NL8720502A - METHOD AND APPARATUS FOR CEMENTING A DRILL WELL TUBE IN MULTIPLE STAGES. - Google Patents
METHOD AND APPARATUS FOR CEMENTING A DRILL WELL TUBE IN MULTIPLE STAGES. Download PDFInfo
- Publication number
- NL8720502A NL8720502A NL8720502A NL8720502A NL8720502A NL 8720502 A NL8720502 A NL 8720502A NL 8720502 A NL8720502 A NL 8720502A NL 8720502 A NL8720502 A NL 8720502A NL 8720502 A NL8720502 A NL 8720502A
- Authority
- NL
- Netherlands
- Prior art keywords
- series
- tubular
- casing
- section
- string
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 26
- 239000004568 cement Substances 0.000 claims description 46
- 238000006073 displacement reaction Methods 0.000 claims description 17
- 238000005553 drilling Methods 0.000 description 16
- 239000012530 fluid Substances 0.000 description 16
- 239000002002 slurry Substances 0.000 description 12
- 230000007246 mechanism Effects 0.000 description 7
- 230000015572 biosynthetic process Effects 0.000 description 5
- 238000005755 formation reaction Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 238000007789 sealing Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000010408 sweeping Methods 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 241001417527 Pempheridae Species 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 238000003801 milling Methods 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
- E21B33/16—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes using plugs for isolating cement charge; Plugs therefor
- E21B33/165—Cementing plugs specially adapted for being released down-hole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
- E21B17/07—Telescoping joints for varying drill string lengths; Shock absorbers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/08—Casing joints
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
- E21B33/146—Stage cementing, i.e. discharging cement from casing at different levels
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Description
i 8720502 VO 11138720502 VO 1113
Werkwijze en inrichting voor het in meer trappen cementeren van een boorputverbuizing.Method and device for multi-stage cementation of a well casing.
Achtergrond van de uitvinding I. Het gebied van de uitvindingBackground of the Invention I. The Field of the Invention
De uitvinding betreft een inrichting en een werkwijze voor het cementeren van een verbuizingsserie in een boorput in meerdere trap-5 pen en in het bijzonder een inrichting en een werkwijze voor het in meerdere trappen cementeren van een verhuizing, waarbij de rotatie van de bovenste serie onafhankelijk van de onderste serie tijdens de tweede cementeertrap mogelijk is teneinde volledige verdringing van boorputfluidum te waarborgen.The invention relates to an apparatus and a method for cementing a casing series in a multi-stage wellbore and in particular an apparatus and a method for multi-stage cementing of a casing, wherein the rotation of the upper series is independent of the bottom string during the second cementing step is possible to ensure complete displacement of well fluid.
10 II. Beschrijving van de stand van de techniek10 II. Description of the prior art
Gedurende diverse werkzaamheden bij het tot stand brengen van een boorput moet, nadat het boorgat tot een diepte van enige duizenden voet is geboord, een stalen verhuizing in de put worden geplaatst om geologische formaties of interessante produktieve zones te isoleren.For various well construction operations, after the well has been drilled to a depth of several thousand feet, a steel casing must be placed in the well to isolate geological formations or interesting productive zones.
15 Deze verhuizing wordt op zijn plaats gecementeerd teneinde te verhinderen dat ongeconsolideerde formaties afkalven en om te verhinderen, dat verschillende formatiefluida zich met elkaar mengen. Bovendien verhindert de verhuizing dat formatiefluida het geboorde gat binnenkomen. Voor welke reden dan ook de stalen verhuizing wordt 20 neergelaten, het boorgat kan niet behoorlijk worden geïsoleerd tenzij het boorfluidum in het gat rondom de verhuizing volledig is vervangen door een uithardend, niet-poreus mengsel zoals cement. Tijdens het cementeren wordt cementslurry in het boorgat omlaag gepompt door de verbuizingsserie en vervolgens terug omhoog langs de buitenzijde van 25 de verbuizingsserie, waarbij de boorspoeling aan de buitenzijde van de verbuizingsserie wordt vervangen door cement en de buitenomtrek van de verhuizing aan de boorgatwand wordt gehecht. Een geslaagde cementering is die, waarbij al de boorspoeling is vervangen door cement en de cement uithardt tot een beschermende mantel voordat 30 andere fluida binnenstromen. Door de diepte van het boorgat is volledige vervanging van boorspoeling door cement over de gehele 78720502 -2- > lengte van de verhuizing een van de moeilijkste van alle werkzaamheden bij olieboring. Indien volledige cementering niet wordt bereikt, is vertikale fluidummigratie door kanalen van niet verdrongen boorspoe-ling mogelijk.This casing is cemented in place to prevent unconsolidated formations from calving and to prevent different formation fluids from mixing together. In addition, the move prevents formation fluids from entering the drilled hole. For whatever reason the steel casing is lowered, the borehole cannot be properly insulated unless the drilling fluid in the hole surrounding the casing has been completely replaced by a hardening, non-porous mixture such as cement. During cementation, cement slurry is pumped down the borehole through the casing string and then back up along the outside of the casing string, replacing the drilling fluid on the outside of the casing string with the outer periphery of the casing adhered to the borehole wall. A successful cementation is one in which all the drilling mud has been replaced by cement and the cement hardens into a protective jacket before other fluids enter. Due to the depth of the borehole, complete replacement of drilling fluid with cement over the entire length of the move is one of the most difficult of all oil drilling operations. If complete cementation is not achieved, vertical fluid migration through undressed drilling mud channels is possible.
5 Verder kan het bij langere verbuizingsseries moeilijk zijn cementslurry in één trap achter de verhuizing te plaatsen omdat de fluidumdichtheid van de slurrykolom groter is dan die van de boor-spoeling, hetgeen moeilijkheden veroorzaakt bij het persen van de slurry vele duizenden voet omlaag door de verhuizing heen en vele 10 duizenden voet terug omhoog in het boorgat. Teneinde deze beperking te vermijden zijn tweetraps-cementeerafsluiters ontwikkeld die het mogelijk maakten cementslurry eerst door de gehele verbuizingsserie omlaag te pompen en terug omhoog in het boorgat tot een tussengelegen punt juist onder de afsluiter. De cementeerafsluiter wordt dan ge-15 opend en laat circulatie vanaf de afsluiter omhoog toe terwijl circulatie in de verbuizingsserie onder de afsluiter wordt afgesloten en de overblijvende cementslurry wordt dan in de verhuizing omlaag gepompt, door de afsluiterpoorten in de ringruimte van het boorgat en terug omhoog in het bovengedeelte van het boorgat naar de opper-20 vlakte.Furthermore, in longer casing runs, it may be difficult to place cement slurry in one stage behind the casing because the fluid density of the slurry column is greater than that of the drilling mud, causing difficulties in pressing the slurry down many thousands of feet through the casing and many ten thousands of feet back up into the borehole. In order to avoid this limitation, two-stage cementing valves have been developed which allowed cement slurry to be pumped first through the entire casing string and back up the borehole to an intermediate point just below the valve. The cementation valve is then opened to allow circulation from the valve upward while circulation in the casing string below the valve is closed and the remaining cement slurry is then pumped down the casing, through the valve ports into the borehole and back up in the upper part of the borehole to the surface.
