RU2012810C1 - Method for reactivation of open pit edges - Google Patents
Method for reactivation of open pit edges Download PDFInfo
- Publication number
- RU2012810C1 RU2012810C1 SU5004858A RU2012810C1 RU 2012810 C1 RU2012810 C1 RU 2012810C1 SU 5004858 A SU5004858 A SU 5004858A RU 2012810 C1 RU2012810 C1 RU 2012810C1
- Authority
- RU
- Russia
- Prior art keywords
- rock mass
- bench
- rock
- horizon
- ledge
- Prior art date
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
Description
Изобретение относится к горной промышленности и может быть использовано при открытой разработке месторождений полезных ископаемых, в частности при разносе бортов карьеров с нагорной частью, их реконструкции, расконсервации, а также при открыто-подземной доработке месторождений. The invention relates to the mining industry and can be used in the open development of mineral deposits, in particular when the quarry sides are separated from the upland part, their reconstruction, re-conservation, as well as during open-underground mining of deposits.
Известен способ построения и последующей расконсервации временного борта карьера, включающий погашение уступов с построением по высоте временного борта в заданной последовательности рабочих площадок уменьшенной ширины и берм безопасности, располагаемых на целике [1] . There is a method of constructing and subsequently re-mothballing a temporary sidewall of a quarry, including the redemption of ledges with the construction of the height of the temporary side in a given sequence of working platforms of reduced width and safety berms located at the rear [1].
Однако оставление взорванной горной массы на нерабочем борту ведет к его выполаживанию, а следовательно, к резкому увеличению объемов вскрышных пород в контурах карьера. However, leaving blasted rock mass on a non-working side leads to its flattening, and consequently, to a sharp increase in the volume of overburden in the contours of the quarry.
Известен способ управления обрушением и перемещением материалов с помощью виброисточников, воздействующих на массив горной массы [2] . Этот способ требует мощных возмущающих усилий на массив (сила 100-10000 тс, частота колебаний 1-60 Гц) и не может обеспечить необходимую производительность перепуска горной массы с верхних горизонтов на нижние за короткий отрезок времени (час, смену). A known method of controlling the collapse and movement of materials using vibration sources acting on the rock mass [2]. This method requires powerful perturbing forces on the array (force 100-10000 ton-force, oscillation frequency 1-60 Hz) and cannot provide the necessary productivity of rock mass bypass from upper horizons to lower in a short period of time (hour, shift).
Известен также способ открытой разработки нагорных месторождений, при котором с нижней границе карьерного поля проходят траншею, служащую нижней откаточной трассой, и из нее осуществляют сооружение спаренных погрузочных площадок, соединенных при помощи рудоскатов с верхними рабочими площадками [3] . There is also known a method of open-pit mining of upland deposits, in which a trench passes through the lower boundary of the quarry field, which serves as the lower return route, and from it the construction of paired loading platforms connected by ore shafts to the upper working platforms [3] is carried out.
Однако для эффективного применения такого способа необходимо условие, чтобы угол наклона породо- и рудоскатов составлял бы не менее 40-45о [4] .However, for effective application of this method requires the condition that the angle of inclination of rock-and rudoskatov would be not less than about 40-45 [4].
При расконсервации бортов карьеров средний угол наклона борта обычно равен 30-40о.When re-conservation of the sides of the quarries, the average angle of inclination of the side is usually equal to 30-40 about .
Недостаточная величина угла наклона борта препятствует эффективному использованию породо- и рудоскатов при расконсервации бортов. Кроме того, безопасная работа экскаватора на отгрузке горной массы из-под породо- и рудоската ограничивается высотой навала не более 1,5 максимальной высоты черпания экскаватора. Объем порций горной массы, переспускаемой по скату на нижние горизонты за один цикл, весьма незначителен и обычно не превышает V ≅0,5 V≅ 0.5 Hк·Π·R
Нк = 1,5 Н˙ч;
Нч - максимальная высота черпания экскаватора, м;
π= 3,14;
Rк - радиус конуса по основанию, м;
Rк = Нк˙ сtg α;
α- угол откоса конуса горной массы, град.The insufficient value of the angle of inclination of the side prevents the effective use of rock and ore mines when re-preserving the sides. In addition, the safe operation of the excavator on the shipment of rock from under the rock and ore deposit is limited to a pile height of not more than 1.5 of the maximum excavation height. The volume of portions of rock mass that is passed along the slope to the lower horizons in one cycle is very small and usually does not exceed V ≅ 0.5 V ≅ 0.5 H to · Π ·
N to = 1.5 N˙h;
N h - the maximum height of the excavator, m;
π = 3.14;
R to - the radius of the cone at the base, m;
R k = N k ˙ сtg α;
α is the slope angle of the cone of the rock mass, deg.
При Нч = 13,35 м (ЭКГ-8И), α= 36о получаем V = 2,2 тыс. м3 разрыхленной горной массы или ≈1,5 тыс. м3 плотной массе. H When H = 13.35 m (ECG-8I), α = 36 to obtain V = 2,2 thousand. M3 loosened rock mass or ≈1,5 thousand. M 3 dense mass.
