Prior art keywords
project
construction
river
evaluation
unit
Prior art date
Application number
KR1020210082474A
Other languages
Korean (ko)
Inventor
장문엽
이진석
이재현
장초록
Original Assignee
주식회사 부린
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 부린 filed Critical 주식회사 부린
Priority to KR1020210082474A priority Critical patent/KR20230000520A/en
Publication of KR20230000520A publication Critical patent/KR20230000520A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a river construction management system, which comprises: a business status part which is configured to manage basic business information including project participants and project operators related to river construction, as well as river construction achievements; a project progress part which manages detailed project contents provided to allow inquiry into the basic business information, and changes in river construction design, or construction volumes by year and by construction type; a budget management part which is provided to manage the basic business information, the total construction budget, annual project costs, or details of the annual budget execution; and a map service part which displays a basic project planning section, a design section, and a construction section for each project on a map screen. The river construction management system according to the present invention can improve project adaptability and secure reliability in project management through the computerization of river construction data, can systematically monitor the river construction plan, and can manage the budget and design changes during the river construction progress stage, thereby enhancing work efficiency.

Description

하천공사관리시스템 {River Construction Management System}River Construction Management System {River Construction Management System}

본 발명은 하천공사관리시스템에 관한 것으로, 보다 구체적으로 하천과 관련된 공사 진행상황을 체계적으로 모니터링하고, 공사 진행단계에서 발생 가능한 예산 및 설계 변경 내역을 관리하여 업무 효율성을 게조하고 사업 내의 약점 및 강점을 도출하여 유지/관리 계획 수립을 용이하게 하며 사업 완료 후 사업을 효율적으로 평가할 수 있도록 개선한 하천공사관리시스템에 관한 것이다.The present invention relates to a river construction management system, and more specifically, systematically monitors the progress of construction related to rivers, manages the budget and design changes that may occur during the construction process, improves work efficiency, and identifies weaknesses and strengths within the project. It is about a river construction management system that has been improved to facilitate maintenance/management plan establishment by deriving and efficiently evaluating the project after project completion.

중앙 부처나 지방자치단체에서는 국민이나 주민의 편의나 환경 개선을 위하여 다양한 종류의 공사를 포함하는 업무를 수행하고 있다.Central ministries and local governments perform tasks including various types of construction for the convenience of citizens and residents or to improve the environment.

이러한 공사 중에서도 하천과 관련된 공사도 포함된다. Among these works, works related to rivers are also included.

하천은 지구상의 물 순환의 한 과정을 담당하는 것으로서, 지표에 강하한 우수가 지표면을 유하, 집합하여 바다에 이르는 동안, 주로 지형상의 원인으로 일정한 유로를 형성하고 있다. 그렇지만, 강우는 계속적으로 또한 일정하지 않기 때문에 하천의 유량도 일정하지 않아, 때로는 상시 흐르는 유로의 용량을 넘어 홍수로 되어 주위에 범람하고, 또 극단적으로는 그 유량이 줄어들기도 한다. Rivers are in charge of a process of water circulation on the earth, and while rainwater that has descended to the surface of the earth flows down and collects on the surface of the earth and reaches the sea, it forms a constant flow mainly due to topographical reasons. However, since the rainfall is not continuous and constant, the flow rate of the river is also not constant, sometimes exceeding the capacity of the flow channel that always flows and flooding the surroundings as a flood, and also, in an extreme case, the flow rate decreases.

또 하천은 그 유수에 따라서 다량의 토사 등을 운반하기 때문에 지표면의 형태를 바꿀 뿐만 아니라, 토사의 세굴 퇴적을 반복함으로써 유로를 바꾸기도 한다. In addition, since a river carries a large amount of soil and the like according to its flow, it not only changes the shape of the land surface, but also changes the flow path by repeating the scour deposition of the soil.

이와 같이 하천은 원래는 자연이 형성한 것이지만, 자연의 지배하에 있는 한은 생물이라고 일컬어지기도 한다. In this way, rivers were originally formed by nature, but as long as they are under the control of nature, they are also called living things.

그러나 인간에게 있어서 하천은 생존의 조건이라고 할 수 있는 물의 공급원임과 동시에, 하천의 비옥한 평지는 중요한 생활의 장이기도 하기 때문에 하천수의 이용을 보다 높여, 하천에 의한 홍수범람을 방지하여 생활의 장을 보다 풍부하고 안전한 것으로 하기 위하여, 하천에 대해 여러 가지의 공사를 행하여 시설을 만들어 왔는데, 이와 같은 목적을 가지고 행하는 사업을 일반적으로 치수사업이라고 부른다. However, for humans, rivers are a source of water supply, which can be said to be a condition for survival, and at the same time, the fertile plains of rivers are also important places of life. In order to make the river more abundant and safe, various constructions have been carried out on the river to create facilities.

치수사업으로서 행하는 하천공사는 그 목적에 따라서 고수공사(홍수방지공사), 저수공사(이수공사) 등으로 분류된다.River works performed as water control projects are classified into high water construction (flood prevention construction) and water storage construction (water drainage construction) according to their purpose.

고수공사란 하천의 고수, 즉 유량이 많은 상태에 대응하여 행하는 공사로서, 하도의 유하능력을 증대시켜, 주변의 범람을 방지해서 하천의 안전도를 높이는 것을 목적으로 하는 것이고, 저수공사란 하천의 저수, 즉 유량이 적은 상태에 대응하여 행하는 공사로서 취수, 주운 등을 위해 저수시에 유로의 안정과 수위, 수심 등의 유지를 꾀하는 것을 목적으로 하는 공사이다. High water construction is a construction carried out in response to the high flow of the river, that is, the state of high flow, which aims to increase the river's safety by increasing the flow capacity of the river and preventing surrounding overflow. In other words, it is a construction that is performed in response to a low flow rate, and is a construction that aims to maintain the stability of the passage and the water level and depth at the time of water storage for water intake and pickup.

그렇지만, 치수사업과 함께 자연하천의 제어가 병행되어 이를테면 유출을 댐 등에 의해 인위적으로 조절하는 등 치수, 이수가 종합된 시설의 축조가 행하여지게 되어서, 이와 같은 분류는 과거만큼의 의미를 갖고 있지는 않다. However, with the control of natural rivers in parallel with the water control project, for example, the construction of a facility that integrates water control and irrigation, such as artificially controlling runoff by dams, etc., this classification does not have as much meaning as in the past.

하천 공사의 목적 및 그 규모를 설정하는 계획을 일반적으로 하천계획이라고 하며 이러한 하천계획 아래에서 하천 공사가 진행된다.The plan to set the purpose and scale of river construction is generally called a river plan, and river construction is carried out under such a river plan.

이러한 하천 공사에는 하천 수리, 하도의 굴착과 준설, 제방, 호안, 수문, 통문, 통관, 보, 양ㆍ배수기장 등이 포함될 수 있다.Such river works may include river repairs, excavation and dredging of river channels, embankments, revetments, sluice gates, gates, customs, weirs, pumping and draining stations, etc.