Hoewel het tweetraps-cementeerproces het cementeren van langere verbuizingsseries vereenvoudigt, kan volledige verdringing van de boorspoeling niet worden gewaarborgd zonder rotatie of heen en weer beweging van de verbuizingsserie. Dit geldt in het bijzonder 25 in een boorgat dat niet zuiver vertikaal is of recht, dan wel elliptisch of een excentrische configuratie heeft. Hoewel heen en weer beweging van de verbuizingsserie tijdens het cementeerproces werkzaam kan zijn voor het verwijderen van spoeling die tussen de verhuizing en de boorgatwand is opgesloten, wordt de voorkeur gegeven 30 aan rotatie aangezien dit het mogelijk maakt opgesloten spoeling uit te vegen door middel van de wrijving tussen de buisserie en de spoeling zodat de spoeling uit het boorgat door cement kan worden vervangen. In kortere boorgaten waar slechts één cementeertrap nodig is, wordt de gehele serie geroteerd tot volledige verdringing 35 van de boorspoeling is bereikt over de totale lengte van de serie.Although the two-stage cementing process simplifies the cementation of longer casing series, complete displacement of the drilling fluid cannot be ensured without rotation or reciprocating of the casing series. This is especially true in a borehole that is not purely vertical or straight, or has an elliptical or eccentric configuration. While reciprocation of the casing string during the cementing process may be effective to remove mud trapped between the casing and the borehole wall, rotation is preferred as it allows the sweeping of trapped mud by sweeping friction between the pipe series and the mud so that the mud from the borehole can be replaced by cement. In shorter boreholes where only one cementing step is required, the entire series is rotated until complete displacement of the drilling mud is achieved over the entire length of the series.
f172 65 0 2 ς t -3-f172 65 0 2 ς t -3-
Het roteren van de gehele serie of het heen en weer bewegen daarvan wordt ook toegepast in het tweetraps-cementeerproces. Terwijl de eerste trap van de slurry in de verhuizing omlaag wordt gepompt en in het benedendeel van het boorgat, wordt de serie geroteerd teneinde 5 een volledige spoelingverplaatsing in de eerste cementeertrap te waarborgen. Zodra echter de eerste fase van de slurry de gelegenheid heeft gehad uit te harden kan het bovenste deel van de verhuizing boven de meertrapscementeerafsluiter niet meer worden geroteerd tijdens de tweede trap. Dit resulteerde in een onvoldoende verdringing van de 10 boorspoeling in de bovenste trap van de cement.Rotating the whole series or moving it back and forth is also used in the two-stage cementing process. While the first stage of the slurry is pumped down into the casing and into the bottom of the borehole, the array is rotated to ensure complete flushing displacement in the first cementation stage. However, once the first stage of the slurry has had an opportunity to cure, the upper part of the casing above the multi-stage cement valve cannot be rotated during the second stage. This resulted in insufficient displacement of the drilling fluid in the top stage of the cement.
Samenvatting van de onderhavige uitvindingSummary of the present invention
De onderhavige uitvinding vermijdt de nadelen van de reeds bekende inrichtingen voor het meertraps-cementeren van een verbui-zingsserie door het verschaffen van een inrichting en een werkwijze 15 voor het meertraps-cementeren waarbij de bovenste verbuizingsserie kan worden geroteerd onafhankelijk van de onderste verbuizingsserie tijdens de tweede trap van de cementering teneinde volledige verdringing van de boorspoeling te waarborgen.The present invention avoids the drawbacks of the prior art multistage cementing apparatus of a casing series by providing a multistage cementing apparatus and method in which the upper casing series can be rotated independently of the lower casing series during the second stage of cementation to ensure complete displacement of the drilling fluid.
De inrichting volgens de uitvinding omvat een rotatie-20 mechanisme dat aangebracht is tussen de bovenste en onderste verbuizingsserie in de nabijheid van de tussengelegen cementeerafsluiter teneinde rotatie van de gehele serie gedurende de eerste trap van de cementering en van het bovenste deel van de verhuizing boven de meertrapscementeeraf sluiter tijdens de tweede of laatste cementeertrap 25 mogelijk te maken.Het mechanisme omvat een onderste buisvormig serie-deel en een bovenste buisvormig seriedeel, welke telescopisch op elkaar aangrijpen zodanig dat het bovenste buisvormige seriedeel vertikaal kan worden verplaatst ten opzichte van het onderste buisvormige seriedeel. In een voorkeursuitvoeringsvorm omvatten beide buisvormige 30 seriedelen spieën die op elkaar kunnen aangrijpen en samenwerken voor het roteren van de gehele verbuizingsserie, echter ten opzichte van elkaar kunnen worden gelost door verplaatsing van de bovenste serie ten opzichte van de onderste serie. Bij het uit aangrijping komen van de spieën zijn het bovenste buisvormige seriedeel en de verhuizing 35 vrij onafhankelijk van het onderste buisvormige seriedeel en de ver- ÏS72Ö502 » -4- buizing te roteren. Omdat bovendien de spieën vrij op elkaar kunnen aangrijpen kan de volledige verhuizing worden geroteerd in elke richting en de spieën kunnen weer in onderlinge aangrijping worden gebracht ook nadat zij eerst uit aangrijping zijn gebracht.The device according to the invention comprises a rotation mechanism arranged between the upper and lower casing series in the vicinity of the intermediate cementing valve to allow rotation of the entire series during the first stage of the cementation and of the upper part of the casing above the enable multi-stage cementing valve during the second or last cementing stage. The mechanism includes a lower tubular serial section and an upper tubular serial section, which telescopically engage each other such that the upper tubular serial section can be vertically displaced relative to the lower tubular serial section . In a preferred embodiment, both tubular series members comprise splines that can engage and cooperate to rotate the entire casing string, but can be released relative to each other by displacement of the top string relative to the bottom string. Upon engagement of the keys, the upper tubular series section and casing 35 are freely rotatable independently of the lower tubular series section and the casing. In addition, since the splines can engage freely, the entire casing can be rotated in any direction and the splines can be inter-engaged again even after they have first been disengaged.
