RU195276U1 - CONSOLE CRANE FOR INSTALLING SUPPORT ADJUSTERS ON THE DEPARTURE MORE THAN 18m - Google Patents
CONSOLE CRANE FOR INSTALLING SUPPORT ADJUSTERS ON THE DEPARTURE MORE THAN 18m Download PDFInfo
- Publication number
- RU195276U1 RU195276U1 RU2019132602U RU2019132602U RU195276U1 RU 195276 U1 RU195276 U1 RU 195276U1 RU 2019132602 U RU2019132602 U RU 2019132602U RU 2019132602 U RU2019132602 U RU 2019132602U RU 195276 U1 RU195276 U1 RU 195276U1
- Authority
- RU
- Russia
- Prior art keywords
- superstructure
- crane
- support
- reach
- engage
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C17/00—Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
Полезная модель относится к области мостостроения, а именно к сооружению временных и низководных мостов с применением консольных кранов.Известен консольный кран СРК-50, недостатком которого является то, что он может применяться для установки надстройки опоры на вылете до 18 м. Для установки надстройки опор на расстояние более 18 м от края сооруженной конструкции требуется применение плавучих кранов, сборка и эксплуатация которых трудозатратна.Задачей, на решение которой направлена заявляемая полезная модель, является возможность установки краном СРК-50 надстроек опор на вылете более 18 м. Данная задача решается за счет того, что к главной балке консольного крана СРК-50 сверху через технологическую балку по бокам устанавливаются лебедки для зацепления нижней части надстройки опоры, а к оголовку консоли крана шарнирно прикрепляется решетчатая стрела, которая через трос соединяется с лебедкой подъема и опускания решетчатой стрелы, а на базовую часть крана устанавливается лебедка для зацепления верхней части надстройки опор. Для зацепления нижней части надстройки опоры (ширина которой может достигать 8 м) электрические лебедки устанавливаются на краях технологической балки, которая в свою очередь прикрепляется к главной балке консольного крана.Техническим результатом, обеспечиваемым приведенной совокупностью признаков, является установка надстроек опор на ростверк фундамента на расстояние более 18 м от края сооруженной конструкции моста без использования плавучего крана.Порядок установки опоры производится следующим образом:строповка надстройки опоры в горизонтальном положении;транспортировка надстройки опоры краном СРК-50 к месту установки;опускание решетчатой стрелы лебедкой подъема и опускания решетчатой стрелы на необходимый вылет;перевод надстройки опоры в вертикальное состояние за счет стравливания тросов лебедок для зацепления нижней части надстройки опоры;установка надстройки опоры на ростверк фундамента.расстроповка надстройки опоры.Таким образом, заявленный технический результат, заключающийся в возможности установки надстройки опоры на расстояние более 18 м, достигнут.The utility model relates to the field of bridge construction, namely to the construction of temporary and low-water bridges using cantilever cranes. The SRK-50 cantilever crane is known, the drawback of which is that it can be used to install a support superstructure at a reach of up to 18 m. To install a superstructure of supports at a distance of more than 18 m from the edge of the constructed structure, the use of floating cranes is required, the assembly and operation of which is labor-intensive. The task to which the claimed utility model is directed is the ability to install and crane СРК-50 of superstructure of supports at a reach of more than 18 m. This problem is solved due to the fact that winches are installed on the sides of the main beam of the console crane СРК-50 on top of the technological beam to engage the lower part of the superstructure of the support, and hinged to the head of the crane console a lattice boom is attached, which is connected via a cable to a hoist for raising and lowering the lattice boom, and a winch is installed on the base part of the crane to engage the upper part of the support superstructure. To engage the lower part of the support superstructure (the width of which can reach 8 m), electric winches are installed on the edges of the technological beam, which in turn is attached to the main beam of the cantilever crane. more than 18 m from the edge of the constructed bridge structure without the use of a floating crane. The order of installation of the support is as follows: slinging the superstructure of the support horizontal position; transportation of the support superstructure with the SRK-50 crane to the installation site; lowering the trellised boom of the hoist to raise and lower the trellised boom to the required reach; translation of the support superstructure to the vertical state by etching the winch cables to engage the lower part of the support superstructure; installation of the support superstructure on the grill foundation. the extension of the support superstructure. Thus, the claimed technical result, which consists in the possibility of installing the support superstructure at a distance of more than 18 m, will reach t
Description
Полезная модель относится к области мостостроения, а именно к сооружению временных и низководных мостов с применением консольных кранов.The utility model relates to the field of bridge construction, namely to the construction of temporary and low-water bridges with the use of jib cranes.