이러한 하천 공사는 하천과 관련된 공사 진행상황을 체계적으로 모니터링하고, 공사 진행단계에서 발생 가능한 예산 및 설계 변경 내역을 관리하여 업무 효율성을 게조하고 사업 내의 약점 및 강점을 도출하여 유지/관리 계획 수립을 용이하게 하며 사업 완료 후 사업을 효율적으로 평가할 수 있도록 하는 것이 바람직하다.These river works systematically monitor the construction progress related to the river, manage the budget and design changes that may occur during the construction process to improve work efficiency, and identify weaknesses and strengths within the project to facilitate maintenance/management plan establishment. It is desirable to enable efficient evaluation of the project after completion of the project.

[참고문헌][references]

특허등록 제10-1961928호 (2019.03.25. 공고)Patent Registration No. 10-1961928 (2019.03.25. Notice)

특허등록 제10-2131946호 (2020.07.09. 공고)Patent Registration No. 10-2131946 (2020.07.09. Notice)

본 발명의 목적은, 하천 공사 자료의 전산화를 통한 사업 적응력 향상 및 사업 관리 신뢰성을 확보할 수 있는 하천공사관리시스템을 제공하는 것이다.An object of the present invention is to provide a river construction management system capable of securing business adaptability and business management reliability through computerization of river construction data.

또한, 본 발명의 다른 목적은, 하천 공사 계획을 체계적으로 모니터링 할 수 있는 하천공사관리시스템을 제공하는 것이다.In addition, another object of the present invention is to provide a river construction management system capable of systematically monitoring river construction plans.

또한, 본 발명의 다른 목적은, 하천 공사 진행 단계에서 예산 및 설계 변경 내역 관리를 할 수 있어 업무 효율성을 향상시킬 수 있는 하천공사관리시스템을 제공하는 것이다.In addition, another object of the present invention is to provide a river construction management system capable of improving work efficiency by managing the budget and design change details at the river construction progress stage.

또한, 본 발명의 또 다른 목적은, 준공도면 등 성과품을 관리하여 민원 발생시에 대응이 용이한 하천공사관리시스템을 제공하는 것이다.In addition, another object of the present invention is to provide a river construction management system that can easily respond to civil complaints by managing achievements such as construction drawings.

또한, 본 발명의 또 다른 목적은, 사업 완료 후 사업의 효율성 등을 평가할 수 있으면서, 사업의 약점 및 수행 방식의 반복적인 사용을 예방하여 사업 성공률 상승 및 예산 낭비를 예방할 수 있는 하천공사관리시스템을 제공하는 것이다.In addition, another object of the present invention is to provide a river construction management system that can prevent the project's weakness and the repetitive use of the project's weakness and the project's success rate and prevent budget waste while being able to evaluate the project's efficiency after completion of the project. is to provide

또한, 본 발명의 또 다른 목적은, 사업 수행 단계별(기본 계획 수립 단계, 사업 설계 단계, 사업 시공 단계) 사업 간 비교 또는 분석이 가능하고, 사업 내의 강점 및 약점을 도출하여 유지 및 관리 계획 수립이 용이한 하천공사관리시스템을 제공하는 것이다.In addition, another object of the present invention is to compare or analyze between projects at each stage of project execution (basic plan establishment stage, project design stage, project construction stage), and establish maintenance and management plans by deriving strengths and weaknesses within the project. It is to provide an easy river construction management system.

본 발명의 목적은, 하천공사관리시스템에 있어서, 하천 공사와 관련된 사업 주체, 사업시행자를 포함하는 사업 기본정보 및 하천 공사 성과품을 관리 가능하게 마련된 사업현황부와; 상기 사업 기본정보 및 하천 공사 설계 변경 내역 또는 연도 및 공종별 공사량을 조회 가능하게 마련된 세부 사업 내용을 관리하는 사업공정부와; 상기 사업 기본정보와 공사 총 예산 및 연도별 사업비 또는 연도별 예산 집행 내역을 관리 가능하게 마련된 예산관리부와; 지도로 표시된 화면 내에 사업별 기본 계획 수립 구간, 설계 구간 및 공사 구간을 표시하는 지도서비스부;를 포함하는 것을 특징으로 하는 하천공사관리시스템에 의하여 달성된다.An object of the present invention is, in a river construction management system, a project status unit provided to manage basic business information and river construction results including a project subject and a project executor related to river construction; A business process department for managing detailed project contents prepared to inquire the project basic information and river construction design change details or year and construction amount by work type; A budget management unit capable of managing the project basic information, total construction budget, annual project cost, or annual budget execution details; It is achieved by the river construction management system, characterized in that it includes; a map service unit that displays the basic plan establishment section, design section, and construction section for each project within the screen displayed as a map.

또한, 선택된 하천 공사 단계별 평가 및 평가 결과를 조회하거나 다른 하천 공사와 평가 결과를 비교 분석 가능하게 마련된 사업평가부;를 포함하는 것이 바람직하다.In addition, it is preferable to include; a project evaluation unit provided to query the evaluation and evaluation results of selected river construction stages or to compare and analyze other river construction and evaluation results.

또한, 상기 사업현황부, 상기 사업공정부, 상기 예산관리부, 상기 지도서비스부 및 상기 사업평가부로 이동 가능하게 마련된 각각의 화면이동버튼을 포함하는 메인화면부;를 더 포함하는 것이 바람직하다.In addition, it is preferable to further include a main screen unit including screen movement buttons provided to move to the project status unit, the project process unit, the budget management unit, the map service unit, and the project evaluation unit.

또한, 상기 사업현황부는 사업목록이 표출된 사업현황리스트 화면과, 신규 사업을 등록하는 신규등록버튼과, 상기 사업현황리스트 화면에서 관련 사업의 위치를 알 수 있도록 상기 지도서비스부 내의 해당 사업구간으로 이동하는 지도보기화면이동버튼과, 검색 조건이 구비된 검색조건 화면으로 이동하는 검색버튼과, 상기 메인화면부로 이동하는 홈이동버튼을 포함하는 것이 바람직하다.In addition, the business status unit includes a business status list screen in which a business list is displayed, a new registration button for registering a new business, and a corresponding business section in the map service unit so that the location of the related business can be known from the business status list screen. It is preferable to include a map view screen movement button that moves, a search button that moves to a search condition screen provided with search conditions, and a home movement button that moves to the main screen.

또한, 상기 사업현황리스트 화면에서 선택된 사업현황 화면에는 하천기본계획보고서, 실시설계보고서, 발주자료 및 준공성과품을 표시, 다운로드 및 입력할 수 있는 버튼을 포함하는 것이 바람직하다.In addition, the project status screen selected from the project status list screen preferably includes buttons for displaying, downloading, and inputting river basic plan reports, implementation design reports, ordering materials, and completed products.

또한, 상기 사업공정부는, 하천기본정보, 설계변경 내역 및 세부 사업내용 항목을 표시하며 상기 설계변경 내역 항목에는 추가 및 삭제 버튼과 변경횟수, 계약일자, 계약 금액 및 설계 변경 내용을 표시하는 항이 포함된 것이 바람직하다.In addition, the project process department displays river basic information, design change details, and detailed project details items, and the design change details items include add and delete buttons and items displaying the number of changes, contract date, contract amount, and design changes it is desirable that

또한, 상기 사업평가부는, 사업평가 대상이 되는 공사와 관련된 자료를 다운로드할 수 있는 버튼과, 평가결과 저장 버튼과, 평가 단계 확인 및 이동 버튼, 평가진행률 확인바, 남은 항목 표시 버튼을 포함하는 것이 바람직하다.In addition, the project evaluation unit includes a button for downloading data related to the construction subject to project evaluation, a save evaluation result button, an evaluation step check and move button, an evaluation progress rate check bar, and a button for displaying remaining items. desirable.