Сменная производительность экскаватора ЭКГ-8И на внутрикарьерных перегрузочных складах составляет 2,86 тыс. м3 в плотной массе (Нормы технологического проектирования, Гипроруда, 1986, с. 37).The replaceable productivity of the EKG-8I excavator at intracarrier transshipment warehouses is 2.86 thousand m 3 in dense mass (Norms of Technological Design, Giproruda, 1986, p. 37).
Таким образом, экскаватор будет полсмены работать на отгрузке горной массы, а затем ждать следующий порции горной массы с верхних горизонтов. Thus, the excavator will work half a shift to ship the rock mass, and then wait for the next portion of the rock mass from the upper horizons.
Наиболее близким к предлагаемому является способ расконсервации временного нерабочих бортов карьеров (5), при этом способе на рабочих площадках во фланговых частях уступов формируют горизонтальные рабочие площадки с экскаваторными перегрузочными пунктами, которые сооружают путем поочередной отгрузки взорванной горной массы на каждом уступе перед началом расконсервации вышележащего уступа, начиная со второго, причем после окончания работ на вышележащем уступе экскаваторный перегрузочный пункт перемещают на нижележащий уступ. Closest to the proposed one is a method of re-preservation of temporary non-working sides of quarries (5), with this method, horizontal working platforms with excavator transshipment points are formed on working platforms in the flank parts of the benches, which are constructed by shipment of blasted rock mass on each ledge before the re-conservation of the overlying ledge starting from the second, and after completion of work on the overlying ledge, the excavator transshipment point is moved to the underlying ledge.
Преимуществами способа являются простота технического решения, использование имеющегося на карьере экскаваторного оборудования. The advantages of the method are the simplicity of the technical solution, the use of excavator equipment available at the quarry.
К недостаткам указанного способа относятся:
- капиталоемкость из-за необходимости сооружения на каждом горизонте по мере расконсервации уступов перегрузочного пункта с экскаватором;
- необходимость перегона экскаватора на нижележащий уступ после отработки (расконсервации) очередного горизонта, что в условиях расконсервации может представлять существенные трудности;
- жесткая зависимость объемов горной массы, перепускаемых по рудо- и породоскатам, от производительности экскаватора на перегрузочном пункте;
- возможность образования зависаний и высоких осыпей горной массы, затрудняющих безопасную и производительную отгрузку горной массы на нижнем концентрационном горизонте в средства железнодорожного транспорта.The disadvantages of this method include:
- capital intensity due to the need to build on each horizon as the re-conservation of the ledges of the transshipment point with an excavator;
- the need to drive the excavator to the underlying ledge after mining (re-preservation) of the next horizon, which in the conditions of re-conservation can pose significant difficulties;
- a rigid dependence of the volume of rock mass bypassed by ore and rock slides, on the performance of the excavator at the transshipment point;
- the possibility of freezing and high screes of rock mass, which impede the safe and productive shipment of rock mass at the lower concentration horizon to the means of railway transport.
На фиг. 1 представлен общий вид расконсервируемого борта карьера; на фиг. 2 - то же, вид в плане. In FIG. 1 presents a General view of the unreserved side of the quarry; in FIG. 2 - same, plan view.
Законсервированный борт карьера представлен уступами 1. Расконсервацию начинают с верхнего уступа 2. Затем разносят нижележащие уступы 1. Взорванную горную массу 3 с учетом ее сортности (руда или порода) грузят экскаваторами 4 в средства внутрикарьерного транспорта 5 (автосамосвалы, думпкары) и доставляют к породо- и рудоскатам. The canned side of the quarry is represented by
Породо- и рудоскаты оборудуют на флангах расконсервируемого борта, начиная от верхнего горизонта до концентрационного, устройствами 6 для регулирования подачи горной массы, например вибропитателями с дистанционным управлением. Питатели 6 такого типа с последовательным или поочередным включением-выключением регулируют подачу горной массы в штабели 7, расположенные на концентра- ционном горизонте 8. В результате становится возможным использовать высокоэффективный гравитационный транспорт при углах наклона борта карьера менее 40-45о. На концентрационном горизонте 8 горная масса экскаваторами 9 грузится в средства внутрикарьерного транспорта 10 и вывозится из карьера.Rocks and ore mines are equipped on the flanks of the unreserved side, from the upper horizon to the concentration one, with
Обязательным условием безаварийной работы по предлагаемому условию является оставление предохранительной подушки из горной массы на питателях при их выключении (как для всех питателей тяжелого типа). A prerequisite for trouble-free operation under the proposed condition is to leave a safety cushion from the rock mass on the feeders when they are turned off (as for all heavy-type feeders).
