KR20230013847A - Offshore structures Foundation construction method and Foundation Construction Support Body - Google Patents

Offshore structures Foundation construction method and Foundation Construction Support Body Download PDF

Info

Publication number
KR20230013847A
KR20230013847A KR1020210094835A KR20210094835A KR20230013847A KR 20230013847 A KR20230013847 A KR 20230013847A KR 1020210094835 A KR1020210094835 A KR 1020210094835A KR 20210094835 A KR20210094835 A KR 20210094835A KR 20230013847 A KR20230013847 A KR 20230013847A
Authority
KR
South Korea
Prior art keywords
support
flange
offshore
foundation construction
fixing
Prior art date
Application number
KR1020210094835A
Other languages
Korean (ko)
Inventor
윤종현
김덕수
Original Assignee
윤종현
김덕수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 윤종현, 김덕수 filed Critical 윤종현
Priority to KR1020210094835A priority Critical patent/KR20230013847A/en
Publication of KR20230013847A publication Critical patent/KR20230013847A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/04Flat foundations in water or on quicksand
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/06Constructions, or methods of constructing, in water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to an offshore structure foundation constructing method, which can reduce working time, and to a support for foundation construction. The support for foundation construction comprises: an anchor bolt installed on a flat surface; a flange with a lower installation hole formed thereon; a pillar erected vertically on all sides of the flange; an upper plate with an upper installation hole (5a) formed thereon; and a drilling frame located within the upper installation hole.

Description

해상 구조물 기초공사 방법 및 기초공사용 지지체{Offshore structures Foundation construction method and Foundation Construction Support Body}Offshore structures Foundation construction method and Foundation Construction Support Body}

본 발명은 해상 구조물용 기초공사 방법 및 기초공사용 지지체에 관한 것으로, 보다 구체적으로는 해상의 간출여와 같은 해상 암반에 등대와 같은 해상 구조물 기초공사에서 수직 천공이 단시간에 저비용으로 이루어질 수 있도록 하여 내구성이 우수한 해상 구조물 기초가 제공될 수 있는 해상 구조물용 기초공사 방법과 함께 이를 위한 해상 구조물 기초공사용 지지체를 제공코자 하는 것이다.The present invention relates to a foundation construction method and a support for foundation construction for offshore structures, and more specifically, to a foundation work for offshore structures such as lighthouses in offshore rock formations such as offshore shedding, so that vertical drilling can be performed in a short time and at low cost, thereby providing durability It is intended to provide a support for offshore structure foundation construction for this along with a foundation construction method for offshore structures that can provide this excellent offshore structure foundation.

일반적으로 등대(등표)와 같은 해상 구조물은 수중의 암초 등 장해물 위치를 표시하여 선박의 안전한 항로를 유도하고 지시하는 기능을 제공하는 해상 교통 표지물이다.In general, maritime structures such as lighthouses (light towers) are maritime traffic signs that provide a function of inducing and instructing a safe course of a ship by displaying the location of an obstacle such as a reef in the water.

상기 해양구조물을 설치하는 암반은, 해상의 수상 돌출암반에 설치하는 것이 보통이며, 수상돌출암반은 해수면 위로 항상 일부가 노출되어 있는 노출암과, 간조시에만 해수면 위로 일부가 노출되는 간출여가 있는데, 이러한 수상돌출 암반에 등표를 설치하고자 하는 경우 암반의 상면을 평탄화시키고, 기초 구조물을 평탄화 된 상면에 설치하고, 그 기초 구조물에 속채움 콘크리트를 시공한 후에 등대 등을 설치하고 있다.It is common for the rock mass to install the offshore structure to be installed on the overhanging rock mass of the sea. In the case of installing a light beacon on such an overhanging rock mass, the upper surface of the rock mass is flattened, a foundation structure is installed on the flattened upper surface, and a lighthouse is installed after constructing filling concrete on the foundation structure.

종래 대표적인 설치방법으로는 해양 표지물을 설치하고자 하는 암반의 상부면에 평탄화부를 형성하고, 그 평탄화부에 미리 제작하여 운반한 우물통 형태의 기초부를 설치한다. 기초부 내부에 속채움 콘크리트를 시공하여 그 상부에 해양표지물을 설치하게 된다.As a conventional representative installation method, a flattening part is formed on the upper surface of a bedrock on which a marine marker is to be installed, and a foundation in the form of a well that is manufactured and transported in advance is installed on the flattening part. Filling concrete is constructed inside the foundation, and a marine marker is installed on top of it.

그러나 상기한 구성으로 등대 등을 설치하는 경우 기초 지반이 암반에 단순히 오려진 구성으로 내구성이 약하여 파도 등에 쉽게 파손될 염려가 있다.However, when a lighthouse or the like is installed with the above configuration, since the foundation ground is simply cut from the bedrock, durability is weak and there is a concern that it may be easily damaged by waves or the like.