5 Naast het verschaffen van onafhankelijke rotatie van de boven ste en onderste verbuizingsserie kan de uitvinding makkelijk in een standaard verbuizingsserie worden aangebracht op elke positie van de serie. Derhalve kunnen meerdere trappen van cementering worden uitgevoerd door eenvoudigweg spieën met variërende wrijvingsaangrijping 10 of lengte aan te brengen aangezien het mechanisme volgens de onderhavige uitvinding geen andere functie vervult dan het controleren van de rotatie van de diverse trappen, verschaft de inrichting flexibiliteit doordat het mogelijk is de inrichting in een serie aan te brengen afhankelijk van de individuele vereisten. Teneinde 15 echter de uitrustingskosten te beperken kan flexibiliteit worden opgeofferd en kan het rotatiemechanisme met de meertrapscementeer-afsluiter tot één enkel gereedschap worden gecombineerd.In addition to providing independent rotation of the top and bottom casing series, the invention can be easily applied in a standard casing series to any position of the series. Therefore, multiple stages of cementation can be performed by simply applying wedges with varying frictional engagement 10 or length since the mechanism of the present invention performs no function other than controlling the rotation of the various stages, the device provides flexibility in that it is possible daisy chain the device according to individual requirements. However, in order to reduce equipment costs, flexibility can be sacrificed and the rotary mechanism with the multi-stage cement valve can be combined into a single tool.
De werkwijze volgens de onderhavige uitvinding maakt van de inrichting gebruik om onafhankelijke rotatie van de bovenste en onder-20 ste verbuizingsseries mogelijk te maken en daardoor een volledige verplaatsing van de boorspoeling te waarborgen. Bij deze procedure wordt de verhuizing in het boorgat neergelaten met het rotatiemechanisme direct boven de meertrapscementeerafsluiter geïnstalleerd. Terwijl cementslurry door de verhuizing naar de bodem van 25 het boorgat wordt gepompt wordt de gehele serie geroteerd voor een goede cementverplaatsing. Zodra de tevoren bepaalde hoeveelheid cement slurry in de verhuizing is gepompt, wordt een klepplug ingebracht en onder druk naar de bodem van de serie gedwongen. Daarna laat men een klepbom in de verhuizing omlaag vallen voor het openen van de tweetraps-30 cementeerafsluiter die zich direct onder het rotatiemechanisme bevindt. Zodra de tussenliggende afsluiterpoorten zijn geopend wordt mogelijke overmaat cement boven de afsluiter uit het boorgat gepompt en de eerste trap toegevoerde cement wordt in de gelegenheid gesteld initieel uit te harden. Nadat voldoende tijd is verstreken 35 worden de spieën op het rotatiemechanisme buiten aangrijping van .8720562 -5- elkaar gebracht door de bovenste serie omlaag te bewegen. Daarna wordt de tweede trap cementslurry door de bovenste verbuizings-serie bewogen terwijl deze onafhankelijk wordt geroteerd. Zodra de cementslurry van de tweede trap volledig is gemengd en in de verbui-5 zing is gepompt wordt een sluitplug achter de cement losgelaten en omlaag bewogen naar de afsluiter en de tussengelegen afsluiterpoorten worden gesloten. Na volledige uitharding van de cement kunnen de diverse pluggen die zich in de verbuizingsserie bevinden worden uitgeboord om toegang te verschaffen tot het boorgat.The method of the present invention utilizes the apparatus to allow independent rotation of the top and bottom casing series and thereby ensure complete drilling mud displacement. In this procedure, the casing is lowered into the borehole with the rotary mechanism installed directly above the multi-stage cementing valve. As cement slurry is pumped through the casing to the bottom of the borehole, the entire series is rotated for proper cement displacement. Once the predetermined amount of cement slurry has been pumped into the casing, a valve plug is inserted and forced to the bottom of the series under pressure. Thereafter, a valve bomb is dropped into the casing to open the two-stage cementing valve located directly below the rotary mechanism. Once the intermediate valve ports are opened, any excess cement is pumped out of the borehole above the valve, and the first stage cement supplied is allowed to initially cure. After sufficient time has elapsed, the keys on the rotation mechanism are disengaged from 8720562-5 by moving the upper series down. The second stage cement slurry is then moved through the top casing string while rotating independently. Once the second stage cement slurry is completely mixed and pumped into the tubing, a blanking plug is released behind the cement and moved down to the valve and the intermediate valve ports are closed. After complete curing of the cement, the various plugs contained in the casing string can be drilled out to provide access to the borehole.
10 De onderhavige uitvinding verschaft derhalve een eenvoudige en geschikte inrichting en werkwijze voor het cementeren van een volledige verbuizingsserie waarbij een volledige verplaatsing van boorspoeling is gewaarborgd.The present invention therefore provides a simple and convenient device and method for cementing a complete casing string with complete displacement of drilling mud.
Andere doelstellingen, aspecten en voordelen van de onder-15 havige uitvinding zullen blijken uit de hiernavolgende gedetailleerde beschrijving onder verwijzing naar de bijgaande tekeningen.Other objects, aspects and advantages of the present invention will become apparent from the following detailed description with reference to the accompanying drawings.
