KR960002473Y1 - Scaffold board - Google Patents

Scaffold board Download PDF

Info

Publication number
KR960002473Y1
KR960002473Y1 KR2019930013140U KR930013140U KR960002473Y1 KR 960002473 Y1 KR960002473 Y1 KR 960002473Y1 KR 2019930013140 U KR2019930013140 U KR 2019930013140U KR 930013140 U KR930013140 U KR 930013140U KR 960002473 Y1 KR960002473 Y1 KR 960002473Y1
Authority
KR
South Korea
Prior art keywords
construction
footrest
building
installation
work
Prior art date
Application number
KR2019930013140U
Other languages
Korean (ko)
Other versions
KR950003946U (en
Inventor
이원형
Original Assignee
이원형
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이원형 filed Critical 이원형
Priority to KR2019930013140U priority Critical patent/KR960002473Y1/en
Publication of KR950003946U publication Critical patent/KR950003946U/en
Application granted granted Critical
Publication of KR960002473Y1 publication Critical patent/KR960002473Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/34Scaffolding bars or members with non-detachably fixed coupling elements with coupling elements using positive engagement, e.g. hooks or pins

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

내용 없음.No content.

Description

건축공사용 족답기구Construction worker

제1도는 본 고안의 구성을 나타낸 전개사시도1 is a perspective view showing the configuration of the subject innovation

제2도는 본 고안의 절첩상태도2 is a folded state of the present invention

제3도는 본 고안의 설치상태 예시도3 is an illustration of the installation state of the present invention

제4도는 본 고안의 설치시 가설지주와의 결합상태를 예시한 단면도Figure 4 is a cross-sectional view illustrating a coupling state with the temporary column in the installation of the subject innovation

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1 : 발판 2 : 힌지1: scaffolding 2: hinge

3 : 걸고리 4 : 지지구3: hook 4: support

5 : 지지암 6 : 괘지핀5: support arm 6: ruler pin

7 : 종설봉 8 : 횡설봉7: vertical rod 8: horizontal rod

본 고안은 건축공사시 임시로 설치되는 가설지주에 설치하여 작업자가 올라설 수 있도록 하는 건축공사용 족답기구에 관한 것이다.The present invention relates to a stepping mechanism for building construction workers to be installed in the temporary construction site temporarily installed during the construction work so that the worker can climb.

종래에는 건축공사를 함에 있어서 외장공사등 기타공사를 의하여 구조물 외부에 가설지주를 엮어서 세운 다음 상기 가설지주와 건축구조물 사이에 고정횡봉을 설치하고 그위에 판넬등을 걸쳐서 얽어맴으로서 족답장치를 완성하고 그위에 작업자가 올라가서 작업을 하였다.In the past, in the construction work, the temporary column is woven to the outside of the structure by other construction such as exterior construction, and then, a fixed horizontal bar is installed between the temporary column and the building structure, and the stepping device is completed by being intertwined over the panel. The worker climbed up and worked on it.

그러나 상기한 종래의 구성은 건축구조물에 고정횡봉을 가설하기가 용이하지 않을 때는 족답장치를 구성하는데 많은 어러움이 따르며, 발판인 판넬이 완벽하게 고정되지 않고 이탈됨으로서 안전사고를 유발할 우려가 따르는 것은 물론, 그 설치작업이나 분해작업이 난해하여 실제로 외장공사를 하는데 소요되는 시간보다는 족답장치를 가설하는데 소요되는 시간이 많아져 인건비 상승의 한 원인이 되었던 것이 지금까지의 실정이었다.However, the above-described conventional configuration has a lot of difficulties in constructing a stepping device when it is not easy to install a fixed transverse bar in a building structure, and it is a concern that a safety accident may be caused by the panel being separated without being completely fixed. Of course, since the installation work or disassembly work is difficult, the time required for installing the stepping device is increased more than the time required for the exterior work, which has been one of the causes of the increase in labor costs.

본 고안은 상기한 종래의 제결함을 감안하여 건축구조물 외부에 가설된 가설지주에 걸치기만 하면 작업자가 올라서서 일할 수 있는 족답기구를 안출한 것으로 족답장치의 설치가 용이하면서도 안전하고 견고한 결합으로 작업중 안전사고가 유발될 염려가 없을 뿐만 아니라 철거 또한 용이하도록 하여 작업에 소요되는 시간을 감소시키고 건축공사비를 절감하도록 함에 그 목적을 둔 것이다.The present invention, in consideration of the above-mentioned conventional defects in the construction of the construction site outside the construction of the temporary construction of the stepping mechanism that can be climbed up to work by the worker, the installation of the stepping device is easy to install while safe and solid working Not only does it cause safety accidents, but also facilitates dismantling, reducing the time spent on work and reducing construction costs.

