RU2013152919A - STEAM GAS INSTALLATION - Google Patents

STEAM GAS INSTALLATION Download PDF

Info

Publication number
RU2013152919A
RU2013152919A RU2013152919/06A RU2013152919A RU2013152919A RU 2013152919 A RU2013152919 A RU 2013152919A RU 2013152919/06 A RU2013152919/06 A RU 2013152919/06A RU 2013152919 A RU2013152919 A RU 2013152919A RU 2013152919 A RU2013152919 A RU 2013152919A
Authority
RU
Russia
Prior art keywords
recuperator
evaporator
condenser
steam
line
Prior art date
Application number
RU2013152919/06A
Other languages
Russian (ru)
Other versions
RU2561780C2 (en
Inventor
Николай Никитович Галашов
Original Assignee
Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный исследовательский Томский политехнический университет"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный исследовательский Томский политехнический университет" filed Critical Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный исследовательский Томский политехнический университет"
Priority to RU2013152919/06A priority Critical patent/RU2561780C2/en
Publication of RU2013152919A publication Critical patent/RU2013152919A/en
Application granted granted Critical
Publication of RU2561780C2 publication Critical patent/RU2561780C2/en

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

Парогазовая установка, содержащая газотурбинную установку, связанную газоходом с котлом-утилизатором, который снабжен газоходом для отвода газов в дымовую трубу, и в который встроены связанные между собой поверхности нагрева экономайзера, испарителя и пароперегревателя, который паропроводом связан с паровой турбиной высокого давления, причем первый рекуператор паропроводом связан с конденсатором-испарителем, который водопроводом связан с первым насосом, а паровая турбина низкого давления одним паропроводом через первый рекуператор связана с конденсатором-испарителем, а другим через второй рекуператор связана с конденсатором, который через второй насос водопроводом связан со вторым рекуператором, отличающаяся тем, что в котел-утилизатор дополнительно встроены поверхности нагрева промежуточного пароперегревателя, а паровая турбина высокого давления через промежуточный пароперегреватель паропроводом связана с паровой турбиной среднего давления, которая паропроводом связана с первым рекуператором, причем охладитель-подогреватель водопроводами связан с первым насосом и экономайзером котла-утилизатора, и трубопроводами с конденсатором-испарителем и со вторым рекуператором, при этом паровые турбины высокого, среднего и низкого давления через общий вал связаны с электрическим генератором.Combined-cycle plant containing a gas turbine unit connected by a gas duct to a recovery boiler, which is equipped with a gas duct for exhausting gases into the chimney, and into which are connected the heating surfaces of an economizer, evaporator and superheater, which is connected by a steam line to a high-pressure steam turbine, the first the recuperator is connected by a steam line to the condenser-evaporator, which is connected by a water line to the first pump, and the low-pressure steam turbine is connected by one steam line through the first recuperator connected to a condenser-evaporator, and another through a second recuperator connected to a condenser, which is connected through a second pump to the second recuperator through a water pipe, characterized in that the heating boiler is additionally equipped with heating surfaces of an intermediate superheater, and a high pressure steam turbine is connected through an intermediate superheater by a steam line with a medium-pressure steam turbine, which is connected by a steam line to the first recuperator, and the cooler-heater is connected by water pipes to the first pump and economizer of the recovery boiler, and pipelines with a condenser-evaporator and with a second recuperator, while steam turbines of high, medium and low pressure are connected through a common shaft to an electric generator.

Claims (1)

Парогазовая установка, содержащая газотурбинную установку, связанную газоходом с котлом-утилизатором, который снабжен газоходом для отвода газов в дымовую трубу, и в который встроены связанные между собой поверхности нагрева экономайзера, испарителя и пароперегревателя, который паропроводом связан с паровой турбиной высокого давления, причем первый рекуператор паропроводом связан с конденсатором-испарителем, который водопроводом связан с первым насосом, а паровая турбина низкого давления одним паропроводом через первый рекуператор связана с конденсатором-испарителем, а другим через второй рекуператор связана с конденсатором, который через второй насос водопроводом связан со вторым рекуператором, отличающаяся тем, что в котел-утилизатор дополнительно встроены поверхности нагрева промежуточного пароперегревателя, а паровая турбина высокого давления через промежуточный пароперегреватель паропроводом связана с паровой турбиной среднего давления, которая паропроводом связана с первым рекуператором, причем охладитель-подогреватель водопроводами связан с первым насосом и экономайзером котла-утилизатора, и трубопроводами с конденсатором-испарителем и со вторым рекуператором, при этом паровые турбины высокого, среднего и низкого давления через общий вал связаны с электрическим генератором. Combined-cycle plant containing a gas turbine unit connected by a gas duct to a recovery boiler, which is equipped with a gas duct for exhausting gases into the chimney, and into which are connected the heating surfaces of an economizer, evaporator and superheater, which is connected by a steam line to a high-pressure steam turbine, the first the recuperator is connected by a steam line to the condenser-evaporator, which is connected by a water line to the first pump, and the low-pressure steam turbine is connected by one steam line through the first recuperator connected to a condenser-evaporator, and another through a second recuperator connected to a condenser, which is connected through a second pump to the second recuperator through a water pipe, characterized in that the heating boiler is additionally equipped with heating surfaces of an intermediate superheater, and a high pressure steam turbine is connected through an intermediate superheater by a steam line with a medium-pressure steam turbine, which is connected by a steam line to the first recuperator, and the cooler-heater is connected by water pipes to the first pump and economizer of the recovery boiler, and pipelines with a condenser-evaporator and with a second recuperator, while steam turbines of high, medium and low pressure are connected through a common shaft to an electric generator.
RU2013152919/06A 2013-11-29 2013-11-29 Combined-cycle plant RU2561780C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2013152919/06A RU2561780C2 (en) 2013-11-29 2013-11-29 Combined-cycle plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2013152919/06A RU2561780C2 (en) 2013-11-29 2013-11-29 Combined-cycle plant

