KR20220111990A - Upper PHC Pile for removeable auxiliary pile and construction method of PHC top-down foundation pile using of the same - Google Patents

Upper PHC Pile for removeable auxiliary pile and construction method of PHC top-down foundation pile using of the same Download PDF

Info

Publication number
KR20220111990A
KR20220111990A KR1020210015433A KR20210015433A KR20220111990A KR 20220111990 A KR20220111990 A KR 20220111990A KR 1020210015433 A KR1020210015433 A KR 1020210015433A KR 20210015433 A KR20210015433 A KR 20210015433A KR 20220111990 A KR20220111990 A KR 20220111990A
Authority
KR
South Korea
Prior art keywords
pile
phc
phc pile
removable auxiliary
casing
Prior art date
Application number
KR1020210015433A
Other languages
Korean (ko)
Other versions
KR102502549B1 (en
Inventor
김인철
김락현
이기철
박정규
정용섭
장순호
유일욱
도남영
김봉찬
고호성
Original Assignee
피에이치씨탑다운(주)
주식회사 포스코건설
롯데건설 주식회사
삼표피앤씨 주식회사
대우조선해양건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 피에이치씨탑다운(주), 주식회사 포스코건설, 롯데건설 주식회사, 삼표피앤씨 주식회사, 대우조선해양건설 주식회사 filed Critical 피에이치씨탑다운(주)
Priority to KR1020210015433A priority Critical patent/KR102502549B1/en
Publication of KR20220111990A publication Critical patent/KR20220111990A/en
Application granted granted Critical
Publication of KR102502549B1 publication Critical patent/KR102502549B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • E02D29/055Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to an upper PHC pile for a detachable auxiliary pile, capable of reinforcing a horizontal load, and to a method for constructing a PHC top-down foundation pile applied therewith. The upper PHC pile for a detachable auxiliary pile comprises: a PHC pile body; upper and lower head reinforcing steel plates; upper and lower PHC pile connection bands; a steel bar introduced with a prestress; a circular reinforcing bar; and a detachable auxiliary pile connecting nut.

Description

착탈식 보조말뚝용 상부 PHC말뚝 및 이를 적용한 PHC 역타 기초파일의 시공 방법{Upper PHC Pile for removeable auxiliary pile and construction method of PHC top-down foundation pile using of the same}Upper PHC Pile for removable auxiliary pile and construction method of PHC top-down foundation pile using of the same}

본 발명은 착탈식 보조말뚝용 상부 PHC말뚝 및 이를 적용한 PHC 역타 기초파일의 시공 방법에 관한 것으로, 특히 상부에 착탈식 보조말뚝과의 착탈 결합 및 안전한 인양을 위한 매립 너트가 설치되고, 하부에 철골 기둥의 설치 지지력이 안정되게 확보되고, PHC말뚝의 케이싱내 삽입시 공기압의 제거가 용이하며, 기둥철골에 전달되는 건축구조물 등의 작업하중에 저항하여 상부 PHC말뚝의 종방향 균열을 방지할 수 있는 착탈식 보조말뚝용 상부 PHC말뚝을 제작하여, 현장에서 철골기둥을 착탈식 보조말뚝용 상부 PHC말뚝과 콘크리트를 통해 합성시켜 역타 공법에 활용할 수 있도록 한 착탈식 보조말뚝용 상부 PHC말뚝 및 이를 적용한 PHC 역타 기초파일의 시공 방법에 관한 것이다.The present invention relates to an upper PHC pile for a removable auxiliary pile and a method of constructing a PHC reverse rudder foundation pile to which the same is applied. In particular, a buried nut for detachable coupling with a removable auxiliary pile and safe lifting is installed at the upper portion, Detachable auxiliary to prevent longitudinal cracking of upper PHC pile by ensuring stable installation bearing capacity, easy removal of air pressure when inserting PHC pile into casing Construction of upper PHC piles for removable auxiliary piles and PHC reverse hitting foundation piles to be used in reverse drilling method by manufacturing upper PHC piles for piles and synthesizing steel pillars with removable auxiliary pile upper PHC piles and concrete at the site it's about how

