MY150281A - System and method for monitoring and controlling production from wells - Google Patents
System and method for monitoring and controlling production from wellsInfo
- Publication number
- MY150281A MY150281A MYPI20094363A MYPI20094363A MY150281A MY 150281 A MY150281 A MY 150281A MY PI20094363 A MYPI20094363 A MY PI20094363A MY PI20094363 A MYPI20094363 A MY PI20094363A MY 150281 A MY150281 A MY 150281A
- Authority
- MY
- Malaysia
- Prior art keywords
- well
- wells
- monitoring
- sensor measurements
- production
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000012544 monitoring process Methods 0.000 title 1
- 238000005259 measurement Methods 0.000 abstract 2
- 238000004590 computer program Methods 0.000 abstract 1
- 239000012530 fluid Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Flow Control (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Pipeline Systems (AREA)
Abstract
A SYSTEM AND METHOD FOR OBTAINING ENHANCED PRODUCTION FROM A WELL IS PROVIDED. THE SYSTEM INCLUDES A PROCESSOR (150) THAT PROCESSES INSTRUCTIONS CONTAINED IN A COMPUTER PROGRAM, WHICH INCLUDES INSTRUCTIONS TO MONITOR ACTUAL FLOW RATE OF THE FLUID FROM EACH PRODUCTION ZONE (52a, 52b) OF A WELL OVER A TIME PERIOD CORRESPONDING TO A FIRST SETTING OF THE FLOW CONTROL DEVICES AND TO EMPLOY A NODAL ANALYSIS ON A PLURALITY OF INPUTS FROM DOWNHOLE SENSOR MEASUREMENTS, SURFACE SENSOR MEASUREMENTS, ONE OR MORE CURRENT POSITIONS OF THE DEVICES TO DETERMINE ONE OR MORE NEW SETTINGS THAT WILL PROVIDE ENHANCED PRODUCTION FROM THE WELL.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/737,402 US20080262737A1 (en) | 2007-04-19 | 2007-04-19 | System and Method for Monitoring and Controlling Production from Wells |
US11/738,327 US20080257544A1 (en) | 2007-04-19 | 2007-04-20 | System and Method for Crossflow Detection and Intervention in Production Wellbores |
Publications (1)
Publication Number | Publication Date |
---|---|
MY150281A true MY150281A (en) | 2013-12-31 |
Family
ID=39876171
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MYPI20094363A MY150281A (en) | 2007-04-19 | 2008-04-18 | System and method for monitoring and controlling production from wells |
Country Status (10)
Country | Link |
---|---|
US (1) | US20080257544A1 (en) |
AU (2) | AU2008270950B2 (en) |
BR (2) | BRPI0810434A2 (en) |
CA (2) | CA2684281A1 (en) |
GB (2) | GB2462949B (en) |
MX (1) | MX2009011200A (en) |
MY (1) | MY150281A (en) |
NO (2) | NO20093167L (en) |
RU (1) | RU2484242C2 (en) |
WO (1) | WO2008131218A2 (en) |
Families Citing this family (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7926593B2 (en) * | 2004-11-23 | 2011-04-19 | Weatherford/Lamb, Inc. | Rotating control device docking station |
US7711486B2 (en) * | 2007-04-19 | 2010-05-04 | Baker Hughes Incorporated | System and method for monitoring physical condition of production well equipment and controlling well production |
US8251140B2 (en) | 2009-09-15 | 2012-08-28 | Schlumberger Technology Corporation | Fluid monitoring and flow characterization |
US20110139446A1 (en) * | 2009-12-15 | 2011-06-16 | Baker Hughes Incorporated | Method of Determining Queried Fluid Cuts Along a Tubular |
CA2705680C (en) | 2010-05-27 | 2012-11-27 | Imperial Oil Resources Limited | Creation of hydrate barrier during in situ hydrocarbon recovery |
US9324049B2 (en) | 2010-12-30 | 2016-04-26 | Schlumberger Technology Corporation | System and method for tracking wellsite equipment maintenance data |
AU2012381054B2 (en) * | 2012-05-21 | 2016-11-10 | Bp Corporation North America Inc. | Methods and systems for pressure testing components of a hydrocarbon well system |
WO2013188088A1 (en) * | 2012-06-15 | 2013-12-19 | Landmark Graphics Corporation | Systems and methods for optimizing facility limited production and injection in an integrated reservoir and gathering network |