이러한 문제점을 해결하는 선행기술로 대한민국 등록특허공고(B1)10-0976766호(2010.08.25.)의 해양표지물 설치를 위한 수중 돌출암 측량 방법 및 이를 이용한 지반조사와 기초부 시공방법이 제안되고 있으며, 선행기술에서의 기초부 시공방법은 수중 돌출암에 해양표지물을 설치하기 위한 지반조사 및 기초부 시공방법에 있어서, 수상 작업을 하기 위한 평저선의 상판 중앙에 서로 다른 직경으로 이루어진 복수의 원형 가이드홀이 구비된 측량 상판부를 설치하고, 상기 측량 상판부의 원형의 가이드홀을 통해서 수중으로 측량장치를 투입하여 수중 돌출암의 상부면에 대해 소정 직경의 원호상의 표고치를 연속적으로 측량하는 측량단계와; 상기 가이드홀을 통해서 일정 간격의 원호상으로 일정 깊이 이상 암반 내부로 천공되게 시료채취공을 형성하여 채취된 시료에 의해 기초 암반 상태를 검사하는 암반 검사 단계와; 상기 암반 검사 단계에서 형성된 각 시료 채취공에 앵커파일을 삽입 설치하는 앵커파일 설치단계와; 상기 앵커파일 설치단계에서 설치된 앵커 파일의 시료채취공에 그라우팅을 실시하여 앵커파일을 고정 설치하는 앵커파일 그라우팅 단계; 상기 측량단계에서 측정된 소정 직경에서의 표고치와 일치되게 하면부를 형성한 원통형 우물통을 육상에서 제작하여, 상기 앵커파일의 외측부에 안착시키는 우물통 안착단계와; 상기 우물통의 하단부 경계면과 암반 사이의 공간 메움 작업을 하고, 우물통의 내부에 상부 구조물 설치를 위한 앵커 설치와 함께 속채움 콘크리트를 타설하는 기초부 속채움 단계와; 기초부 속채움 단계 이후에 상부 구조물을 설치하여 해양표지물을 설치하는 단계를 포함하여 수행하도록 이루어진 것을 특징으로 하고 있다.As a prior art to solve these problems, the Republic of Korea Patent Publication (B1) 10-0976766 (2010.08.25.) proposes an underwater protruding rock survey method for marine marker installation and a ground investigation and foundation construction method using the same. , In the foundation construction method in the prior art, in the ground investigation and foundation construction method for installing marine markers on underwater protruding rocks, a plurality of circular guide holes made of different diameters in the center of the top plate of a pontoon for waterworks A surveying step of installing the survey upper plate provided therewith and inserting a surveying device into the water through a circular guide hole of the survey upper plate to continuously measure an elevation value on an arc of a predetermined diameter with respect to an upper surface of an underwater protruding arm; A rock mass inspection step of forming a sampling hole to be drilled into the rock mass at a predetermined depth or more in an arc shape at a predetermined interval through the guide hole, and examining the state of the basic rock mass with the collected sample; An anchor file installation step of inserting and installing an anchor file into each sample collection hole formed in the rock mass inspection step; An anchor pile grouting step of fixing and installing the anchor pile by grouting the sampling hole of the anchor pile installed in the anchor pile installation step; A well barrel mounting step of manufacturing a cylindrical well barrel having a lower surface to match the elevation value at the predetermined diameter measured in the surveying step on land, and seating it on the outer side of the anchor pile; A foundation filling step of filling in the space between the boundary surface of the lower end of the well barrel and the bedrock, and installing anchors for installing upper structures inside the well barrel and pouring filling concrete; It is characterized in that it is made to be performed including the step of installing the marine marker by installing the upper structure after the step of filling the foundation.

상기한 선행기술의 경우 시료채취공에 앵커파일을 고정 설치한 후 그 앵커파일을 내측 지지대로 사용하여 우물통을 설치하게 되므로 견고하게 기초부를 시공할 수 있어 내구성을 높일 수 있다.In the case of the prior art described above, since anchor piles are fixed to the sampling hole and then the anchor pile is used as an inner support to install the well, the foundation can be constructed firmly and durability can be increased.

그러나 기초부의 고정이 앵커파일에 국한되어 있어 내구성을 높이는 데 한계가 있고, 바지선 등에서 앵커파일을 위한 천공에 많은 어려움이 발생하므로 시공비용이 상승하는 등의 문제점도 있다.However, since the fixing of the foundation is limited to the anchor pile, there is a limit to increasing durability, and there are problems such as an increase in construction cost because it is difficult to drill holes for anchor piles in barges.

KRKR 100976766 100976766 B1B1 2010.08.25.2010.08.25.

이에 본 발명자는 종래 해상구조물용 기초공사시 수직 천공에 따른 문제점을 해결하고자 본 발명을 연구 개발한 것이다.Accordingly, the present inventors have researched and developed the present invention in order to solve the problems caused by vertical drilling during foundation construction for conventional offshore structures.

즉, 본 발명에서는 간출여와 같은 해상 암반에 등대나 기타 해상구조물을 설치하기 위한 기초공사를 할 때 먼저 해상 암반에 지지체를 1차 설치한 상태에서 천공 작업이 이질 수 있도록 함으로 해서 수직 천공을 단시간에 저비용으로 제공되도록 하며, 내구성이 우수한 해상 구조물 기초가 제공될 수 있는 해상 구조물 기초공사 방법 및 기초공사용 지지체를 제공함에 발명의 기술적 과제를 두고 본 발명을 완성한 것이다.That is, in the present invention, when performing the foundation work for installing a lighthouse or other offshore structures on offshore rocks such as gulfs, vertical drilling can be performed in a short time by allowing the drilling work to be carried out in a state in which the support is first installed on the offshore rocks. The present invention has been completed with the technical problem of the invention in providing a method for foundation construction of offshore structures and a support for foundation construction, which can be provided at low cost and provide a foundation for offshore structures with excellent durability.

과제 해결 수단으로 본 발명에서는 첫째 해상 암반에 형성한 평탄면에 설치하는 앵커볼트와; 앵커볼트가 결합되는 고정구멍이 형성되고 중심으로 하부 설치공이 형성된 플랜지와; 플랜지의 사방에 수직으로 세워지는 지주와; 플랜지보다 넓은 평면적으로 지주의 상부에 결합되며, 중심으로 상부 설치공이 형성된 상판과; 플랜지와 상판의 가장자리에 양단이 결합되는 지주와; 상기 하부설치공과 상부 설치공 내에 위치하며, 조밀하게 배치된 소구경의 가이드파이프의 상하단을 고정플랜지로 결합한 천공틀을 포함하는 것을 특징으로 한다.In the present invention as a means of solving the problems, the first anchor bolt installed on the flat surface formed on the offshore bedrock; A flange having a fixing hole to which an anchor bolt is coupled and a lower installation hole formed in the center; A post erected vertically on all sides of the flange; A top plate coupled to the top of the holding in a plane wider than the flange and having an upper installation hole at the center; A post having both ends coupled to the edge of the flange and the top plate; It is located in the lower installation hole and the upper installation hole, characterized in that it comprises a perforated frame combining the upper and lower ends of the densely arranged small-diameter guide pipe with a fixing flange.

