RU210088U1 - Movable mounting platform for cluster drilling - Google Patents
Movable mounting platform for cluster drilling Download PDFInfo
- Publication number
- RU210088U1 RU210088U1 RU2021123628U RU2021123628U RU210088U1 RU 210088 U1 RU210088 U1 RU 210088U1 RU 2021123628 U RU2021123628 U RU 2021123628U RU 2021123628 U RU2021123628 U RU 2021123628U RU 210088 U1 RU210088 U1 RU 210088U1
- Authority
- RU
- Russia
- Prior art keywords
- supports
- skis
- drilling
- mounting platform
- drilling rig
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 47
- 239000000314 lubricant Substances 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 abstract description 7
- 238000009434 installation Methods 0.000 description 4
- 230000000284 resting effect Effects 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 229910002804 graphite Inorganic materials 0.000 description 1
- 239000010439 graphite Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
Полезная модель относится к нефтегазопромысловому оборудованию, в частности к буровым установкам, и может быть использована для кустового бурения разведочных и эксплуатационных нефтяных и газовых скважин.Техническим результатом заявленной полезной модели является повышение производительности строительства нефтяных и газовых скважин.Технический результат достигается тем, что перемещаемая монтажная платформа для кустового бурения скважин, установленная на направляющие опоры с возможностью продольного перемещения по этим опорам и служащая для размещения буровой установки и другого технологического оборудования, согласно полезной модели установлена на лыжи, обеспечивающие ее возвратно-поступательное перемещение путем скольжения по опорам с помощью гидроцилиндров, установленных посредством кронштейнов с возможностью пошаговой перенастройки на опорах и соединенных с лыжами, на поверхности скольжения опор с шагом размещены пары направляющих элементов, между которыми установлены лыжи, на монтажной платформе размещены элементы позиционирования мобильной буровой установки и силовые элементы для крепления силовых и ветровых оттяжек.Кроме того, опоры выполнены с сечением трапецеидального профиля.Кроме того, элементы позиционирования мобильной буровой установки выполнены в виде аппарелей.Кроме того, между поверхностями лыж и опор нанесена смазка, снижающая трение скольжения. 3 з.п. ф-лы, 11 ил.The utility model relates to oil and gas equipment, in particular drilling rigs, and can be used for cluster drilling of exploratory and production oil and gas wells. The technical result of the claimed utility model is to increase the productivity of the construction of oil and gas wells. platform for cluster drilling of wells, mounted on guide supports with the possibility of longitudinal movement along these supports and serving to accommodate a drilling rig and other technological equipment, according to the utility model, is mounted on skis that ensure its reciprocating movement by sliding along the supports with the help of hydraulic cylinders installed by means of brackets with the possibility of stepwise reconfiguration on the supports and connected to the skis, pairs of guide elements are placed in increments on the sliding surface of the supports, between which the skis are installed, on the mount The positioning elements of the mobile drilling rig and power elements for attaching power and wind braces are placed on the platform. In addition, the supports are made with a trapezoidal profile section. lubricant that reduces sliding friction. 3 w.p. f-ly, 11 ill.
Description
Заявленное техническое решение относится к нефтегазопромысловому оборудованию, в частности к буровым установкам, и может быть использовано для кустового бурения разведочных и эксплуатационных нефтяных и газовых скважин.The claimed technical solution relates to oil and gas equipment, in particular to drilling rigs, and can be used for cluster drilling of exploratory and production oil and gas wells.
Для кустового бурения разведочных и эксплуатационных нефтяных и газовых скважин как отечественные, так и зарубежные производители разрабатывают и выпускают кустовые буровые установки различной конструкции, позволяющие производить кустовое бурение, то есть такое бурение нескольких скважин на одной буровой площадке при перемещении комплекса буровой установки по специальным тумбам-направляющим или специальному основанию.For cluster drilling of exploratory and production oil and gas wells, both domestic and foreign manufacturers develop and produce cluster drilling rigs of various designs that allow cluster drilling, that is, such drilling of several wells on one drilling site while moving the drilling rig complex along special pedestals - guide or special base.
Известна установка для кустового бурения, содержащая блоки-модули с буровым оборудованием, установленные эшелоном, скрепленные между собой быстроразъемными соединениями сквозным проходом от рабочей площадки до концевого модуля (патент РФ №24231, приоритет от 05.10.2001 г.).Known installation for cluster drilling, containing blocks-modules with drilling equipment installed echelon, fastened together by quick-connect connections through the passage from the working platform to the end module (RF patent No. 24231, priority dated 05.10.2001).
