WO2002063130A1
(en)
*
|
2001-02-05 |
2002-08-15 |
Schlumberger Holdings Limited |
Optimization of reservoir, well and surface network systems
|
WO2004046503A1
(en)
*
|
2002-11-15 |
2004-06-03 |
Schlumberger Surenco Sa |
Optimizing well system models
|
US7539625B2
(en)
|
2004-03-17 |
2009-05-26 |
Schlumberger Technology Corporation |
Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies
|
MXPA06000064A
(es)
*
|
2003-06-25 |
2006-04-07 |
Schlumberger Technology Corp |
Metodo y aparato y dispositivo para almacenar un programa que incluye un sistema integrado de control de flujo de trabajo de planeacion de pozo con dependencias de proceso.
|
US20050199391A1
(en)
*
|
2004-02-03 |
2005-09-15 |
Cudmore Julian R. |
System and method for optimizing production in an artificially lifted well
|
US7809537B2
(en)
*
|
2004-10-15 |
2010-10-05 |
Saudi Arabian Oil Company |
Generalized well management in parallel reservoir simulation
|
US7387165B2
(en)
*
|
2004-12-14 |
2008-06-17 |
Schlumberger Technology Corporation |
System for completing multiple well intervals
|
US7596480B2
(en)
*
|
2005-04-14 |
2009-09-29 |
Saudi Arabian Oil Company |
Solution method and apparatus for large-scale simulation of layered formations
|
US20070016389A1
(en)
*
|
2005-06-24 |
2007-01-18 |
Cetin Ozgen |
Method and system for accelerating and improving the history matching of a reservoir simulation model
|
US20090216508A1
(en)
*
|
2005-07-27 |
2009-08-27 |
Bruce A Dale |
Well Modeling Associated With Extraction of Hydrocarbons From Subsurface Formations
|
MX2007016595A
(es)
|
2005-07-27 |
2008-03-04 |
Exxonmobil Upstream Res Co |
Modelaje de pozo asociado con extraccion de hidrocarburos a partir de yacimientos subterraneos.
|
CN101233526B
(zh)
*
|
2005-07-27 |
2012-07-04 |
埃克森美孚上游研究公司 |
与从地下岩层抽取碳氢化合物相关的井建模
|
US20070032994A1
(en)
*
|
2005-08-02 |
2007-02-08 |
Kimminau Stephen J |
System and method of flow assurance in a well
|
US8818776B2
(en)
*
|
2005-08-09 |
2014-08-26 |
Halliburton Energy Services, Inc. |
System and method for downhole tool system development
|
FI119263B
(fi)
|
2005-08-30 |
2008-09-15 |
Sandvik Tamrock Oy |
Adaptiivinen käyttöliittymä kallionporauslaitteelle
|
US8352226B2
(en)
*
|
2006-01-31 |
2013-01-08 |
Landmark Graphics Corporation |
Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator
|
US8504341B2
(en)
*
|
2006-01-31 |
2013-08-06 |
Landmark Graphics Corporation |
Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators
|
EP1989396A4
(en)
*
|
2006-02-10 |
2014-08-27 |
Exxonmobil Upstream Res Co |
FLEXIBLE DRILLING COMPLETATIONS
|
US7840287B2
(en)
*
|
2006-04-13 |
2010-11-23 |
Fisher-Rosemount Systems, Inc. |
Robust process model identification in model based control techniques
|
WO2008002345A2
(en)
*
|
2006-06-26 |
2008-01-03 |
Exxonmobil Upstream Research Company |
Method for comparing and back allocating production
|
US20080065362A1
(en)
*
|
2006-09-08 |
2008-03-13 |
Lee Jim H |
Well completion modeling and management of well completion
|
US7860593B2
(en)
|
2007-05-10 |
2010-12-28 |
Canrig Drilling Technology Ltd. |
Well prog execution facilitation system and method
|
WO2009024545A1
(en)
*
|
2007-08-17 |
2009-02-26 |
Shell Internationale Research Maatschappij B.V. |
Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
WO2009029135A1
(en)
*
|
2007-08-24 |
2009-03-05 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
US8423337B2
(en)
*
|
2007-08-24 |
2013-04-16 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
US20100191516A1
(en)
*
|
2007-09-07 |
2010-07-29 |
Benish Timothy G |
Well Performance Modeling In A Collaborative Well Planning Environment
|
FR2923855B1
(fr)
*
|
2007-11-21 |
2009-12-11 |
Inst Francais Du Petrole |
Methode pour optimiser la trajectoire d'un forage par mise a jour d'une interpretation structurale.