상기한 목적을 달성하기 위한 본 고안은 시공하는 건축물 외부에 임시로 설치하는 가설지주의 횡설봉에 결합하기 위한 다수의 걸고리와 종설봉에 결합되는 지지구를 일체로 형성한 발판으로 구성하되, 상기 발판은 적어도 두개를 힌지부로 연결하여 절첩되도록 하였으며, 다수의 발판을 이어서 설치시 상호 지지되도록 게지핀을 돌설한 것으로 이를 첨부도면에 의거 더욱 상세히 설명하면 다음과 같다.The present invention for achieving the above object is composed of a footrest integrally formed with a plurality of hooks and supporters coupled to the rods for coupling to the horizontal rods of the temporary support temporarily installed outside the construction building, At least two of the scaffolds are connected by hinges to be folded, and a plurality of scaffolds are provided with ridge pins to be mutually supported upon installation.

제1도에 도시한 바와 같이 표면에 강도를 보강하고 미끄럼을 방지하는 엠보싱부(1a)를 형성한 적어도 두개의 발판(1)을 힌지부(2)로 절첩가능하게 연결한 다음, 상기 두개의 발판(1)중 어느 한개에는 선단에 적어도 두개이상의 걸고리(3)를 형성하고, 상기 걸고리(3)가 형성된 선단 중앙 저면에 두개의 클립(4a)을 갖는 지지구(4)를 일체로 형성하여 그 양측에 상기 발판(1)의 양단 후단부를 받쳐서 지지하는 지지암(5)을 V자 형으로 형성하였다.As shown in FIG. 1, at least two scaffolds 1 having embossed portions 1a for reinforcing strength and preventing slippage on the surface are foldably connected to the hinge portions 2, and then the two At least one hook (3) is formed at one end of the footrest (1), and the support (4) having two clips (4a) is integrally formed at the bottom of the tip center where the hook (3) is formed. Support arms 5 supporting the rear ends of both ends of the scaffold 1 on both sides thereof were formed in a V shape.

또한 상기 발판(1)에 힌지(2)로 연결되어 절첩되는 나머지 발판(1)에는 다수의 발판(1)을 이어사 설치할 때 인접 발판에 걸려서 지지되는 게지핀(6)을 형성하였다.In addition, the rest of the footrest (1) is connected to the hinge (1) to the footrest (1) was formed by a gage pin (6) that is supported by being caught by the adjacent footrest when a plurality of footrest (1) is installed by the next step.

이와 같이 구성된 본 고안의 작용효과를 첨부도면 제3도와 제4도에 의거 상세히 설명하면 다음과 같다.Referring to the effect of the present invention configured as described in detail based on the attached drawings 3 and 4 as follows.

건축물을 신축하거나 개축할때 작업자가 올라서는 족답기구를 설치함에 있어서, 먼저 건축물 외부에 다수의 종설봉(7)과 횡설봉(8)을 엮어서 가설지주를 설치한 다음, 상기 가설지주의 횡설봉(8)에는 걸고리(3)를 걸어서 고정함과 동시에 종설봉(7)에 지지구(4)의 클립(4a)을 결합하고 발판(1)을 고정하여 설치한다.In installing a stepping mechanism that a worker climbs when constructing or rebuilding a building, first install a temporary column by weaving a plurality of rods (7) and a horizontal rod (8) outside the building, and then install a temporary pole At 8, the hooks 3 are fixed to each other, and at the same time, the clips 4a of the support 4 are coupled to the vertical rods 7, and the footrest 1 is fixed and installed.

이와 같은 발판(1)을 건축물 주변에 연속반복으로 설치함에 있어서는, 상기와 동일한 방법으로 다수의 발판(1)을 인접되게 설치하거나 힌지(2)로 절첩되도록두개의 발판(1)으로 구성하여 자유상태인 발판(1)은 일측에 형성된 게지핀(6)이 인접한 발판(1)에 걸리도록 설치하면 되는 것이다.In the installation of such scaffold 1 continuously around the building, a plurality of scaffolds 1 are installed adjacent to each other in the same manner as described above or configured by two scaffolds 1 so as to be folded by the hinges 2. The footrest 1 in a state may be provided so that the gage pin 6 formed in one side may be caught by the adjacent footrest 1.