CN103541699B (en) * | 2012-07-12 | 2015-12-02 | 中国石油化工股份有限公司 | Anti-anti-channeling zonal flow rate controls flow string |
MX359317B (en) | 2012-09-26 | 2018-09-25 | Halliburton Energy Services Inc | Method of placing distributed pressure gauges across screens. |
EP2900908B1 (en) | 2012-09-26 | 2018-10-31 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
US9598952B2 (en) | 2012-09-26 | 2017-03-21 | Halliburton Energy Services, Inc. | Snorkel tube with debris barrier for electronic gauges placed on sand screens |
US8857518B1 (en) | 2012-09-26 | 2014-10-14 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
BR112015006639B1 (en) | 2012-09-26 | 2020-12-15 | Halliburton Energy Services, Inc | SYSTEMS AND METHODS OF COMPLETING MULTIPLE ZONES WITH SINGLE DISPLACEMENT |
EP3521554B1 (en) | 2012-09-26 | 2023-03-29 | Halliburton Energy Services Inc. | In-line sand screen gauge carrier |
US9163488B2 (en) | 2012-09-26 | 2015-10-20 | Halliburton Energy Services, Inc. | Multiple zone integrated intelligent well completion |
MY186980A (en) | 2012-09-26 | 2021-08-26 | Halliburton Energy Services Inc | Snorkel tube with debris barrier for electronic gauges placed on sand screens |
US8893783B2 (en) * | 2012-09-26 | 2014-11-25 | Halliburton Energy Services, Inc. | Tubing conveyed multiple zone integrated intelligent well completion |
GB2546937B (en) * | 2012-11-02 | 2017-11-29 | Silixa Ltd | Combining seismic survey and DAS fluid flow data for improved results |
WO2015040042A1 (en) * | 2013-09-17 | 2015-03-26 | Mærsk Olie Og Gas A/S | Detection of a watered out zone in a segmented completion |
US9611731B2 (en) * | 2013-10-04 | 2017-04-04 | Halliburton Energy Services, Inc. | Determination of formation dip/azimuth with multicomponent induction data |
US20150114631A1 (en) * | 2013-10-24 | 2015-04-30 | Baker Hughes Incorporated | Monitoring Acid Stimulation Using High Resolution Distributed Temperature Sensing |
WO2015073626A1 (en) * | 2013-11-13 | 2015-05-21 | Schlumberger Canada Limited | Well testing and monitoring |
US20150134258A1 (en) * | 2013-11-13 | 2015-05-14 | Schlumberger Technology Corporation | Well Pressure Control Event Detection and Prediction Method |
US20170247986A1 (en) * | 2014-10-28 | 2017-08-31 | Bryan BUSSELL | Additive management system |
US10280740B2 (en) * | 2014-12-03 | 2019-05-07 | Baker Hughes, A Ge Company, Llc | Sandface liner with power, control and communication link via a tie back string |
CN106150445B (en) * | 2015-04-14 | 2018-09-21 | 大庆丹枫石油技术开发有限公司 | Two layers of layering perforation-zonal testing axle-linked cable-car of one-trip string and its operating method |
CN106150446B (en) * | 2015-04-14 | 2018-12-21 | 华通科创(唐山)石油工程技术服务有限公司 | It is a kind of can Xian Ce lower layer across every combined operation of perforation and testing tubing string and its operating method |
CN106285548B (en) * | 2015-05-12 | 2018-09-21 | 江苏省金峰石油机械制造有限公司 | The switchable screen casing combination unit of packer- |
CN106285559B (en) * | 2015-05-29 | 2018-09-07 | 良工阀门集团有限公司 | Pressure-controlled normally open valve is combined the unit with pressure-controlled normally close valve and its operating method |
US10648293B2 (en) | 2015-08-05 | 2020-05-12 | Halliburton Energy Services, Inc. | Quantification of crossflow effects on fluid distribution during matrix injection treatments |
RU2604103C1 (en) * | 2015-08-31 | 2016-12-10 | Общество с ограниченной ответственностью "Газпром добыча Кузнецк" | Method of automatic control of coal-methanol well |
CN105134140A (en) * | 2015-09-17 | 2015-12-09 | 东营嘉岩石油工艺研究院 | Fixed chain type long-stroke pumping unit |