|
CA2705277C
(en)
*
|
2007-12-18 |
2017-01-17 |
Exxonmobil Upstream Research Company |
Determining connectivity architecture in 2-d and 3-d heterogeneous data
|
US8370122B2
(en)
|
2007-12-21 |
2013-02-05 |
Exxonmobil Upstream Research Company |
Method of predicting connectivity between parts of a potential hydrocarbon reservoir and analyzing 3D data in a subsurface region
|
WO2009085395A1
(en)
*
|
2007-12-31 |
2009-07-09 |
Exxonmobil Upstream Research Company |
Methods and systems for determining near-wellbore characteristics and reservoir properties
|
CA2708967A1
(en)
*
|
2008-01-22 |
2009-07-30 |
Exxonmobil Upstream Research Company |
Dynamic connectivity analysis
|
EP2252903A4
(en)
|
2008-03-10 |
2018-01-03 |
Exxonmobil Upstream Research Company |
Method for determing distinct alternative paths between two object sets in 2-d and 3-d heterogeneous data
|
US9733388B2
(en)
|
2008-05-05 |
2017-08-15 |
Exxonmobil Upstream Research Company |
Systems and methods for connectivity analysis using functional objects
|
US8352228B2
(en)
*
|
2008-12-23 |
2013-01-08 |
Exxonmobil Upstream Research Company |
Method for predicting petroleum expulsion
|
US9552462B2
(en)
*
|
2008-12-23 |
2017-01-24 |
Exxonmobil Upstream Research Company |
Method for predicting composition of petroleum
|
BRPI1006862B1
(pt)
|
2009-01-13 |
2020-03-17 |
Exxonmobil Upstream Research Company |
Método e sistema para otimização de tomada de decisão para um poço de hidrocarbonetos, e, sistema associado com a produção de hidrocarbonetos
|
US8793110B2
(en)
|
2009-03-13 |
2014-07-29 |
Exxonmobil Upstream Research Company |
Method for predicting fluid flow
|
US8403061B2
(en)
*
|
2009-10-02 |
2013-03-26 |
Baker Hughes Incorporated |
Method of making a flow control device that reduces flow of the fluid when a selected property of the fluid is in selected range
|
WO2011043862A1
(en)
|
2009-10-07 |
2011-04-14 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
CA2774181A1
(en)
|
2009-10-20 |
2011-04-28 |
Exxonmobil Upstream Research Company |
Method for quantitatively assessing connectivity for well pairs at varying frequencies
|
US8886502B2
(en)
*
|
2009-11-25 |
2014-11-11 |
Halliburton Energy Services, Inc. |
Simulating injection treatments from multiple wells
|
US8898044B2
(en)
|
2009-11-25 |
2014-11-25 |
Halliburton Energy Services, Inc. |
Simulating subterranean fracture propagation
|
US9176245B2
(en)
*
|
2009-11-25 |
2015-11-03 |
Halliburton Energy Services, Inc. |
Refining information on subterranean fractures
|
WO2011100002A1
(en)
|
2010-02-12 |
2011-08-18 |
Exxonmobil Upstream Research Company |
Method and system for partitioning parallel simulation models
|
EP2545461A4
(en)
|
2010-03-12 |
2017-09-27 |
Exxonmobil Upstream Research Company |
Dynamic grouping of domain objects via smart groups
|
US9134454B2
(en)
|
2010-04-30 |
2015-09-15 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
WO2011146866A2
(en)
|
2010-05-21 |
2011-11-24 |
Schlumberger Canada Limited |
Method and apparatus for deploying and using self-locating downhole devices
|
US8463586B2
(en)
|
2010-06-22 |
2013-06-11 |
Saudi Arabian Oil Company |
Machine, program product, and computer-implemented method to simulate reservoirs as 2.5D unstructured grids
|
WO2012015521A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
EP2599029A4
(en)
|
2010-07-29 |
2014-01-08 |
Exxonmobil Upstream Res Co |
METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION
|
CA2805446C
(en)
|
2010-07-29 |
2016-08-16 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
CA2808078C
(en)
|
2010-08-24 |
2018-10-23 |
Exxonmobil Upstream Research Company |
System and method for planning a well path
|
US8433551B2
(en)
|
2010-11-29 |
2013-04-30 |
Saudi Arabian Oil Company |
Machine, computer program product and method to carry out parallel reservoir simulation
|
US8386227B2
(en)
|
2010-09-07 |
2013-02-26 |
Saudi Arabian Oil Company |
Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
|
WO2012039811A1
(en)
|
2010-09-20 |