상기한 바와 같이 본 고안은 건축공사시 작업자가 올라서기 위한 족답기구를 설치 및 철거에 편리하도록 안출하여 공사에 소요되는 시간을 감소하고 이에 따른 인건비를 절감함은 물론 보관이 용이하고 사용수명을 연장하여 보다 경제적으로 이용할 수 있도록 함으로써 실사용에 있어서 매우 유용한 신규한 고안이다.As described above, the present invention reduces the time required for the construction by reducing the time required for the construction by laying out a convenient stepping mechanism for the worker to climb during construction work, thereby reducing labor costs and extending the service life. It is a novel design very useful in practical use by making it more economically available.

Claims (1)

건축물 외부에 설치되는 가설지주의 횡성봉에 결합하는 다수의 걸고리와, 종설봉에 결합되는 지지구를 일체로 형성하며,It is formed integrally with a plurality of hooks coupled to the horizontal rods of the temporary column installed on the outside of the building, and supporters coupled to the vertical rods, 적어도 두개를 힌지부로 연결하여 절첩되도록 함과 동시에 다수개를 이어서 설치시 상호 지지되도록 게지핀을 형성한 발판으로 구성함을 특징으로 하는 건축공사용 족답기구Stepping mechanism for a construction engineer, characterized in that it consists of a scaffolding formed with a gage pin so that at least two of them are folded and connected to each other at the same time to be supported at the time of installation
KR2019930013140U 1993-07-16 1993-07-16 Scaffold board KR960002473Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019930013140U KR960002473Y1 (en) 1993-07-16 1993-07-16 Scaffold board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019930013140U KR960002473Y1 (en) 1993-07-16 1993-07-16 Scaffold board

Publications (2)

Publication Number Publication Date
KR950003946U KR950003946U (en) 1995-02-17
KR960002473Y1 true KR960002473Y1 (en) 1996-03-25

Family

ID=19359183

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019930013140U KR960002473Y1 (en) 1993-07-16 1993-07-16 Scaffold board

Country Status (1)

Country Link
KR (1) KR960002473Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100491272B1 (en) * 1997-07-16 2005-08-01 페어차일드코리아반도체 주식회사 A method of fabricating soi wafer
KR101683403B1 (en) * 2015-12-29 2016-12-06 주식회사 로드맥스 엔지니어링 Cable inspection available rail road emergency exit route

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100491272B1 (en) * 1997-07-16 2005-08-01 페어차일드코리아반도체 주식회사 A method of fabricating soi wafer
KR101683403B1 (en) * 2015-12-29 2016-12-06 주식회사 로드맥스 엔지니어링 Cable inspection available rail road emergency exit route

Also Published As

Publication number Publication date
KR950003946U (en) 1995-02-17

Similar Documents

Publication Publication Date Title
KR102357311B1 (en) A safety board for architectural scaffolding
KR960002473Y1 (en) Scaffold board
CA2268946A1 (en) Securing device for a supporting bar
GB1592372A (en) Collapsible builders stage
JPH025215B2 (en)
KR200394640Y1 (en) B.T safety parapet for adjusting the height thereof
US4858724A (en) Safety fence for scaffolds
KR0119386Y1 (en) Structure for connecting the sagety rope to steel construction
JP2635927B2 (en) Cross-shaped connecting members for temporary scaffold frames
CN212271579U (en) Portable standardized stair structure
JP2527428Y2 (en) Framework scaffolding
JP3638761B2 (en) H-framework scaffold
KR200145486Y1 (en) Hanger for safety ropes of steel structure
JPH047317Y2 (en)
JPS641395Y2 (en)
EP1876315A1 (en) Integral safety system which can be used for construction
JPH0425877Y2 (en)
JPH0249306Y2 (en)
JPH0458866B2 (en)
JPS624124Y2 (en)
JP3075475U (en) Scaffold for laying bridge pipelines
CN112431398A (en) Protective frame and high-altitude operation safety device
JPH0118753Y2 (en)
JPH0557201U (en) Vertical frame for scaffolding and handrail for scaffolding
KR200206946Y1 (en) Working stage

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20010326

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee