Method of compacting concrete mix Download PDF

Info

Publication number
PL111724B2
PL111724B2 PL20624878A PL20624878A PL111724B2 PL 111724 B2 PL111724 B2 PL 111724B2 PL 20624878 A PL20624878 A PL 20624878A PL 20624878 A PL20624878 A PL 20624878A PL 111724 B2 PL111724 B2 PL 111724B2
Authority
PL
Poland
Prior art keywords
drainage
time
concrete
concrete mass
revibration
Prior art date
Application number
PL20624878A
Other languages
Polish (pl)
Other versions
PL206248A1 (en
Inventor
Roman Bogdanski
Stanislaw Kozakiewicz
Ryszard Rozenek
Zbigniew Lewandowski
Andrzej Bronowski
Original Assignee
Przed Budownictwa Przemysloweg
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Przed Budownictwa Przemysloweg filed Critical Przed Budownictwa Przemysloweg
Priority to PL20624878A priority Critical patent/PL111724B2/en
Publication of PL206248A1 publication Critical patent/PL206248A1/en
Publication of PL111724B2 publication Critical patent/PL111724B2/en

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

Przedmiotem wynalazku jest sposób zageszczania masy betonowej przy zastosowaniu prózniowego odwadniania oraz rewibracji wtórnych i opóznionycli polaczonych w jeden laczny proces technologiczny.Znany i zalecany w literaturze krajowej i zagranicznej sposób prózniowego odwadniania masy betonowej polega na zageszczaniu jej za pomoca wibratorów, a nastepnie odprowadzeniu nadmiaru wody przy uzyciu urzadzen wywolujacych dzialanie podcisnienia, przy czym czas dzialania podcisnienia na powierzchnie betonu ma charakter ciagly.Ten sposóo odwadniania betonów posiada szereg wad które praktycznie uniemozliwiaja stosowanie go w warunkach budowy. Do zasadniczych wad nalezy zaliczyc ciaglosc procesu odwadniania, co powoduje podciaganie drobnych czastek masy betonowej i zasklepianie mikrokanalików i tworzenia na powierzchni betonu czerepu, który uniemozliwia przeplyw wody zdolnych warstw masy betonowej. Dzialanie podcisnienia bez przeplywu wody powoduje szronienie przewodów odprowadzajacych az do tworzenia sie w nich korków lodowych juz przy temperaturze otoczenia niniejszej od + 10°C. Powyzsze zjawiska, spowodowane dzialaniem podcisnienia na mase betonowa, ograniczaja czas odwadniania do kilkunastu minut, a ilosc odprowadzona wody nie przekracza 15% co ma minimalny wplyw na zageszczenie betonu, a tym samym na jego wytrzymalosc.Celem wyeliminowania powyzszych wad i niedogodnosci opracowano sposób zageszczenia betonu, który dzieki wprowadzeniu prózniowego odwadniania i rewibracji umozliwia odprowadzenie kilkakrotnie wiekszej ilosci wody z masy betonowej.Istota sposobu zageszczania betonu, wedlug wynalazku, jest polaczenie dwóch klasycznych, odrebnie stosowanych metod, wibrowania i prózniowego odwadniania, w jeden laczny proces technologiczny charakteryzujacy sie interwalowo-przemiennym dzialaniem ich specyficznych cech na mase betonowa. Laczny czas prózniowego odwadniania i rewibracji jest w zasadzie zblizony do czasu klasycznego prózniowego odwadniania. Uzyskuje sie to dzieki mozliwosci stosowania sposobu,jednoczesnie na dwóch plaszczyznach masy betonowej z ty m, ze w czasie gdy najednej dokonuje sie prózniowe odwadnianie, druga warstwa jest poddawana rewibracji. Proces prózniowego odwadniania jest przerywany z chwila zasklepiania sie porów i mikrokanalików2 111724 sygnalizowany spadkiem przeplywu woay w przewodzie odwadniajacym, po czym mase betonowa poddaje sie rewibracji. Rewibracja powoduje zmiane lepkosci betonu, otwarcie porów i powstanie nowych mikrokanalików, co umozliwia powtórne efektywne prózniowe odwadnianie. Czynnosci prózniowego odwadniania i rewibracji moga oyc wielokrotnie powtarzane w zaleznosci od zalozonych parametrów stawianych elementom budowlanym z tym, ze czas kazdego odwadniania jest wielkoscia stala natomiast czas kazdej nastepnej rewibracji .jest wiekszy od poprzedniej. Ten sposób odwadniania umozliwia odprowadzenie wody w ilosci ponad 50%%.Zastrzezenie patentowe Sposób zageszczania masy betonowej procesami prózniowego odwadniania i wibracji, znamienny t y m„ ze mase betonowa poddaje sie w sposób przemienny prózniowemu odwadnianiu i rewibracji jako jeden proces technologiczny z tym, ze czas kazdego cyklu odwadniania jest staly, natomiast czas kazdej nastepnej rewibracji jest wiekszy od czasu rewibracji poprzedniej.Prac. Poligraf. UP PRL naklad 120+18 Cena 45 zl PLThe subject of the invention is a method of concentration of concrete mass by means of vacuum drainage as well as secondary and delayed revibrations combined into one combined technological process. The method of vacuum dewatering of concrete mass, known and recommended in domestic and foreign literature, consists in concentrating it with the use of vibrators, and then draining excess water. the use of devices inducing a negative pressure effect, while the duration of the negative pressure on the concrete surface is continuous. This method of concrete drainage has a number of disadvantages that make it practically impossible to use it in construction conditions. The main disadvantages include the continuity of the dewatering process, which causes the pulling of small concrete mass particles and the sealing of microchannels and the formation of a body on the concrete surface that prevents the flow of water from capable layers of concrete mass. The action of the negative pressure without the flow of water causes frosting of the drain pipes until the formation of ice plugs in them already at an ambient temperature of + 10 ° C. The above-mentioned phenomena, caused by the effect of negative pressure on the concrete mass, limit the drainage time to several minutes, and the amount of water drained does not exceed 15%, which has a minimal effect on the concentration of concrete, and thus its strength. In order to eliminate the above-mentioned defects and inconveniences, a method of concrete consolidation has been developed which, thanks to the introduction of vacuum drainage and revibration, enables the discharge of several times more water from the concrete mass. The essence of the concrete consolidation method, according to the invention, is the combination of two classic, separately used methods, vibration and vacuum drainage, into one combined technological process characterized by interval-alternating the effect of their specific features on the concrete mass. The total time of vacuum drainage and revibration is basically similar to that of classic vacuum drainage. This is achieved thanks to the possibility of using the method simultaneously on two surfaces of the concrete mass with the exception that while vacuum drainage is performed on one of them, the second layer is subjected to revibration. The process of vacuum dewatering is interrupted when the pores and microchannels become closed2 111724, signaled by a decrease in the water flow in the drainage conduit, and then the concrete mass is subjected to revibration. The re-vibration changes the viscosity of the concrete, opens the pores and creates new microchannels, which allows for effective repeated vacuum drainage. The activities of vacuum drainage and revibration can be repeated many times depending on the assumed parameters for building elements, with the fact that the time of each drainage is a constant value, while the time of each subsequent revision is greater than the previous one. This method of dewatering enables the drainage of water in the amount of more than 50%%. Patent claim A method of concentrating the concrete mass by means of vacuum drainage and vibration processes, characterized by the fact that "the concrete mass is alternately subjected to vacuum drainage and revibration as one technological process, with each time the drainage cycle is constant, while the time of each subsequent revibration is greater than the time of the previous revibration. Typographer. UP PRL, circulation 120 + 18 Price PLN 45 PL