또한, 상기 사업평가 대상이 되는 공사에 대한 평가를 완료한 후 평과 결과조회 화면이 생성되며, 상기 평가 결과조회 화면에는 종합평가결과 항목, 기본계획수립단계 항목, 사업설계단계 항목, 사업시공단계 항목, 리포트출력 항목을 포함하는 것이 바람직하다.In addition, after completing the evaluation of the project subject to project evaluation, an evaluation result inquiry screen is created, and the evaluation result inquiry screen includes comprehensive evaluation result items, master plan establishment stage items, project design stage items, and project construction stage items. , It is desirable to include a report output item.

또한, 상기 기본계획수립단계 항목, 상기 사업설계단계 항목 및 상기 사업시공단계 항목에는 분류된 카테고리별 최종 평가 점수 및 카테고리별 점수 그래프가 표시되는 것이 바람직하다.In addition, it is preferable that a final evaluation score for each category and a score graph for each category are displayed in the basic plan establishment stage item, the project design stage item, and the project construction stage item.

본 발명에 따르면, 하천 공사 자료의 전산화를 통한 사업 적응력 향상 및 사업 관리 신뢰성을 확보할 수 있는 하천공사관리시스템을 제공할 수 있다.According to the present invention, it is possible to provide a river construction management system capable of improving business adaptability and securing business management reliability through computerization of river construction data.

또한, 하천 공사 계획을 체계적으로 모니터링 할 수 있는 하천공사관리시스템을 제공할 수 있다.In addition, it is possible to provide a river construction management system that can systematically monitor river construction plans.

또한, 하천 공사 진행 단계에서 예산 및 설계 변경 내역 관리를 할 수 있어 업무 효율성을 향상시킬 수 있는 하천공사관리시스템을 제공할 수 있다.In addition, it is possible to provide a river construction management system that can improve work efficiency by managing budget and design change details at the river construction progress stage.

또한, 준공도면 등 성과품을 관리하여 민원 발생시에 대응이 용이한 하천공사관리시스템을 제공할 수 있다.In addition, it is possible to provide a river construction management system that is easy to respond to when civil complaints occur by managing achievements such as completion drawings.

또한, 사업 완료 후 사업의 효율성 등을 평가할 수 있으면서, 사업의 약점 및 수행 방식의 반복적인 사용을 예방하여 사업 성공률 상승 및 예산 낭비를 예방할 수 있는 하천공사관리시스템을 제공할 수 있다.In addition, it is possible to provide a river construction management system that can prevent the project's weakness and the repetitive use of the project's weakness and prevent the project's success rate and budget waste while being able to evaluate the project's efficiency after the project is completed.

또한, 사업 수행 단계별(기본 계획 수립 단계, 사업 설계 단계, 사업 시공 단계) 사업 간 비교 또는 분석이 가능하고, 사업 내의 강점 및 약점을 도출하여 유지 및 관리 계획 수립이 용이한 하천공사관리시스템을 제공할 수 있다.In addition, it provides a river construction management system that enables comparison or analysis between projects at each stage of project implementation (basic plan establishment stage, project design stage, project construction stage) and makes it easy to establish maintenance and management plans by deriving strengths and weaknesses within the project. can do.

도 1은 본 발명의 하천관리시스템의 일실시예에 따른 메인화면부,
도 2는 사업현황부 메인화면의 예,
도 3은 도 2의 화면에서 선택된 사업의 사업현황이 팝업된 예,
도 4는 사업공정부 메인화면의 예,
도 5는 도 4의 선택된 사업의 사업공정정보가 팝업된 예,
도 6은 예산관리부 메인화면의 예,
도 7은 도 6의 예산관리내역이 팝업된 예,
도 8은 지도서비스부의 메인화면의 예,
도 9는 도 8에서 사업 관련 내용을 선택시 팝업된 예,
도 10은 사업평가부 메인화면의 예,
도 11은 도 10의 평가하기의 예,
도 12는 도 10의 평가 결과 조회의 일예,
도 13은 도 10의 평가 결과 조회의 다른 예이다.
1 is a main screen unit according to an embodiment of a river management system of the present invention;
2 is an example of the main screen of the business status unit,
Figure 3 is an example of a pop-up business status of the business selected on the screen of Figure 2,
4 is an example of the main screen of the business process department;
Figure 5 is an example of pop-up business process information of the selected business of Figure 4,
6 is an example of the main screen of the budget management unit;
7 is an example in which the budget management details of FIG. 6 are popped up;
8 is an example of a main screen of a map service unit;
9 is an example of a pop-up when selecting business-related content in FIG. 8;
10 is an example of the main screen of the project evaluation unit;
11 is an example of evaluating in FIG. 10;
12 is an example of evaluation result inquiry of FIG. 10;
13 is another example of the evaluation result inquiry of FIG. 10 .

본 발명에 따른 하천공사관리시스템(100, 이하에서 ‘하천관리시스템’이라 함)에 대하여 도 1 내지 도 13을 참조하여 이하에서 구체적으로 설명한다.The river construction management system (100, hereinafter referred to as 'river management system') according to the present invention will be described in detail below with reference to FIGS. 1 to 13.

도 1은 본 발명의 하천관리시스템의 일실시예에 따른 메인화면부이고, 도 2는 사업현황부 메인화면의 예이며, 도 3은 도 2의 화면에서 선택된 사업의 사업현황이 팝업된 예이고, 도 4는 사업공정부 메인화면의 예이며, 도 5는 도 4의 선택된 사업의 사업공정정보가 팝업된 예이고, 도 6은 예산관리부 메인화면의 예이며, 도 7은 도 6의 예산관리내역이 팝업된 예이고, 도 8은 지도서비스부의 메인화면의 예이며, 도 9는 도 8에서 사업 관련 내용을 선택시 팝업된 예이고, 도 10은 사업평가부 메인화면의 예이며, 도 11은 도 10의 평가하기의 예이고, 도 12는 도 10의 평가 결과 조회의 일예이며, 도 13은 도 10의 평가 결과 조회의 다른 예이다.Figure 1 is a main screen unit according to an embodiment of the river management system of the present invention, Figure 2 is an example of the main screen of the business status unit, Figure 3 is an example of the business status of the business selected on the screen of Figure 2 is popped up , FIG. 4 is an example of the main screen of the business process unit, FIG. 5 is an example of a pop-up of business process information of the selected business of FIG. 4, FIG. 6 is an example of the main screen of the budget management unit, and FIG. 7 is the budget management of FIG. 8 is an example of the main screen of the map service unit, FIG. 9 is an example of pop-up when business-related content is selected in FIG. 8, FIG. 10 is an example of the main screen of the project evaluation unit, and FIG. is an example of evaluation in FIG. 10 , FIG. 12 is an example of evaluation result inquiry in FIG. 10 , and FIG. 13 is another example of evaluation result inquiry in FIG. 10 .

본 발명을 보다 상세하게 설명하기에 앞서, 본 발명은 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있는 바, 구현예(態樣, aspect)(또는 실시예)들을 본문에 상세하게 설명하고자 한다. 그러나 이는 본 발명을 특정한 개시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.Prior to explaining the present invention in more detail, since the present invention can be made with various changes and can have various forms, the implementation examples (or embodiments) will be described in detail in the text. . However, this is not intended to limit the present invention to a specific form disclosed, and should be understood to include all modifications, equivalents, or substitutes included in the spirit and scope of the present invention.

