NZ616446B2 - Method of forming a substrate for a sports surface of a sports pitch, such a substrate as well as a sports pitch provided with such substrate - Google Patents
Method of forming a substrate for a sports surface of a sports pitch, such a substrate as well as a sports pitch provided with such substrate Download PDFInfo
- Publication number
- NZ616446B2 NZ616446B2 NZ616446A NZ61644612A NZ616446B2 NZ 616446 B2 NZ616446 B2 NZ 616446B2 NZ 616446 A NZ616446 A NZ 616446A NZ 61644612 A NZ61644612 A NZ 61644612A NZ 616446 B2 NZ616446 B2 NZ 616446B2
- Authority
- NZ
- New Zealand
- Prior art keywords
- granules
- sports
- substrate
- layer
- course
- Prior art date
Links
- 239000000758 substrate Substances 0.000 title claims abstract description 27
- 239000000463 material Substances 0.000 claims abstract description 70
- 239000008187 granular material Substances 0.000 claims abstract description 43
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 31
- 229920003023 plastic Polymers 0.000 claims abstract description 30
- 239000004033 plastic Substances 0.000 claims abstract description 30
- 239000010426 asphalt Substances 0.000 claims description 18
- 229920002635 polyurethane Polymers 0.000 claims description 8
- 239000004814 polyurethane Substances 0.000 claims description 8
- 229920000098 polyolefin Polymers 0.000 claims description 5
- 238000002156 mixing Methods 0.000 claims description 2
- 239000011248 coating agent Substances 0.000 claims 1
- 238000000576 coating method Methods 0.000 claims 1
- 238000011065 in-situ storage Methods 0.000 abstract description 2
- 239000010410 layer Substances 0.000 description 73
- 238000009411 base construction Methods 0.000 description 28
- 238000010276 construction Methods 0.000 description 27
- 230000035939 shock Effects 0.000 description 26
- 239000011230 binding agent Substances 0.000 description 23
- 238000009434 installation Methods 0.000 description 23
- 239000011435 rock Substances 0.000 description 19
- 238000000034 method Methods 0.000 description 17
- 239000011295 pitch Substances 0.000 description 17
- 239000002131 composite material Substances 0.000 description 13
- 238000004064 recycling Methods 0.000 description 11
- 238000011068 load Methods 0.000 description 10
- 239000000203 mixture Substances 0.000 description 10
- 239000002689 soil Substances 0.000 description 10
- 238000004519 manufacturing process Methods 0.000 description 8
- 239000002699 waste material Substances 0.000 description 7
- 238000010521 absorption reaction Methods 0.000 description 6
- 238000009412 basement excavation Methods 0.000 description 6
- 229920001971 elastomer Polymers 0.000 description 5
- 239000004575 stone Substances 0.000 description 5
- 239000002245 particle Substances 0.000 description 4
- 239000011800 void material Substances 0.000 description 4
- 230000002745 absorbent Effects 0.000 description 3
- 239000002250 absorbent Substances 0.000 description 3
- 238000005054 agglomeration Methods 0.000 description 3
- 230000002776 aggregation Effects 0.000 description 3
- 239000000969 carrier Substances 0.000 description 3
- 239000004567 concrete Substances 0.000 description 3
- 238000002716 delivery method Methods 0.000 description 3
- 239000010791 domestic waste Substances 0.000 description 3
- 229920000642 polymer Polymers 0.000 description 3
- 230000000246 remedial Effects 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 238000004642 transportation engineering Methods 0.000 description 3
- 240000000218 Cannabis sativa Species 0.000 description 2
- 210000001503 Joints Anatomy 0.000 description 2
- 229920000426 Microplastic Polymers 0.000 description 2
- 241000238814 Orthoptera Species 0.000 description 2
- 241000219843 Pisum Species 0.000 description 2
- 235000010582 Pisum sativum Nutrition 0.000 description 2
- 239000004952 Polyamide Substances 0.000 description 2
- 239000004793 Polystyrene Substances 0.000 description 2
- 206010047289 Ventricular extrasystoles Diseases 0.000 description 2
- 239000011324 bead Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000005056 compaction Methods 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- 238000000280 densification Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 238000005755 formation reaction Methods 0.000 description 2
- 239000004746 geotextile Substances 0.000 description 2
- 235000012149 noodles Nutrition 0.000 description 2
- 239000008188 pellet Substances 0.000 description 2
- 229920002647 polyamide Polymers 0.000 description 2
- 229920000728 polyester Polymers 0.000 description 2
- 229920002223 polystyrene Polymers 0.000 description 2
- 238000007781 pre-processing Methods 0.000 description 2
- 239000002356 single layer Substances 0.000 description 2
- 229920003048 styrene butadiene rubber Polymers 0.000 description 2
- -1 moulded articles Substances 0.000 description 1
- 210000001736 Capillaries Anatomy 0.000 description 1
- 230000036462 Unbound Effects 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000003247 decreasing Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 235000013305 food Nutrition 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 230000003301 hydrolyzing Effects 0.000 description 1
- 238000010297 mechanical methods and process Methods 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- 238000009376 nuclear reprocessing Methods 0.000 description 1
- 239000005022 packaging material Substances 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 229920000915 polyvinyl chloride Polymers 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000003134 recirculating Effects 0.000 description 1
- 230000000717 retained Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000007873 sieving Methods 0.000 description 1
- 230000037078 sports performance Effects 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29B—PREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
- B29B17/00—Recovery of plastics or other constituents of waste material containing plastics
- B29B17/0026—Recovery of plastics or other constituents of waste material containing plastics by agglomeration or compacting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29B—PREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