Известен консольный кран СРК-50 (1. Руководство по устройству и эксплуатации крана СРК-50), предназначенный для установки в пролет моста металлических пролетных строений (сборно-разборных и цельно перевозимых) полной массой до 34,4 м с уложенным мостовым полотном общей массой до 55 т и железобетонных пролетных строений массой до 70 т, длиной до 23 м и массой до 85 т, длиной до 19 м, для снятия пролетных строений с железнодорожных платформ и тележек, а также для установки блоков опор на вылете до 18 м.Known console crane SRK-50 (1. Guide to the design and operation of the crane SRK-50), designed for installation in the span of the bridge of metal spans (collapsible and integrally transported) with a total weight of up to 34.4 m with a laid bridge canvas with a total weight up to 55 t and reinforced concrete spans weighing up to 70 t, length up to 23 m and weighing up to 85 t, length up to 19 m, for removing spans from railway platforms and bogies, as well as for installing support blocks at a reach of up to 18 m.
Консольный кран СРК-50 (фиг. 1 поз. 1) состоит из базовой части (фиг. 1 поз. 2), главной балки (фиг. 1 поз. 3), гибких тяг, ходовой части, платформы для противовеса, противовеса, полиспастов, трех лебедок, электрооборудования и электростанции.The SRK-50 jib crane (Fig. 1 pos. 1) consists of a base part (Fig. 1 pos. 2), a main beam (Fig. 1 pos. 3), flexible rods, a running gear, a platform for a counterweight, a counterweight, and chain hoists , three winches, electrical equipment and a power plant.
Недостатком данного технического устройства является то, что оно может применяется для установки надстройки опоры (фиг. 1 поз. 4) на вылете до 18 м. Для установки надстройки опор (фиг. 1 поз. 4) на расстояние более 18 м от края сооруженной конструкции (фиг. 2 поз. 5) требуется применение плавучих кранов, сборка и эксплуатация которых трудозатратна.The disadvantage of this technical device is that it can be used to install a support superstructure (Fig. 1, item 4) at a reach of up to 18 m. To install a support superstructure (Fig. 1 item. 4) at a distance of more than 18 m from the edge of the constructed structure (Fig. 2 item 5) requires the use of floating cranes, the assembly and operation of which is labor-intensive.
Задачей, на решение которой направлена заявляемая полезная модель, является возможность установки краном СРК-50 (фиг. 1 поз. 1) надстроек опор (фиг. 1 поз. 4) на вылете более 18 м.The task to which the claimed utility model is directed is the possibility of installing crane SRK-50 (Fig. 1 pos. 1) of the add-on supports (Fig. 1 pos. 4) at a reach of more than 18 m.
Данная задача решается за счет того, что к главной балке (фиг. 1 поз. 3) консольного крана СРК-50 сверху через технологическую балку (фиг. 1 поз. 4) по бокам устанавливаются лебедки для зацепления нижней части надстройки опоры (фиг. 1 поз. 6), а к оголовку консоли (фиг. 1 поз. 7) крана шарнирно прикрепляется решетчатая стрела (фиг. 1 поз. 8), которая через трос соединяется с лебедкой подъема и опускания решетчатой стрелы (фиг. 1 поз. 9), а на базовую часть крана (фиг. 1 поз. 2) устанавливается лебедка для зацепления верхней части надстройки опор (фиг. 1 поз. 10). Все вышеуказанные лебедки рекомендовано устанавливать с электрическим приводом и выводом управления ими на отдельный пульт.This problem is solved due to the fact that to the main beam (Fig. 1 pos. 3) of the SRK-50 jib crane from above, winches are installed on the sides to engage the lower part of the support superstructure (Fig. 1) pos. 6), and a trellised boom (Fig. 1 pos. 8) is pivotally attached to the head of the console (Fig. 1 pos. 7), which is connected via a cable to the winch raising and lowering the trellised boom (Fig. 1 pos. 9) and a winch is installed on the base part of the crane (Fig. 1, pos. 2) to engage the upper part of the superstructure of supports (Fig. 1, pos. 10). All of the above winches are recommended to be installed with an electric drive and a control output to them on a separate console.