Korte beschrijving van de tekeningBrief description of the drawing
De uitvinding zal worden verduidelijkt onder verwijzing naar de hiernavolgende gedetailleerde beschrijving van een voorkeursuit-20 voeringsvorm van de onderhavige uitvinding, gelezen samen met de bijgaande tekening waarin de verwijzingscijfers in alle aanzichten betrekking hebben op dezelfde onderdelen en waarbij:The invention will be elucidated with reference to the following detailed description of a preferred embodiment of the present invention, read in conjunction with the accompanying drawing, in which the reference numbers in all views refer to the same parts and wherein:
Fig. 1 een perspectief-aanzicht met uiteengenomen delen is van de inrichting waarin de onderhavige uitvinding is ver-25 werkt; fig. 2 een gedeeltelijk in doorsnede aangegeven zijaanzicht is van de inrichting volgens de uitvinding in de aan-grijpingstoestand; fig. 3 een gedeeltelijk in doorsnede weergegeven zij-30 aanzicht is van de inrichting volgens de onderhavige uitvinding in de uit aangrijping gebrachte toestand; fig. 4 een dwarsdoorsnede perspectief-aanzicht is volgens de lijn 4-4 in fig. 2; en ,8720502 -6- fig. 5-9 schematische illustraties zijn van een dwars-doorsnede-aanzicht van een boorgat dat in de grond is gevormd en die de werkwijze en de inrichting volgens de onderhavige uitvinding weergeven.Fig. 1 is an exploded perspective view of the device in which the present invention is incorporated; FIG. 2 is a partial cross-sectional side view of the device of the invention in the engaged condition; FIG. 3 is a partial cross-sectional side view of the device of the present invention in its disengaged condition; Fig. 4 is a cross-sectional perspective view taken along line 4-4 in Fig. 2; and, 8720502-6 FIGS. 5-9 are schematic illustrations of a cross-sectional view of a borehole formed in the ground illustrating the method and apparatus of the present invention.
5 Gedetailleerde beschrijving van een voorkeursuitvoeringsvorm van de onderhavige uitvindingDetailed description of a preferred embodiment of the present invention
Eerst refererend aan fig. 1 - 4, is een rotatieinrichting 10 volgens de onderhavige uitvinding weergegeven die in serie is ver-10 bonden met een buisvormige verbuizingsserie 12. De volledige ver- buizingsserie 12 omvat een bovenste verbuizingsserie 14 en een onderste verbuizingsserie 16, die met elkaar zijn verbonden door de rotatieinrichting 10. De rotatieinrichting 10 omvat middelen voor het selectief overdragen van een rotatiekoppel van de bovenste verbui-15 zingsserie 14 naar de onderste verbuizingsserie 16, echter kan uit aangrijping worden gebracht voor het verschaffen van rotatie van de bovenste serie 14 onafhankelijk van de onderste serie 16 terwijl de seriedelen met elkaar verbonden blijven, zoals hierna zal worden beschreven.Referring first to Figs. 1-4, there is shown a rotary device 10 of the present invention connected in series with a tubular casing series 12. The complete casing series 12 includes an upper casing series 14 and a lower casing series 16, which are connected together by the rotation device 10. The rotation device 10 includes means for selectively transferring a rotation torque from the upper casing series 14 to the lower casing series 16, but may be disengaged to provide rotation of the upper series 14 independently of the lower array 16 while the array members remain connected together as will be described below.
20 De rotatie-inrichting 10 omvat in het algemeen een buisvormig onderste seriegedeelte 18 en een buisvormig bovenste seriegedeelte 20. Het onderste buisvormige seriegedeelte 18 is losneembaar bevestigd aan de onderste verbuizingsserie 16 door middel van samenwerkende schroefdraad 22. Op dergelijke wijze is het bovenste buis-25 vormige seriegedeelte 20 losneembaar bevestigd aan de bovenste verbuizingsserie 14 door schroefdrmd 2+.Het zal echter duidelijk zijn dat de rotatie-inrichting in serie in de verbuizingsserie 12 kan zijn opgenomen op elke bekende wijze of ook kan zijn gecombineerd met andere gereedschappen die in het cementatieproces dat hierna zal 30 worden beschreven, worden gebruikt. Verder omvat het bovenste buisvormige seriegedeelte 20 een klokhuis (E. mandrel) 26 en een bovenste bus 28 voor het vergemakkelijken\anhet assembleren van de rotatieinrichting 10. De klokhuis 26 en de bus 28 zijn vast met elkaar verbonden door middel van schroefdraad 27 en omvat afdichtmiddelen 35 30 die fluidumstroming tussen deze componenten van het bovenste··· buisvormige seriegedeelte 20 verhinderen. De afdichtmiddelen 30 bieden ,8720502 -7- verder weerstand tegen relatieve rotatie van de klokhuis 26 en de bus 28 nadat deze componenten zijn geassembleerd.The rotary device 10 generally comprises a tubular lower serial section 18 and a tubular upper serial section 20. The lower tubular serial section 18 is releasably attached to the lower casing string 16 by co-operating thread 22. In this manner, the upper tubular 25 shaped series portion 20 releasably attached to the upper casing series 14 by screw thread 2+. However, it will be appreciated that the rotary device may be serially included in the casing series 12 in any known manner or may also be combined with other tools included in the cementation process to be described hereinafter will be used. Furthermore, the upper tubular series section 20 includes a core (E. mandrel) 26 and an upper sleeve 28 for facilitating assembly of the rotational device 10. The core 26 and sleeve 28 are fixedly connected by screw thread 27 and include sealing means 35 which prevents fluid flow between these components of the top tubular series section 20. The sealing means 30 further resist relative rotation of the core 26 and sleeve 28 after these components have been assembled.
Zoals het beste blijkt uit fig.2 en 3 is het onderste buisvormige seriegedeelte 18 telescopisch opgenomen in het bovenste 5 buisvormige seriegedeelte 20 en in het bijzonder in de bovenste bus 28. Aldus is het bovenste buisvormige seriegedeelte 20 glijdend beweegbaar ten opzichte van het onderste buisvormige seriegedeelte 18 zodat de bovenste verbuizingsserie 14 in langsrichting kan worden verplaatst ten opzichte van de onderste verbuizingsserie 12 vanuit 10 de relatieve positie afgebeeld in fig. 2 naar de positie afgebeeld in fig. 3. Bovendien werkt het einde 32 van de bovenste klokhuis 26 als een aanslagoppervlak tegen het onderste buisvormige seriegedeelte 18 voor het beperken van de omlaagbeweging van het bovenste buisvormige seriegedeelte 20 ten opzichte van het onderste buisvormige 15 seriegedeelte 18.Omgekeerd omvatten het onderste buisvormige seriegedeelte 18 en de bovenste bus 28 aangrijpschouders 34, resp. 36 die de omhoogbeweging van de bovenste verhuizing 14 ten opzichte van de onderste verhuizing 12 beperken. Derhalve hebben de componenten van de rotatie-inrichting 10 een vaste afstand waarover zij zich 20 onderling in langsrichting kunnen verplaatsen, hetgeen het losraken van de bovenste verbuizingsserie 14 van de onderste verbuizingsserie 12 zonder dat de rotatie-inrichting wordt losgemaakt, verhinderd.As best shown in FIGS. 2 and 3, the lower tubular series section 18 is telescopically received in the upper tubular series section 20, and in particular in the upper sleeve 28. Thus, the upper tubular series section 20 is movable with respect to the lower tubular series section 18 so that the upper casing string 14 can be longitudinally displaced relative to the lower casing string 12 from 10 the relative position shown in Fig. 2 to the position shown in Fig. 3. In addition, the end 32 of the upper core casing 26 acts as a abutment surface against the lower tubular series section 18 for limiting the downward movement of the upper tubular series section 20 relative to the lower tubular series section 18. Conversely, the lower tubular series section 18 and the upper sleeve 28 comprise gripping shoulders 34, respectively. 36 which limit the upward movement of the upper casing 14 relative to the lower casing 12. Therefore, the components of the rotary device 10 have a fixed distance over which they can move longitudinally relative to each other, preventing dislodgement of the upper casing string 14 from the lower casing string 12 without detaching the rotational shock.