GB2544799A (en) * | 2015-11-27 | 2017-05-31 | Swellfix Uk Ltd | Autonomous control valve for well pressure control |
US10215002B2 (en) | 2016-05-05 | 2019-02-26 | Saudi Arabian Oil Company | Determining wellbore leak crossflow rate between formations in an injection well |
RU2634754C1 (en) * | 2016-08-16 | 2017-11-07 | Публичное акционерное общество "Акционерная нефтяная Компания "Башнефть" | Method of automatic distribution of total gas flow through pressure wells in water-gas method effect on formation |
US10401207B2 (en) * | 2016-09-14 | 2019-09-03 | GE Oil & Gas UK, Ltd. | Method for assessing and managing sensor uncertainties in a virtual flow meter |
US20180187533A1 (en) * | 2017-01-05 | 2018-07-05 | Saudi Arabian Oil Company | Hydrocarbon production by fluidically isolating vertical regions of formations |
RU2652220C1 (en) * | 2017-06-27 | 2018-04-25 | Акционерное общество "Новомет-Пермь" | Method of determining flow rate of wells equipped with pumping units |
RU2652219C1 (en) * | 2017-06-27 | 2018-04-25 | Акционерное общество "Новомет-Пермь" | Method of determining flow rate of wells equipped with pumping units |
RU2653210C2 (en) * | 2017-08-15 | 2018-05-07 | Олег Сергеевич Николаев | Method for interval oil production from a multiple zone well and a packerless pumping plant for implementation thereof |
US10900344B2 (en) | 2017-11-07 | 2021-01-26 | Saudi Arabian Oil Company | Determining wellbore leak crossflow rate between formations in an injection well |
CN109944581B (en) * | 2017-12-19 | 2022-03-29 | 中国石油天然气股份有限公司 | Method and device for acquiring casing damage of oil well |
RU2679773C1 (en) * | 2018-01-10 | 2019-02-12 | Общество с ограниченной ответственностью "Газпром проектирование" | Method of accounting of gas flows on man-made fluid-conducting channels between two gas-condensate formations |
US10625669B2 (en) * | 2018-02-21 | 2020-04-21 | Ford Global Technologies, Llc | Vehicle sensor operation |
RU2704068C1 (en) * | 2018-11-13 | 2019-10-23 | Общество с ограниченной ответственностью "Газпромнефть Научно-Технический Центр" (ООО "Газпромнефть НТЦ") | Method for assessment of inter-column inter-formation overflow in a well |
CN109138982B (en) * | 2018-11-16 | 2023-09-26 | 美钻深海能源科技研发(上海)有限公司 | Automatic safety well closing system for underwater equipment biological corrosion |
CA3151074C (en) * | 2019-10-25 | 2023-10-10 | Robert Charles DE LONG | Wax removal in a production line |
RU2759143C1 (en) * | 2020-11-27 | 2021-11-09 | Общество с ограниченной ответственностью «Тюменский институт нефти и газа» | Method for increasing the efficiency of hydrodynamic methods for increasing the petroleum recovery of a reservoir |
RU2758326C1 (en) * | 2021-04-12 | 2021-10-28 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method for regulating the operating mode of a well equipped with an electric center pump installation in an inter-well pumping system |
CN115492558B (en) * | 2022-09-14 | 2023-04-14 | 中国石油大学(华东) | Device and method for preventing secondary generation of hydrate in pressure-reducing exploitation shaft of sea natural gas hydrate |
Family Cites Families (55)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3211225A (en) * | 1963-05-28 | 1965-10-12 | Signal Oil & Gas Co | Well treating apparatus |
US3710867A (en) * | 1971-01-05 | 1973-01-16 | Petrolite Corp | Apparatus and process for adding chemicals |
US3954006A (en) * | 1975-01-31 | 1976-05-04 | Schlumberger Technology Corporation | Methods for determining velocities and flow rates of fluids flowing in well bore |
US4064936A (en) * | 1976-07-09 | 1977-12-27 | Mcclure L C | Chemical treating system for oil wells |
FR2421272A1 (en) * | 1978-03-28 | 1979-10-26 | Europ Propulsion | SYSTEM FOR REMOTE CONTROL AND MAINTENANCE OF A SUBMERSIBLE WELL HEAD |