- B29B17/00—Recovery of plastics or other constituents of waste material containing plastics
- B29B17/0026—Recovery of plastics or other constituents of waste material containing plastics by agglomeration or compacting
- B29B17/0036—Recovery of plastics or other constituents of waste material containing plastics by agglomeration or compacting of large particles, e.g. beads, granules, pellets, flakes, slices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29B—PREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
- B29B9/00—Making granules
- B29B9/16—Auxiliary treatment of granules
- B29B2009/163—Coating, i.e. applying a layer of liquid or solid material on the granule
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29B—PREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
- B29B9/00—Making granules
- B29B9/08—Making granules by agglomerating smaller particles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29B—PREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
- B29B9/00—Making granules
- B29B9/16—Auxiliary treatment of granules
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C13/00—Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C13/00—Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
- E01C13/02—Foundations, e.g. with drainage or heating arrangements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C13/00—Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
- E01C13/08—Surfaces simulating grass ; Grass-grown sports grounds
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/62—Plastics recycling; Rubber recycling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T428/00—Stock material or miscellaneous articles
- Y10T428/249921—Web or sheet containing structurally defined element or component
- Y10T428/249953—Composite having voids in a component [e.g., porous, cellular, etc.]
- Y10T428/249982—With component specified as adhesive or bonding agent
Abstract
method of forming a substrate for a sports surface of a sports pitch is disclosed. The method comprises the steps of agglomerating and granulating plastics materials to form granules having a predetermined range of sizes. The granules are coated in situ with a binding material so that they form a fluent material which is formed into a layer (11) on the site of the sports pitch (5). The layer (11) is set so the granules adhere to each other to form a voided water permeable structure. The method can utilise recycled end of life plastics. fluent material which is formed into a layer (11) on the site of the sports pitch (5). The layer (11) is set so the granules adhere to each other to form a voided water permeable structure. The method can utilise recycled end of life plastics.
Description
Method of forming a substrate for a sports surface of a sports pitch,
such a substrate as well as
a sports pitch provided with such subtrate.
DESCRIPTION
The invention relates to a method of forming a substrate for a sports surface of a
sports pitch.
The invention also relates to a substrate obtained with the method according to the
invention.
Furthermore the invention also relates to a sports pitch provided with such subtrate.
Many sports, such as field hockey, tennis, American football etc are currently played
on artificial turf (grass) sports pitches, which in general comprising a carrier as well as
artificial fibres extending from said carrier. Said carrier is placed on a substrate which forms
a stable subsurface base construction for the complete pitch installation.
Examples of sports that utilise such artificial turf pitch (ATP) constructions are:
• Soccer
• American Football
• Australian Rules Football
• Gaelic Football / Hurling (GAA)
• Rugby Union / League
• Hockey
• Cricket outfields etc
In addition to sports pitches, the basic methodologies explained above also apply to
other smaller areas in which artificial turf maybe used. For example:
• Play grounds
• Landscape / leisure areas
• Cricket wickets
• Bowls rinks
• Tennis courts
• Futsul courts
• Education multiple use areas
The traditional base construction methodology for artificial turf systems has
historically been based around the excavation of the existing subbase and the subsequent
replacement of this subb ase with graded rock and s pecially designed drainage systems.
There has been substantial development in construction methodologies and systems
that are designed to limit and / or replace the use and design of traditional base construction
system. These systems have been primarily designed to reduce the cost and to simplify the
work untaken.
Due to the increasing awareness of human activity on the environment, the issue and
practice of recycling has become more popular. In many cases governments are now
legislating for the increased practice of recycling end of life and waste materials. This
practice is seen at all levels of society and business, from road side recycling of household
waste to legal obligations and quotas on businesses to recycle or dispose of waste in an
environmentally responsible manner. This has also become a key political issue and the
general trend of thinking is to reduce waste, carbon footprint, as well as waste to traditional
landfill. National and local governments, plus private contractors have developed large
infrastructures in order to divert some materials away from landfill for the purpose of
recycling.
A new industry has developed which has been improving and developing methods of
collection, separation and industrial processes that increase the ability to reclaim key
materials from waste sources. One of the largest parts of the recycling industry is the
recycling of plastics. However, these companies tend to process materials that are easy to
convert and have the highest grades and resale val ue.
The vast majority of waste plastics is mixed (com ingled) and as such is difficult to
identify, sort, separate, clean and recycle and is therefore too expensive to process. In
addition, the grades of these materials are very low and therefore have little resale value
and are therefore regarded as “end of life” plastics.