Недостатком такой компоновки блоков-модулей является сложность операций по замене модулей в случае выхода какого-либо из них из строя, а также сложность установки дополнительных модулей.The disadvantage of this arrangement of blocks-modules is the complexity of operations for replacing modules in the event of failure of any of them, as well as the complexity of installing additional modules.
Известные кустовые буровые установки содержат блоки-модули со следующим буровым оборудованием: вышечно-лебедочный блок, блок циркуляционной системы, блок буровых насосов, блок цементирования, компрессорный блок и блок электрооборудования, которые смонтированы на общей монтажной платформе, которая имеет возможность горизонтального перемещения по двум или более направляющим. При этом блоки оборудования приемного моста со стеллажами для работы с трубами расположены сбоку, обычно, перпендикулярно направлению движения монтажной платформы буровой установки. При перемещении монтажной платформы буровой установки к другой скважине блоки-модули, расположенные сбоку эшелона, необходимо демонтировать.Well-known cluster drilling rigs contain blocks-modules with the following drilling equipment: a derrick winch block, a circulation system block, a drilling pump block, a cementing block, a compressor block and an electrical equipment block, which are mounted on a common mounting platform, which has the ability to move horizontally along two or more guiding. In this case, the equipment blocks of the receiving bridge with racks for working with pipes are located on the side, usually perpendicular to the direction of movement of the drilling rig mounting platform. When moving the mounting platform of the drilling rig to another well, the blocks-modules located on the side of the echelon must be dismantled.
Аналогичную конструкцию имеет, в частности, кустовая буровая установка БУ 5000/320 ЭУК-Я (см. «Новое поколение буровых установок завода Уралмаш в Западной Сибири», В.Г. Колчерин и др., Справочное пособие, 2002 г.).In particular, the cluster drilling rig BU 5000/320 EUK-Ya has a similar design (see “New generation of drilling rigs of the Uralmash plant in Western Siberia”, V.G. Kolcherin et al., Handbook, 2002).
Расположение блоков-модулей кустовой буровой установки на монтажной платформе, способной перемещаться по горизонтальным направляющим, имеет существенные недостатки. Эти недостатки связаны с тем, что стационарное крепление вышечно-лебедочного блока, размещение технологического оборудования в блоках-модулях последовательно эшелоном исключает возможность их использования в непосредственной близости от устья скважины, что ухудшает выполнение технологических операций, делает невозможным установку дополнительных блоков, что снижает эффективность эксплуатации установки. Кроме того, из-за значительного веса всего комплекса оборудования требуется привод большой мощности для перемещения монтажной платформы между скважинами и, как следствие, большой расход энергоресурсов.The arrangement of blocks-modules of a cluster drilling rig on a mounting platform capable of moving along horizontal guides has significant drawbacks. These shortcomings are due to the fact that the stationary fastening of the derrick-and-draw unit, the placement of process equipment in block-modules in succession by an echelon excludes the possibility of their use in the immediate vicinity of the wellhead, which worsens the performance of technological operations, makes it impossible to install additional units, which reduces the efficiency of operation. installation. In addition, due to the significant weight of the entire equipment complex, a high-power drive is required to move the mounting platform between wells and, as a result, a large consumption of energy resources.
Частично указанные выше недостатки аналогов устранены в кустовой буровой установке (патент РФ №2426854, приоритет от 22.03.2010 г.), содержащей монтажную платформу, установленную с возможностью горизонтального перемещения на буровой площадке и которая содержит блоки, выполненные в виде технологических модулей различного функционального назначения: блок цементирования скважин, блок циркуляционной системы, насосный блок с буровыми насосами, блок электрооборудования, компрессорный блок, вышечно-лебедочный блок и приемный мост с буровыми трубами.Partially, the disadvantages of analogues mentioned above are eliminated in a cluster drilling rig (RF patent No. 2426854, priority dated March 22, 2010), which contains an assembly platform installed with the possibility of horizontal movement on the drilling site and which contains blocks made in the form of technological modules for various functional purposes : well cementing unit, circulation system unit, pumping unit with drilling pumps, electrical equipment unit, compressor unit, derrick winch unit and receiving bridge with drill pipes.
Общим существенным недостатком известных технических решений является невозможность использования в их составе мобильных буровых установок с телескопическими вышками, из-за этого значительно увеличен объем работ и трудозатраты по монтажу вышечно-лебедочного блока в стационарном исполнении, что снижает производительность строительства скважин.A common significant drawback of the known technical solutions is the impossibility of using mobile drilling rigs with telescopic derricks in their composition, because of this, the amount of work and labor costs for the installation of a stationary derrick and winch block are significantly increased, which reduces the productivity of well construction.
