel, the opening being connected by a water conduit to a turbine.
Гидроэлектростанция показана на чертеже и включает: закрытый обводной канал 1 с входным отверстием 2, напорный резервуар 3, напорное отверстие 4, водовод 5, турбину 6, отсасывающую трубу 7, машинное отделение 8. The hydroelectric power station is shown in the drawing and includes: a closed bypass channel 1 with an inlet 2, a pressure tank 3, a pressure hole 4, a water conduit 5, a turbine 6, a suction pipe 7, an engine room 8.
Работает гидроэлектростанция следующим образом. Вода через входное отверстие 2 закрытого обводного канала 1 наполняет напорный резервуар 3, затем через напорное отверстие 4 по водоводу 5 попадает на лопасти турбины 6 и по отсасывающей трубе 7 сбрасывается в реку. The hydroelectric power station operates as follows. Water through the inlet 2 of the closed bypass channel 1 fills the pressure tank 3, then through the pressure hole 4 through the water conduit 5 it enters the blades of the turbine 6 and is discharged into the river via the suction pipe 7.
Предложенная электростанция упрощает конструкцию, увеличивает мощность, улучшает экологию. The proposed power plant simplifies the design, increases power, improves the environment.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU96104436/13A RU2157870C2 (en) | 1996-03-05 | 1996-03-05 | Hydroelectric power plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU96104436/13A RU2157870C2 (en) | 1996-03-05 | 1996-03-05 | Hydroelectric power plant |
Publications (2)
Publication Number | Publication Date |
---|---|
RU96104436A RU96104436A (en) | 1998-06-27 |
RU2157870C2 true RU2157870C2 (en) | 2000-10-20 |
Family
ID=20177743
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU96104436/13A RU2157870C2 (en) | 1996-03-05 | 1996-03-05 | Hydroelectric power plant |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2157870C2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011102750A1 (en) | 2010-02-16 | 2011-08-25 | Mironov Dmitri Victorovich | Method for producing hydroelectric power |
RU2448215C2 (en) * | 2008-03-04 | 2012-04-20 | Григорий Германович Ушаков | Hydraulic power unit with discharge water conduit and side water intake |
US8648487B2 (en) | 2009-11-09 | 2014-02-11 | Technische Universität München | Shaft power plant |
US9109571B2 (en) | 2009-08-12 | 2015-08-18 | Technische Universität München | Shaft power plant |
RU2817040C1 (en) * | 2023-08-01 | 2024-04-09 | Федеральное государственное автономное образовательное учреждение высшего образования "Южно-Уральский государственный университет (национальный исследовательский университет)" ФГАОУ ВО "ЮУрГУ (НИУ)" | Small hydroelectric power plant |
-
1996
- 1996-03-05 RU RU96104436/13A patent/RU2157870C2/en active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2448215C2 (en) * | 2008-03-04 | 2012-04-20 | Григорий Германович Ушаков | Hydraulic power unit with discharge water conduit and side water intake |
US9109571B2 (en) | 2009-08-12 | 2015-08-18 | Technische Universität München | Shaft power plant |
US8648487B2 (en) | 2009-11-09 | 2014-02-11 | Technische Universität München | Shaft power plant |
WO2011102750A1 (en) | 2010-02-16 | 2011-08-25 | Mironov Dmitri Victorovich | Method for producing hydroelectric power |
RU2817040C1 (en) * | 2023-08-01 | 2024-04-09 | Федеральное государственное автономное образовательное учреждение высшего образования "Южно-Уральский государственный университет (национальный исследовательский университет)" ФГАОУ ВО "ЮУрГУ (НИУ)" | Small hydroelectric power plant |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6396162B1 (en) | Underground hydroelectric plant | |
US8231327B2 (en) | River high pressure energy conversion machine | |
CA2458286C (en) | A system for generating power | |
RU2157870C2 (en) | Hydroelectric power plant | |
US11434866B2 (en) | Water current catcher system for hydroelectricity generation | |
RU2006142800A (en) | CHANNEL HYDRO POWER PLANT | |
GB2330625A (en) | Wave/river power generating system | |
KR100695544B1 (en) | Equipment hydroelectric powergeneration using rotation drum many | |
CN101535629B (en) | Flood control system | |
RU2448215C2 (en) | Hydraulic power unit with discharge water conduit and side water intake | |
RU2709997C2 (en) | Damless hydroelectric power plant (dhepp) in downstream of dam hydroelectric plant (hep) | |
RU95115316A (en) | HYDRO POWER PLANT AND METHOD OF ITS CONSTRUCTION | |
CN110397117A (en) | A kind of Tubular pumping station using unidirectional tubular through flow pump | |
RU96104436A (en) | HYDRO POWER PLANT | |
RU2114243C1 (en) | Hydroelectric power plant | |
RU2005199C1 (en) | Vacuum hydroelectric station | |
RU2469148C1 (en) | Diversion hydroelectric power plant without dam and with pressure waterway | |
RU2167334C1 (en) | Gyro-pneumatic power plant | |
RU2002888C1 (en) | Pressure derivation cascade for hydro-electric power station | |
RU2023904C1 (en) | Hydroelectric power plant | |
SU1199969A1 (en) | Tidal power plant | |
JPH09273471A (en) | Automatic circulation water type power generator | |
KR200386117Y1 (en) | Equipment hydroelectric powergeneration using rotation drum many | |
RU25014U1 (en) | HYDRO POWER PLANT | |
RU2348830C1 (en) | Method for increase of hydropower plant capacity and hydropower plant |