Для зацепления нижней части надстройки опоры (ширина которой может достигать 8 м) электрические лебедки устанавливаются на краях технологической балки (фиг. 1 поз. 11), которая в свою очередь прикрепляется к главной балке консольного крана (фиг. 1 поз. 3). Для установки надстроек опор разной высоты прикрепление технологической балки (фиг. 1 поз. 11) необходимо с возможностью перемещения по главной балке. В качестве технологической балки (фиг. 1 поз. 11) под лебедки можно использовать стойки КЗ длиной 6 метров из имущества эстакады РЭМ-500.To engage the lower part of the support superstructure (the width of which can reach 8 m), electric winches are installed on the edges of the technological beam (Fig. 1, pos. 11), which in turn is attached to the main beam of the jib crane (Fig. 1, pos. 3). To install superstructures of supports of different heights, the attachment of the technological beam (Fig. 1, item 11) is necessary with the possibility of moving along the main beam. As a technological beam (Fig. 1, item 11) under the winch, you can use short racks 6 meters long from the property of the REM-500 trestle.
Техническим результатом, обеспечиваемым приведенной совокупностью признаков, является установка надстроек опор на ростверк фундамента (фиг. 2 поз. 12) на расстояние более 18 м от края сооруженной конструкции моста (фиг. 2 поз. 5) без использования плавучего крана.The technical result provided by the given set of features is the installation of add-on supports on the foundation grill (Fig. 2 pos. 12) at a distance of more than 18 m from the edge of the constructed bridge structure (Fig. 2 pos. 5) without the use of a floating crane.
Сущность полезной модели поясняется чертежами, на которых изображено:The essence of the utility model is illustrated by drawings, which depict:
на фиг. 1 показана оснастка консольного крана:in FIG. 1 shows the equipment of a jib crane:
поз. 1 - консольный кран СРК-50;pos. 1 - console crane SRK-50;
поз. 2 - базовая часть крана;pos. 2 - the base part of the crane;
поз. 3 - главная балка крана;pos. 3 - the main beam of the crane;
поз. 4 - надстройка опоры;pos. 4 - a superstructure of a support;
поз. 6 - лебедка для зацепления нижней части надстроек опор;pos. 6 - winch for engaging the lower part of the superstructure of supports;
поз. 7 - оголовок консоли;pos. 7 - the head of the console;
поз. 8 - решетчатая стрела;pos. 8 - trellised arrow;
поз. 9 - лебедка подъема и опускания решетчатой стрелы;pos. 9 - winch raising and lowering the trellised boom;
поз. 10 - лебедка для зацепления верхней части надстроек опор;pos. 10 - winch for engaging the upper part of the superstructure of supports;
поз. 11 - технологическая балка;pos. 11 - technological beam;
на фиг. 2 показана установка надстроек опор консольным краном:in FIG. 2 shows the installation of add-on supports with a jib crane:
поз. 5 - край сооруженной конструкции моста;pos. 5 - edge of the constructed bridge structure;
поз. 12 - ростверк фундамента.pos. 12 - foundation grillage.
Осуществляется полезная модель следующим образом. К главной балке (фиг. 1 поз. 3) без изменения ее конструктивных элементов прикрепляется технологическая балка (фиг. 1 поз. 11) в месте позволяющем зацеплять нижнюю часть надстройки опоры (фиг. 1 поз. 4) в горизонтальном положении как показано на фигуре 1. К оголовку консоли крана (фиг. 1 поз. 7) шарнирно прикрепляется решетчатая стрела (фиг. 1 поз. 8) с системой тросов и лебедок для подъема и опускания стрелы и зацепления верхней части надстройке опор.A utility model is implemented as follows. To the main beam (Fig. 1, pos. 3), without changing its structural elements, the technological beam (Fig. 1, pos. 11) is attached in a place that allows the lower part of the support superstructure to be hooked (Fig. 1, pos. 4) in a horizontal position as shown in the figure 1. To the head of the console of the crane (Fig. 1 pos. 7), a lattice boom (Fig. 1 pos. 8) is hinged with a system of cables and winches for raising and lowering the boom and engaging the upper part of the support superstructure.