2012-03-29 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
EP2668641B1
(en)
|
2011-01-26 |
2020-04-15 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3d earth model
|
CA2822890A1
(en)
|
2011-02-21 |
2012-08-30 |
Exxonmobil Upstream Research Company |
Reservoir connectivity analysis in a 3d earth model
|
US8924029B2
(en)
*
|
2011-02-23 |
2014-12-30 |
Honeywell International Inc. |
Apparatus and method for increasing the ultimate recovery of natural gas contained in shale and other tight gas reservoirs
|
US20120278053A1
(en)
*
|
2011-04-28 |
2012-11-01 |
Baker Hughes Incorporated |
Method of Providing Flow Control Devices for a Production Wellbore
|
WO2013006226A1
(en)
|
2011-07-01 |
2013-01-10 |
Exxonmobil Upstream Research Company |
Plug-in installer framework
|
US9489176B2
(en)
|
2011-09-15 |
2016-11-08 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform EOS calculations
|
US9238953B2
(en)
|
2011-11-08 |
2016-01-19 |
Schlumberger Technology Corporation |
Completion method for stimulation of multiple intervals
|
US9650851B2
(en)
|
2012-06-18 |
2017-05-16 |
Schlumberger Technology Corporation |
Autonomous untethered well object
|
GB201212654D0
(en)
*
|
2012-07-13 |
2012-08-29 |
Simpson Neil A A |
Hydraulic actuation device
|
US10138724B2
(en)
*
|
2012-07-31 |
2018-11-27 |
Landmark Graphics Corporation |
Monitoring, diagnosing and optimizing gas lift operations by presenting one or more actions recommended to achieve a GL system performance
|
AU2013324162B2
(en)
|
2012-09-28 |
2018-08-09 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
US9951592B2
(en)
|
2013-03-08 |
2018-04-24 |
Kurt Carleton |
Apparatuses and methods for gas extraction from reservoirs
|
US9816353B2
(en)
|
2013-03-14 |
2017-11-14 |
Schlumberger Technology Corporation |
Method of optimization of flow control valves and inflow control devices in a single well or a group of wells
|
CA2907728C
(en)
|
2013-06-10 |
2021-04-27 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
US9631468B2
(en)
|
2013-09-03 |
2017-04-25 |
Schlumberger Technology Corporation |
Well treatment
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
MX2016004391A
(es)
*
|
2013-10-23 |
2016-12-07 |
Landmark Graphics Corp |
Visualizacion tridimensional de pozos.
|
CN105765160A
(zh)
*
|
2013-11-15 |
2016-07-13 |
兰德马克绘图国际公司 |
优化用于累积液体注入的流量控制装置特性
|
US10520925B2
(en)
|
2013-11-15 |
2019-12-31 |
Landmark Graphics Corporation |
Optimizing flow control device properties on a producer well in coupled injector-producer liquid flooding systems
|
CA2933822C
(en)
*
|
2014-01-24 |
2019-05-21 |
Landmark Graphics Corporation |
Optimized flow control device properties for accumulated gas injection
|
EP3175265A1
(en)
|
2014-07-30 |
2017-06-07 |
ExxonMobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
EP3213126A1
(en)
|
2014-10-31 |
2017-09-06 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
WO2016069170A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
US10380281B2
(en)
|
2016-11-22 |
2019-08-13 |
Landmark Graphics Corporation |
Vector-ratio safety factors for wellbore tubular design
|
EP3559401B1
(en)
|
2016-12-23 |
2023-10-18 |
ExxonMobil Technology and Engineering Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
US10891407B2
(en)
|
2017-03-28 |
2021-01-12 |
Saudi Arabian Oil Company |
System and method for automated-inflow control device design
|
US11041976B2
(en)
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
WO2019147689A1
(en)
|
2018-01-23 |
2019-08-01 |
Baker Hughes, A Ge Company, Llc |
Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods
|
US11808903B2
(en)
|
2018-05-12 |
2023-11-07 |
Schlumberger Technology Corporation |
Seismic data interpretation system
|
US10808517B2
(en)
|
2018-12-17 |
2020-10-20 |
Baker Hughes Holdings Llc |
Earth-boring systems and methods for controlling earth-boring systems
|
US11401786B2
(en)
|
2019-03-06 |
2022-08-02 |
Saudi Arabian Oil Company |
Systems and methods for hydrocarbon reservoir well connectivity graph optimization, simulation and development
|