Such ‘end of life’ plastic materials are typically in the form of packaging materials,
moulded articles, products, profiles, sheet, coatings, fabrics or fibers and are found in
general industrial, manufacturing, building and household waste etc. They can broadly be
described as:
• Plastic granules, beads, pellets, slivers, flakes, chips and noodles derived from
recycling plastics. These types of plastics cover all families of polymers defined
as plastics, such as, but not limited to the families of Polyolefin, Polyesters,
Polyamides, Poly Vinyl Chlorides (PVC’s), Polystyrenes and Polyurethanes
found in general industrial, manufacturing, land transportation, aerospace,
agricultural, horticultural, food and general packaging, building and household
waste. Also, sources such as material reclaimed from landfill and material
retrieved / harvested from the oceans in the form of flotsam and jetsam.
• Plastic granules, beads, pellets, slivers, flakes and noodles derived from
recycling artificial grass surfaces, domestic and industrial floorings. The types of
plastics cover of the families of Polyolefin, Polyesters, Polyamides, PVC’s,
Polystyrenes and Polyurethanes.
This material is referred to as “Feedstock” and there are vast quantities of this
material available. Feedstock will generally consist of a random mix of plastic types, sizes,
densities, colours; in a form of being flexible, rigid, semi rigid, filled or expanded in character
or nature and are likely to include thin sheets, film, fibers, etc.
As such, to be made suitable for use in the formation of the invention the feedstock
material must be processed using mechanical methods which result in a granulate with a
more consistent size, bulk density and volume. Such processes are known as densification
or agglomeration.
Densification or agglomeration is a process well known in the recycling plastics
industry, in which plastics are chopped into fine flakes and then fed into a machine which
uses friction to convert them into a semi molten state. The fine flakes join together increasing
the mass and density of the material flowing through the machine. The mass of plastics
exiting the machine is cooled, chopped, granulated or otherwise comminuted to a
predetermined size. The densifying process includes one or more sieving stages whereby
granulate which is considered to be outside the predetermined useful range is automatically
returned to the infeed of the densifying process. In the vast majority of plastics recycling the
aim for the processor is to ensure the plastic material been put into the process is of the
same polymer type and the material is totally free from other polymer types and totally clean.
As explained previously this requires a great deal of preprocessing to ensure that the final
granules are fit for sale to the plastic industry, much of the waste plastic collected is either to
dirty, too mixed or be at the end of the ability to rerecycle to be of any commercial value,
and is therefore landfilled and burnt.
For the purposes of the invention the plastic material (referred to above as
Feedstock) used in the agglomeration process can be any type of plastics and the presence
of some foreign materials which are nonplastic (e. g. wood, paper, fibres) are not an issue,
therefore the amount of preprocessing is reduced a nd increased quantities of material due
for landfill or burning are reused.
To be considered suitable for use in the formation of the invention, the densified
plastic granulate shall be of a size whereby the ratio of the largest dimensional plane of each
granule (x) and its perpendicular dimensions (y and z) are at least 30% to 100% of the
largest dimensional plane.
The cornerstone of the invention is to use the Feedstock plastic, which is then
agglomerated into granules and then used in the construction of base construction profiles in
the applications described in the background section above.
The basis of the invention is to create a system which provides an option for either an
insituation or a pref ormed module which has the p roperties of base point loading,
compression strength, inbuilt porosity and control led / managed drainage, plus inbuilt
shock absorption.
The system is designed to limit the environmental impact and carbon footprint of the
base construction element while reducing the financial cost of the project. The system will
reduce the amount of spoil removed from site by reducing the required excavation depths
(depending on preexisting geological conditions). Although certain aspects of the traditional
base profile will still be required, the amount of rock required to build up the base profile will
be significantly reduced. There will still be a requirement for the geot extile membrane and
the nonporous capping layer.
In order the achieve the desire properties, balanced against the existing geological
conditions and the reduction of environmental construction impacts, the invention uses the
granules as the aggregate material which in turn is bound together in order to stabilise the
structure, resulting in a substrate layer according to the invention.
The binding materials can be Polyurethane, Bitumen or Polyolefin displacements,
which are mixed (either hot or cold) with the granules at ratios depending on application and
property requirements. Such binders are characterised to impart thermal stability, hydrolytic
stability, having no significant change in properties upon being submerged in water or
exposed to changing humidity and temperature environments. Thus the desired structural
integrity and physical properties remain on standing and when in use.
The granules are in a loose granule form and depending on the application and
properties required the size range of the granules is between 0.5 mm to 20mm. The ratio or
particle range of these sizes is adjusted depending on the properties required. Added to this
is the binding material which is added using formulas based on weight of the granules.
These ratios range between 8% binder by weights to 30% binder by weight.
The invention will be made in a porous permeable form by using proportions of
granules and binder so that sufficient void or interstitial space remains between the granules.
This void space can vary in amount in accordance with the particulate which is used for
example between 15% to 60% by volume. Such void space will be an advantage to allow
drainage in all directions, vertically and laterally.
Void space can also be used to provide storage or attenuation of water if is so
necessary.