도심지에서 깊은 지하구조물 신축시, 굴착공사 전 지하 외부 벽체와 기둥을 선 시공한 후 굴착공사와 병행하여 지하 구조물을 지상에서 부터 지하로 구축하는 공법을 탑다운공법(Top down Method), 역타(逆打)공법이라 한다. 기존 오픈 컷 공법으로 시공하기 어려운 대단면, 고심도의 굴착이나 인접건물이 밀집한 도심지에서 안정적으로 적용할 수 있다. 이 역타공법은 지상, 지하 동시작업으로 공기단축이 가능하고, 1층 슬래브 선시공하여 작업장으로 활용이 가능하고, 굴착 소음, 분진 방지가 가능하고, 인접건물에 악영향 적으며, 흙막이의 우수한 안전성이 확보되는 장점을 갖는다.When constructing a deep underground structure in a downtown area, the top-down method and reverse tapping method are used to construct the underground structure from the ground to the basement in parallel with the excavation work after pre-constructing the underground external walls and columns before excavation work.打) It is called construction method. It can be applied stably in large-area, high-depth excavation, which is difficult to construct with the existing open cut method, or in downtown areas where adjacent buildings are dense. This reverse drilling method can shorten the construction period by simultaneously working on the ground and underground, and it can be used as a workshop by pre-constructing a slab on the first floor, it is possible to prevent excavation noise and dust, has little adverse effect on adjacent buildings, and secures excellent safety of retaining wall has the advantage of being

역타공법에서 PHC 파일을 적용하는 경우, 착탈식 보조말뚝을 상부 PHC말뚝에 용이하게 체결할 수 있어야 한다. 또한 철둥철골을 통해 상부 PHC말뚝의 횡방향으로 건축구조물 등의 작업하중이 전달되어 상부 PHC말뚝에 종방향으로 균열이 발생됨으로 이에 대한 대책이 필요하다. 또한 상부 PHC말뚝은 내부 바닥에 철골 기둥을 안정되게 지지할 수 있는 충분한 바닥 강도를 갖추어야 하고, 케이싱 내로 삽입될 시 공기압을 제거할 수 있는 바닥 구조를 갖추어야 한다.In case of applying the PHC pile in the reverse drilling method, it should be possible to easily fasten the removable auxiliary pile to the upper PHC pile. In addition, the work load of the building structure is transmitted in the transverse direction of the upper PHC pile through the iron frame, and cracks occur in the upper PHC pile in the longitudinal direction, so countermeasures are required. In addition, the upper PHC pile must have sufficient floor strength to stably support the steel column on the inner floor, and must have a floor structure that can remove air pressure when inserted into the casing.

본 발명의 배경이 되는 기술로는 한국 등록특허 등록번호 제10-1766165호(특허문헌 1)로서, '착탈식 보조항을 이용한 역타 지지용 파일 시공방법 및 이를 이용한 역타공법'이 제안되어 있다. 이는 지하층의 작업하중과 구조물 하중을 지지하는 대구경 PHC파일과 착탈식 보조항을 연결하여 시공하고 착탈식 보조항의 내부로 철골기둥을 삽입하여 PHC파일과 연결한 후 굴착공사를 하도록 하여 역타구간에서의 파일 공사비를 대폭 절감할 수 있도록 한 것이다. As the background technology of the present invention, as Korean Patent Registration No. 10-1766165 (Patent Document 1), 'a method of constructing a pile for back hitting using a detachable auxiliary port and a reverse punching method using the same' has been proposed. It is constructed by connecting a large-diameter PHC pile that supports the working load and structural load of the basement floor and a removable auxiliary port. This allows for significant savings.

그러나 상기 배경기술은 철골기둥의 수직하중으로 인해 발생된 횡방향 하중으로 인해 이음부 PHC파일에 종방향 균열이 발생될 수 있다. 또한 이음부 PHC파일을 케이싱 내부로 삽입시 하부 PHC파일에 공기압이 형성되어 하부 PHC파일의 하단에서 일정 높이까지 소일시멘트를 채움하기 어렵다. 또한 철골기둥을 지지하는 마감플레이트에 보강구조가 없어 철골기둥의 지지력을 높이는데 한계가 있다.However, in the background art, longitudinal cracks may occur in the joint PHC pile due to the lateral load generated due to the vertical load of the steel column. In addition, when inserting the joint PHC pile into the casing, air pressure is formed in the lower PHC pile, making it difficult to fill the soil cement from the lower end of the lower PHC pile to a certain height. In addition, there is no reinforcing structure in the finishing plate supporting the steel column, so there is a limit in increasing the bearing capacity of the steel column.