Техническим результатом заявленной полезной модели является повышение производительности строительства нефтяных и газовых скважин.The technical result of the claimed utility model is to increase the productivity of the construction of oil and gas wells.
Технический результат достигается тем, что в перемещаемом технологическом комплексе для кустового бурения скважин, содержащем установленную на направляющие опоры с возможностью продольного перемещения по этим опорам монтажную платформу для размещения буровой установки и другого технологического оборудования, согласно изобретению монтажная платформа установлена на лыжи, обеспечивающие возвратно-поступательное перемещение монтажной платформы путем скольжения по опорам с помощью гидроцилиндров, установленных посредством кронштейнов с возможностью пошаговой перенастройки на опорах и соединенных с лыжами, на поверхности скольжения опор с шагом размещены пары направляющих элементов, между которыми установлены лыжи, на монтажной платформе размещены элементы позиционирования мобильной буровой установки и силовые элементы для крепления силовых и ветровых оттяжек.The technical result is achieved by the fact that in a movable technological complex for cluster drilling of wells, containing a mounting platform installed on guide supports with the possibility of longitudinal movement along these supports, according to the invention, the mounting platform is installed on skis that provide reciprocating movement of the mounting platform by sliding along the supports with the help of hydraulic cylinders installed by means of brackets with the possibility of stepwise reconfiguration on the supports and connected to the skis, pairs of guide elements are placed in steps on the sliding surface of the supports, between which the skis are installed, positioning elements of the mobile drilling rig are placed on the mounting platform and power elements for fastening power and wind braces.
Кроме того, опоры выполнены с сечением трапецеидального профиля.In addition, the supports are made with a trapezoidal profile section.
Кроме того, элементы позиционирования мобильной буровой установки выполнены в виде аппарелей.In addition, the positioning elements of the mobile drilling rig are made in the form of ramps.
Кроме того, между поверхностями лыж и опор нанесена смазка, снижающая трение скольжения.In addition, a lubricant is applied between the surfaces of the skis and supports, which reduces sliding friction.
Сущность изобретения поясняется чертежами.The essence of the invention is illustrated by drawings.
На фиг. 1 изображен общий вид в изометрии; фиг. 2 - размещение направляющих опор перемещаемого технологического комплекса, вид сверху; фиг. 3 - сечение А-А на фиг. 2; фиг. 4 - сечение Б-Б на фиг. 3; фиг. 5 - схема размещения лыж на направляющих опорах, вид сверху; фиг. 6 -сечение А-А на фиг. 5; фиг. 7 - сечение Б-Б на фиг. 6; фиг. 8 - размещение элементов позиционирования мобильной буровой установки на монтажной платформе, вид сверху; фиг. 9 - размещение гидроцилиндра с кронштейном на направляющей опоре, вид сбоку; фиг. 10 - сечение А-А на фиг. 9; фиг. 11 - сечение Б-Б на фиг. 9.In FIG. 1 shows a general view in isometry; fig. 2 - placement of guide supports of the movable technological complex, top view; fig. 3 - section A-A in Fig. 2; fig. 4 - section B-B in Fig. 3; fig. 5 - layout of skis on guide supports, top view; fig. 6 - section A-A in Fig. 5; fig. 7 - section B-B in Fig. 6; fig. 8 - placement of positioning elements of the mobile drilling rig on the mounting platform, top view; fig. 9 - placement of a hydraulic cylinder with a bracket on a guide support, side view; fig. 10 is a section A-A in FIG. nine; fig. 11 - section B-B in Fig. nine.
