PH12017000175A1 - Steel box girder continuous bridge and construction methods thereof - Google Patents
Steel box girder continuous bridge and construction methods thereofInfo
- Publication number
- PH12017000175A1 PH12017000175A1 PH12017000175A PH12017000175A PH12017000175A1 PH 12017000175 A1 PH12017000175 A1 PH 12017000175A1 PH 12017000175 A PH12017000175 A PH 12017000175A PH 12017000175 A PH12017000175 A PH 12017000175A PH 12017000175 A1 PH12017000175 A1 PH 12017000175A1
- Authority
- PH
- Philippines
- Prior art keywords
- section
- span
- point part
- upper flange
- pier
- Prior art date
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a steel box girder continuous bridge formed by continuously connecting and installing a steel box girder constituted by an upper flange, a lower flange provided to be spaced apart from the upper flange, and a pair of trusses connecting the upper flange and the lower flange on the tops of an abutment and a pier, including an irregular span constituted by a short span L1 and a long span L2 in which the lengths of both spans of a pier point part are different from each other, wherein in the upper flange of the pier point part, a (0.1 to 0.2) L2/2 section in the direction of a short span and a (0.1 to 0.2) L1/2 section in the direction of a long span from the center of the pier point part are configured by a closed cross section, the upper flanges of a negative moment section and a positive moment section other than the section configured as the closed cross section is configured by an opened cross section in which the center is opened, the upper flange configured by the opened cross section includes a truss-shaped horizontal spacing, and in the lower flange of the pier point part, high-strength concrete is filled and synchronized in a (0.2 to 0.4) L2/2 section in the direction of the short span and a (0.2 to 0.4) L1/2 section in the direction of the long span from the center of the pier point part. According to the present invention, the amount of expensive steel required is remarkably reduced and corrosion of concrete and steel is prevented to remarkably increase durability of a structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PH12017000175A PH12017000175A1 (en) | 2017-06-16 | 2017-06-16 | Steel box girder continuous bridge and construction methods thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PH12017000175A PH12017000175A1 (en) | 2017-06-16 | 2017-06-16 | Steel box girder continuous bridge and construction methods thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
PH12017000175A1 true PH12017000175A1 (en) | 2019-02-04 |
Family
ID=65351524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PH12017000175A PH12017000175A1 (en) | 2017-06-16 | 2017-06-16 | Steel box girder continuous bridge and construction methods thereof |
Country Status (1)
Country | Link |
---|---|
PH (1) | PH12017000175A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114491757A (en) * | 2022-01-26 | 2022-05-13 | 扬州大学 | Gravity center positioning method for assembly type bridge special-shaped pier stud based on severe mathematical model |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004238810A (en) * | 2003-02-03 | 2004-08-26 | Jfe Engineering Kk | Diaphragm for joining corrugated steel plate web beams, and providing method therefor |
KR100948358B1 (en) * | 2009-07-16 | 2010-03-22 | 노윤근 | Construction technique of steel box girder bridge and this |
KR100975539B1 (en) * | 2010-01-11 | 2010-08-13 | 노윤근 | Steel box continuous bridge with irruglar span or regular span and this construction technique |
KR101084397B1 (en) * | 2011-06-09 | 2011-11-18 | 주식회사 인터컨스텍 | A composite steel box girder using precast concrete for continuous bridges and thereof manufacturing method |
CN205295909U (en) * | 2015-12-21 | 2016-06-08 | 华汇工程设计集团股份有限公司 | Combination steel box girder structure of assembling fast |
-
2017
- 2017-06-16 PH PH12017000175A patent/PH12017000175A1/en unknown
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004238810A (en) * | 2003-02-03 | 2004-08-26 | Jfe Engineering Kk | Diaphragm for joining corrugated steel plate web beams, and providing method therefor |
KR100948358B1 (en) * | 2009-07-16 | 2010-03-22 | 노윤근 | Construction technique of steel box girder bridge and this |
KR100975539B1 (en) * | 2010-01-11 | 2010-08-13 | 노윤근 | Steel box continuous bridge with irruglar span or regular span and this construction technique |
KR101084397B1 (en) * | 2011-06-09 | 2011-11-18 | 주식회사 인터컨스텍 | A composite steel box girder using precast concrete for continuous bridges and thereof manufacturing method |
CN205295909U (en) * | 2015-12-21 | 2016-06-08 | 华汇工程设计集团股份有限公司 | Combination steel box girder structure of assembling fast |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114491757A (en) * | 2022-01-26 | 2022-05-13 | 扬州大学 | Gravity center positioning method for assembly type bridge special-shaped pier stud based on severe mathematical model |
CN114491757B (en) * | 2022-01-26 | 2024-01-23 | 扬州大学 | Gravity center positioning method for special-shaped pier column of assembled bridge based on severe mathematical model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Shakirov et al. | A Suspension Bridge As One of Modern Prospective Type Of Construction | |
CN204530418U (en) | A kind of steel plate combination beam bridge | |
CN106049255A (en) | Simple-support variant-continuous structure of steel-ultrahigh performance concrete light composite beam and construction method for same | |
CN103255726A (en) | Construction method for continuous beam and arch combination bridge | |
ATE546598T1 (en) | LATTICE BEAM | |
CN105714681B (en) | Implementation method of suspension type monorail traffic rigid frame system | |
CN103290786A (en) | System and method for rapidly reinforcing railway bridge by external prestressing | |
SG11201907593QA (en) | Steel-framed concrete beam and method for constructing steel-framed concrete beam | |
WO2012044013A3 (en) | Truss structure having an open-section upper chord member and a production method for the same, and a truss bridge using the truss structure having an open-section upper chord member and a method for constructing the same | |
RU2578401C1 (en) | Cable-stayed bridge | |
CN209178792U (en) | A kind of urban landscape bridge that setting Variable Section Steel structural ornament encircles | |
KR101169012B1 (en) | Psc box girder and it's construction method | |
PH12017000175A1 (en) | Steel box girder continuous bridge and construction methods thereof | |
CN104612031B (en) | Reinforced concrete continuous rigid frame arch bridge and construction method | |
FI20075207A0 (en) | Composite beam | |
KR101980187B1 (en) | A temporary bridge and construction method for the temporary bridge | |
KR20140105147A (en) | Prestressed concrete girder with reinforced rigidity between positive moment zone and negative moment zone | |
CN205874988U (en) | Case back board prestressing tendons positioner | |
RU2608378C1 (en) | Method of reconstruction and reinforcement of steel-concrete composite simply supported bridge superstructure by straight cables | |
CN105648911B (en) | Bridge construction Cast-in-situ Beam, bent cap, binder concrete adhesion type prestressed girder support | |
CN203593945U (en) | Railway continuous beam-arch-steel bar suspender combined structure | |
CN203904828U (en) | Rubber bearing | |
RU153646U1 (en) | Cable-stayed Bridge | |
CN203174485U (en) | Small-span plate girder bridge framework | |
CN203229863U (en) | Large-span plate girder bridge frame |