RU2007108855A - METHOD FOR DEVELOPING WELLS AND TESTING FLOORS IN THE PROCESS OF SWABING (OPTIONS) - Google Patents

METHOD FOR DEVELOPING WELLS AND TESTING FLOORS IN THE PROCESS OF SWABING (OPTIONS) Download PDF

Info

Publication number
RU2007108855A
RU2007108855A RU2007108855/03A RU2007108855A RU2007108855A RU 2007108855 A RU2007108855 A RU 2007108855A RU 2007108855/03 A RU2007108855/03 A RU 2007108855/03A RU 2007108855 A RU2007108855 A RU 2007108855A RU 2007108855 A RU2007108855 A RU 2007108855A
Authority
RU
Russia
Prior art keywords
swab
tubing
packer
lowering
tubing string
Prior art date
Application number
RU2007108855/03A
Other languages
Russian (ru)
Other versions
RU2341653C1 (en
Inventor
Ринат Раисович Зарипов (RU)
Ринат Раисович Зарипов
Виктор Салимович Хакимов (RU)
Виктор Салимович Хакимов
Айрат Радикович Адиев (RU)
Айрат Радикович Адиев
Original Assignee
Открытое акционерное общество НПФ "Геофизика" (RU)
Открытое акционерное общество НПФ "Геофизика"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество НПФ "Геофизика" (RU), Открытое акционерное общество НПФ "Геофизика" filed Critical Открытое акционерное общество НПФ "Геофизика" (RU)
Priority to RU2007108855/03A priority Critical patent/RU2341653C1/en
Publication of RU2007108855A publication Critical patent/RU2007108855A/en
Application granted granted Critical
Publication of RU2341653C1 publication Critical patent/RU2341653C1/en

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Claims (2)

1. Способ освоения скважин и испытания пластов в процессе свабирования, включающий герметичное перекрытие интервала испытания от остальной части ствола скважины пакером на колонне насосно-компрессорных труб (НКТ), опускание в НКТ на геофизическом кабеле подземного свабировочного оборудования, осуществление свабирования путем опускания сваба на заданную глубину и последующего поднятия его с объемом флюида из скважины, обеспечение информационного сопровождения технологических параметров, отличающийся тем, что выше пакера в НКТ размещают комплексный скважинный прибор, осуществляющий оперативный контроль притока флюида, поступающего из пласта в процессе свабирования и обеспечивающий передачу данных на устье скважины по кабелю, спущенному на колонне НКТ по затрубному пространству, а после вызова притока из пласта, снижения уровня жидкости в колонне НКТ и информационного сопровождения технологических параметров свабирования осуществляют изоляцию полости НКТ от пласта посредством электромеханического пакера и регистрируют изменения давления во времени выше и ниже электромеханического пакера датчиками давления, по кривой притока и восстановления давления пласта во времени определяют характеристики пласта.1. A method of well development and formation testing during the swab process, including tight shutoff of the test interval from the rest of the wellbore by a packer on the tubing string, lowering of underground swabbing equipment into the tubing on the geophysical cable, swabbing by lowering the swab to a predetermined depth and its subsequent raising with the volume of fluid from the well, providing informational support of technological parameters, characterized in that it is placed above the packer in the tubing a complex downhole tool that provides operational control of fluid inflow from the reservoir during the swab process and ensures data transmission at the wellhead through a cable running down the tubing string through the annulus, and after the inflow from the reservoir is called, the fluid level in the tubing string and information tracking technological parameters of swab isolation of the tubing cavity from the reservoir by means of an electromechanical packer and recording pressure changes over time above and below lektromehanicheskogo packer pressure sensors inflow curve and recovery characteristics of the formation pressure is determined during formation time. 2. Способ освоения скважин и испытания пластов в процессе свабирования, включающий опускание в насосно-компрессорную трубу (НКТ) на геофизическом кабеле подземного свабировочного оборудования, осуществление свабирования путем опускания сваба на заданную глубину и последующего поднятия его с объемом флюида из скважины, обеспечение информационного сопровождения технологических параметров, отличающийся тем, что на колонне НКТ опускают пакер-втулку, обеспечивающий герметичное перекрытие интервала испытания от остальной части ствола скважины, в который при последующей операции спуска колонны НКТ плотно вставляют хвостовик с комплексным скважинным прибором, позволяющим осуществлять оперативный контроль притока флюида, поступающего из пласта в процессе свабирования и обеспечивающим передачу данных на устье скважины по кабелю, спущенному на колонне НКТ по затрубному пространству, а после вызова притока из пласта, снижения уровня жидкости в колонне НКТ и информационного сопровождения технологических параметров свабирования осуществляют изоляцию полости НКТ от пласта посредством электромеханического пакера и регистрируют изменения давления во времени выше и ниже электромеханического пакера датчиками давления, по кривой притока и восстановления давления пласта во времени определяют характеристики пласта.2. A method of well development and formation testing during the swab process, including lowering into the tubing on the geophysical cable of the underground swab equipment, swabbing by lowering the swab to a predetermined depth and then raising it with the volume of fluid from the well, providing information support technological parameters, characterized in that the packer sleeve is lowered on the tubing string, providing a tight seal of the test interval from the rest of the barrel auger, in which, during the subsequent operation of lowering the tubing string, the liner is tightly inserted with an integrated downhole tool that allows for operational control of fluid flow from the reservoir during the swab process and ensures data transmission to the wellhead via a cable lowered into the tubing string through the annulus, and after calling the inflow from the reservoir, lowering the liquid level in the tubing string and information support of the technological parameters of swabbing, the tubing cavity is isolated from the reservoir by means of an electromechanical packer and record pressure changes in time above and below the electromechanical packer by pressure sensors, formation characteristics are determined from the formation inflow and pressure recovery curve over time.
RU2007108855/03A 2007-03-09 2007-03-09 Method of development of wells and testing of formations in process of swabbing (versions) RU2341653C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2007108855/03A RU2341653C1 (en) 2007-03-09 2007-03-09 Method of development of wells and testing of formations in process of swabbing (versions)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2007108855/03A RU2341653C1 (en) 2007-03-09 2007-03-09 Method of development of wells and testing of formations in process of swabbing (versions)