각 도면에서 동일한 참조부호, 특히 십의 자리 및 일의 자리 수, 또는 십의 자리, 일의 자리 및 알파벳이 동일한 참조부호는 동일 또는 유사한 기능을 갖는 부재를 나타내고, 특별한 언급이 없을 경우 도면의 각 참조부호가 지칭하는 부재는 이러한 기준에 준하는 부재로 파악하면 된다.In each drawing, the same reference numeral, in particular, the same number of tens and ones digits, or the same reference numerals having the same tens digit, ones digit, and alphabet indicate members having the same or similar functions, and unless otherwise specified, each of the drawings Members indicated by reference numerals may be understood as members conforming to these standards.

또 각 도면에서 구성요소들은 이해의 편의 등을 고려하여 크기나 두께를 과장되게 크거나(또는 두껍게) 작게(또는 얇게) 표현하거나, 단순화하여 표현하고 있으나 이에 의하여 본 발명의 보호범위가 제한적으로 해석되어서는 안 된다.In addition, the components in each drawing are expressed in exaggeratedly large (or thick) small (or thin) or simplified expressions in size or thickness in consideration of convenience of understanding, etc., but the scope of protection of the present invention is thereby limited. It shouldn't be.

본 명세서에서 사용한 용어는 단지 특정한 구현예(태양, 態樣, aspect)(또는 실시예)를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, ~포함하다~ 또는 ~이루어진다~ 등의 용어는 명세서 상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.Terms used in this specification are only used to describe a specific embodiment (aspect, aspect, aspect) (or embodiment), and are not intended to limit the present invention. Singular expressions include plural expressions unless the context clearly dictates otherwise. In this application, terms such as ~comprising~ or ~consisting of are intended to designate that there is a feature, number, step, operation, component, part, or combination thereof described in the specification, but one or more other features It should be understood that it does not preclude the possibility of the presence or addition of numbers, steps, operations, components, parts, or combinations thereof.

다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥 상 가지는 의미와 일치하는 의미를 가지는 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.Unless defined otherwise, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which the present invention belongs. Terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with the meaning in the context of the related art, and unless explicitly defined in the present application, they should not be interpreted in an ideal or excessively formal meaning. don't

본 발명의 일실시예에 따른 하천관리시스템(100)은 도 1 내지 도 13에 도시된 바와 같이, 하천 공사와 관련된 사업 주체, 사업시행자를 포함하는 사업 기본정보 및 하천 공사 성과품을 관리 가능하게 마련된 사업현황부(120)와; 상기 사업 기본정보 및 하천 공사 설계 변경 내역 또는 연도 및 공종별 공사량을 조회 가능하게 마련된 세부 사업 내용을 관리하는 사업공정부와(130); 상기 사업 기본정보와 공사 총예산 및 연도별 사업비 또는 연도별 예산 집행 내역을 관리 가능하게 마련된 예산관리부(140)와; 지도로 표시된 화면 내에 사업별 기본 계획 수립 구간, 설계 구간 및 공사 구간을 표시하는 지도서비스부(150) 또는 선택된 하천 공사 단계별 평가 및 평가 결과를 조회하거나 다른 하천 공사와 평가 결과를 비교 분석 가능하게 마련된 사업평가부(160);를 포함하는 것이 바람직하다.As shown in FIGS. 1 to 13, the river management system 100 according to an embodiment of the present invention is provided to manage basic business information and river construction results including business subjects and project operators related to river construction With the business status unit 120; A business process department (130) for managing detailed project contents prepared to inquire the project basic information and river construction design change details or year and construction amount by type of work; A budget management unit 140 provided to manage the basic project information and the total budget of the construction and the project cost by year or the details of execution of the budget by year; A map service department (150) that displays the basic plan establishment section, design section, and construction section for each project within the screen displayed as a map, or a project prepared to search for evaluation and evaluation results of selected river construction stages, or to compare and analyze evaluation results with other river construction projects It is preferable to include; evaluation unit 160;

또한, 하천관리시스템(100)은, 상기 사업현황부(120), 상기 사업공정부(130), 상기 예산관리부(140), 상기 지도서비스부(150) 및 상기 사업평가부(160)로 이동 가능하게 마련된 각각의 화면이동버튼를 포함하는 메인화면부(110);를 더 포함하는 것이 바람직하다.In addition, the river management system 100 moves to the project status unit 120, the business process unit 130, the budget management unit 140, the map service unit 150 and the project evaluation unit 160. It is preferable to further include; the main screen unit 110 including each of the screen movement buttons provided to be possible.

하천관리시스템(100)은, 미도시된 서버와 서버와 유선 또는 유선으로 연결된 사용자의 컴퓨터를 포함하는 개인단말기 등을 포함하는 것이 바람직하다. The river management system 100 preferably includes a server, not shown, and a personal terminal including a user's computer connected to the server by wire or wire.

메인화면부(110)는 사용자가 하천관리시스템(100)에 접근하여 로그인을 한 경우 표시되는 화면으로 메인화면부(110)는 다양한 항목을 문자, 바 형태 또는 사각 바 형태로 노출시키고 항목 등을 클릭하면 선택하여 클릭한 위치로 이동하거나 관련 정보가 팝업 형태로 화면에 노출되게 된다.The main screen unit 110 is a screen displayed when a user accesses the river management system 100 and logs in. The main screen unit 110 exposes various items in the form of letters, bars or square bars and displays items such as When clicked, it selects and moves to the clicked position or exposes related information to the screen in the form of a pop-up.

메인화면부(110)에서 ‘하천공사관리시스템’ 우측의 ‘사업현황’, ‘사업공정정보’, ‘예산관리’, ‘하천사업평가’, ‘공지사항’ 또는 ‘지도보기’문자에 마우스를 위치시키면 파란 블록을 포함하여 활성화 표시가 되고 클릭(다블 클릭 등)하면 대응하여 사업현황부(120), 사업공정부(130), 예산관리부(140), 사업평가부(160), 공지사항 또는 지도서비스부(150) 페이지로 각각 이동한다.On the main screen (110), mouse over the letters 'Project Status', 'Business Process Information', 'Budget Management', 'River Project Evaluation', 'Notice' or 'Map View' on the right side of the 'River Construction Management System'. When it is placed, it becomes active including the blue block, and when clicked (double click, etc.), it responds to the project status unit 120, project process unit 130, budget management unit 140, project evaluation unit 160, notice or Each moves to the map service unit 150 page.

그리고, 사용자가 많이 접근하는 항목을 중앙에 큰 사각형 형태인 ‘공사위치 바로가기’, ‘사업현황’, ‘예산관리’, ‘사업공정정보’ 또는 ‘하천사업평가’ 항목에 마우스를 위치시키면 파란 블록을 포함하는 활성화 표시가 되고 활성화된 위치를 클릭하면 선택된 ‘지도서비스부(150)’, 예산관리부(140), 사업공정부(130), 사업평가부(160) 페이지로 각각 이동할 수 있다. In addition, when the mouse is placed on the items that are frequently accessed by users, such as 'Shortcut to construction location', 'Project status', 'Budget management', 'Project process information' or 'River project evaluation', which is a large square in the center, blue When an active display including a block is displayed and an activated location is clicked, the selected 'map service unit 150', budget management unit 140, project process unit 130, and project evaluation unit 160 pages can be moved respectively.

