NO2556462T3 - - Google Patents
Info
- Publication number
- NO2556462T3 NO2556462T3 NO11766290A NO11766290A NO2556462T3 NO 2556462 T3 NO2556462 T3 NO 2556462T3 NO 11766290 A NO11766290 A NO 11766290A NO 11766290 A NO11766290 A NO 11766290A NO 2556462 T3 NO2556462 T3 NO 2556462T3
- Authority
- NO
- Norway
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Feedback Control In General (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US32135810P | 2010-04-06 | 2010-04-06 | |
PCT/US2011/021141 WO2011126585A1 (en) | 2010-04-06 | 2011-01-13 | Hierarchical modeling of physical systems and their uncertainties |
Publications (1)
Publication Number | Publication Date |
---|---|
NO2556462T3 true NO2556462T3 (no) | 2018-03-24 |
Family
ID=44763211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO11766290A NO2556462T3 (no) | 2010-04-06 | 2011-01-13 |
Country Status (7)
Country | Link |
---|---|
US (1) | US9864354B2 (no) |
EP (1) | EP2556462B1 (no) |
CN (1) | CN102834834B (no) |
BR (1) | BR112012023311A2 (no) |
CA (1) | CA2791642C (no) |
NO (1) | NO2556462T3 (no) |
WO (1) | WO2011126585A1 (no) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2499548A4 (en) * | 2009-11-12 | 2017-01-25 | Exxonmobil Upstream Research Company | Method and system for rapid model evaluation using multilevel surrogates |
WO2017027068A1 (en) * | 2015-08-07 | 2017-02-16 | Schlumberger Technology Corporation | Well management on cloud computing system |
US11669063B2 (en) * | 2018-11-28 | 2023-06-06 | ExxonMobil Technology and Engineering Company | Surrogate model for a chemical production process |
GB2591898A (en) * | 2018-12-20 | 2021-08-11 | Landmark Graphics Corp | Seamless scaling geomodeling |
EP3969944A4 (en) * | 2019-05-13 | 2023-01-18 | Services Pétroliers Schlumberger | TRAINING A MACHINE LEARNING SYSTEM USING HARD AND SOFT CONSTRAINTS |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2376704B (en) * | 1998-05-15 | 2003-03-05 | Baker Hughes Inc | Automatic hydrocarbon production management system |
US6826520B1 (en) | 1999-06-24 | 2004-11-30 | Exxonmobil Upstream Research Company | Method of upscaling permeability for unstructured grids |
AU8025000A (en) | 1999-10-13 | 2001-04-23 | Trustees Of Columbia University In The City Of New York, The | Petroleum reservoir simulation and characterization system and method |
US7734457B2 (en) * | 1999-10-16 | 2010-06-08 | Computer Associates Think, Inc. | Method and system for generating dynamic comparison models |
US20070271077A1 (en) | 2002-11-15 | 2007-11-22 | Kosmala Alexandre G | Optimizing Well System Models |
US7373251B2 (en) | 2004-12-22 | 2008-05-13 | Marathon Oil Company | Method for predicting quantitative values of a rock or fluid property in a reservoir using seismic data |
US7606784B2 (en) | 2005-08-02 | 2009-10-20 | Northrop Grumman Corporation | Uncertainty management in a decision-making system |
GB2445305A (en) | 2005-08-15 | 2008-07-02 | Univ Southern California | Method and system for integrated asset management utilizing multi-level modeling of oil field assets |
US20100082142A1 (en) | 2005-11-22 | 2010-04-01 | Usadi Adam K | Simulation System and Method |
US7467045B2 (en) * | 2006-01-20 | 2008-12-16 | Schlumberger Technology Corporation | Method for assessment of uncertainty and risk |
US7716029B2 (en) | 2006-05-15 | 2010-05-11 | Schlumberger Technology Corporation | Method for optimal gridding in reservoir simulation |
US7254091B1 (en) | 2006-06-08 | 2007-08-07 | Bhp Billiton Innovation Pty Ltd. | Method for estimating and/or reducing uncertainty in reservoir models of potential petroleum reservoirs |
US8620715B2 (en) | 2006-06-10 | 2013-12-31 | Schlumberger Technology Corporation | Method including a field management framework for optimization of field development and planning and operation |
CA2660444C (en) | 2006-08-14 | 2017-07-11 | Exxonmobil Upstream Research Company | Enriched multi-point flux approximation |
US8170801B2 (en) * | 2007-02-26 | 2012-05-01 | Bp Exploration Operating Company Limited | Determining fluid rate and phase information for a hydrocarbon well using predictive models |
US7895547B2 (en) * | 2008-05-01 | 2011-02-22 | International Business Machines Corporation | Test pattern based process model calibration |
US8061444B2 (en) | 2008-05-22 | 2011-11-22 | Schlumberger Technology Corporation | Methods and apparatus to form a well |
EP2387730A1 (en) | 2009-01-13 | 2011-11-23 | ExxonMobil Upstream Research Company | Methods and systems to volumetrically conceptualize hydrocarbon plays |
US8275589B2 (en) * | 2009-02-25 | 2012-09-25 | Schlumberger Technology Corporation | Modeling a reservoir using a compartment model and a geomechanical model |
EP2404198A4 (en) | 2009-03-05 | 2017-09-27 | Exxonmobil Upstream Research Company | Optimizing reservoir performance under uncertainty |
WO2012078238A1 (en) | 2010-12-09 | 2012-06-14 | Exxonmobil Upstream Company | Optimal design system for development planning of hydrocarbon resources |
CA2850929A1 (en) | 2011-10-03 | 2013-04-11 | Exxonmobil Research And Engineering Company | Methods for coating tubular devices used in oil and gas drilling, completions and production operations |
US20160253607A1 (en) | 2014-03-11 | 2016-09-01 | Lu Xu | Risk Measure-Based Decision Support Tool For Reservoir Development |
-
2011
- 2011-01-13 BR BR112012023311A patent/BR112012023311A2/pt not_active Application Discontinuation
- 2011-01-13 US US13/581,450 patent/US9864354B2/en active Active
- 2011-01-13 EP EP11766290.8A patent/EP2556462B1/en active Active
- 2011-01-13 CA CA2791642A patent/CA2791642C/en active Active
- 2011-01-13 NO NO11766290A patent/NO2556462T3/no unknown
- 2011-01-13 WO PCT/US2011/021141 patent/WO2011126585A1/en active Application Filing
- 2011-01-13 CN CN201180017983.4A patent/CN102834834B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN102834834A (zh) | 2012-12-19 |
EP2556462B1 (en) | 2017-10-25 |
US9864354B2 (en) | 2018-01-09 |
WO2011126585A1 (en) | 2011-10-13 |
EP2556462A4 (en) | 2014-05-14 |
CA2791642A1 (en) | 2011-10-13 |
US20130018642A1 (en) | 2013-01-17 |
BR112012023311A2 (pt) | 2016-05-24 |
CN102834834B (zh) | 2016-08-03 |
CA2791642C (en) | 2018-09-11 |
EP2556462A1 (en) | 2013-02-13 |