Thans verwijzend naar de fig. 1 en 4, zijn middelen aangebracht voor het selectief overdragen van een rotatiekoppel van 25 het bovenste buisvormige seriegedeelte 20 op het onderste buisvormige seriegedeelte 18 opdat de bovenste verbuizingsserie 14 onafhankelijk van de onderste verbuizingsserie 12 kan worden geroteerd. In een voorkeursuitvoering van de onderhavige uitvinding omvatten deze middelen op elkaar aangrijpende spieën 40 die in de 30 bovenste en onderste buisvormige seriegedeelten zijn gevormd.Referring now to FIGS. 1 and 4, means are provided for selectively transmitting a rotary torque from the upper tubular series section 20 to the lower tubular series section 18 so that the upper casing string 14 can be rotated independently of the lower casing string 12. In a preferred embodiment of the present invention, these means comprise interlocking keys 40 formed in the upper and lower tubular series portions.
Deze spieën 40 omvatten bij voorkeur een paar spieën 42 die gevormd zijn op het onderste gedeelte 18 en een paar spieën 44 die op het bovenste gedeelte 20 zijn gevormd. Deze spieën vormen corresponderende langsgroeven 46 die de spieën van de samenwerkende component 35 van de rotatieinrichting 10 opnemen. Zoals in de tekeningen weergegeven kunnen deze spieën elke gewenste breedte hebben zolang de «8720502 -8- corresponderende groef 46 nauwkeurig is aangepast aan de breedte van de samenwerkende spie teneinde verloren rotatiebeweging tot een minimum te beperken. In een voorkeursuitvoeringsvorm hebben de spieën 42 echter een aanzienlijk kleinere breedte dan de spieën 44 van het 5 bovenste buisvormige seriegedeelte 20 teneinde de vervaardigingskosten te verminderen. Bovendien kan elk aantal spieën worden toegepast voor het bereiken van soortgelijke resultaten of voor het variëren van de wrijvingsaangrijping tussen verschillende stellen rotatie-componenten die op verschillende niveaus langs de verbuizingsserie 10 12 zijn aangebracht. Daarbij kan de lengte van de spieën worden ge varieerd om een grotere langsverplaatsing mogelijk te maken voordat de spieën van elkaar losgeraken.These splines 40 preferably include a pair of splines 42 formed on the lower portion 18 and a pair of splines 44 formed on the upper portion 20. These splines form corresponding longitudinal grooves 46 which receive the splines of the co-operating component 35 of the rotary device 10. As shown in the drawings, these keys may have any desired width as long as the corresponding groove 46 is accurately matched to the width of the cooperating key to minimize lost rotational movement. In a preferred embodiment, however, the keys 42 have a considerably smaller width than the keys 44 of the upper tubular series section 20 in order to reduce the manufacturing cost. In addition, any number of keys can be used to achieve similar results or to vary the frictional engagement between different sets of rotary components arranged at different levels along the casing string 12. In addition, the length of the splines can be varied to allow greater longitudinal displacement before the splines come apart.
Het aanbrengen van de rotatie-inrichting 10 maakt een langsverplaatsing mogelijk van het bovenste buisvormige seriegedeelte 20 15 ten opzichte van het onderste buisvormige seriegedeelte 18. Na plaatsing van de afdichtingen 30 en 38 in hun opneemgroeven 48 wordt het onderste buisvormige seriegedeelte 18 geplaatst in de bovenste bus 28 zodanig dat de spieën 42 aangrijpen in de groeven 46. Het bovenste buisvormige seriegedeelte 20 kan nu worden aangebracht 20 door plaatsing van de klokhuis 26 in het einde van de bus 28 en door het roteren van de klokhuis 26 laten aangrijpen van de schroefdraden 27 van elke component. Het deel 50 met vergrote diameter van het onderste gedeelte 18 is nu gepositioneerd, opgesloten tussen het einde 32 van de klokhuis 26 en de aanslagschouder 36 van de 25 bus 28. De rotatie-inrichting 10 kan nu worden aangebracht in de verbuizingsserie 12 om meertrapscementering van de serie 12 te bewerkstelligen en zoals in het hiernavolgende zal worden beschreven.The mounting of the rotary device 10 allows longitudinal displacement of the upper tubular series section 20 with respect to the lower tubular series section 18. After the seals 30 and 38 are placed in their receiving grooves 48, the lower tubular series section 18 is placed in the upper sleeve 28 such that the keys 42 engage in the grooves 46. The upper tubular series section 20 can now be fitted 20 by placing the core 26 in the end of the sleeve 28 and rotating the core 26 to engage the threads 27 of each component. The enlarged diameter portion 50 of the lower portion 18 is now positioned trapped between the end 32 of the core 26 and the stop shoulder 36 of the sleeve 28. The rotary device 10 can now be mounted in the casing series 12 to allow multi-stage cementing to accomplish the series 12 and as will be described below.
Thans refererend aan de fig. 5-9, is de rotatie-inrichting 10 zoals afgeheeld aangebracht in een volledige verbuizingsserie 12.Referring now to FIGS. 5-9, the rotary device 10 is mounted in a complete casing series 12 as tilted.