US4354553A (en) * | 1980-10-14 | 1982-10-19 | Hensley Clifford J | Corrosion control downhole in a borehole |
US4436148A (en) * | 1981-04-27 | 1984-03-13 | Richard Maxwell | Chemical treatment for oil wells |
US4375833A (en) * | 1981-09-04 | 1983-03-08 | Meadows Floyd G | Automatic well treatment system |
US4635723A (en) * | 1983-07-07 | 1987-01-13 | Spivey Melvin F | Continuous injection of corrosion-inhibiting liquids |
US4582131A (en) * | 1984-09-26 | 1986-04-15 | Hughes Tool Company | Submersible chemical injection pump |
US4665981A (en) * | 1985-03-05 | 1987-05-19 | Asadollah Hayatdavoudi | Method and apparatus for inhibiting corrosion of well tubing |
US4589434A (en) * | 1985-06-10 | 1986-05-20 | Exxon Production Research Co. | Method and apparatus to prevent hydrate formation in full wellstream pipelines |
JPS62110135A (en) * | 1985-11-08 | 1987-05-21 | Cosmo Co Ltd | Method and apparatus for quantifying concentration of asphaltene |
US4721158A (en) * | 1986-08-15 | 1988-01-26 | Amoco Corporation | Fluid injection control system |
US4830112A (en) * | 1987-12-14 | 1989-05-16 | Erickson Don J | Method and apparatus for treating wellbores |
US4901563A (en) * | 1988-09-13 | 1990-02-20 | Atlantic Richfield Company | System for monitoring fluids during well stimulation processes |
US4926942A (en) * | 1989-02-22 | 1990-05-22 | Profrock Jr William P | Method for reducing sand production in submersible-pump wells |
US5006845A (en) * | 1989-06-13 | 1991-04-09 | Honeywell Inc. | Gas kick detector |
US5172717A (en) * | 1989-12-27 | 1992-12-22 | Otis Engineering Corporation | Well control system |
US5517593A (en) * | 1990-10-01 | 1996-05-14 | John Nenniger | Control system for well stimulation apparatus with response time temperature rise used in determining heater control temperature setpoint |
US5305209A (en) * | 1991-01-31 | 1994-04-19 | Amoco Corporation | Method for characterizing subterranean reservoirs |
US5209301A (en) * | 1992-02-04 | 1993-05-11 | Ayres Robert N | Multiple phase chemical injection system |
US5353237A (en) * | 1992-06-25 | 1994-10-04 | Oryx Energy Company | System for increasing efficiency of chemical treatment |
US5706896A (en) * | 1995-02-09 | 1998-01-13 | Baker Hughes Incorporated | Method and apparatus for the remote control and monitoring of production wells |
US6006832A (en) * | 1995-02-09 | 1999-12-28 | Baker Hughes Incorporated | Method and system for monitoring and controlling production and injection wells having permanent downhole formation evaluation sensors |
US5829520A (en) * | 1995-02-14 | 1998-11-03 | Baker Hughes Incorporated | Method and apparatus for testing, completion and/or maintaining wellbores using a sensor device |
US5647435A (en) * | 1995-09-25 | 1997-07-15 | Pes, Inc. | Containment of downhole electronic systems |
US5767680A (en) * | 1996-06-11 | 1998-06-16 | Schlumberger Technology Corporation | Method for sensing and estimating the shape and location of oil-water interfaces in a well |
US6446014B1 (en) * | 1997-02-25 | 2002-09-03 | Cham Ocondi | Method and apparatus for measuring and controlling the flow of fluids from coal seam gas wells |
US6061634A (en) * | 1997-04-14 | 2000-05-09 | Schlumberger Technology Corporation | Method and apparatus for characterizing earth formation properties through joint pressure-resistivity inversion |
US6281489B1 (en) * | 1997-05-02 | 2001-08-28 | Baker Hughes Incorporated | Monitoring of downhole parameters and tools utilizing fiber optics |
US5937946A (en) * | 1998-04-08 | 1999-08-17 | Streetman; Foy | Apparatus and method for enhancing fluid and gas flow in a well |
BR9916388A (en) * | 1998-12-21 | 2001-11-06 | Baker Hughes Inc | Chemical injection system and closed loop monitoring for oil field operations |
US6196314B1 (en) * | 1999-02-15 | 2001-03-06 | Baker Hughes Incorporated | Insoluble salt control system and method |
US6467340B1 (en) * | 1999-10-21 | 2002-10-22 | Baker Hughes Incorporated | Asphaltenes monitoring and control system |
US6543540B2 (en) * | 2000-01-06 | 2003-04-08 | Baker Hughes Incorporated | Method and apparatus for downhole production zone |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
NO20002137A (en) * | 2000-04-26 | 2001-04-09 | Sinvent As | Reservoir monitoring using chemically intelligent tracer release |
RU15117U1 (en) * | 2000-05-26 | 2000-09-20 | Общество с ограниченной ответственностью "Пульс" | SYSTEM OF MANAGEMENT OF THE PROCESS OF INTENSIFICATION OF LIQUID PRODUCTION FROM DRILLING WELLS AND A DEVICE FOR INTENSIFICATION OF PRODUCTION |
US6408943B1 (en) * | 2000-07-17 | 2002-06-25 | Halliburton Energy Services, Inc. | Method and apparatus for placing and interrogating downhole sensors |
DE60131181T2 (en) * | 2000-09-12 | 2008-08-07 | Schlumberger Technology B.V. | EXAMINATION OF MULTILAYER STORES |
US20020112888A1 (en) * | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
WO2002063130A1 (en) * | 2001-02-05 | 2002-08-15 | Schlumberger Holdings Limited | Optimization of reservoir, well and surface network systems |
US6795773B2 (en) * | 2001-09-07 | 2004-09-21 | Halliburton Energy Services, Inc. | Well completion method, including integrated approach for fracture optimization |
US7178591B2 (en) * | 2004-08-31 | 2007-02-20 | Schlumberger Technology Corporation | Apparatus and method for formation evaluation |
RU2240422C2 (en) * | 2002-08-20 | 2004-11-20 | Общество с ограниченной ответственностью "Дарси Ойл Инжиниринг" | Method for optimizing process of oil extraction from bed |
US7725301B2 (en) * | 2002-11-04 | 2010-05-25 | Welldynamics, B.V. | System and method for estimating multi-phase fluid rates in a subterranean well |
JP2007533969A (en) * | 2003-03-17 | 2007-11-22 | ジュール マイクロシステムズ カナダ インコーポレイテッド | System that enables remote analysis of fluids |
US7261162B2 (en) * | 2003-06-25 | 2007-08-28 | Schlumberger Technology Corporation | Subsea communications system |
US20050149264A1 (en) * | 2003-12-30 | 2005-07-07 | Schlumberger Technology Corporation | System and Method to Interpret Distributed Temperature Sensor Data and to Determine a Flow Rate in a Well |
US6874361B1 (en) * | 2004-01-08 | 2005-04-05 | Halliburton Energy Services, Inc. | Distributed flow properties wellbore measurement system |
US7114557B2 (en) * | 2004-02-03 | 2006-10-03 | Schlumberger Technology Corporation | System and method for optimizing production in an artificially lifted well |
GB2416871A (en) * | 2004-07-29 | 2006-02-08 | Schlumberger Holdings | Well characterisation using distributed temperature sensor data |
US7654318B2 (en) * | 2006-06-19 | 2010-02-02 | Schlumberger Technology Corporation | Fluid diversion measurement methods and systems |
US7890273B2 (en) * | 2007-02-20 | 2011-02-15 | Schlumberger Technology Corporation | Determining fluid and/or reservoir information using an instrumented completion |
-
2007
- 2007-04-20 US US11/738,327 patent/US20080257544A1/en not_active Abandoned
-
2008
- 2008-04-18 BR BRPI0810434-4A2A patent/BRPI0810434A2/en not_active IP Right Cessation
- 2008-04-18 AU AU2008270950A patent/AU2008270950B2/en active Active
- 2008-04-18 GB GB0918121.5A patent/GB2462949B/en active Active
- 2008-04-18 GB GB0918123A patent/GB2461210B/en not_active Expired - Fee Related
- 2008-04-18 CA CA002684281A patent/CA2684281A1/en not_active Abandoned
- 2008-04-18 MX MX2009011200A patent/MX2009011200A/en active IP Right Grant
- 2008-04-18 CA CA2684291A patent/CA2684291C/en active Active
- 2008-04-18 RU RU2009142437/03A patent/RU2484242C2/en not_active IP Right Cessation