Предлагаемый способ расконсервации бортов карьеров обеспечивает:
высокую производительность при расконсервации борта карьера (отечественные вибропитатели имеют производительность до 1200 т/ч при размере куска до 1000 мм, пластинчатые - 6000 т/ч при куске до 1300 мм);
взаимозаменяемость породо- и рудоспусков при изменении сортности горной массы на расконсервируемом горизонте, поочередное их погашение на отрабатываемом горизонте;
безопасность работы экскаватора на концентрационном горизонте, так как высота штабеля 7 регулируется включением-выключением питателя на вышележащем горизонте;
значительную вместимость породо- и рудоскатов из-за наличия дополнительных емкостей на каждом горизонте, оборудованном питателями;
низкие капитальные затраты и эксплуатационные расходы в связи с простотой конструкции и дешевизной питателей, особенно вибрационных. (56) Авторское свидетельство СССР N 945433, кл. Е 21 С 41/00, 1982.The proposed method of de-preservation of quarry sides provides:
high performance when mothballed on board the quarry (domestic vibratory feeders have a capacity of up to 1200 t / h with a piece size of up to 1000 mm, plate - 6000 t / h with a piece of up to 1300 mm);
interchangeability of rock and ore passes when changing the grade of rock mass on the unconserved horizon, their alternate repayment on the worked out horizon;
safety operation of the excavator on the concentration horizon, since the height of the
significant capacity of rock and ore mines due to the availability of additional tanks on each horizon equipped with feeders;
low capital and operating costs due to the simplicity of design and low cost of feeders, especially vibrating. (56) Copyright certificate of the USSR N 945433, cl. E 21 C 41/00, 1982.
Авторское свидетельство СССР N 996729, кл. Е 21 С 41/00, 1983. USSR copyright certificate N 996729, cl. E 21 C 41/00, 1983.
Авторское свидетельство СССР N 323555, кл. Е 21 С 41/00, 1972. USSR author's certificate N 323555, cl. E 21 C 41/00, 1972.
Лазоватский Г. А. Эффективность использования породо- и рудоскатов на открытых горных разработках, Горный журнал, 1991, N 3, с. 15-19. Lazovatsky G.A. Efficiency of using rock and ore mines in open pit mining, Mining Journal, 1991,
Авторское свидетельство СССР N 1027391, кл. Е 21 С 41/00, 1983. USSR author's certificate N 1027391, cl. E 21 C 41/00, 1983.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU5004858 RU2012810C1 (en) | 1991-07-01 | 1991-07-01 | Method for reactivation of open pit edges |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU5004858 RU2012810C1 (en) | 1991-07-01 | 1991-07-01 | Method for reactivation of open pit edges |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2012810C1 true RU2012810C1 (en) | 1994-05-15 |
Family
ID=21586579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU5004858 RU2012810C1 (en) | 1991-07-01 | 1991-07-01 | Method for reactivation of open pit edges |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2012810C1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989617A (en) * | 2017-12-05 | 2018-05-04 | 昆明冶金高等专科学校 | A kind of strip mining transformation method of gently inclined orebody |
-
1991
- 1991-07-01 RU SU5004858 patent/RU2012810C1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989617A (en) * | 2017-12-05 | 2018-05-04 | 昆明冶金高等专科学校 | A kind of strip mining transformation method of gently inclined orebody |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20100171360A1 (en) | Method for open pit bench mining | |
WO2010017582A1 (en) | Mining system | |
RU2012810C1 (en) | Method for reactivation of open pit edges | |
RU2123597C1 (en) | Method for mining steep seams | |
RU2064582C1 (en) | Method for openpit mining of minerals | |
US4377310A (en) | Method of underground working of ore deposits and handling ore | |
SU996729A1 (en) | Method of controlling caving-in and motion of materials | |
SU693010A1 (en) | Method of dump formation while working mineral deposits | |
RU2186982C1 (en) | Method of preparation of new haulage level and excavator-railway complex for method embodiment | |
RU2171377C2 (en) | Method of opencast mining of steep elongated mineral deposits | |
SU1580008A1 (en) | Method of mining thick steep ore bodies | |
RU2809406C1 (en) | Method for forming dumps with separation of enriched fine fraction | |
SU1176077A1 (en) | Method of combination excavation of minerals in outline-adjoining area of open mine | |
RU2514035C2 (en) | Method of combined development of steeply-dipping ore bodies | |
SU1154468A1 (en) | Method of strip mining of sloping beds of mineral fields | |
SU1716135A1 (en) | Method for mining of mineral folded beds | |
SU899959A1 (en) | Method of mining mineral deposits | |
RU2124128C1 (en) | Method for opencast development of deposits | |
SU1744254A1 (en) | Method for re-activation of pit side | |
WO2024082011A1 (en) | Method of mining in underground mines including disposal of tailings | |
SU823578A1 (en) | Method of apparatus for carrying rock to dump | |
SU754063A1 (en) | Method of rectoring the surface and recultivating the areas of caving-in zones | |
RU2046951C1 (en) | Deep open-cast mine transportation method | |
SU742589A1 (en) | Method of mining super-thin sharply assending seams | |
SU1176078A1 (en) | Method of combination excavation of minerals in outline-adjoining area of open mine |