BRIEF DESCRIPTION OF THE DRAWINGS
The invention will now be discussed in the detailed figurative description below,
whererin:
Figure 1 represents the crosss ection of a typical , known dynamic base construction
profile according to the state of the art;
Figure 2 represents the crosssection of a typical , known engineered base
construction with shock pad profile;
Figure 3 represents the crosssection of another t ypical, known engineered base
construction with insituation shock pad profile;
Figure 4 represents the crosssection of another t ypical, known engineered base
construction with preformed shock pad profile
Figure 5 represents the crosssection of an insit uation subg rade course
construction profile according to the invention;
Figure 6 represents the crosssection of a preform ed subg rade course in panel
format construction profile according to the invention;
Figure 7 represents the crosssection of an insit uation subg rade course and
performance course construction profile according to the invention;
Figure 8 represents a crosssection of a pref orme d dualdensity performance course
plus subg rade course in panel format construction profile according to the invention;
Figure 9 represents the crosssection of an insit uation composite course
construction profile according to the invention;
Figure 10 represents the crosssection of a prefor med Composite course in panel
format construction profile according to the invention;
Figure 11 represents the crosss ection of an insi tuation subg rade course and
performance course construction profile over an existing brown field substrate according to
the invention.
DETAILED DESCRIPTION OF THE DRAWINGS
For example Figure 1 represents the crosssection of a typical, known dynamic base
construction profile according to the state of the art:
1. Turf surface
2. Loose stone binding
3. Grade rock subbase
4. Nonporous capping layer
. Natural soils
6. Field water drains
When constructing an ATP according to the state of the art, many projects are
referred to as ‘full build’ projects, which are defined as newbuild pitches constructed on a
virgin site and include the construction of a stable subg rade, drainage system, porous base,
optional shock absorption layer and finally the artificial turf surface.
The start of the construction process is to remove a predetermined depth of existing
subsoils 5. This depth is determined by a geologic al survey which measures and classifies
the conditions on that particular site. These conditions relate to the make up of the existing
sub grades, plus local drainage, rainfall and general location factors. From this data the
depth of excavation and the profile of the base construction can be designed.
The depth and therefore the volume of spoil 5 removed can be quite wideranging.
However an average of 0.5 metres depth of removal is usually performed. It is also assumed
that the average sized ATP would be 6000 square metres (m ). As a consequence, the
amount of spoil to be removed from a 6000 m pitch construction would be 3000m³.
Typically, all spoil is transported to landfill, hence a large cost in transportation, landfill fees
and impact on the environment.
In order to prevent water movement from the subso il base into the new base
construction, a capping layer of geot extile 4 and specially graded rock / dust 3 must be
installed before the main body of the new base is constructed. Over the top of this capping
layer 4 is installed a drainage system 6, which is designed to remove water permeating
down through the upper rock subbase by means of dr ainage pipes in the field pattern.
These pipes lead the water off the playing area into ring main land drains or similar water
drainage control systems. In some cases water is piped into storage facilities and re
circulated back on to the pitch, either as part of the turf system performance or for use as
cooling during hot weather.
The excavated area (with capping layer 4) now needs to be in filled with layers of
specially graded rock 2 and 3 which will provide a stable, free draining platform on which to
install the playing surface 1. The rock has to be sourced and graded to a particular
specification and this rock needs to be transported to site, in filled, levelled and compacted.
In some cases the correct rock specification may only be available in certain quarries, which
in turns adds to the cost and environmental impact.
Most standard ATP systems are designed to have either a ‘dynamic’ or ‘engineered’
base construction. However there are some variations which are deemed acceptable in
some localised markets around the world.
Dynamic bases (also known as unbound bases) are d efined as base profiles that
have a loose rock construction 2 throughout and are topped with a compacted, rock binding
layer. This binder layer consists of fine graded rock dust and is designed to be stable and
free draining.
Figure 2 represents the crosssection of a typical , known engineered base
construction with shock pad profile:
7. Asphalt wearing course
8. Asphalt load bearing layer
3. Graded rock subbase
4. Nonporous capping layer
. Natural soils
6. Field water drains
Although engineered bases (also known as bound bases) still have the loose rock
construction 2 as described above with reference to Figure 1, instead of being topped with
the loose binding layer, they are typically topped with two layers of porous asphalt, indicated
with reference numerals 7 and 8.
The first layer or levelling / load bearing layer 8 consists of a certain consistent rock
grade bound with bitumen laid at an average depth of 25 millimetres (mm). The second
layer, known as the wearing course 7 is paved over the first asphalt layer 8 and consists of a
finer graded rock bound with bitumen.
There are strict tolerances required when installing this upper wearing course 7 which
ensures the finished surfaces is level and free from ridges, dips and bumps. This critical
element requires expensive paving machinery which is operated by highly skilled workers
and is a considerable cost in the overall base construction. Furthermore, it is a time
consuming process.
It is a common occurrence for the upper wear layer 7 to be installed outside
acceptable tolerances and therefore requires extensive remedial works. These works add
unbudgeted cost to the project and impact on the p roject on time completion mandates.
Depending on the type of artificial turf system to be installed a shock absorption layer
9 or 10 (see Figures 3 and 4) maybe required over the completed base construction 7834.
There are a very wide range of ‘shock pad’ systems available that generally fall into two
main categories:
• Insituation as shown in Figure 3
• Pref ormed as shown in Figure 4
Figure 3 represents the crosssection of a typical , known engineered base
construction with insituation shock pad profile:
1. Turf surface
9. Insituation shock pad
7. Asphalt wearing course
8. Asphalt load bearing layer
3. Graded rock subbase
4. Nonporous capping layer
. Natural soils
6. Field water drains
The insituation pads 9 of the Figure 3 embodiment are defined as pads that are
installed onsite by a machine directly onto the ba se construction. The vast majority of in
situation pads are paved directly onto the dynamic or engineered base construction and use
a combination of rubber granules mixed with a Polyurethane binder.