즉, 사용자가 많이 접근하는 항목을 중앙에도 배치시켜 사용자의 편리성을 향상시켰다.In other words, the user's convenience is improved by arranging the items frequently accessed by the user in the center.

메인화면부(110)의 하단부에는 ‘공지사항’ 및 ‘사업현황’ 항목이 있으며, 공지사항 항목에서는 최근 공지사항 표출 및 확인이 가능하고, 사업현황 항목에서는 최근 등록된 사업현황 목록이 표출되고 확인이 가능하다.At the lower part of the main screen part 110, there are 'Notice' and 'Business Status' items. In the Notice item, recent notices can be displayed and checked, and in the Business Status item, a list of recently registered business status is displayed and confirmed. this is possible

메인화면부(110)의 상단 우측의 ‘로그아웃’ 문자를 클릭하면 본 하천관리시스템(100)에서 로그아웃된다.If you click the 'logout' character on the upper right of the main screen unit 110, you are logged out of the river management system 100.

메인화면부(110)에서 ‘사업현황’ 항목을 클릭하면 도 2와 같은 사업현황부(120) 페이지로 이동한다.When the 'business status' item is clicked on the main screen unit 110, it moves to the business status unit 120 page as shown in FIG.

사업현황부(120)에는 사업 현황을 등록, 조회할 수 있으며 신규등록 버튼과 선택된 사업의 지도보기 항목 등이 화면에 표시되어 있다.In the business status unit 120, business status can be registered and inquired, and a new registration button and a map view item of the selected business are displayed on the screen.

사업현황부(120)에는 검색된 조건에 해당하는 번호, 사업명, 수계명, 관리기관, 등록일자 등이 목록으로 표출되게 된다.In the business status unit 120, the number corresponding to the searched condition, business name, successor name, management institution, registration date, etc. are displayed as a list.

도 3은 사업현황부(120)의 목록에서 목록 중의 사업을 선택된 경우 선택된 사업의 현황이 팝업 형태로 표출된 예를 도시한 것이다.3 shows an example in which the current status of the selected business is expressed in a pop-up form when a business is selected from the list of the business status unit 120.

사업현황부(120)에 팝업 형태로 표출된 각 사업의 현황은 ‘하천 기본정보’, ‘하천 공사’ 및 ‘준공성과품’ 등의 항목으로 나누어져 있다.The current status of each project expressed in the form of a pop-up in the project status unit 120 is divided into items such as 'basic river information', 'river construction' and 'completion results'.

‘하천 공사’ 항목에는 사업명, 하천구분, 하천명, 수계명, 관리주체, 사업시행자, 해당시군구, 사업기간, 사업구분, 총사업비, 주소, 공사시점(위도/경도), 공사종점(위도/경도) 등의 내용이 표시되거나 신규 등록시 등록을 할 수 있다.Project name, river classification, river name, water system name, management entity, project operator, relevant city/gun/gu, project period, project classification, total project cost, address, construction start point (latitude/longitude), construction end point (latitude/longitude) ), etc. are displayed or can be registered when new registration is made.

한편 ‘준공 성과품’ 항목에는 하천 기본계획 보고서, 실시설계보고서, 발주 자료, 중공 성과품을 업로드하거나 표출시킬 수 있다.On the other hand, in the 'Completed Products' item, river master plan reports, construction design reports, ordering materials, and hollow products can be uploaded or displayed.

이러한 준공 성과품에 기초하여 공사가 완료되고 민원이 발생된 경우 그 민원 발생과 관련된 자료를 매우 효과적으로 찾을 수 있다.Based on these completed products, when the construction is completed and civil complaints occur, data related to the civil complaints can be found very effectively.

메인화면부(110)에서 ‘사업공정정보’를 클릭하면 이동하는 사업공정부(130)의 메인 화면은 도 4와 같다.The main screen of the business process unit 130 that moves when 'business process information' is clicked on the main screen unit 110 is shown in FIG. 4 .

사업공정부(130)의 메인 화면에는 선택되거나 리스트된 사업의 번호, 사업명, 수계명, 관리기관, 날짜 등이 목록으로 도 4에서와 같이 표출된다.On the main screen of the business process unit 130, the selected or listed business number, business name, successor name, managing institution, date, etc. are displayed as a list as shown in FIG. 4.

사업공정부(130)에서 선택된 사업은 도 5에 도시된 바와 같이 ‘하천 기본정보’, ‘설계변경 내용’ 및 ‘세부 사업내용’ 항목으로 구분되어 표시된다.As shown in FIG. 5, the project selected in the business process unit 130 is divided into 'river basic information', 'design change details', and 'detailed project contents' and displayed.

특히, ‘설계변경 내용’ 항목에는 순번, 변경 횟수, 계약일자, 계약 금액, 설계변경 내용 등의 항목으로 입력이 가능하고 목록으로 나타나게 된다.In particular, in the ‘design change details’ item, items such as order number, number of changes, contract date, contract amount, and details of design changes can be entered and displayed as a list.

그리고, 세부 사업내용에는 ‘전체 공사량’과 각 차수별로 공종, 구분, 단위, 전체(차수)공사량을 입력하거나 표시할 수 있다. In addition, in the detailed project details, ‘total construction amount’ and work type, category, unit, and total (order) construction amount for each order can be entered or displayed.

사업공정부(130)에는 ‘사업현황부’나 ‘사업예산부’로 바로가기 버튼도 마련되어 있다.The business process unit 130 also has a shortcut button to 'project status unit' or 'project budget unit'.

메인화면부(110)에서 ‘예산관리’를 클릭하면 이동하는 예산관리부(140)의 메인 화면은 도 6과 같다.The main screen of the budget management unit 140 that moves when 'budget management' is clicked on the main screen unit 110 is shown in FIG. 6 .

예산관리부(140)의 메인 화면에는 선택되거나 리스트된 사업의 번호, 사업명, 수계명, 관리기관, 날짜 등이 목록으로 도 7에서와 같이 표출된다.On the main screen of the budget management unit 140, the selected or listed project number, project name, successor name, managing institution, date, etc. are displayed as a list as shown in FIG. 7.

예산관리부(140)에서 선택된 사업은 도 6에 도시된 바와 같이 ‘하천 기본정보’, ‘하천공사 총 예산’ 및 ‘예산 집행 내역’ 항목으로 구분되어 표시된다.As shown in FIG. 6, the project selected by the budget management unit 140 is divided into 'basic river information', 'total budget for river construction', and 'budget execution details' and displayed.

예산집행 내역 항목에는 해당연도, 집행현황, 집행총액, 전체 예산대비 집행율, 잔액, 첨부파일 등의 목록이 입력되거나 표출될 수 있다. 여기서 전체 예상대비 집행율 및 잔액은 해당연도의 집행총액을 입력하면 자동으로 계산될 수 있어 편리하다.Lists such as the relevant year, execution status, total amount of execution, rate of execution against the entire budget, balance, attached files, etc. may be input or displayed in the budget execution details item. Here, it is convenient that the total expected execution rate and balance can be automatically calculated by entering the total execution amount for the year.