Publications (2)

Publication Number Publication Date
RU2013152919A true RU2013152919A (en) 2015-06-10
RU2561780C2 RU2561780C2 (en) 2015-09-10

Family

ID=53285108

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2013152919/06A RU2561780C2 (en) 2013-11-29 2013-11-29 Combined-cycle plant

Country Status (1)

Country Link
RU (1) RU2561780C2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11603794B2 (en) 2015-12-30 2023-03-14 Leonard Morgensen Andersen Method and apparatus for increasing useful energy/thrust of a gas turbine engine by one or more rotating fluid moving (agitator) pieces due to formation of a defined steam region
RU2686541C1 (en) * 2018-06-13 2019-04-29 Федеральное государственное автономное образовательное учреждение высшего образования "Национальный исследовательский Томский политехнический университет" Steam-gas plant

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4875436A (en) * 1988-02-09 1989-10-24 W. R. Grace & Co.-Conn. Waste heat recovery system
US5632143A (en) * 1994-06-14 1997-05-27 Ormat Industries Ltd. Gas turbine system and method using temperature control of the exhaust gas entering the heat recovery cycle by mixing with ambient air
DE102004037417B3 (en) * 2004-07-30 2006-01-19 Siemens Ag Method and device for transferring heat from a heat source to a thermodynamic cycle with a working medium comprising at least two substances with non-isothermal evaporation and condensation

Also Published As

Publication number Publication date
RU2561780C2 (en) 2015-09-10

Similar Documents

Publication Publication Date Title
RU2012105280A (en) STEAM TURBINE UNIT WITH STEAM TURBINE ASSEMBLY AND USER OF TECHNOLOGICAL STEAM AND METHOD OF OPERATION
RU2013130993A (en) FURNISHING STEAM HEAT TAKE-OFF IN FUEL FUEL POWER ENGINEERING PLANT
RU2012145608A (en) STEAM GAS INSTALLATION
JP2015081560A5 (en)
RU2012138690A (en) STEAM-GAS ADJUSTMENT OF A STEAM TURBINE POWER UNIT WITH DOCRITICAL STEAM PARAMETERS
RU2013152919A (en) STEAM GAS INSTALLATION
WO2015077095A3 (en) Selective pressure kettle boiler for rotor air cooling applications
RU2013137078A (en) STEAM GAS INSTALLATION
RU2015107419A (en) STEAM TURBINES
RU2009109733A (en) STEAM-GAS UNIT WITH STEAM TURBINE COMPRESSOR ACTUATOR AND REGENERATIVE GAS TURBINE
RU2013127318A (en) STEAM GAS INSTALLATION
RU2012145607A (en) STEAM GAS INSTALLATION
RU126373U1 (en) STEAM GAS INSTALLATION
RU2015149555A (en) METHOD FOR WORKING MANEUVERED REGENERATIVE STEAM-GAS HEAT ELECTROCENTRAL AND DEVICE FOR ITS IMPLEMENTATION
RU2012152236A (en) POWER PLANT WITH STEAM-GAS PLANT
RU109797U1 (en) HEAT RECOVERY COMPLEX WITH STEAM TURBINE
EA201001472A1 (en) ELECTRIC POWER GENERATING COMPLEX WITH COMBINED FUEL
RU2013102787A (en) STEAM GAS INSTALLATION
RU2008114100A (en) STEAM GAS INSTALLATION
RU2016134576A (en) The method of operation of a maneuverable cogeneration combined-cycle plant and a device for its implementation
WO2016054595A3 (en) Combined electricity, heat, and chill generation for a rankine engine
UA115466U (en) THERMAL-GAS INSTALLATION FOR RECONSTRUCTION OF HEATING POWER PLANTS
RU2008101717A (en) ELECTRIC GENERATING COMPLEX WITH COMBINED FUEL
RU2016136467A (en) STEAM-GAS ENERGY UNIT WITH STEAM-GENERATING HYDROGEN-OXYGEN PLANTS
RU2012145603A (en) STEAM GAS INSTALLATION

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20151130