Publications (2)

Publication Number Publication Date
RU2007108855A true RU2007108855A (en) 2008-09-20
RU2341653C1 RU2341653C1 (en) 2008-12-20

Family

ID=39867529

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2007108855/03A RU2341653C1 (en) 2007-03-09 2007-03-09 Method of development of wells and testing of formations in process of swabbing (versions)

Country Status (1)

Country Link
RU (1) RU2341653C1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2483208C1 (en) * 2012-07-23 2013-05-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for subsequent development of multisite well
RU2543246C1 (en) * 2013-08-20 2015-02-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Well formation development device
RU2559247C1 (en) * 2014-07-28 2015-08-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Express method to determine characteristics of bottomhole zone in stripped wells used for well completion and system for its implementation
RU2603322C1 (en) * 2015-09-10 2016-11-27 Общество с ограниченной ответственностью Предприятие "ФХС-ПНГ" Method of downhole tools delivery to bottoms of drilled wells with complex profile, carrying out geophysical survey and complex for its implementation

Also Published As

Publication number Publication date
RU2341653C1 (en) 2008-12-20

Similar Documents

Publication Publication Date Title
CN110168191B (en) Method for plugging and pressure testing of drilled well
US6543540B2 (en) Method and apparatus for downhole production zone
RU2362005C2 (en) Method of conservation, completion and repair of well
CN102007264B (en) Method and apparatus for programmable pressure drilling and programmable gradient drilling, and completion
RU2660704C2 (en) Barrier testing method
US6330913B1 (en) Method and apparatus for testing a well
US20120043079A1 (en) Sand control well completion method and apparatus
US9739113B2 (en) Completions fluid loss control system
US9708906B2 (en) Method and system for hydraulic fracture diagnosis with the use of a coiled tubing dual isolation service tool
CN107567532A (en) Lifted by nitrogen, production logging and recovery test extend the method for carrying out well testing operation with single coiled tubing
RU2007108855A (en) METHOD FOR DEVELOPING WELLS AND TESTING FLOORS IN THE PROCESS OF SWABING (OPTIONS)
RU2611792C1 (en) Method for isolation of watered intervals in horizontal section of wellbore
GB2597369A (en) High flowrate formation tester
US20150136406A1 (en) Subsea Intervention Plug Pulling Device
RU2418162C1 (en) Method for improving permeability of bed during extraction of high-viscosity oil
WO2001049973A1 (en) Method and apparatus for downhole production testing
EP2964873B1 (en) Wireline assisted coiled tubing portion and method for operation of such a coiled tubing portion
RU2625126C1 (en) Downhole testing method in open hole
RU2527960C1 (en) Well surveying method
Shumakov et al. Get the Most About Your Reservoir From Downhole Pressure Data by Managing Environmental and Operational Interference
RU2008130738A (en) METHOD FOR MONITORING A MULTILAYER WELL
RU2425961C1 (en) Well operation method
Shumakov et al. New generation impulse testing: An environmentally friendly well testing solution for tight reservoirs to acquire accurate reservoir information
US9228427B2 (en) Completion method to allow dual reservoir saturation and pressure monitoring
RU2442877C1 (en) Method for gas well suspension

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20190310