30 De verbuizingsserie 12 is afgebeeld in een boorgat 52 dat in de grond is aangebracht voor het onderzoek naar mogelijke koolwaterstofreserves. De verbuizingsserie 12 strekt zich in hoofdzaak uit tot de bodem 54 van het boorgat 52. De verbuizingsserie 12 omvat een groot aantal onderling verbonden componenten die specifieke functies vervullen 35 bij de boorwerkzaamheden. De werkwijze volgens de uitvinding zal echter worden beschreven in samenhang met de componenten die nood- „8720502 -9- zakelijk zijn voor het toepassen van de werkwijze. Opgenomen in de ver-buizingsserie 12 is een tussenliggende afsluiter 56 welke is. voorzien van zijpoorten 58 die selectief kunnen worden geopend en gesloten. Bij voorkeur is de afsluiter 56 aangebracht juist onder de rotatie-5 inrichting 10. Alternatief kan de afsluiter 56 integraal zijn uitgevoerd met de rotatie-inrichting 10, in het bijzonder het onderste buisvormige seriegedeelte 18 voor het aanzienlijk verminderen van de ver-vaardigingskosten. Indien aldus uitgevoerd zal de afsluiter 56 samen met het onderste gedeelte 18 roteren.The casing string 12 is shown in a borehole 52 drilled into the ground to investigate potential hydrocarbon reserves. The casing string 12 extends substantially to the bottom 54 of the borehole 52. The casing string 12 includes a large number of interconnected components that perform specific functions in the drilling operations. However, the method of the invention will be described in conjunction with the components necessary for the application of the method. Included in the tubing string 12 is an intermediate valve 56 which is. provided with side ports 58 that can be selectively opened and closed. Preferably, the valve 56 is disposed just below the rotational device 10. Alternatively, the valve 56 may be integral with the rotational device 10, in particular the lower tubular serial section 18, to significantly reduce manufacturing costs. If so performed, the valve 56 will rotate together with the lower portion 18.
10 Zodra de volledige verbuizingsserie 12, inclusief de rotatie- inrichting 10 en de afsluiter 56, in het boorgat 52 is neergelaten, zoals afgebeeld in fig. 5, kan het meertraps-cementatieproces worden aangevangen. Terwijl de gehele serie 12 wordt geroteerd, wordt de eerste trap van cement 60 door de binnenruimte 62 van de verhuizing 12 15 verplaatst en uit stroompoorten 64 in het einde van de verhuizing 12.Once the entire casing string 12, including the rotary device 10 and the valve 56, has been lowered into the borehole 52, as shown in Fig. 5, the multistage cementation process can commence. As the entire series 12 is rotated, the first stage of cement 60 is moved through the interior 62 of the casing 12 and out of flow ports 64 at the end of the casing 12.
Bij voortgezette drukuitoefening vanaf het oppervlak zal de cement worden gedwongen omhoog terug te stromen in het boorgat 52 aan de buitenzijde van de verhuizing 12 zoals afgebeeld in fig. 6. Teneinde een constante stroom te waarborgen wordt de cement 60 onmiddellijk 20 gevolgd door een eerste plug 66, die als een veger werkzaam is om alle cement 60 in de binnenruimte 62 van de verhuizing 12 omlaag te dwingen. Druk aan de achterzijde van de plug 66 wordt gehandhaafd totdat de plug 66 de drijfmof 68 bereikt. Deze drijfmof 68 omvat een aanslagvernauwing 70 die de plug 66 opvangt voor het afsluiten van de 25 fluidumstroming door het einde van de verhuizing 12. Aangezien het volume cement 60, nodig voor het voltooien van de eerste cementatie-trap kan worden geschat, zal de hoogte van de kolom cement 60 aan de buitenzijde van de verhuizing 12 bij voorkeur tot juist onder de zijpoorten 58 van de afsluiter 56 reiken op het moment dat de plug 66 30 dit punt zoals aangegeven in fig. 7 bereikt. Aldus is de eerste trap cement 60 op de juiste wijze verplaatst terwijl de gehele verbuizingsserie 12 wordt geroteerd om een juiste verplaatsing van de boorspoeling en hechting van de verhuizing aan de boorgatwand door de cement te waarborgen.With continued pressure from the surface, the cement will be forced to flow back up into the borehole 52 on the outside of the casing 12 as shown in Fig. 6. To ensure constant flow, the cement 60 is immediately followed by a first plug 66 which acts as a sweeper to force down all of the cement 60 in the interior 62 of the casing 12. Pressure at the rear of the plug 66 is maintained until the plug 66 reaches the floating sleeve 68. This float sleeve 68 includes a stop constriction 70 that captures plug 66 to shut off fluid flow through the end of casing 12. Since the volume of cement 60 required to complete the first cementation step can be estimated, the height from the cement column 60 on the outside of the casing 12 preferably reach just below the side ports 58 of the valve 56 when the plug 66 reaches this point as shown in FIG. Thus, the first stage cement 60 is properly displaced while the entire casing string 12 is rotated to ensure proper displacement of the drilling fluid and adhesion of the casing to the borehole wall through the cement.
35 Nog steeds verwijzend naar fig. 7, laat men een tweede plug of "bom" 72 in de verhuizing 12 vallen voor het openen van de . 872 050 2 -10- zijpoorten 58 van de tussengelegen afsluiter 56. De kracht van de plug 72 zorgt er voor dat de afdichtring 74, die de poorten 38 bedekt, omlaag beweegt, waardoor fluidumstroom door de poorten mogelijk wordt. Met de eerste trap van de cement 60 op de juiste wijze 5 geplaatst en met de poort 58 geopend, wordt de cement 60 in staat gesteld ten minste gedeeltelijk uit te harden alvorens de tweede cementeertrap wordt aangevangen.Referring still to Fig. 7, a second plug or "bomb" 72 is dropped into casing 12 to open the casing. 872 050 2-10 side ports 58 of the intermediate valve 56. The force of the plug 72 causes the sealing ring 74 covering the ports 38 to move downward allowing fluid flow through the ports. With the first stage of the cement 60 properly positioned and with the port 58 opened, the cement 60 is allowed to at least partially cure before the second cementation stage is initiated.