예산관리부(140)에는 ‘사업현황부’나 ‘사업공정부’로 바로가기 버튼도 마련되어 있다.The budget management unit 140 also has a shortcut button to 'project status unit' or 'business process unit'.

메인화면부(110)에서 ‘지도보기’를 클릭하면 이동하는 지도서비스부(150)의 메인 화면은 도 8과 같다.The main screen of the map service unit 150 that moves when 'View Map' is clicked on the main screen unit 110 is shown in FIG. 8 .

지도서비스부(150)의 메인 화면에는 하천공사를 검색하거나 하천사업 즐계찾기, 사업현황 팝업 오픈, 공사위치 바로가기, 일반지도 도는 위성지도 선택 및 유역/하천/사업구간 레이어를 선택할 수 있는 기능 버튼이나 항목이 마련되어 있다.On the main screen of the map service unit 150, function buttons for searching for river construction, searching for river projects, opening business status pop-ups, going to construction locations, selecting a general map or satellite map, and selecting a layer for a basin/river/business section or items are provided.

도 8과 같은 지도서비스부(150)에서 부분적으로 선택된 내용들이 팝업되거나 관련 지도가 표시된 것의 예가 도 9이다.9 is an example of popping up partially selected contents or displaying a related map in the map service unit 150 as shown in FIG. 8 .

메인화면부(110)에서 ‘하천사업평가’를 클릭하면 이동하는 사업평가부(160)의 메인 화면은 도 10과 같다.The main screen of the project evaluation unit 160, which moves when 'river project evaluation' is clicked on the main screen unit 110, is shown in FIG. 10.

사업평가부(160)의 메인 화면에는 선택되거나 리스트된 사업의 번호, 사업명, 수계명, 관리기관, 평가, 결과조회 등이 목록으로 도 10에서와 같이 표출된다.On the main screen of the project evaluation unit 160, the selected or listed project number, project name, successor name, management institution, evaluation, result inquiry, etc. are displayed as a list as shown in FIG. 10.

평가 항목에는 관련 사업명의 평가를 수정하거나, 평가하기가 가능하고, 결과조회 항목에서는 평가된 결과를 조회할 수 있다.In the evaluation item, it is possible to modify or evaluate the evaluation of the related business name, and in the result inquiry item, the evaluated result can be inquired.

도 10에서 ‘평가’항목의 ‘평가하기’를 클릭하면 평가시작하기 화면이 표시(미도시)되고 평가시작을 클릭하면 평가할 내용이 상위 카테고리, 중위 카테고리 및 하위 카테고리가 순차적으로 평가할 항목이 도 11과 같이 팝업된다.In FIG. 10, if you click 'Evaluate' in the 'Evaluation' item, the evaluation start screen is displayed (not shown), and if you click 'Evaluation Start', the items to be evaluated are sequentially displayed in the upper category, middle category, and lower category. pops up like

도 11에서 상위 카테고리(도 11의 ‘③’ 참조)는 ‘기본계획 수립단계’, ‘사업설계 단계’ 및 ‘사업시공 단계’이고, 중위 카테고리(도 11의 ‘④’ 참조)는 ‘정책적 부합성’, ‘사업의 적정성’ 및 ‘하천유역 조사의 정확도’이며, 하위 카테고리는 보다 상세한 평가 문항인 “Q1”, “Q1-1” 및 “Q1-2”이다.In FIG. 11, the upper category (see '④' in FIG. 11) is 'basic plan establishment stage', 'business design stage', and 'project construction stage', and the middle category (see '④' in FIG. 11) is 'policy part'. These are 'Synthesis', 'Adequacy of Project' and 'Accuracy of River Basin Survey', and subcategories are more detailed evaluation items such as “Q1”, “Q1-1” and “Q1-2”.

그리고, 도 11에서는 평가 대상이 되는 사업의 관련자료를 다운로드할 수 있는 버튼(도 11의 ‘①’ 참조), 경가결과 저장 버튼(도 11의 ‘②’ 참조), 평가진행율 확인버튼(도 11의 ‘⑤’ 참조), 남은 문항수 확인 버튼(도 11의 ‘⑥’ 참조), 이전 문항이나 다음 문항으로 이동할 수 있는 버튼(도 11의 ‘⑦’ 및 ‘⑧’ 참조)이 마련되어 있다.And, in FIG. 11, a button for downloading data related to the project to be evaluated (see '①' in FIG. 11), a save result button (see '②' in FIG. 11), and an evaluation progress rate confirmation button (see FIG. 11 '⑤' in), a button to check the number of remaining questions (see '⑥' in FIG. 11), and a button to move to the previous or next question (see '⑦' and '⑧' in FIG. 11).

아울러 평가를 완료하여 평가 결과를 저장하면 그 결과를 조회할 수 있는데 평가결과를 클릭하면 팝업되는 화면의 일예가 도 12이다.12 is an example of a screen that pops up when an evaluation result is clicked.

도 12의 평가결과 화면에는 종합평가 결과 및 각 단계별(기본계획 수립 단계, 사업설계 단계, 사업시공 단계) 평가 결과를 조회할 수 있도록 선택하는 항목과 평가결과를 리포트로 출력할 수 있는 리포트 출력 항목이 구비되어 있다.On the evaluation result screen of FIG. 12, items to be selected so that comprehensive evaluation results and evaluation results for each stage (basic plan establishment phase, business design phase, project construction phase) can be inquired, and report output items to output evaluation results as a report are displayed. is provided.

도 12는 종합평가결과를 선택한 평가 결과를 그래프와 도표로 화면에 표시한 일예이고, 도 13은 기본설계 수립 단계를 선택한 평가 결과를 그래프와 도표로 표시한 일예이다.12 is an example of displaying the evaluation result of selecting the comprehensive evaluation result in graphs and charts on the screen, and FIG. 13 is an example of displaying the evaluation result of selecting the basic design establishment step in graphs and tables.

이러한 본 발명에 따른 하천관리시스템(100)의 효과를 기술적 측면에서 살펴보면, 하천 사업에 특화된 사후 평가기법 개발 및 시스템 활용을 통한 사업의 효과성 분석이 가능하고, 하천관리시스템 개발을 통한 하천 관련 업무를 수행하는 정부부처 및 지자체 등의 업무효율성을 향상시킬 수 있다. 또한, 향후 다른 시스템과의 연계를 통한 하천 사업 생애 주기(기본계획 수립 → 실시설계 → 시공 → 유지·관리) 관리가 가능하며, 시스템을 활용하여 하천공사 위치 확인을 통한 기본계획 수립구간 대비 공사구간 확인이 가능하다.Looking at the effect of the river management system 100 according to the present invention from a technical point of view, it is possible to analyze the effectiveness of the project through the development of a post-evaluation technique specialized for the river project and the use of the system, and river-related tasks through the development of the river management system It can improve the work efficiency of government departments and local governments that perform In addition, it is possible to manage the river project life cycle (basic plan establishment → construction design → construction → maintenance and management) through linkage with other systems in the future, and the construction section compared to the basic plan establishment section through the location check of river construction using the system it is possible to check

또한, 경제·산업적 측면에서, 하천사업 사후 평가기법 개발을 통한 국가하천 및 지방하천을 대상으로 수행되는 사업의 지속성 확보 및 효과적인 사후관리를 통한 예산의 과잉투자를 방지할 수 있으며, 하천관리시스템 활용으로 사업 중 발생하는 예산 및 설계 변경 이력사항 관리 및 예산의 초과집행을 예방할 수 있고, 시스템을 활용한 성과품 관리를 통한 민원해결 시간 단축으로 인력 및 장비 등의 비용을 절감할 수 있다.In addition, from the economic and industrial aspect, it is possible to prevent over-investment of the budget through securing the continuity of projects carried out for national and local rivers through the development of ex-post evaluation techniques for river projects and effective follow-up management, and utilizing the river management system. It is possible to manage the history of budget and design changes that occur during the project and prevent over-execution of the budget, and reduce the cost of manpower and equipment by reducing the time to resolve civil complaints through product management using the system.