한국 등록특허 등록번호 제10-1766165호Korean Patent Registration No. 10-1766165

본 발명은 상부에 착탈식 보조말뚝과의 착탈 결합 및 안전한 인양을 위한 매립 너트가 설치되고, 하부에 철골 기둥의 설치 지지력이 안정되게 확보되고, PHC말뚝의 케이싱내 삽입시 공기압의 제거가 용이하며, 기둥철골에 전달되는 건축구조물 등의 작업하중에 저항하여 상부 PHC말뚝의 종방향 균열을 방지할 수 있는 착탈식 보조말뚝용 상부 PHC말뚝을 제작하여, 현장에서 철골기둥을 착탈식 보조말뚝용 상부 PHC말뚝과 콘크리트를 통해 합성시켜 역타 공법에 활용할 수 있도록 한 착탈식 보조말뚝용 상부 PHC말뚝 및 이를 적용한 PHC 역타 기초파일의 시공 방법을 제공함에 그 목적이 있다.In the present invention, a buried nut for detachable coupling with a removable auxiliary pile and safe lifting is installed at the upper part, the installation support force of the steel column is stably secured at the lower part, and the removal of air pressure is easy when inserting the PHC pile into the casing, By manufacturing upper PHC piles for detachable auxiliary piles that can prevent longitudinal cracking of upper PHC piles by resisting the working load of building structures, etc. transmitted to column steel frames, The purpose of this is to provide an upper PHC pile for a removable auxiliary pile that can be synthesized through concrete and used in the reverse punching method, and a construction method of the PHC reverse punching foundation pile to which it is applied.

본 발명의 바람직한 실시 예에 따른 착탈식 보조말뚝용 상부 PHC말뚝은,The upper PHC pile for a removable auxiliary pile according to a preferred embodiment of the present invention,

하부로 하부 PHC 말뚝과 용접되어 연결되고 상부로 착탈식 보조말뚝과 연결되어 역타 공법에 사용되는 착탈식 보조말뚝용 상부 PHC말뚝에 있어서, 타설 콘크리트를 원심 성형하여 이루어진 PHC말뚝 본체와; 상기 PHC말뚝 본체의 상면 및 하면에 각기 원판상으로 설치되어 원형 배열된 다수의 땅콩구멍을 갖고 두부를 보강하는 상,하부 두부보강철판과; 상기 PHC말뚝 본체의 상부 및 하부 둘레로 각기 원통링 형태로 설치된 상,하부 PHC 말뚝 연결밴드와; 상기 PHC말뚝 본체의 둘레로 땅콩구멍을 따라 원형 배열되어 프리스트레스가 도입되어 있는 강봉과; 원형 또는 나선형을 이루어 상기 강봉과 접합되어 축하중에서 발생된 수평하중에 대한 저항을 보강하는 원형 보강근과; 상기 PHC말뚝 본체의 상면에 착탈식 보조말뚝과 고장력 볼트로 체결하기 위해 매립되어 설치된 착탈식 보조말뚝 연결용 너트;를 포함하여 구성된 것을 특징으로 한다.In the upper PHC pile for a removable auxiliary pile used in reverse drilling method by being welded and connected to the lower PHC pile and connected to the detachable auxiliary pile at the top, the PHC pile body comprising: a PHC pile body made by centrifugal molding of poured concrete; Upper and lower head reinforcing steel plates installed on the upper and lower surfaces of the PHC pile body in a circular plate shape, respectively, and having a plurality of peanut holes arranged in a circle to reinforce the head; Upper and lower PHC pile connection bands respectively installed in a cylindrical ring shape around the upper and lower parts of the PHC pile body; A steel bar in which pre-stress is introduced in a circular arrangement along the peanut hole around the PHC pile body; a circular reinforcing bar formed in a circle or spiral form and joined to the steel bar to reinforce resistance to a horizontal load generated from an axial load; It is characterized in that it comprises a; detachable auxiliary pile connection nut installed embedded in the upper surface of the PHC pile body for fastening with a high-tensile bolt to the auxiliary pile.