Nadat de cement 60 in staat is gesteld gedeeltelijk uit te harden, wordt de bovenste verbuizingsserie 14 omlaag bewogen om de 10 spieën 40 van de rotatieinrichting 10 buiten aangrijping van elkaar te brengen. In de voorkeursuitvoeringsvorm zal het noodzakelijk zijn de bovenste verbuizingsserie 14 ongeveer 18 inches in langs-richting te verplaatsen teneinde de samenwerkende spieën van de rotatie-inrichting 10 onderling te lossen. De vereiste verplaatsing 15 zal echter afhankelijk zijn van de lengte van de spieën 40. Met de spieën buiten aangrijping kan thans de bovenste serie 14 worden geroteerd en/of heen en weer bewogen onafhankelijk van de onderste verbuizingsserie 16. Derhalve kan, tijdens roteren en/of heen en weer bewegen van de bovenste serie 16, de tweede trap van cement 80 20 door de binnenruimte 62 van de bovenste verbuizingsserie 16 worden verplaatst zoals weergegeven in fig.7.After the cement 60 is allowed to partially cure, the top casing string 14 is moved downwardly to disengage the 10 keys 40 of the rotary device 10. In the preferred embodiment, it will be necessary to longitudinally displace the upper casing string 14 about 18 inches in order to loosen the co-operating keys of the rotary device 10 among themselves. However, the required displacement 15 will depend on the length of the splines 40. With the splines out of engagement, the upper series 14 can now be rotated and / or reciprocated independently of the lower casing series 16. Therefore, during rotation and / or reciprocating the upper series 16, the second stage of cement 80 20 is moved through the inner space 62 of the upper casing series 16 as shown in FIG. 7.
Thans verwijzend naar fig. 8 en 9 zal, terwijl de tweede trap cement 80 in de binnenruimte van de verhuizing omlaag beweegt deze door de zijpoorten 58 worden geleid in het boorgat 52. Aan-25 gezien de cement 60 van de eerste trap juist onder de afsluiter 56 is uitgehard, zal de uit de poorten 58 stromende cement 80 worden gedwongen in het boorgat 52 omhoog te stromen aan de buitenzijde van de bovenste verbuizingsserie 14 zoals afgebeeld in fig. 8. Evenals bij de eerste trap wordt de cement 80 van de tweede trap 30 gevolgd door een derde of sluitplug 82 die een volledige verplaatsing van de cement waarborgt. Wanneer de sluitplug 82 de afsluiter 56 bereikt, grijpt deze aan op de binnanmof 84 en dwingt deze omlaag teneinde de zijpoorten 58 zoals afgebeeld in fig. 9, wederom te sluiten. Aangezien opnieuw het volume cement 80 kan worden 35 geschat zal na voltooiing van de tweede cementatietrap de hoogte van de cementkolom aan de buitenzijde van de verhuizing zich uit- .8720502 -11- strekken tot het grondoppervlak. Bovendien wordt tijdens deze tweede trap de bovenste verbuizingsserie 14 continu geroteerd en/of heen en weer bewogen voor het waarborgen van een goede verplaatsing van de cement 80.Referring now to FIGS. 8 and 9, as the second stage cement 80 moves downwardly into the interior of the casing, it will pass through the side ports 58 into the borehole 52. As the first stage cement 60 is just below the casing. valve 56 is cured, the cement 80 flowing out of the ports 58 will be forced to flow up the borehole 52 on the outside of the top casing string 14 as shown in Fig. 8. As with the first stage, the cement 80 of the second stage 30 followed by a third or sealing plug 82 which ensures complete displacement of the cement. When the closure plug 82 reaches the valve 56, it engages the inner sleeve 84 and forces it down to close the side ports 58 as shown in Figure 9 again. Since again the volume of cement 80 can be estimated, upon completion of the second cementation step, the height of the cement column on the outside of the casing will extend to the ground surface. In addition, during this second stage, the top casing string 14 is continuously rotated and / or reciprocated to ensure proper displacement of the cement 80.
5 De werkwijze en inrichting volgens de uitvinding maken derhalve een meertraps-cementering van een verbuizingsserie mogelijk terwijl onafhankelijke rotatie en/of heen en weer beweging van de bovenste verbuizingsserie tijdens de tweede trap van de cemen-tering mogelijk is. Hoewel de werkwijze volgens de uitvinding is be-10 schreven in samenhang met twee trappen van cementatie waarbij gebruik wordt gemaakt van slechts één rotatie-inrichting, zal het duidelijk zijn, dat elk aantal rotatie-inrichtingen kan worden toegepast voor het mogelijk maken van een meertraps-cementering. De hier beschreven werkwijze vereenvoudigt op effectieve wijze bovendien het daarop-15 volgende uitboren of uitfrezen van het gat aangezien de grootste hoeveelheid cement in het boorgat aan de buitenzijde van de verhuizing is ge dwongen. Derhalve vermindert de onderhavige uitvinding de kosten verbonden met het cementeren van een verbuizingsserie en verschaft tevens een uitstekende isolatie van de verhuizing voor het 20 effectief isoleren van geologische formaties in de boorput.The method and apparatus according to the invention therefore permit a multi-stage cementation of a casing series while allowing independent rotation and / or reciprocation of the upper casing series during the second stage of the cementation. Although the method according to the invention has been described in connection with two stages of cementation using only one rotary device, it will be appreciated that any number of rotary devices can be used to enable a multi-stage cementation. Moreover, the method described here effectively simplifies subsequent drilling or milling out of the hole since the largest amount of cement is forced into the borehole on the outside of the casing. Therefore, the present invention reduces the costs associated with cementing a casing string and also provides excellent casing isolation for effectively isolating geological formations in the wellbore.
De in het voorgaande gegeven beschrijving is uitsluitend bedoeld voor de duidelijkheid en een goed begrip en geen onnodige beperkingen zullen aan het voorgaande deel van de beschrijving worden ontleend en deskundigen op dit vakgebied zullen voor de hand 25 liggende wijzigingen kunnen aanbrengen zonder buiten het raam en de geest van de aangehechte conclusies te treden.The foregoing description is for clarity and understanding only and no unnecessary limitations will be taken from the preceding portion of the description and those skilled in the art will be able to make obvious changes without going beyond the window and the spirit of the attached conclusions.