그리고, 사회적 측면에서, 통합적 하천사업 평가에 관한 기술 제공을 통한 향후 하천관련 정책 및 기본계획의 발전을 유도할 수 있고, 하천관리시스템을 통한 하천공사 관리 능력을 향상시킬 수 있다.And, in the social aspect, it is possible to induce the development of future river-related policies and basic plans through the provision of technology for integrated river project evaluation, and it is possible to improve river construction management capabilities through the river management system.

아울러, 정책 결정 및 지원 측면에서, 하천 사업 사후 평가 결과를 바탕으로 하천사업 계획 시 기반자료로 활용 가능하며, 하천관리시스템을 통해 하천사업의 현황부터 예산, 공정관리까지 공사 수행 일련의 과정을 모니터링하여 사업의 실효성 및 연속성을 확보할 수 있으며, GIS(지리 정보 시스템) 기반 기본계획 수립구간 대비 설계 및 공사구간 표출을 통한 공사구간 선정 시 활용을 할 수 있다.In addition, in terms of policy decisions and support, the results of ex-post evaluation of river projects can be used as basic data for river project planning, and the river management system monitors a series of construction processes from the status of river projects to budget and process management. It can secure the effectiveness and continuity of the project, and can be used when selecting the construction section through design and construction section expression in preparation for the GIS (Geographical Information System)-based master plan establishment section.

또한, 본 발명과 관련된 어플리케이션을 개발하여 사용자가 휴대하면서 작업, 내용 확인 등이 가능하다.In addition, by developing an application related to the present invention, it is possible for a user to work and check contents while carrying it.

이에, 본 발명에 따르면, 하천 공사 자료의 전산화를 통한 사업 적응력 향상 및 사업 관리 신뢰성을 확보할 수 있는 하천공사관리시스템을 제공할 수 있다.Accordingly, according to the present invention, it is possible to provide a river construction management system capable of improving business adaptability and securing project management reliability through computerization of river construction data.

또한, 하천 공사 계획을 체계적으로 모니터링 할 수 있는 하천공사관리시스템을 제공할 수 있다.In addition, it is possible to provide a river construction management system that can systematically monitor river construction plans.

또한, 하천 공사 진행 단계에서 예산 및 설계 변경 내역 관리를 할 수 있어 업무 효율성을 향상시킬 수 있는 하천공사관리시스템을 제공할 수 있다.In addition, it is possible to provide a river construction management system that can improve work efficiency by managing budget and design change details at the river construction progress stage.

또한, 준공도면 등 성과품을 관리하여 민원 발생시에 대응이 용이한 하천공사관리시스템을 제공할 수 있다.In addition, it is possible to provide a river construction management system that is easy to respond to when civil complaints occur by managing achievements such as completion drawings.

또한, 사업 완료 후 사업의 효율성 등을 평가할 수 있으면서, 사업의 약점 및 수행 방식의 반복적인 사용을 예방하여 사업 성공률 상승 및 예산 낭비를 예방할 수 있는 하천공사관리시스템을 제공할 수 있다.In addition, it is possible to provide a river construction management system that can prevent the project's weakness and the repetitive use of the project's weakness and prevent the project's success rate and budget waste while being able to evaluate the project's efficiency after the project is completed.

또한, 사업 수행 단계별(기본 계획 수립 단계, 사업 설계 단계, 사업 시공 단계) 사업 간 비교 또는 분석이 가능하고, 사업 내의 강점 및 약점을 도출하여 유지 및 관리 계획 수립이 용이한 하천공사관리시스템을 제공할 수 있다.In addition, it provides a river construction management system that enables comparison or analysis between projects at each stage of project implementation (basic plan establishment stage, project design stage, project construction stage) and makes it easy to establish maintenance and management plans by deriving strengths and weaknesses within the project. can do.

여기서, 본 발명의 여러 실시예들을 도시하여 설명하였지만, 본 발명의 속하는 기술 분야의 통상의 지식을 가진 자라면 본 발명의 원칙이나 정신에서 벗어나지 않으면서 본 실시예를 변형할 수 있음을 알 수 있을 것이다. 발명의 범위는 첨부된 청구항과 그 균등물에 의해 정해질 것이다.Here, although various embodiments of the present invention have been illustrated and described, those of ordinary skill in the art to which the present invention pertains can recognize that the present embodiment can be modified without departing from the spirit or principle of the present invention. will be. The scope of the invention will be defined by the appended claims and their equivalents.

100 : 하천관리시스템 110 : 메인화면부
120 : 사업현황부 130 : 사업공정부
140 : 예산관리부 150 : 지도서비스부
160 : 사업평가부
100: river management system 110: main screen
120: business status department 130: business process department
140: Budget Management Department 150: Map Service Department
160: Project Evaluation Department

Claims (9)