Перемещаемый технологический комплекс для кустового бурения скважин содержит монтажную платформу 1, размещенную на направляющих опорах 2 с возможностью горизонтального перемещения вдоль опор 2, закрепленных на основании буровой площадки. Для заезда на монтажную платформу 1 и выезда с нее мобильной буровой установки (не показано) на буровой площадке установлен трап 3, сопряженный с верхней поверхностью монтажной платформы 1. На монтажной платформе 1 кроме мобильной буровой установки может быть установлено различное технологическое оборудование (не показано), размещение которого производится в соответствии с проектом по строительству нефтяных или газовых скважин. Схема размещения направляющих опор 2 относительно оси скважины показана на фиг. 2. Каждая из направляющих опор 2 собрана из отдельных балок с торцевыми стенками с отверстиями под болтовые соединения 4 (фиг. 4). Сечение направляющих опор 2 выполнено трапецеидальной формы (фиг. 3) с большим основанием, опирающимся на буровую площадку, для обеспечения устойчивой и равнопрочной конструкции опоры. На направляющих опорах 2 размещены лыжи 5 (фиг. 5), поверхность скольжения которых по верхней поверхности опор 2 расположена между парами направляющих элементов 6, размещенных на верхней поверхности опор 2 с определенным шагом. Величина выступа направляющих элементов 6, их форма и шаг размещения выбираются конструктивно. Каждая из лыж 5 собрана из отдельных сборок (балок) с торцевыми стенками с отверстиями под болтовые соединения 7 (фиг. 7). Сечение лыж 5 выполнено трапецеидальной формы (фиг. 6) с малым основанием, опирающимся на поверхность скольжения опоры 2, для обеспечения более равномерной нагрузки от монтажной платформы 1 на поверхность скольжения опоры 2 и обеспечения малой скорости скольжения лыж 5 относительно опор 2. Лыжи 5 снабжены массивом штифтов 8 для соединения и фиксации с нижней частью монтажной платформы 1, имеющей соответствующий массив отверстий (условно не показано) под штифты 8. Для снижения трения скольжения между верхней поверхностью опор 2 и нижней поверхностью лыж 5 нанесена смазка, например, на основе графита. Возвратно-поступательное перемещение монтажной платформы 1 вдоль опор 2 осуществляется посредством гидроцилиндров 9, которые установлены и зафиксированы на каждой из опор 2 посредством кронштейнов 10 (фиг. 9 и 10). На осях 11 кронштейнов 10 установлены проушины штоков гидроцилиндров 9 (фиг. 10), а проушины корпусов гидроцилиндров 9 установлены на соответствующих осях 12 проушин лыж 5. Кронштейны 10 установлены на опорах 2 с возможностью пошаговой перенастройки, то есть имеют способность смещаться на опорах 2 в соответствии с конструктивно установленным шагом, закрепляться и фиксироваться для операций перемещения монтажной платформы 1. Для обеспечения позиционирования мобильной буровой установки (не показано) на монтажной платформе 1 установлены аппарели 13 (фиг. 8). Форма и высота аппарелей по отношению к верхней плоскости монтажной платформы выбираются конструктивно. На верхней части монтажной платформы 1 размещены силовые элементы (условно не показано), например, в виде болтов с проушинами для крепления ветровых и силовых оттяжек мобильной буровой установки. Схема размещения этих силовых элементов на монтажной платформе 1 выбирается исходя из модели буровой мобильной установки и ее конструктивно-силовой схемы, касающейся установки силовых и ветровых оттяжек.The movable technological complex for cluster drilling of wells contains a
Эксплуатация перемещаемого технологического комплекса для кустового бурения скважин осуществляется в соответствии с технологическими регламентами и проектом строительства конкретных нефтяных (газовых) скважин.The operation of the movable technological complex for cluster drilling of wells is carried out in accordance with the technological regulations and the project for the construction of specific oil (gas) wells.
Опытно-промышленная эксплуатация предложенного технического решения показала его высокую эффективность.Pilot operation of the proposed technical solution has shown its high efficiency.
Использование перемещаемого технологического комплекса для кустового бурения скважин позволяет повысить производительность работ по строительству скважин и, как следствие, повысить в целом эффективность эксплуатации технологического комплекса при строительстве нефтяных и газовых скважин.The use of a movable technological complex for cluster drilling of wells makes it possible to increase the productivity of well construction and, as a result, to increase the overall efficiency of the operation of the technological complex during the construction of oil and gas wells.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2021123628U RU210088U1 (en) | 2021-08-05 | 2021-08-05 | Movable mounting platform for cluster drilling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2021123628U RU210088U1 (en) | 2021-08-05 | 2021-08-05 | Movable mounting platform for cluster drilling |
Publications (1)