Claims (1)

1. Zastrzezenie patentowe Sposób zageszczania masy betonowej procesami prózniowego odwadniania i wibracji, znamienny t y m„ ze mase betonowa poddaje sie w sposób przemienny prózniowemu odwadnianiu i rewibracji jako jeden proces technologiczny z tym, ze czas kazdego cyklu odwadniania jest staly, natomiast czas kazdej nastepnej rewibracji jest wiekszy od czasu rewibracji poprzedniej. Prac. Poligraf. UP PRL naklad 120+18 Cena 45 zl PL1. Patent claim A method of concentrating the concrete mass by means of the processes of vacuum drainage and vibration, characterized by the fact that "the concrete mass is alternately subjected to vacuum drainage and revibration as one technological process, with the fact that the time of each drainage cycle is constant, while the time of each subsequent revision is greater than the time of the previous revision. Wash. Typographer. UP PRL, circulation 120 + 18 Price PLN 45 PL
PL20624878A 1978-04-20 1978-04-20 Method of compacting concrete mix PL111724B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL20624878A PL111724B2 (en) 1978-04-20 1978-04-20 Method of compacting concrete mix

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL20624878A PL111724B2 (en) 1978-04-20 1978-04-20 Method of compacting concrete mix

Publications (2)

Publication Number Publication Date
PL206248A1 PL206248A1 (en) 1979-05-07
PL111724B2 true PL111724B2 (en) 1980-09-30

Family

ID=19988815

Family Applications (1)

Application Number Title Priority Date Filing Date
PL20624878A PL111724B2 (en) 1978-04-20 1978-04-20 Method of compacting concrete mix

Country Status (1)

Country Link
PL (1) PL111724B2 (en)

Also Published As

Publication number Publication date
PL206248A1 (en) 1979-05-07

Similar Documents

Publication Publication Date Title
US2651414A (en) Hydrocarbon separator apparatus and separator element
ATE70606T1 (en) PROCESS FOR PRODUCTION OF HOLLOW ELEMENTS SUCH AS PIPES, SILOS OR BUNKER AND ELEMENTS MANUFACTURED BY THIS PROCESS.
DK0768941T3 (en) Method and apparatus for producing bodies of consolidated particulate material and thus produced pro
PL111724B2 (en) Method of compacting concrete mix
GB1330706A (en) Method and apparatus for loosening soil from mass of pervious cloth
US1344324A (en) Light-weight artificial cement stone for building purposes
DE2636482A1 (en) PROCESS FOR THE PRODUCTION OF LIGHT MOERTELS
DE230527C (en)
JPH0368484A (en) Method for cleaning drainpipe
ES8400512A1 (en) Method and apparatus for the wet treatment of textile materials.
FR2427914A1 (en) METHOD FOR COVERING A CEILING BOARD OR CEILING ELEMENT
JPS5739134A (en) Dewatering method for wire rod
SU1673477A1 (en) Method for manufacturing concrete products with facing coat
RU1771498C (en) Method for building hydraulic fill structures
JPS6452959A (en) Method of discharging excess water in placing cocnrete
US447972A (en) Manufacture of bricks
US3155755A (en) Apparatus and process for manufacturing cement articles
DE396104C (en) Process for coring blast furnace slag using water
SU1033669A1 (en) Method of removing salts from capillary-porous stone material
US789610A (en) Objects of artificial marble and process of producing same.
Saeed et al. Study a new technique for producing Vacuum-dewatered concrete
AT137538B (en)
DE69100178T2 (en) Slip casting process with drainage of the slip.
DE154408C (en)
US1471876A (en) Concrete and process for making same