둘째 해상 암반에 형성한 평탄면에 설치하는 앵커볼트와; 앵커볼트가 하측으로 결합된 복수의 지주와; 지주의 상부에 결합되며, 중심으로 상부 설치공이 형성된 상판과; 상기 상부 설치공 내에 위치하며, 조밀하게 배치된 소구경의 가이드파이프의 상하단을 고정플랜지로 결합한 천공틀을 포함하는 것을 특징으로 한다.Second, an anchor bolt installed on a flat surface formed in offshore bedrock; A plurality of holding anchor bolts coupled to the lower side; A top plate coupled to the upper part of the holding and having an upper installation hole formed in the center; Located in the upper installation hole, characterized in that it comprises a perforated frame combining the upper and lower ends of the densely arranged small-diameter guide pipe with a fixing flange.

셋째 해상 암반에 중량의 치즐로 해머질 하여 평탄면을 조성하는 평탄단계와; 평탄면에 천공틀을 고정하도록 앵커볼트를 시공하는 앵커볼트시공단계와; 평탄면에 시공된 앵커볼트에 지지체를 고정하는 지지체고정단계와; 지지체에 천공기를 올려 천공틀의 가이드파이프로 오거를 삽입하여 암반에 일정 깊이고 소구경의 구멍을 조밀하게 천공하는 천공단계와; 지지체에서 천공기 및 천공틀을 제거하는 천공틀제거단계와; 암반에 조밀하게 천공된 구멍 위로 치즐로 해머질하고 함마그라브 작업하여 일정 깊이로 굴착하는 굴착단계를 포함하는 것을 특징으로 한다.Third, a flattening step of forming a flat surface by hammering the sea bedrock with a heavy chisel; An anchor bolt construction step of constructing anchor bolts to fix the perforation frame to the flat surface; A support fixing step of fixing the support to the anchor bolts installed on the flat surface; A drilling step of inserting an auger into a guide pipe of a drilling frame by raising a drilling machine on a support and densely drilling small-diameter holes at a certain depth in the bedrock; A punching frame removing step of removing the punching machine and the punching frame from the support; It is characterized in that it includes an excavation step of hammering with a chisel over a hole drilled densely in the bedrock and excavating to a certain depth by working with a hammer.

넷째 상기 앵커볼트시공단계는 지지체 하부에 구비된 플랜지의 고정구멍에 일치하는 위치 또는 상판에 수직으로 구비된 지주의 하측에 일치하는 위치에 형성하는 것을 특징으로 한다.Fourth, the anchor bolt construction step is characterized in that it is formed at a position corresponding to the fixing hole of the flange provided on the lower part of the support or at a position corresponding to the lower side of the support provided vertically on the upper plate.

다섯째 상기 지지체고정단계는 지지체에 구비된 플랜지의 고정구멍에 앵커볼트를 결합하거나 또는 지지체에 수직으로 형성된 지주 하단을 앵커볼트에 용접하는 것을 특징으로 한다.Fifth, the support fixing step is characterized in that an anchor bolt is coupled to a fixing hole of a flange provided in the support body, or a lower end of a post formed perpendicular to the support body is welded to the anchor bolt.

본 발명에서 제공하는 해상 구조물 기초공사 방법 및 기초공사용 지지체를 사용할 경우 해상 암반에 수평으로 설치된 지지체에서 천공 작업이 행해지므로 수직 천공이 가능하고, 수면 위에 상판이 위치하도록 고정된 지지체에서 천공 작업이 이루어지므로 작업시간이 단축될 수 있다.In the case of using the offshore structure foundation construction method and support for foundation construction provided by the present invention, since drilling is performed on a support installed horizontally on an offshore bedrock, vertical drilling is possible, and drilling is performed on a support fixed so that the upper plate is located on the water surface. Therefore, the working time can be shortened.

또한 천공 작업이 이루어지는 지지체가 수면위 고정된 상태이므로 작업자의 피로도를 줄일 수 있고, 안전사고 위험도 획기적으로 줄일 수 있는 것이다.In addition, since the support in which the drilling operation is performed is fixed on the water surface, it is possible to reduce worker's fatigue and drastically reduce the risk of safety accidents.

도 1은 본 발명에서 제공하는 해상 구조물 기초공사용 지지체의 바림직한 일 실시례를 보인 정단면도
도 2는 도 1의 평면도
도 3은 도 1에서의 플랜지 저면도
도 4는 본 발명에 적용되는 구조물 기초공사용 지지체의 다른 예를 보인 정단면도
도 5는 본 발명 해상 구조물 기초공사용 지지체에 적용된 천공틀의 구성을 보인 사시도
도 6은 본 발명에서 제공하는 해상 구조물 기초공사 방법에 따른 블록도
도 7a 내지 7f는 본 발명에서 제공하는 해상 구조물 기초공사 방법에서의 각 단계별 작업 상태도
1 is a front cross-sectional view showing a preferred embodiment of a support for offshore structure foundation construction provided by the present invention
Figure 2 is a plan view of Figure 1
Figure 3 is a bottom view of the flange in Figure 1
Figure 4 is a front cross-sectional view showing another example of a support for structure foundation construction applied to the present invention
Figure 5 is a perspective view showing the configuration of a perforated frame applied to the support for foundation construction of offshore structures of the present invention
6 is a block diagram according to the offshore structure foundation construction method provided by the present invention
7a to 7f are work state diagrams for each step in the offshore structure foundation construction method provided by the present invention

이하 본 발명에서 제공하는 해상 구조물 기초공사 방법 및 기초공사용 지지체를 첨부 도면에 의거하여 설명한다.Hereinafter, the offshore structure foundation construction method and foundation support body provided by the present invention will be described based on the accompanying drawings.