- 2008-04-18 AU AU2008242758A patent/AU2008242758A1/en not_active Abandoned
- 2008-04-18 WO PCT/US2008/060817 patent/WO2008131218A2/en active Application Filing
- 2008-04-18 MY MYPI20094363A patent/MY150281A/en unknown
- 2008-04-18 BR BRPI0810415-8A2A patent/BRPI0810415A2/en not_active IP Right Cessation
-
2009
- 2009-10-19 NO NO20093167A patent/NO20093167L/en not_active Application Discontinuation
- 2009-10-19 NO NO20093161A patent/NO20093161L/en not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
GB0918121D0 (en) | 2009-12-02 |
GB2462949B (en) | 2012-10-24 |
WO2008131218A2 (en) | 2008-10-30 |
CA2684291A1 (en) | 2009-01-08 |
AU2008270950A1 (en) | 2009-01-08 |
GB2461210B (en) | 2010-12-01 |
US20080257544A1 (en) | 2008-10-23 |
GB0918123D0 (en) | 2009-12-02 |
RU2484242C2 (en) | 2013-06-10 |
BRPI0810415A2 (en) | 2014-10-14 |
NO20093167L (en) | 2010-01-18 |
GB2461210A (en) | 2009-12-30 |
GB2462949A (en) | 2010-03-03 |
CA2684281A1 (en) | 2008-10-30 |
BRPI0810434A2 (en) | 2014-10-14 |
NO20093161L (en) | 2009-11-18 |
AU2008270950B2 (en) | 2014-06-05 |
CA2684291C (en) | 2014-07-29 |
MX2009011200A (en) | 2009-12-09 |
AU2008242758A1 (en) | 2008-10-30 |
RU2009142437A (en) | 2011-05-27 |
WO2008131218A3 (en) | 2009-01-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MY150281A (en) | System and method for monitoring and controlling production from wells | |
WO2009005876A3 (en) | System and method for monitoring and controlling production from wells | |
GB2461445A (en) | System and method for monitoring physical condition of production well equipment and controlling well production | |
GB2488724A (en) | Wireline-adjustable downhole flow control devices and methods for using same | |
WO2014055598A3 (en) | Apparatus, system, and method for controlling the flow of drilling fluid in a wellbore | |
GB2447820A (en) | Well control systems and associated methods | |
GB2469776A (en) | A system and method for real-time quality control for downhole logging devices | |
MY154395A (en) | System and method for water breakthrough detection intervention in a production well | |
NO20171711A1 (en) | Condition Based Maintenance Program Based on Life-Stress Acceleration Model and Time-Varying Stress Model | |
MX2012012066A (en) | Feedback control in microfluidic systems. | |
SG135168A1 (en) | System and method for monitoring drilling process parameters and controlling drilling operation | |
MX2014006013A (en) | Use of downhole pressure measurements while drilling to detect and mitigate influxes. | |
GB2472919B (en) | Adjustment of mud circulation when evaluating a formation | |
DE602005024044D1 (en) | METHOD, SYSTEM AND PROGRAM MEMORY DEVICE FOR OPTIMIZING VALVE SETTINGS IN INSTRUMENTED DRILLING TUBES USING ADJUSTED GRADIENT TECHNOLOGY AND RESERVOIR SIMULATION | |
GB2482839A (en) | Well monitoring | |
ATE520063T1 (en) | IMPROVEMENTS IN DRILLING EQUIPMENT AND METHODS | |
GB2454390A (en) | Method for controlling and/or optimizing production of oil and/or gas wells and facilities | |
EA201070005A1 (en) | SYSTEMS AND METHODS OF TREATMENT OF THE UNDERGROUND PLATE WITH INTERPRETATION OF THE DATED CYCLE DURING THE REAL TIME MODE | |
MY159134A (en) | Valve control system, bidet using the same, and valve control method | |
MY155157A (en) | Selective control of flow through a well screen | |
SA119410067B1 (en) | Predicting Material Distribution in A Hydraulic Fracturing Treatment Stage | |
MY180660A (en) | Real time downhole sensor data for controlling surface stimulation equipment | |
MX342054B (en) | Production system for producing hydrocarbons from a well. | |
GB2506779A (en) | Active equivalent circulating density control with real-time data connection | |
GB2464030A (en) | Methods and systems of planning a procedure for cleaning a wellbore |