Порядок установки опоры производится следующим образом:The procedure for installing the support is as follows:
строповка надстройки опоры (фиг. 1 поз. 4) в горизонтальном положении;slinging of the superstructure of the support (Fig. 1, item 4) in a horizontal position;
транспортировка надстройки опоры краном СРК-50 (фиг. 1 поз. 1) к месту установки;transportation of the support superstructure by crane SRK-50 (Fig. 1, pos. 1) to the installation site;
опускание решетчатой стрелы (фиг. 1 поз. 8) лебедкой подъема и опускания решетчатой стрелы (фиг. 1 поз. 9) на необходимый вылет;lowering the trellised boom (Fig. 1, pos. 8) with a winch to raise and lower the trellised boom (Fig. 1 pos. 9) to the required reach;
перевод надстройки опоры в вертикальное состояние за счет стравливания тросов лебедок для зацепления нижней части надстройки опоры (фиг. 1 поз. 6);translation of the support superstructure into a vertical state due to the removal of winch cables to engage the lower part of the support superstructure (Fig. 1, item 6);
установка надстройки опоры (фиг. 1 поз. 4) на ростверк фундамента (фиг. 2 поз. 12);installation of the support superstructure (Fig. 1, item 4) on the foundation grill (Fig. 2, item 12);
расстроповка надстройки опоры и отход крана СРК-50 для установки пролетного строения.unloading of the superstructure of the support and the departure of the crane SRK-50 for the installation of the superstructure.
В виду увеличения массы консольного крана СРК-50 необходимо предварительно рассчитать и увеличить массу противовеса с учетом веса надстройки опоры и необходимого вылета стрелы, а также усилить железнодорожный путь под консольным краном.In view of the increase in mass of the SRK-50 jib crane, it is necessary to first calculate and increase the mass of the counterweight, taking into account the weight of the support superstructure and the necessary boom extension, as well as to strengthen the railway track under the jib crane.
Таким образом, заявленный технический результат, заключающийся в возможности установки надстройки опоры на расстояние более 18 м, достигнут.Thus, the claimed technical result, which consists in the possibility of installing the superstructure of the support at a distance of more than 18 m, has been achieved.
Использованные источникиUsed sources
1. Руководство по устройству и эксплуатации крана СРК-50. М.: Воениздат, 1974 - 42 с.1. Guide to the design and operation of the crane SRK-50. M .: Military Publishing, 1974 - 42 p.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2019132602U RU195276U1 (en) | 2019-10-14 | 2019-10-14 | CONSOLE CRANE FOR INSTALLING SUPPORT ADJUSTERS ON THE DEPARTURE MORE THAN 18m |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2019132602U RU195276U1 (en) | 2019-10-14 | 2019-10-14 | CONSOLE CRANE FOR INSTALLING SUPPORT ADJUSTERS ON THE DEPARTURE MORE THAN 18m |
Publications (1)
Publication Number | Publication Date |
---|---|
RU195276U1 true RU195276U1 (en) | 2020-01-22 |
Family
ID=69184317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2019132602U RU195276U1 (en) | 2019-10-14 | 2019-10-14 | CONSOLE CRANE FOR INSTALLING SUPPORT ADJUSTERS ON THE DEPARTURE MORE THAN 18m |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU195276U1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2740595C1 (en) * | 2020-02-18 | 2021-01-15 | Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" | Method of mounting imzh-500 railroad bridge with collapsible railway cantilever crane for installation of support and spans in one process cycle |
RU203777U1 (en) * | 2020-10-06 | 2021-04-21 | Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" Министерства обороны Российской Федерации | Jib crane with the ability to erect superstructures on nearby bridges without changing direction |