도 1은 본 발명에서 제공하는 해상 구조물 기초공사용 지지체의 바림직한 일 실시례를 보인 정면도를 도시한 것이고, 도 2는 도 1의 평면도, 도 3은 도 1에서의 플랜지 저면도를 각각 도시한 것이다.1 is a front view showing a preferred embodiment of a support for offshore structure foundation construction provided by the present invention, FIG. 2 is a plan view of FIG. 1, and FIG. 3 is a bottom view of the flange in FIG. 1, respectively. .

본 발명에서 제공하는 해상 구조물 기초공사용 지지체(1)는 하부가 해상에 위치하는 해상 암반(100)(노출암 또는 간출여(간조 때 물밖으로 머리를 내미는 바위))에 고정되고, 상부가 만조 상태에서 물 위에 노출될 수 있도록 구성하고 있다.The support 1 for offshore structure foundation construction provided by the present invention is fixed to the offshore rock mass 100 (exposed rock or low tide (rock protruding out of the water at low tide)) where the lower part is located on the sea, and the upper part is in the high tide state. It is configured so that it can be exposed on the water.

바람직한 예로는 하측의 플랜지(2)와, 플랜지(2)에 세워지는 지주(3)(4)와, 지주(3)(4)의 상측으로 설치되는 상판(5)과, 상판(5)과 플랜지(2)에 수직으로 설치되는 천공틀(6)로 대분된다.A preferred example is the flange 2 on the lower side, the posts 3 and 4 built on the flange 2, the top plate 5 installed above the posts 3 and 4, and the top plate 5 It is largely divided into a perforation frame 6 installed vertically on the flange 2.

플랜지(2)는 중심에 하부 설치공(2a)이 형성된 도넛형으로 구성되며, 고정구멍(2b)을 원주방향으로 형성한다. 고정구멍(2b)으로는 해상 암반(100)에 평탄면을 형성한 상태에서 시공되어 있는 앵커볼트(10)가 조립되어 해상 구조물 기초공사용 지지체(1)를 고정시킬 수 있도록 한다. The flange 2 is formed in a toroidal shape with a lower installation hole 2a formed in the center, and a fixing hole 2b is formed in the circumferential direction. An anchor bolt 10, which is constructed in a state in which a flat surface is formed on the offshore rock mass 100, is assembled into the fixing hole 2b so that the support 1 for offshore structure foundation construction can be fixed.

플랜지(2)의 상측으로는 수직 방향으로 지주(3)를 세우고, 외향 경사지게 지주(4)를 세우며, 이들 지주(3)(4)의 상단에는 넓은 평면적을 갖는 상판(5)을 설치한다.On the upper side of the flange 2, a post 3 is erected in a vertical direction, and a post 4 is erected inclined outward, and a top plate 5 having a wide plane area is installed at the upper end of these posts 3 and 4.

상기 지주(3)(4) 및 상판(5)을 구성하고 있는 골조는 H빔이나 I빔 등으로 제작하며, 상판(5)은 천공기(20)가 올려질 정도로 넓은 평면적을 가지도록 구성한다.The frame constituting the pillars 3 and 4 and the top plate 5 is made of H-beam or I-beam, and the top plate 5 is configured to have a wide plane area so that the puncher 20 can be lifted.

또한 상판(5)의 중심에는 하부 설치공(2a)과 동축상에 위치하도록 상부 설치공(5a)을 형성한다.In addition, an upper installation hole 5a is formed at the center of the upper plate 5 so as to be coaxially positioned with the lower installation hole 2a.

상기 상판(5)의 상부 설치공(5a)과, 플랜지(2)의 하부 설치공(2a)에는 천공틀(6)을 결합한다.The perforation frame 6 is coupled to the upper installation hole 5a of the upper plate 5 and the lower installation hole 2a of the flange 2.

천공틀(6)은 지지체(1)에 조립한 상태에서 지지체(1)에 볼트, 너트로 고정한다.The punching frame 6 is fixed to the support 1 with bolts and nuts in a state in which it is assembled to the support 1.

도 4는 본 발명에 적용되는 해상 구조물 기초공사용 지지체의 다른 예를 보인 정단면도를 도시한 것이다.4 is a front cross-sectional view showing another example of a support for offshore structure foundation construction applied to the present invention.

본 발명에서 제공하는 해상 구조물 지초공사용 지지체(1)는 지주(3)의 상측으로 상판(5)을 설치하고, 상판(5)의 중심에 형성된 상부 설치공(5a)에 천공틀(6)을 결합한 구성이다.In the support 1 for offshore structure foundation construction provided by the present invention, a top plate 5 is installed on the upper side of a post 3, and a perforation frame 6 is installed in an upper installation hole 5a formed in the center of the top plate 5 It is a combined composition.

상기 지주(3)는 하측으로 앵커볼트(10)가 결합되도록 구성되어 있다.The support 3 is configured such that the anchor bolt 10 is coupled to the lower side.

상기 지주(3) 및 상판(5)을 구성하고 있는 골조는 H빔이나 I빔 등으로 제작하며, 상판(5)은 천공기(20)가 올려질 정도로 넓은 평면적을 가지도록 구성한다.The frame constituting the support 3 and the top plate 5 is made of an H-beam or an I-beam, and the top plate 5 is configured to have a wide planar area so that the puncher 20 can be lifted.

본 발명 해상 구조물 기초공사용 지지체(1)의 다른 예의 평면도는 도 2와 동일한 구성을 가진다. A plan view of another example of the support 1 for offshore structure foundation construction of the present invention has the same configuration as that of FIG. 2 .