하천공사관리시스템에 있어서,
하천 공사와 관련된 사업 주체, 사업시행자를 포함하는 사업 기본정보 및 하천 공사 성과품을 관리 가능하게 마련된 사업현황부와;
상기 사업 기본정보 및 하천 공사 설계 변경 내역 또는 연도 및 공종별 공사량을 조회 가능하게 마련된 세부 사업 내용을 관리하는 사업공정부와;
상기 사업 기본정보와 공사 총 예산 및 연도별 사업비 또는 연도별 예산 집행 내역을 관리 가능하게 마련된 예산관리부와;
지도로 표시된 화면 내에 사업별 기본 계획 수립 구간, 설계 구간 및 공사 구간을 표시하는 지도서비스부;를 포함하는 것을 특징으로 하는 하천공사관리시스템.
In the river construction management system,
A project status unit prepared to manage basic business information and river construction outcomes, including project subjects and project operators related to river construction;
A business process department for managing detailed project contents prepared to inquire the project basic information and river construction design change details or year and construction amount by work type;
A budget management unit capable of managing the project basic information, total construction budget, annual project cost, or annual budget execution details;
River construction management system comprising a; map service unit for displaying the basic plan establishment section, design section and construction section for each project within the screen displayed as a map.
제1항에 있어서,
선택된 하천 공사 단계별 평가 및 평가 결과를 조회하거나 다른 하천 공사와 평가 결과를 비교 분석 가능하게 마련된 사업평가부;를 포함하는 것을 특징으로 하는 하천공사관리시스템.
According to claim 1,
A river construction management system comprising a; project evaluation unit provided to query the evaluation and evaluation results of selected river construction stages or to compare and analyze evaluation results with other river construction works.
제2항에 있어서,
상기 사업현황부, 상기 사업공정부, 상기 예산관리부, 상기 지도서비스부 및 상기 사업평가부로 이동 가능하게 마련된 각각의 화면이동버튼를 포함하는 메인화면부;를 더 포함하는 것을 특징으로 하는 하천공사관리시스템.
According to claim 2,
River construction management system characterized in that it further comprises; a main screen unit including each screen movement button provided to be movable to the project status unit, the project process unit, the budget management unit, the map service unit, and the project evaluation unit. .
제3항에 있어서,
상기 사업현황부는 사업목록이 표출된 사업현황리스트 화면과, 신규 사업을 등록하는 신규등록버튼과, 상기 사업현황리스트 화면에서 관련 사업의 위치를 알 수 있도록 상기 지도서비스부 내의 해당 사업구간으로 이동하는 지도보기화면이동버튼과, 검색 조건이 구비된 검색조건 화면으로 이동하는 검색버튼과, 상기 메인화면부로 이동하는 홈이동버튼을 포함하는 것을 특징으로 하는 하천공사관리시스템.
According to claim 3,
The business status unit moves to the corresponding business section in the map service unit so that the business status list screen on which the business list is displayed, the new registration button for registering a new business, and the location of the related business on the business status list screen A river construction management system comprising a map view screen movement button, a search button for moving to a search condition screen equipped with search conditions, and a home movement button for moving to the main screen unit.
제4항에 있어서,
상기 사업현황리스트 화면에서 선택된 사업현황 화면에는 하천기본계획보고서, 실시설계보고서, 발주자료 및 준공성과품을 표시, 다운로드 및 입력할 수 있는 버튼을 포함하는 것을 특징으로 하는 하천공사관리시스템.
According to claim 4,
The project status screen selected from the project status list screen includes a button for displaying, downloading and inputting river basic plan reports, implementation design reports, ordering data and completed products. River construction management system.
제1항에 있어서,
상기 사업공정부는,
하천기본정보, 설계변경 내역 및 세부 사업내용 항목을 표시하며
상기 설계변경 내역 항목에는 추가 및 삭제 버튼과 변경횟수, 계약일자, 계약 금액 및 설계 변경 내용을 표시하는 항이 포함된 것을 특징으로 하는 하천공사관리시스템.
According to claim 1,
The business process department,
Displays river basic information, design change details, and detailed project details.
The design change details item includes an add and delete button, a number of changes, a contract date, a contract amount, and a term for displaying design changes.
제1항에 있어서,
상기 사업평가부는,
사업평가 대상이 되는 공사와 관련된 자료를 다운로드할 수 있는 버튼과, 평가결과 저장 버튼과, 평가 단계 확인 및 이동 버튼, 평가진행률 확인바, 남은 항목 표시 버튼을 포함하는 것을 특징으로 하는 하천공사관리시스템.
According to claim 1,
The project evaluation department,
A river construction management system characterized in that it includes a button for downloading construction data related to project evaluation, a save evaluation result button, an evaluation stage confirmation and movement button, an evaluation progress rate confirmation bar, and a button for displaying remaining items .
제7항에 있어서,
상기 사업평가 대상이 되는 공사에 대한 평가를 완료한 후 평과 결과조회 화면이 생성되며,
상기 평가 결과조회 화면에는 종합평가결과 항목, 기본계획수립단계 항목, 사업설계단계 항목, 사업시공단계 항목, 리포트출력 항목을 포함하는 것을 특징으로 하는 하천공사관리시스템,
According to claim 7,
After completing the evaluation of the project subject to the above project evaluation, the evaluation result inquiry screen is created.
The evaluation result inquiry screen includes a comprehensive evaluation result item, a basic plan establishment stage item, a project design stage item, a project construction stage item, and a report output item.
제8항에 있어서,
상기 기본계획수립단계 항목, 상기 사업설계단계 항목 및 상기 사업시공단계 항목에는 분류된 카테고리별 최종 평가 점수 및 카테고리별 점수 그래프가 표시되는 것을 특징으로 하는 하천공사관리시스템.
According to claim 8,
The river construction management system, characterized in that the final evaluation score by category and a score graph by category are displayed in the basic plan establishment stage item, the project design stage item, and the project construction stage item.
KR1020210082474A 2021-06-24 2021-06-24 River Construction Management System KR20230000520A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210082474A KR20230000520A (en) 2021-06-24 2021-06-24 River Construction Management System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210082474A KR20230000520A (en) 2021-06-24 2021-06-24 River Construction Management System

Publications (1)

Publication Number Publication Date
KR20230000520A true KR20230000520A (en) 2023-01-03

Family

ID=84924683

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210082474A KR20230000520A (en) 2021-06-24 2021-06-24 River Construction Management System

Country Status (1)

Country Link
KR (1) KR20230000520A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116797157A (en) * 2023-03-17 2023-09-22 中铁水利水电规划设计集团有限公司 River course treatment engineering cost management system based on artificial intelligence

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116797157A (en) * 2023-03-17 2023-09-22 中铁水利水电规划设计集团有限公司 River course treatment engineering cost management system based on artificial intelligence
CN116797157B (en) * 2023-03-17 2024-05-07 中铁水利水电规划设计集团有限公司 River course treatment engineering cost management system based on artificial intelligence

Similar Documents

Publication Publication Date Title
Guidotti et al. Modeling the resilience of critical infrastructure: The role of network dependencies
Tharme et al. Development of the Building Block Methodology for instream flow assessments, and supporting research on the effects of different magnitude flows on riverine ecosystems
Ruggieri et al. Seismic vulnerability analysis of Masonry Churches in Piemonte after 2003 Valle Scrivia earthquake: Post-event screening and situation 17 years later
Zhou et al. Development of a database exclusively for subway construction accidents and corresponding analyses
Serre et al. Levee performance assessment methods integrated in a GIS to support planning maintenance actions
CN114066211A (en) Watershed water environment management big data platform
Belayutham et al. The dynamics of proximal and distal factors in construction site water pollution
Ray et al. Understanding the user context: decision calendars as frameworks for linking climate to policy, planning, and decision‐making
KR20230000520A (en) River Construction Management System
Akmam Syed Zakaria et al. Economic effects of migrant labor on industrialized building system (IBS) adoption in the Malaysian construction industry
Council on Environmental Quality (US) Considering cumulative effects under the national environmental policy act
Wurbs Incorporation of environmental flows in water allocation in Texas
Rathi Development of environmental management program in environmental impact assessment reports and evaluation of its robustness: an Indian case study
Low et al. Cost-influencing risk factors in infrastructure projects on soft soils
Chohan et al. A Methodology to Develop a Mobile Application Model to Appraise Housing Design Quality.
Knezic et al. GIS‐based DSS for priority setting in humanitarian mine‐action
Tulau et al. The Warrumbungle Post‐Fire Recovery Project—raising the profile of soils
Keneley et al. Stakeholder participation in estuary management: the development of Victoria's Estuary Entrance Management Support System
Van Quang et al. Local government response capacity to natural disasters in the Central Highlands Provinces, Vietnam
Sedighkia et al. Evaluating minimum environmental flow requirements in rivers: a combined decision-Tree approach integrating hydrological, physical habitat, and water quality indexes
Tam et al. Environmental performance assessment in China and Hong Kong
Labonnote Stormwater-related databases–Review and recommendations
Felix et al. Decision support system for flood risk assessment and public sector performance management of emergency scenarios
Patino-Gomez GIS for large-scale watershed observational data model
Holcombe et al. Co-producing data and decision support tools to reduce landslide risk in the humid tropics

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E601 Decision to refuse application