,8726502, 8726502
Claims (14)
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US89991186A | 1986-08-25 | 1986-08-25 | |
US89991186 | 1986-08-25 | ||
PCT/US1987/002235 WO1988001678A1 (en) | 1986-08-25 | 1987-08-25 | Method and apparatus for multi-stage cementing of a well casing |
US8702235 | 1987-08-25 |
Publications (1)
Publication Number | Publication Date |
---|---|
NL8720502A true NL8720502A (en) | 1988-07-01 |
Family
ID=25411726
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NL8720502A NL8720502A (en) | 1986-08-25 | 1987-08-25 | METHOD AND APPARATUS FOR CEMENTING A DRILL WELL TUBE IN MULTIPLE STAGES. |
Country Status (6)
Country | Link |
---|---|
CN (1) | CN1014084B (en) |
CA (1) | CA1289056C (en) |
DK (1) | DK224988D0 (en) |
GB (1) | GB2202881B (en) |
NL (1) | NL8720502A (en) |
WO (1) | WO1988001678A1 (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6446725B2 (en) * | 1999-11-30 | 2002-09-10 | Cgi Downhole Solutions Inc. | Rotating casing assembly and method |
CN1095023C (en) * | 2000-12-08 | 2002-11-27 | 中国石化胜利油田有限公司采油工艺研究院 | Cementing tool for plugging well underground |
US6520257B2 (en) | 2000-12-14 | 2003-02-18 | Jerry P. Allamon | Method and apparatus for surge reduction |
US6491103B2 (en) | 2001-04-09 | 2002-12-10 | Jerry P. Allamon | System for running tubular members |
CN100334321C (en) * | 2005-08-03 | 2007-08-29 | 潘永华 | Oil pipe in oil pumping well grout filling leakage blocking construction |
RU2457313C1 (en) * | 2008-05-04 | 2012-07-27 | Акватик Компани | Riser aluminium arrangement |
WO2011060495A1 (en) * | 2009-11-19 | 2011-05-26 | Ian Gray | Sliding seal for an inflatable packer |
NO334300B1 (en) * | 2011-08-31 | 2014-02-03 | Perigon Handel As | Wave-inducing device, casing system and method for cementing in a hydrocarbon well, as well as using the wave-inducing device, casing system and method for cementing a casing in a hydrocarbon well |
CA2935911C (en) * | 2014-03-05 | 2019-05-07 | Halliburton Energy Services, Inc. | Compression set downhole clutch |
CN112443285B (en) * | 2019-09-02 | 2023-04-25 | 中国石油天然气股份有限公司 | Sand control device capable of replacing slurry outside pipe and slurry replacing method |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2407983A (en) * | 1946-09-24 | Completion of wells | ||
US1860669A (en) * | 1932-01-22 | 1932-05-31 | Halliburton Erle Palmer | Method and apparatus for cementing wells |
US2177172A (en) * | 1937-01-11 | 1939-10-24 | Erd V Crowell | Apparatus for cementing wells |
US2624549A (en) * | 1947-03-24 | 1953-01-06 | Oakie G Wallace | Method and means of rotary drilling |
US3062285A (en) * | 1959-12-02 | 1962-11-06 | California Research Corp | Two-stage oil well casing cementing with upper and lower stationary jets for secondary stage |
US3216452A (en) * | 1963-11-01 | 1965-11-09 | Baker Oil Tools Inc | Stage collars for tubular strings |
US4054040A (en) * | 1974-02-21 | 1977-10-18 | A-Z International Tool Company | Telescoping torque transmission apparatus |
US4333530A (en) * | 1976-08-16 | 1982-06-08 | Armstrong Ernest E | Method and apparatus for cementing a casing |
US4239083A (en) * | 1979-05-07 | 1980-12-16 | Baker International Corporation | Method and apparatus for rotating tubing conduits |
US4450912A (en) * | 1982-06-07 | 1984-05-29 | Baker Oil Tools, Inc. | Method and apparatus for well cementing through a tubular member |
US4487263A (en) * | 1982-12-27 | 1984-12-11 | William Jani | Cement staging apparatus for wells and including well casing and a process therefor |
US4562889A (en) * | 1984-04-13 | 1986-01-07 | Braddick Britt O | Method and apparatus for rotating and reciprocating well bore liner |
-
1987
- 1987-08-25 CA CA000545264A patent/CA1289056C/en not_active Expired
- 1987-08-25 WO PCT/US1987/002235 patent/WO1988001678A1/en unknown
- 1987-08-25 CN CN87105805.7A patent/CN1014084B/en not_active Expired
- 1987-08-25 NL NL8720502A patent/NL8720502A/en unknown
- 1987-08-25 GB GB8808885A patent/GB2202881B/en not_active Expired - Fee Related
-
1988
- 1988-04-25 DK DK224988A patent/DK224988D0/en not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
CA1289056C (en) | 1991-09-17 |
DK224988A (en) | 1988-04-25 |
CN1014084B (en) | 1991-09-25 |
WO1988001678A1 (en) | 1988-03-10 |
GB8808885D0 (en) | 1988-06-15 |
CN87105805A (en) | 1988-08-31 |
GB2202881A (en) | 1988-10-05 |
DK224988D0 (en) | 1988-04-25 |
GB2202881B (en) | 1990-05-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5901796A (en) | Circulating sub apparatus | |
US7131505B2 (en) | Drilling with concentric strings of casing | |
US10000991B2 (en) | Frac plug | |
RU2103472C1 (en) | Method and system for drilling and completion of side holes, and connecting device | |
US7086481B2 (en) | Wellbore isolation apparatus, and method for tripping pipe during underbalanced drilling | |
US5427177A (en) | Multi-lateral selective re-entry tool | |
EP0633391B1 (en) | Sliding sleeve casing tool | |
US5533573A (en) | Method for completing multi-lateral wells and maintaining selective re-entry into laterals | |
US5477923A (en) | Wellbore completion using measurement-while-drilling techniques | |
US6708770B2 (en) | Drillable bridge plug | |
US5454430A (en) | Scoophead/diverter assembly for completing lateral wellbores | |
US4856591A (en) | Method and apparatus for completing a non-vertical portion of a subterranean well bore | |
CA2954789C (en) | Reverse cementation of liner string for formation stimulation | |
CA2473210C (en) | Plug-dropping container for releasing a plug into a wellbore | |
GB2216926A (en) | Drilling and lining a borehole | |
GB2285998A (en) | Liner tie-back sleeve | |
AU2006306375A1 (en) | Fracking multiple casing exit laterals | |
NL8720502A (en) | METHOD AND APPARATUS FOR CEMENTING A DRILL WELL TUBE IN MULTIPLE STAGES. | |
CA2708591C (en) | Methods and apparatus for wellbore construction and completion | |
US10364644B2 (en) | Stage cementing tool | |
WO1994029563A1 (en) | Method for completing multi-lateral wells and maintaining selective re-entry into laterals | |
GB2318817A (en) | Method for completing a wellbore | |
EP0787888B1 (en) | Circulating sub | |
NL2023370B1 (en) | method and apparatus for introducing a junction assembly | |
CA2196857C (en) | A circulating sub apparatus |