한편 상기 천공틀(6)은 도 5에 도시된 바와 같이 상하측으로 고정플랜지(6a)가 배치되며, 고정플랜지(6a)에는 수개의 가이드파이프(6b)의 상단과 하단을 고정한 구성으로 이루어진다, 가이드파이프(6b)는 조밀하게 배치될 수 있다.On the other hand, as shown in FIG. 5, the perforation frame 6 has a fixed flange 6a disposed upward and downward, and the upper and lower ends of several guide pipes 6b are fixed to the fixed flange 6a. Guide The pipe 6b can be arranged densely.

이상과 같이 구성되는 본 발명의 해상 구조물 기초공사용 지지체(1)는 주로 해상 암반(100) 등에 등대와 같은 각종 해상 구조물을 위한 기초공사를 할 때 사용되는 것으로, 상기에서 언급한 바와 같이 해상 암반(100)에 평탄면을 형성하고, 이에 앵커볼트(10)를 결합한 상태에서 지지체(1)를 고정하면 되는 것이다.The support 1 for offshore structure foundation construction of the present invention configured as described above is mainly used when foundation work is performed for various offshore structures such as lighthouses on offshore bedrock 100, etc., as mentioned above, offshore bedrock ( 100) to form a flat surface, and fix the support body 1 in a state in which the anchor bolt 10 is coupled thereto.

이하에서 본 발명에서 제공하는 해상 구조물 기초공사 방법을 설명키로 한다.Hereinafter, the offshore structure foundation construction method provided by the present invention will be described.

도 6은 본 발명에서 제공하는 해상 구조물 기초공사 방법에 따른 블록도를 도시한 것이고, 도 7a 내지 7f는 본 발명에서 제공하는 해상 구조물 기초공사 방법에서의 각 단계별 작업 상태도를 도시한 것이다.6 shows a block diagram according to the offshore structure foundation construction method provided by the present invention, and FIGS. 7a to 7f show work state diagrams for each step in the offshore structure foundation construction method provided by the present invention.

본 발명에서 제공하는 해상 구조물 기초공사 방법은 상기에서와 같은 해상 구조물 기초공사용 지지체(1)를 이용하며, 1)평탄단계(S10), 2)앵커시공단계(S20), 3)지지체고정단계(S30), 4)천공단계(S40), 5)천공틀제거단계(S50), 6)굴착단계(S60)에 의해 이루어지는 것으로 각 단계별로 이하 설명한다.The offshore structure foundation construction method provided by the present invention uses the support (1) for offshore structure foundation construction as described above, 1) flattening step (S10), 2) anchor construction step (S20), 3) support fixing step ( S30), 4) drilling step (S40), 5) drilling frame removal step (S50), and 6) excavation step (S60), and each step will be described below.

1)평탄단계(S10)1) Flattening step (S10)

평탄단계(S10)는 도 7a에 도시된 바와 같이 해상 암반(100)에 평탄면을 조성하는 단계이며, 바람직하기로는 바지선(30)에 크레인(40)을 적재한 상태에서 크레인(40)과 연결되어 있는 치즐(50)을 자유낙하 시키는 방법을 통해서 해상 암반(100)의 상부면을 수평 상태가 되도록 조성한다.The flattening step (S10) is a step of forming a flat surface on the offshore bedrock 100 as shown in FIG. 7A, preferably connected to the crane 40 while the crane 40 is loaded on the barge 30. The upper surface of the offshore bedrock 100 is created to be in a horizontal state through a method of free falling the chisel 50.

2)앵커시공단계(S20)2) Anchor construction stage (S20)

앵커시공단계(S20)는 도 7b에 도시된 바와 같이 평탄면에 천공틀(6)을 고정하도록 앵커를 시공하는 단계이다.The anchor construction step (S20) is a step of constructing an anchor to fix the perforation frame 6 to a flat surface, as shown in FIG. 7B.

이를 위해서는 지지체(1)의 평탄된 해상 암반(100) 위에 올려두고 지지체(1)의 플랜지(2)에 형성한 고정구멍(2b) 위치에 해당하도록 해상 암반(100)에 앵커볼트(10)를 시공하면 된다.To this end, the anchor bolt 10 is placed on the flattened offshore rock mass 100 of the support body 1 and anchor bolts 10 are placed on the offshore rock mass 100 so as to correspond to the location of the fixing hole 2b formed in the flange 2 of the support body 1. You have to build it.

이때 도 1 내지 도 3과 같이 지지체(1)를 구성하는 경우 플랜지(2)의 고정구멍(2b)에 부합하도록 앵커볼트(10)를 시공하고, 도 4와 같이 지지체(1)를 구성하는 경우 지주(3) 하단에 부합하도록 앵커볼트(10)를 시공하면 된다.At this time, when the support body 1 is configured as shown in FIGS. 1 to 3, the anchor bolt 10 is constructed to match the fixing hole 2b of the flange 2, and the support body 1 is configured as shown in FIG. It is only necessary to construct the anchor bolt 10 so as to match the bottom of the post 3.

앵커볼트(10)가 설치되는 평탄면이 간조시 해수면에 노출되는 경우 간조시간을 이용하여 앵커볼트를 시공하고, 간조시에도 해수면 아래에 위치하는 경우 작업자가 안전하게 잠수장비를 착용한 상태에서 작업한다.If the flat surface where the anchor bolt 10 is installed is exposed to the sea level at low tide, the anchor bolt is constructed using the low tide time, and if it is located below the sea level even at low tide, the worker safely wears diving equipment. .

3)지지체고정단계(S30)3) Support fixing step (S30)

지지체고정단계(S30)는 도 7c에 도시된 바와 같이 지지체(1) 및 지지체(1) 결합되는 천공틀(6)을 고정하는 단계이다.The support fixing step (S30) is a step of fixing the support 1 and the perforation frame 6 to which the support 1 is coupled, as shown in FIG. 7C.

지지체(1)는 미리 설계된 구성으로 육상에서 제작되며, 설치상태에서 상판(5)이 만조시에도 해수면 위에 위치할 수 있는 구성을 가지도록 한다. The support body 1 is manufactured on land in a pre-designed configuration, and in the installed state, the top plate 5 has a configuration that can be located on the sea level even at high tide.