RU2774693C1 (en) * | 2021-06-07 | 2022-06-21 | Федеральное государственное бюджетное учреждение "3 Центральный научно-исследовательский институт" Министерства обороны Российской Федерации | Collapsible cantilever crane |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU171107A1 (en) * | Государственный ордена Трудового Красного Знамени проектно | ASSEMBLY CRANE | ||
JPS5459752A (en) * | 1977-10-01 | 1979-05-14 | Orenstein & Koppel Ag | Bridge crane |
RU190500U1 (en) * | 2019-05-07 | 2019-07-02 | Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" | CONSOLE CRANE FOR INSTALLATION OF SUPPORT BLOCKS AT DEPARTURE OVER 18 M. |
-
2019
- 2019-10-14 RU RU2019132602U patent/RU195276U1/en not_active IP Right Cessation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU171107A1 (en) * | Государственный ордена Трудового Красного Знамени проектно | ASSEMBLY CRANE | ||
JPS5459752A (en) * | 1977-10-01 | 1979-05-14 | Orenstein & Koppel Ag | Bridge crane |
RU190500U1 (en) * | 2019-05-07 | 2019-07-02 | Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" | CONSOLE CRANE FOR INSTALLATION OF SUPPORT BLOCKS AT DEPARTURE OVER 18 M. |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2740595C1 (en) * | 2020-02-18 | 2021-01-15 | Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" | Method of mounting imzh-500 railroad bridge with collapsible railway cantilever crane for installation of support and spans in one process cycle |
RU203777U1 (en) * | 2020-10-06 | 2021-04-21 | Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" Министерства обороны Российской Федерации | Jib crane with the ability to erect superstructures on nearby bridges without changing direction |
RU2774693C1 (en) * | 2021-06-07 | 2022-06-21 | Федеральное государственное бюджетное учреждение "3 Центральный научно-исследовательский институт" Министерства обороны Российской Федерации | Collapsible cantilever crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101476294B (en) | Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower | |
RU195276U1 (en) | CONSOLE CRANE FOR INSTALLING SUPPORT ADJUSTERS ON THE DEPARTURE MORE THAN 18m | |
EP3922844A1 (en) | Apparatus for installation and disassembly of wind turbine and construction method using same | |
CN205387439U (en) | Mast hoisting accessory | |
CN105484267A (en) | Deep-water high-flow-speed fixed-point accurate throwing and filling device and construction method | |
RU190500U1 (en) | CONSOLE CRANE FOR INSTALLATION OF SUPPORT BLOCKS AT DEPARTURE OVER 18 M. | |
EP0680540B1 (en) | Scaffolding system | |
NL2024512B1 (en) | Offshore vessel crane | |
RU180628U1 (en) | CONSOLE CRANE FOR INSTALLATION OF A FLAT SUPPORT OF A METAL TACKET | |
RU2556777C2 (en) | Hoisting gear for flyover erection | |
RU190781U1 (en) | CONSOLE CRANE FOR INSTALLATION OF WOODEN SUPPLEMENTS FROM THE SAWN FOREST | |
RU139819U1 (en) | Cable-stayed adjustable vertical-lifting bridge | |
GB2071599A (en) | Improvements in wireline masts | |
CN203682931U (en) | Wharf building crane | |
KR101383287B1 (en) | Transferring Method and Transferring Apparatus of Load in Column Structure | |
CN204224987U (en) | A kind of continuous girder bridge multiple pipeline installation structure | |
CN114701949A (en) | Method for installing main girder of bridge crane of main power house of pump station | |
CN209872197U (en) | Hoisting accessory for building | |
CN202194363U (en) | Movable steel pipe scaffold operation platform for over-water construction | |
RU2774693C1 (en) | Collapsible cantilever crane | |
CN104328741B (en) | The multiple pipeline construction method of installation of a kind of continuous girder bridge | |
RU141109U1 (en) | Cable-stayed two-pivot drawbridge | |
SU850785A1 (en) | Method of erecting the span structure of a gallery | |
RU2618853C1 (en) | Compact hoisting machine "bogatyr" and method of its installation | |
KR20150021229A (en) | Beam launcher with three auto anchorages and oil cylinder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM9K | Utility model has become invalid (non-payment of fees) |
Effective date: 20200114 |