Publication Number | Publication Date |
---|---|
RU210088U1 true RU210088U1 (en) | 2022-03-28 |
Family
ID=81076411
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2021123628U RU210088U1 (en) | 2021-08-05 | 2021-08-05 | Movable mounting platform for cluster drilling |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU210088U1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU222006U1 (en) * | 2023-07-13 | 2023-12-06 | Общество с ограниченной ответственностью "Идель Нефтемаш" | Movable mounting platform for cluster drilling of wells |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU232896A1 (en) * | А. Ф. Колбин, С. Л. Драхлис , А. Е. Чеченев Проектна контора треста Шахтспецстрой | INSTALLATION FOR DRILLING WELLS | ||
US3031167A (en) * | 1959-03-13 | 1962-04-24 | Universal Drilling Co Inc | Hydraulic device for skids |
US4544135A (en) * | 1982-04-29 | 1985-10-01 | Dolphin Titan International, Inc. | Rig skidding system |
RU2004753C1 (en) * | 1992-09-03 | 1993-12-15 | Ямальское вышкомонтажное управление Треста "Северспецбургаз" | Drilling rig |
RU2378482C2 (en) * | 2008-01-17 | 2010-01-10 | Закрытое акционерное общество "Уралмаш-буровое оборудование" (ЗАО "Уралмаш-буровое оборудование") | Cluster drilling plant |
RU2426854C1 (en) * | 2010-03-22 | 2011-08-20 | Общество с ограниченной ответственностью "Лицензионная Компания "КУНГУР" | Multiple drilling rig with simplified layout of assembly |
WO2018093254A8 (en) * | 2016-11-15 | 2019-05-31 | Ihc Holland Ie B.V. | Device for transporting, in particular skidding or jacking, a heavy object |
-
2021
- 2021-08-05 RU RU2021123628U patent/RU210088U1/en active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU232896A1 (en) * | А. Ф. Колбин, С. Л. Драхлис , А. Е. Чеченев Проектна контора треста Шахтспецстрой | INSTALLATION FOR DRILLING WELLS | ||
US3031167A (en) * | 1959-03-13 | 1962-04-24 | Universal Drilling Co Inc | Hydraulic device for skids |
US4544135A (en) * | 1982-04-29 | 1985-10-01 | Dolphin Titan International, Inc. | Rig skidding system |
RU2004753C1 (en) * | 1992-09-03 | 1993-12-15 | Ямальское вышкомонтажное управление Треста "Северспецбургаз" | Drilling rig |
RU2378482C2 (en) * | 2008-01-17 | 2010-01-10 | Закрытое акционерное общество "Уралмаш-буровое оборудование" (ЗАО "Уралмаш-буровое оборудование") | Cluster drilling plant |
RU2426854C1 (en) * | 2010-03-22 | 2011-08-20 | Общество с ограниченной ответственностью "Лицензионная Компания "КУНГУР" | Multiple drilling rig with simplified layout of assembly |
WO2018093254A8 (en) * | 2016-11-15 | 2019-05-31 | Ihc Holland Ie B.V. | Device for transporting, in particular skidding or jacking, a heavy object |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU222006U1 (en) * | 2023-07-13 | 2023-12-06 | Общество с ограниченной ответственностью "Идель Нефтемаш" | Movable mounting platform for cluster drilling of wells |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20100071906A1 (en) | System and method for simultaneous sea drilling operations | |
RU2378482C2 (en) | Cluster drilling plant | |
EP3692239B1 (en) | Mobile drilling apparatus for a drilling site with cluster of wells and method of assembling and moving thereof | |
CN111029968B (en) | Multilayer modularization spanning frame that does not have a power failure suitable for intensive block construction | |
RU210088U1 (en) | Movable mounting platform for cluster drilling | |
CN110985085A (en) | Support arrangement for arch tunnel construction is used | |
CN212077970U (en) | Mine ecological remediation is with lattice roof beam of installation of being convenient for | |
CN109868802B (en) | Lifting device for truss pile leg and ocean platform | |
CN212129954U (en) | Assembled construction equipment for municipal building | |
CN214162879U (en) | General type hydraulic turbine servomotor fast overhaul platform | |
CN201448062U (en) | Fast moving drilling machine derrick | |
CN2095281U (en) | Underwell assembling platform of hydraulic support | |
CN209795604U (en) | Connecting piece of telescopic platform assembled on frame | |
RU2764959C2 (en) | Advanced illumination system installed on an elevated structure | |
CN113977476A (en) | Hydraulic drive type flange sleeve clamping tool | |
CN109778883B (en) | Novel steel cofferdam structure and installation method | |
CN101749042A (en) | Top adjusting mechanism of tunneling immediate support device | |
RU116558U1 (en) | COMPACT SPEED DRILLING RIG | |
RU83280U1 (en) | PIT DRILLING RIG | |
CN219840605U (en) | Oil well fracturing fixing and dismounting equipment | |
CN213741899U (en) | Special-shaped steel truss mounting structure encorbelments | |
CN108868191B (en) | Following movable counterforce device for integral translation of structure and installation and working method thereof | |
RU2426854C1 (en) | Multiple drilling rig with simplified layout of assembly | |
CN220487936U (en) | Base for rapidly installing water pump | |
US20160153278A1 (en) | Temporary roof support system |