앵커시공단계(S20)에서 시공되어 있는 앵커볼트(10)에 지지체(1)를 고정함과 아울러 지지체(1)의 상판(5)과 하판에 형성되어 있는 상하부 설치공(2a)(5a)으로, 상하측으로 배치된 고정플랜지(6a)에 수개의 가이드파이프(6b)의 상단과 하단을 고정하여 구성한 천공틀(6)을 결합한다.In the anchor construction step (S20), the support (1) is fixed to the anchor bolts (10), and the upper and lower installation holes (2a, 5a) formed on the upper and lower plates of the support (1) , The perforated frame 6 configured by fixing the upper and lower ends of several guide pipes 6b to the fixing flange 6a arranged vertically is coupled.

앵커볼트(10)에 지지체(1)를 고정하는 구성으로는 도 1 내지 도 3과 같이 지지체(1)를 구성하는 경우 플랜지(2)의 고정구멍(2b)에 앵커볼트(10)를 결합하고, 도 4와 같이 지지체(1)를 구성하는 경우 지주(3) 하단을 앵커볼트(10)에 용접하는 방법으로 고정하면 된다.As a configuration for fixing the support body 1 to the anchor bolt 10, when the support body 1 is configured as shown in FIGS. 1 to 3, the anchor bolt 10 is coupled to the fixing hole 2b of the flange 2 , in the case of constructing the support body 1 as shown in FIG. 4, the lower end of the post 3 may be fixed by welding to the anchor bolt 10.

4)천공단계(S40)4) Drilling step (S40)

천공단계(S40)는 도 7d에 도시된 바와 같이 지지체(1)의 상판(5)에 천공기(20)를 올리고, 천공기(20)로 구멍을 천공한다.In the drilling step (S40), as shown in FIG. 7D, the puncher 20 is placed on the top plate 5 of the support 1, and holes are drilled using the puncher 20.

천공기(20)능 바지선(30)에 비치되어 있는 크레인(40)으로 지지체(1)에 올리며, 천공기(20)의 오거를 천공틀(6)에 구비되어 있는 가이드파이프(6b)로 내입시켜 소구경의 구멍을 조밀하게 천공하는 단계이다.The drilling machine 20 is raised on the support body 1 by the crane 40 provided on the barge 30, and the auger of the drilling machine 20 is inserted into the guide pipe 6b provided in the drilling frame 6. This is the step of densely drilling the aperture hole.

이때 천공기(20)를 이용하여 천공하는 구멍의 깊이는 대략 7~8m 깊이가 되도록 한다.At this time, the depth of the hole to be drilled using the puncher 20 is approximately 7 to 8 m deep.

6)천공틀제거단계(S50)6) Perforation frame removal step (S50)

천공틀제거단계(S50)는 도 7e에 도시된 바와 같이 지지체(1)에서 천공틀(6)을 제거하는 단계이다.The puncture frame removal step (S50) is a step of removing the puncture frame 6 from the support 1 as shown in FIG. 7E.

즉, 천공틀(6)에 설치되어 있는 가이드파이프(6b)를 이용하여 해상 암반(100)에 소정 깊이로 소구경의 구멍을 조밀하게 천공한 상태에서 바지선(30)에 비치되어 있는 크레인(40)을 이용하여 철거하고, 아울러 지지체(1)에 결합되어 있는 천공틀(6)을 분리 철거하여 후술할 굴착작업이 이루어질 수 있도록 한다.That is, the crane 40 provided on the barge 30 in a state in which small-diameter holes are densely drilled to a predetermined depth in the offshore bedrock 100 using the guide pipe 6b installed in the drilling frame 6 ) is used to remove, and in addition, the perforation frame 6 coupled to the support 1 is separated and removed so that the excavation work to be described later can be performed.

7)굴착단계(S60)7) Excavation step (S60)

굴착단계(S60)는 도 7f에 도시된 바와 같이 지지체(1)에서 천공기(20) 및 천공틀(6)을 제거한 상태에서 이루어진다.The excavation step (S60) is performed in a state in which the puncher 20 and the puncher frame 6 are removed from the support 1, as shown in FIG. 7f.

바람직하기로는 바지선(30)에 구비된 크레인(40)에 연결되어 있는 치즐(50)을 조밀하게 구멍이 천공되어 있는 부분을 자유 낙하시켜 타격하고, 아울러 함마그라브(60)를 이용하여 파쇄된 슬러지를 외부로 배출하는 방법을 반복적으로 통해서 소망하는 깊이로 대구경의 구멍을 천공하는 공정이다.Preferably, the chisel 50 connected to the crane 40 provided on the barge 30 is free-falling and hitting the part where the holes are drilled densely, and the sludge crushed using the hammer grab 60 It is a process of drilling a large-diameter hole to a desired depth through the method of discharging to the outside repeatedly.

대구경의 구멍은 천공기(20)에 의해 소구경으로 천공되어 있는 7~8m 깊이가 될 때까지 상기 작업을 반복한다.The above operation is repeated until the large-diameter hole is 7 to 8 m deep, which is drilled with a small diameter by the drilling machine 20.

상기와 같이 해상 암반(100)에 대구경의 구멍을 천공한 상태에서, 천공된 구멍과 연장되도록 지지체(1)에 거푸집을 설치하고, 시멘트몰탈을 채워 수면 위로 노출되는 해상 구조물 기초부를 설치하면, 해상 구조물 기초부자 완성된 상태에서 거푸집 및 지지체(1)를 철거하면 된다.As described above, in the state in which a large-diameter hole is drilled in the offshore rock mass 100, a formwork is installed on the support 1 so as to extend with the drilled hole, and the base of the offshore structure exposed above the water surface is installed by filling with cement mortar. It is only necessary to remove the formwork and support (1) in the state in which the structure foundation is completed.