The rubber granules used in such pads are generally sourced from recycled/
granulated car and truck tyres and are referred to as StyreneButadieneRubber ( SBR)
granules. In some markets a small ratio of pea gravel is mixed with the rubber and again
bound with Polyurethane binder. The mixture is laid onto the base construction with a
specialised paving machine, which controls the depth and evenness of the shock pad.
An advantage of this form of installation is that the pad 9 is attached to the base
construction 7834 and is therefore dimensionally stable both during installation and during
the play life of the pitch. There are no seams or joints in this form of pad and therefore
limited potential for failure.
This process requires highly specialised equipment, operated by highly skilled
workers. As in the laying of the asphalt wear layer 7 the tolerances required are very strict
and often remedial work is required.
Figure 4 represents the crosssection of a typical , known engineered base
construction with preformed shock pad profile:
1. Turf surface
. Preformed Shock pads
7. Asphalt wearing course
8. Asphalt load bearing layer
3. Graded rock subbase
4. Nonporous capping layer
. Natural soils
6. Field water drains
Pref ormed shock pads 10 are pads that have been m anufactured away from the
work site by companies who specialise in this area. Although this form of shock pad 10 can
also be produced from SBR rubber and Polyurethane binder, other pref ormed systems use
a much wider range of materials. These alternative systems comprise many other shock
absorbent materials such as open and closed cell foams, felts, threedimensional random or
woven matrices, all of which can be constructed with either virgin of recycled materials.
As pref ormed products are made in a controlled fa ctory environment the tolerances
of thickness, density and performance can be controlled. The system can be made into a
variety of formats, but the most common are rolls or panels. These rolls or panels 10 are
delivered to the work site and installed onto the base construction by various techniques by
the workers who generally install the turf. Little specialised installation equipment is required
and the work skill level is reduced. As the products are manufactured under controlled
environments the strict tolerances of conformity are easier to meet with limited remedial work
required.
However, the drawbacks for this type of pad tend to be around the added cost of
transportation from the manufacturing site to the work site. These pad formats tend to be
quite bulky and this in turn limits the how many square metres can be loaded per container
or truck.
In addition, pref ormed pads 10 can suffer from di mensional instability and movement
during turf installation and during the playing life of the pitch. There is also a potential for
failure in the joints or seams 10a created during installation. Furthermore, any small
undulations in the base/subbase 7834 cannot be ‘masked’ or levelled by the pref ormed
layer 10 as they are a constant thickness.
In general terms pref ormed shock pads 10 (Figure 4) are a more expensive system
when compared to ins ituation pads 9 (Figure 3).
It is worth noting that the base construction profiles and methodologies described
above accounts for approximately 4050% of the enti re cost of the project.
Due to surface usage demands and the sports / bio mechanical requirements
specified by sports governing bodies, the use of shock pads under artificial turf is becoming
more common, especially in the increasing volume markets of contact sports such as
Soccer, American Football, Rugby, Australian Rules football and Gaelic Football.
Most forms of shock pad can be engineered to provide satisfactory performance for
the sports / biom echanical performance for certain sports but this can often compromise the
performance requirements of other sports. Therefore the ability to design a turf system which
is a true ‘cross code’, multiple use surfaces is limited.
For example, a surface which conforms to the highest Soccer performance criteria
will not offer the required performance characteristics for a top level Australian Rules football
surface.
The follow are examples of possible ratios of granules granule size range and binder
content by weight, based against application:
Example 1
A structure consisting of particle sizes form 0.5mm to 5mm and a binder content of
% by weight of granules will deliver increased properties for biom echanical values but
decrease the civil engineering values. This kind of ratio suits areas where the underlying
geology is stable, either from exist subsoils/grad es or where existing ATP are been
renovated, hence the preexistence of a stone base layer.
The layer offers a shock absorbent and safety value which still offers the properties of
water management and some civil engineering values such as point and spread loading,
allow some reduction in base construction depth, depending on the depth of the layer
according to the invention.
Example 2
A structure consisting of particle sizes form 5 mm to 10 mm and a binder content of
% by weight of granules will deliver good properties for biomechanical values and good
values for civil engineering values. This kind of ratio suits the vast majority of applications as
the required properties are balanced while offer excellent water management properties. The
structure allows for a significant reduction in base construction depth, depending on the
depth of the layer according to the invention.
Example 3
A structure consisting of particle sizes from 10mm to 20mm and a binder content of
% by weight of granules will deliver decreased properties for biomechanical values but
increased the civil engineering values. This kind of application suits areas where the
underlying geog raphical is unstabile, or the dema nds of the end use require high civil
values for point loading. The layer offers some shock absorbent value which still offers the
properties of water management and increased ability for water storage within the layer
according to the invention. The strength of this structure further reduces the base
construction depth depending on the thickness of the layer according to the invention.
The example listed above represent a Soft, Medium and Hard structures, but the
adjustment of the granules granule size spread with the 0.520mm range, plus the ratio of
binder content, plus the depth of the layer gives the ability to design and formulate, tailor
made solutions in all applications and environments. In some instances the layer according
to the invention would benefit from the inclusion of nonplastic materials, such as rubber
ganules, recycled glass chippings, stone chipping, lava stones and pea gravel. These
inclusion will help assist added values in either sports performance values or civil
enginnering values.
Depending on the playing surface design and requirements the system would either
be a single layer of material according to the invention; which would replace the standard
‘dynamic’ base construction profile. This layer is now referred to as the ‘subg rade course’.
In the case that the system requires a shock pad then a second layer (herein referred
to as the ‘performance course’) would be placed on top of the subg rade course.
Some applications may allow a composite single layer which would offer the required
values for subg rade and performance courses.
The subg rade course is designed to act as the loa d bearing and drainage layer and
replaces the vast majority of excavation depth and subsequent volume of rock required in
standard construction profiles. The thickness of this layer can range from 10 mm to 100 mm
depending on the underlying geological conditions. The layer can be composed using
granules at granule size ratios which are formulated depending on the performance required,
while parameters are influenced by the existing geological and drainage conditions, point
loading and stability requirements. The nature of this layer allows the free flow of water both
horizontally and vertically, therefore a standard field drainage system is not required.
If required, base profiling and design could allow water to be held within the sub
grade course. The benefit of this water retention would have a double benefit; firstly to create
a mini artificial aquifer, thus allowing water to be retained and recirculated to water fully
synthetic (waterbased) Hockey pitches. Secondly, f or pitches with infill systems, to help
assist in cooling the playing surface; either by rec irculating water from the mini aquifer onto
the playing surface, or through retaining moisture in the infill materials from the subg rade
layer up.
The two methods of installation of this subg rade course would be:
1. Direct installation of the subg rade course (in situation method as described above)
as shown in Figure 5, and
2. Indirect installation of the subg rade course (p ref ormed method as described
above) as shown in Figure 6.
Figure 5 represents the crosssection of an insit uation subg rade course
construction profile:
1. Turf surface
11. In situation subg rade course
4. Nonporous capping layer
. Natural soils
The materials are mixed together in the predeterm ined ratios and a binding agent is
added and mixed with the materials. The resulting mixture is paved directly onto the capping
layer 4 in the same manner as asphalt, utilising the same machinery. While the skill level
required ensuring correct levels and smoothness is still important, it is an existing skill with
no new special requirements or training.
Figure 6 represents the crosssection of a preform ed subg rade course in panel
format construction profile:
1. Turf surface
11. Performed subg rade course in panel format with interlocking profile.
4. Nonporous capping layer
. Natural soils
The subg rade course 11 can be manufactured offsi te in panel format and then
installed over the capping layer 4. The materials are mixed together in the predetermined
ratios and a binding agent is added and mixed with the materials. This resulting mixture can
be extruded or moulded or formed as a mass and cut sliced or otherwise divided into
separate panels, boards or tiles 11 which can have interlocking faces 11a11b to allow the
panels 11 to be close fitting or locked together during on site installation.
The benefit of this delivery method is that the consistency of the layer 11 can be
controlled under strict manufacturing conditions. The design of the panels 11 also allows
quick and easy installation in all weather conditions with no specialised equipment required.
In a further improvement an additional performance course 12 (Figure 7 and 8) can
be implemented in the overall construction. The performance course 12 is designed to act as
a stable shock absorption layer with added point loading, replacing the wearing asphalt
course and the insituation or pref ormed shock pad . The thickness of this layer 12 can
range from 5 mm to 100 mm depending on the shock absorption characteristics required.
The layer can be composed of one or more of the materials described above, mixed in
various ratios. These ratios are formulated depending on the performance required. The
layer 12 is porous and displays the same water control and management characteristics as
the subg rade course described above.
The two methods of installation of this subg rade course 12 would be:
1. Direct installation of the performance course onto subg rade course (insituation
method described above) as shown in Figure 7;
2. Indirect installation of the performance course onto subg rade course (pref ormed
method described above) as shown in Figure 8.
Figure 7 represents the crosssection of an insit uation subg rade course and
performance course construction profile:
1. Turf surface
12. In situation performance course
11. In situation subg rade course
4. Nonporous capping layer
. Natural soils
The materials are mixed together in the predeterm ined ratios and a binding agent is
added and mixed with the materials. The resulting mixture 12 is paved directly onto the sub
grade course 11 in the same manner as asphalt, utilising the same machinery. The binder in
the performance course 12 reacts with the cured binder in the subg rade course 11 during
installation so that both layers 11 and 12 are firmly locked together. While the skill level
required ensuring correct levels and smoothness is still important, it is an existing skill with
no new special requirements or training.
Figure 8 represents a crosssection of a pref orme d dualdensity performance course
12 plus subg rade course 11 in panel format constru ction profile 20:
1. Turf surface
. Dual density panel format with interlocking pr ofile.
4. Nonporous capping layer
5. Natural soils
As with the offsite manufacture of the subg rade course 11 (described above with
reference to Figure 6) the separate panels 11 and 12 can be manufactured as ‘dual density’
panels 20. The materials for the subg rade course 1 1 are still mixed together in the pre
determined ratios and a binding agent is added and mixed with the materials. This resulting
mixture is extruded or moulded into panels 11 as before. However, there is a second step in
which materials for the performance course 12 is still mixed together in the predetermined
ratios and a binding agent is added and mixed with the materials. These materials are then
extruded or moulded on top of the subg rade course or layer 11 to form two distinct layers
within the same panel 20.
The panel now has all the properties required of the two courses 11 and 12. These
panels are designed to have interlocking ‘male’ an d ‘female’ profiles 20a20b. These
profiles allow the separate panels 20 to be locked together during on site installation.
The benefit of this delivery method is that the consistency of the layer 20 can be
controlled under strict manufacturing conditions. The design of the panels 20 also allows
quick and easy installation in all weather conditions with no specialised equipment required.
Depending on the geological and sport performance specifications the system can be
designed as a composite grade. The composite grade is one layer 13 which offers the
performance of both the subg rade course / layer 11 and performance course / layer 12. The
performance is predetermined by the selection of m aterials and the mixing ratios of those
materials. This layer 13 can be installed either by the insituation of pref ormed methods
described above. The thickness of this layer can range from 5 mm to 100 mm depending on
the characteristics required. The layer 13 is porous and displays the same water control and
management characteristics as the other methods described above.
The two methods of installation of this composite course would be:
1. Direct installation of the composite course (in situation method described above) as
shown in Figure 9;
2. Indirect installation of the composite course (pref ormed method described above) as
shown in Figure 10.
Figure 9 represents the crosssection of an insit uation composite course
construction profile:
1. Turf surface
13. Insituation composite course
4. Nonporous capping layer
5. Natural soils
The materials are mixed together in the predeterm ined ratios and a binding agent is
added and mixed with the materials. The resulting mixture 13 is paved directly onto the
capping layer 4 in the same manner as asphalt, utilising the same machinery.
While the skill level required ensuring correct levels and smoothness is still important,
it is an existing skill with no new special requirements or training.
Figure 10 represents the crosssection of a prefor med composite course 13 in panel
format construction profile:
1. Turf surface
13. Pref ormed composite course in panel format wit h interlocking profile.
4. Nonporous capping layer
. Natural soils
The composite course 13 can be manufactured offsi te in the panels 13’ and then
installed over the capping layer 4. The materials are mixed together in the predetermined
ratios and a binding agent is added and mixed with the materials. This resulting mixture is
extruded or moulded into panels 13’ which are designed to have interlocking ‘male’ and
‘female’ profiles 13a13b. These profiles allow the panels 13’ to be locked together during
installation.
The benefit of this delivery method is that the consistency of the layer 13 can be
controlled under strict manufacturing conditions. The design of the panels 13 also allows
quick and easy installation in all weather conditions with no specialised equipment required.
In another embodiment shown in Figure 11 it is now possible to construct ATP`s on
‘brown field’ sites. Brown field sites can be defined as areas which have previously been
used for some other purpose i.e. old landfill sites, disused industrial sites, education and
housing areas etc. It is important to note that these areas of different from ‘green field’ sites,
which are defined as areas that have had no previous usage apart from agriculture and / or
natural land.
Figure 11 represents the crosss ection of an insi tuation subg rade course and
performance course construction profile 14 over an existing brown field substrate 45:
1. Turf surface
14. Retaining curb stones
13. In situation or preformed subg rade course
4. Nonporous capping layer
. Exist brown field sub structure
The preservation of green field areas is a high priority for national and local
governments and it is preferable to reuse areas wh ich have been made redundant. As a
standard ATP base construction profile requires the excavation and removal of existing
substrates below the level of the proposed pitch, this can pose a problem on brown field
sites (depending on local conditions etc). If, for example, the proposed site is on an area of
demolished industrial units, it is likely that the concrete and foundation will still be in
situation. Normally this would require complicated and costly removal. The principal system
being proposed allows the pitch to be constructed over the existing ground without any
removal.
The construction, base profiles and the installation methods described above (in
situation and pref ormed) remain the same and the c apping layer 4 is formed over the exist
ground 5. The composition and the thickness of the system depend over what type of
surface is being constructed. For example, a construction over an existing concrete or rubble
floor will already have a great deal of load bearing and spread capacity, therefore the design
of the layers can be designed to concentrate on shock absorption and drainage.
As has been indicated in the preceding description of the inventionthere are
significant opportunities for reducing the amount of excavation on green field sport sites and
for avoiding the need to break up existing flat substrates, such as concrete floors, on brown
field sites.
According to the invention a substrate is formed from granular plastics material,
which has been coated in binder to form a stable, substantially incompressible, water
permeable or water retaining substrate. Surprisingly it has been proven that a particularly
suitable material for this purpose is “end of life” plastics material, which is the plastics
material that current processes cannot any longer recycle, because of its chemistry, because
it is has already been recycled, because it is dirty or otherwise difficult to sort. Not only does
this have environmental advantages, because the material no longer has to go to landfill or
incineration, the material is also preserved for future reuse, reprocessing or recycling.
As is indicated this subbase may be formed as pre form parts, but it is particularly
advantageously used by forming appropriate layers in situ using existing pavement pavers,
which typically lay down a 2½ metre wide layer of self levelling material, without, essentially
any compaction, the only pressure on the material being that of the grader or scraper bar.
This not only enables the system to be used with existing technology and existing skills, it is
readily open to a range of uses in accordance with local practices and will level out minor
undulations in the surface on which it has been laid.
The absence of compaction means that the granular material will adhere to where it
contacts other granular material leaving a pattern of voids through the material so that it is
pervious to water. If it is laid on an impermeable surface, the nature of the material formed is
such that water will become subject to lateral capillary action whereby the water is ejected
through the side edges of the substrate frequently avoiding the need for drains to be formed
underneath the substrate location. It also means that the substrate can be laid flat, without
the need for drainage grading, which occurs in most existing arrangements.
The binding materials can be Polyurethane, Bitumen or Polyolefin displacements and
may form between 8 and 20% of the substrate. It is desirable that the granules have a range
of sizes in order to provide a good pattern of voids.
Claims (13)
1. A method of forming a stable substrate for a sports surface of a sports pitch including: 5 a) Obtaining granules formed by granulating agglomerated plastic materials, the granules having a predetermined range of sizes; b) Coating the granules with a binding material so that they form a fluent material; c) Forming a layer of the fluent material on the site of the sports pitch; and d) Setting the laid material such that the granules adhere where they contact each 10 other to form a voided water permeable structure.
2. A method as claimed in claim 1 wherein the plastics material is “end of life” plastics material.
3. A method as claimed in claim 1 or claim 2 wherein the granules are substantially incompressible. 15
4. A method as claimed in any one of the preceding claims wherein the binding material is a Polyurethane, Bitumen or Polyolefin.
5. A method as claimed in any one of the preceding claims wherein the substrate is formed in adjacent edge butting layers.
6. A method as claimed in claim 5 wherein the binding material adhere at the butted 20 edges.
7. A method as claimed in any one of the preceding claims wherein the bulk density of the layers is selected in accordance with the characteristics of the surface on which it is laid.
8. A method as claimed in any one of the preceding claims wherein the layer is between 20mm and 100mm thick. 25
9. A substrate for a sports surface of a sports pitch obtained by the method of any one of claims 1 to 8, the substrate comprising: a) granules formed by granulating agglomerated plastic materials, the granules having a predetermined range of sizes; b) a binding material with which the granules are coated; 30 wherein a material obtained by mixing the granules and the binding material is set such that the granules have been adhered where they contact each other to form a voided water permeable structure.
10. A sports pitch comprising a substrate according to claim 9.
11. A method of forming a stable substrate for a sports surface substantially as herein described, with reference to any one or more of the drawings.
12. A substrate for a sports surface substantially as herein described, with reference to any one or more of the drawings. 5
13. A sports pitch substantially as herein described, with reference to any one or more of the drawings.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB201105755A GB201105755D0 (en) | 2011-04-05 | 2011-04-05 | ATP base construction |
GB1105755.1 | 2011-04-05 | ||
PCT/NL2012/050217 WO2012138216A1 (en) | 2011-04-05 | 2012-04-02 | Method of forming a substrate for a sports surface of a sports pitch, such a substrate as well as a sports pitch provided with such substrate |
Publications (2)
Publication Number | Publication Date |
---|---|
NZ616446A NZ616446A (en) | 2015-11-27 |
NZ616446B2 true NZ616446B2 (en) | 2016-03-01 |
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9932713B2 (en) | Method of forming a substrate for a sports surface of a sports pitch, such a substrate as well as a sports pitch provided with such substrate | |
US10119228B2 (en) | Structural underlayment support system and panel for use with paving and flooring elements | |
CN100441775C (en) | Method of upgrading gravel and/or dirt roads and a composite road resulting therefrom | |
CN112627154B (en) | Water network zone lime solidified soil test section filling design method | |
CN107651887A (en) | A kind of high-modulus rubber-asphalt mixture and preparation method thereof | |
KR100497253B1 (en) | Paving materials using chip of waste tire and urethane rubber | |
NZ616446B2 (en) | Method of forming a substrate for a sports surface of a sports pitch, such a substrate as well as a sports pitch provided with such substrate | |
Frydenlund et al. | Foamglass-A New Vision in Road Construction | |
KR20140114711A (en) | Improvement Method for Base Ground of Pavement Block using Light-Weighted Foam Soil | |
Paige-Green | Appropriate roads for rural access | |
CN204509927U (en) | A kind of drainage crack resistance formula cold-regenerated road surface structure | |
CN217266706U (en) | Hot regeneration road surface structure of plantmix | |
WO2017093822A1 (en) | Process for construction of artificial roads, walk ways, footpaths, etc. from waste plastic, plastic type resins and related polymers | |
CN115110364A (en) | Solid waste utilization lime fly ash stabilized soil pavement structure and construction method | |
Prusinski | Recycling Flexible Pavements with Cement: Diverse Methods Produce Durable Pavements | |
CN115217008A (en) | Method for widening treatment of solid waste by using calcium carbide to stabilize regenerated granular road bed | |
CN118186845A (en) | Asphalt pavement structure with asphalt layer reflection crack prevention base layer and construction method | |
JPS6128042B2 (en) | ||
Gray | Designing Building Products Made With Recycled Tires | |
Saghafi et al. | A review of the influence of chalk on pavement performance in the South East of England, UK |