이상과 같이 제공되는 본 발명의 해상 구조물 기초공사 방법 및 기초공사용 지지체(1)를 사용할 경우 해상 암반(100)에 수평으로 설치된 지지체(1)에서 천공 작업이 행해지므로 수직 천공이 가능하고, 수면 위에 상판(5)이 위치하도록 고정된 지지체(1)에서 천공 작업이 이루어지므로 작업시간이 단축될 수 있으며, 작업이 이루어지는 지지체(1)가 수면위 고정된 상태이므로 작업자의 피로도를 줄일 수 있고, 안전사고 위험도 획기적으로 줄일 수 있는 것이다.In the case of using the offshore structure foundation construction method and the support body (1) for foundation construction of the present invention provided as described above, since the drilling operation is performed in the support body (1) installed horizontally on the offshore rock mass (100), vertical drilling is possible, and above the water surface Since the drilling work is performed on the support 1 fixed so that the top plate 5 is located, the working time can be shortened, and since the support 1 on which the work is performed is fixed on the water surface, the fatigue of the operator can be reduced and safety The risk of an accident can also be drastically reduced.

본 발명의 상세한 설명에서는 구체적인 실시례에 관해 설명하고 있으나, 본 발명의 범주에서 벗어나지 않는 한도 내에서 다양한 변형이 가능함은 물론이다. 그러므로 본 발명의 보호 범위는 설명된 실시례에 국한되어 정해져서는 안 되며, 후술하는 청구범위 뿐만 아니라 균등한 것들에 의해 정해져야 한다.Although specific embodiments have been described in the detailed description of the present invention, various modifications are possible without departing from the scope of the present invention. Therefore, the protection scope of the present invention should not be limited to the described embodiments and should not be defined, but should be defined by the equivalents as well as the claims described later.

1:(해상 구조물 기초공사용) 지지체
2:플랜지 2a:하부 설치공
2b:고정구멍 3, 4:지주
5:상판 5a:상부 설치공
6:천공틀 6a:고정플랜지
6b:가이드파이프 10:앵커볼트
20:천공기 30:바지선
40:크레인 50:치즐
60:함마그라브 100:해상 암반
S10:평탄단계 S20:앵커시공단계
S30:지지체고정단계 S40:천공단계
S50:천공틀제거단계 S60:굴착단계
1: (for offshore structure foundation construction) support
2: Flange 2a: Lower installation hole
2b: fixing hole 3, 4: post
5: Top plate 5a: Upper installation hole
6: perforation frame 6a: fixed flange
6b: guide pipe 10: anchor bolt
20: drilling machine 30: barge
40: crane 50: chisel
60: Hamma Grav 100: Sea Bedrock
S10: Flattening step S20: Anchor construction step
S30: support fixing step S40: drilling step
S50: Drilling frame removal step S60: Excavation step

Claims (5)

해상 암반(100)에 형성한 평탄면에 설치하는 앵커볼트(10)와;
앵커볼트(10)가 결합되는 고정구멍(2b)이 형성되고 중심으로 하부 설치공(2a)이 형성된 플랜지(2)와;
플랜지(2)의 사방에 수직으로 세워지는 지주(3)와;
플랜지(2)보다 넓은 평면적으로 지주(3)의 상부에 결합되며, 중심으로 상부 설치공(5a)이 형성된 상판(5)과;
플랜지(2)와 상판(5)의 가장자리에 양단이 결합되는 경사진 구성의 지주(4)와;
상기 상부 설치공(5a)과 하부 설치공(2a) 내에 위치하며, 조밀하게 배치된 소구경의 가이드파이프(6b)의 상하단을 고정플랜지(6a)로 결합한 천공틀(6)을 포함하는 것을 특징으로 하는 해상 구조물 기초공사용 지지체.
An anchor bolt 10 installed on a flat surface formed on the offshore bedrock 100;
A flange 2 having a fixing hole 2b to which the anchor bolt 10 is coupled and a lower installation hole 2a at the center thereof;
A post (3) erected vertically on all sides of the flange (2);
A top plate 5 coupled to the upper portion of the support 3 in a plane wider than the flange 2 and having an upper installation hole 5a formed at the center thereof;
The flange 2 and the upper plate 5 of both ends coupled to the edge of the inclined structure of the support (4) and;
It is located in the upper installation hole (5a) and the lower installation hole (2a) and includes a perforation frame (6) combining the upper and lower ends of the densely arranged small-diameter guide pipe (6b) with a fixing flange (6a). A support for offshore structure foundation construction.
해상 암반(100)에 형성한 평탄면에 설치하는 앵커볼트(10)와;
앵커볼트(10)가 하측으로 결합된 복수의 지주(3)들과;
지주(3)의 상부에 결합되며, 중심으로 상부 설치공(5a)이 형성된 상판(5)과;
상기 상부 설치공(5a) 내에 위치하며, 조밀하게 배치된 소구경의 가이드파이프(6b)의 상하단을 고정플랜지(6a)로 결합한 천공틀(6)을 포함하는 것을 특징으로 하는 해상 구조물 기초공사용 지지체.
An anchor bolt 10 installed on a flat surface formed on the offshore bedrock 100;
A plurality of pillars 3 to which the anchor bolts 10 are coupled downward;
A top plate 5 coupled to the upper portion of the support 3 and having an upper installation hole 5a formed therein;
Located in the upper installation hole (5a) and comprising a perforated frame (6) combining the upper and lower ends of the densely arranged small-diameter guide pipe (6b) with a fixing flange (6a), a support for offshore structure foundation construction .
해상 암반(100)에 중량의 치즐(50)로 해머질 하여 평탄면을 조성하는 평탄단계(S10)와;
평탄면에 천공틀(6)을 고정하도록 앵커볼트(10)를 시공하는 앵커시공단계(S20)와;
평탄면에 시공된 앵커볼트(10)에 지지체(1)를 고정하는 지지체고정단계(S30)와;
지지체(1)에 천공기(20)를 올려 천공틀(6)의 가이드파이프(6b)로 오거를 삽입하여 해상 암반(100)에 일정 깊이고 소구경의 구멍을 조밀하게 천공하는 천공단계(S40)와;
지지체(1)에서 천공기(20) 및 천공틀(6)을 제거하는 천공틀제거단계(S50)와;
해상 암반(100) 조밀하게 천공된 구멍 위로 치즐(50)로 해머질하고 함마그라브(60) 작업하여 일정 깊이로 굴착하는 굴착단계(S60)를 포함하는 것을 특징으로 하는 해상 구조물 기초공사 방법.
A flattening step (S10) of forming a flat surface by hammering the sea bedrock 100 with a heavy chisel 50;
An anchor construction step (S20) of constructing anchor bolts 10 to fix the perforation frame 6 to a flat surface;
A support fixing step (S30) of fixing the support 1 to the anchor bolt 10 constructed on the flat surface;
A drilling step (S40) of inserting the auger into the guide pipe 6b of the drilling frame 6 by placing the drilling machine 20 on the support 1 and densely drilling small-diameter holes at a certain depth in the offshore rock 100 Wow;
A punching frame removing step (S50) of removing the punching machine 20 and the punching frame 6 from the support 1;
An offshore structure foundation construction method comprising an excavation step (S60) of hammering with a chisel 50 over a densely drilled hole in the offshore bedrock 100 and excavating to a certain depth by working with a hammer grab 60.
청구항 3에 있어서;
상기 앵커시공단계(S20)는 지지체(1) 하부에 구비된 플랜지(2)의 고정구멍(2b)에 일치하는 위치 또는 상판(5)에 수직으로 구비된 지주(3)의 하측에 일치하는 위치에 형성하는 것을 특징으로 하는 해상 구조물 기초공사 방법.
in claim 3;
The anchor construction step (S20) is a position corresponding to the fixing hole 2b of the flange 2 provided at the bottom of the support 1 or a position corresponding to the lower side of the support 3 provided vertically on the top plate 5 Offshore structure foundation construction method, characterized in that formed in.
청구항 3에 있어서;
상기 지지체고정단계(S30)는 지지체(1)에 구비된 플랜지(2)의 고정구멍(2a)에 앵커볼트(10)를 결합하거나 또는 지지체(2)에 수직으로 형성된 지주(3) 하단을 앵커볼트(10)에 용접하는 것을 특징으로 하는 해상 구조물 기초공사 방법.
in claim 3;
In the support fixing step (S30), the anchor bolt 10 is coupled to the fixing hole 2a of the flange 2 provided in the support 1, or the lower end of the post 3 formed perpendicular to the support 2 is anchored. Offshore structure foundation construction method, characterized in that welding to the bolt (10).
KR1020210094835A 2021-07-20 2021-07-20 Offshore structures Foundation construction method and Foundation Construction Support Body KR20230013847A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210094835A KR20230013847A (en) 2021-07-20 2021-07-20 Offshore structures Foundation construction method and Foundation Construction Support Body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210094835A KR20230013847A (en) 2021-07-20 2021-07-20 Offshore structures Foundation construction method and Foundation Construction Support Body

Publications (1)

Publication Number Publication Date
KR20230013847A true KR20230013847A (en) 2023-01-27

Family

ID=85101552

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210094835A KR20230013847A (en) 2021-07-20 2021-07-20 Offshore structures Foundation construction method and Foundation Construction Support Body

Country Status (1)

Country Link
KR (1) KR20230013847A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100976766B1 (en) 2008-06-24 2010-08-25 한국해양연구원 survey and construct method for mounting of beacon the sea on underwater baserock

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100976766B1 (en) 2008-06-24 2010-08-25 한국해양연구원 survey and construct method for mounting of beacon the sea on underwater baserock

Similar Documents

Publication Publication Date Title
KR100758113B1 (en) Cast-in-place large diameter piling method by casing rotator in underwater rock conditions
KR100964796B1 (en) Method for constructing the steel pipe-concrete composite pile structurized of burying and unifying into the bedrock, and a pile construction
CN111851484B (en) Method for cutting off semi-invasive prestressed anchor cable in supporting pile by rotary drilling rig
CN209508992U (en) A kind of underwater embedding rock steel sheet pile cofferdam structure
KR100975988B1 (en) The Method for Constructing Underwater Structure
KR102637552B1 (en) File construction apparatus capable of simultaneous achievement of hole-boring and vibrating
CN108179759B (en) Underwater core drilling and undercutting bottomless method for pilot well
CN102383428B (en) Middle pick reverse drawing method prestressed centrifugally pile tube pile-sinking device and pile-sinking method thereof
KR20230013847A (en) Offshore structures Foundation construction method and Foundation Construction Support Body
JP2004285735A (en) Method of constructing temporary landing bridge by using truss frame
CN102605781A (en) Rocky bed steel pipe pile sinking construction process
JPH1136338A (en) Construction method of underground structure
CN114673144A (en) Rapid pile planting construction method for trestle steel pipe pile on bare rock of inclined base surface
CN109469080B (en) Underwater rock-socketed steel sheet pile cofferdam structure and construction method thereof
JP6585930B2 (en) Caisson applied method
CN114687356B (en) Construction method for deep foundation pit excavation of building
KR102622212B1 (en) Pre-drilling method for offshore wind power using guide frame and pre-drilling equipment
CN113026688B (en) System for expanding piles to form wall by using foundation rocks at bottom of concrete guide wall foundation
KR100983072B1 (en) Light Beacon Structure
CN215367361U (en) Open caisson pile clamping breaking structure
JP2002121753A (en) Floating construction method for pier
CN217419652U (en) Excavation supporting structure for deep silted geological foundation pit
KR100497283B1 (en) Piling method and pile connector thereof
JP3297158B2 (en) How to build underwater structures
CN209798763U (en) steel anchor supporting structure for foundation pit supporting

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right