또한, 상기 상부 PHC말뚝내로 삽입되는 철골기둥의 거치를 위해 PHC말뚝 본체의 하부측 하부 두부보강철판에 접합되어지고, 상부 PHC말뚝의 케이싱 내 삽입시 그 내부에 채워지는 공기압을 제거하기 위한 에어홀을 갖는 철골기둥 거치용 막음철판과; 상기 에어홀에 위치하여 철골기둥 거치용 막음철판에 접합되어 콘크리트가 에어홀을 통하여 빠져나가지 못하도록 하는 콘크리트 막음용 메탈라스 철망과; 상기 철골거치용 막음철판의 하면에 에어홀을 지나가도록 +자 형으로 설치되어 철골기둥 거치용 막음철판을 보강하는 십자형 보강리브;를 더 포함한 것을 특징으로 한다.In addition, it is joined to the lower head reinforcing steel plate on the lower side of the PHC pile body for the mounting of the steel pillar inserted into the upper PHC pile, and an air hole for removing the air pressure filled therein when the upper PHC pile is inserted into the casing. A blocking iron plate for mounting a steel frame having a; a metal lath wire mesh for blocking concrete, which is located in the air hole and is joined to the iron plate for mounting the steel frame to prevent the concrete from escaping through the air hole; It is characterized in that it further comprises a; cross-shaped reinforcing rib installed in a +-shape to pass through the air hole on the lower surface of the blocking iron plate for steel frame mounting to reinforce the blocking iron plate for steel column mounting.

또한, 착탈식 보조말뚝 연결용 너트는 땅콩구멍의 회전 직경 상에 착탈식 보조말뚝과 체결이 용이한 위치에 하부 PHC 말뚝과 상부 PHC말뚝의 총무게를 안전하게 인양할 수 있도록 다수개가 원형 배열되어 있는 것을 특징으로 한다.In addition, a plurality of nuts for connecting the removable auxiliary pile are arranged in a circle so that the total weight of the lower PHC pile and the upper PHC pile can be safely lifted at a position where it is easy to fasten with the removable auxiliary pile on the rotation diameter of the peanut hole. do it with

한편, 본 발명의 일 실시 예에 따른 착탈식 보조말뚝용 상부 PHC말뚝을 사용하여 PHC 역타 기초파일을 시공하는 방법은,On the other hand, the method of constructing a PHC reverse rudder foundation pile using an upper PHC pile for a removable auxiliary pile according to an embodiment of the present invention,

지면의 제1서비스홀에 인입시킨 상부 PHC말뚝에 착탈식 보조말뚝을 회전 체결시켜 놓는 단계와; 착탈식 보조말뚝을 통해 상부 PHC말뚝을 인양한 후, 제2서비스홀에 인입되어 있는 하부 PHC말뚝에 상부 PHC말뚝을 용접 이음하는 단계와; 오거드릴과 케이싱을 사용하여 케이싱 홀을 암반층 일정 깊이만큼 형성시키는 케이싱 천공을 실시하는 단계와; 케이싱 홀의 막장에 일정 깊이만큼 1차 시멘트 그라우트 충진 후 오거드릴을 통해 상하교반을 실시하는 단계와; 제2서비스홀에 위치되어 있는 하부 PHC말뚝, 상부 PHC말뚝 및 착탈식 보조말뚝을 인양하여 1차 시멘트 그라우트 충진이 이루어진 상기 케이싱의 내부로 인입시킨 후, 드롭햄머 또는 유압햄머로 경타를 실시하는 단계와; 착탈식 보조말뚝을 역회전시켜 상부 PHC말뚝으로부터 연결을 해제시켜 놓는 단계와; 케이싱을 인발한 후, 2차 시멘트 그라우트를 하부 PHC말뚝과 상부 PHC말뚝의 각기 외주면으로 주입하는 단계와; 상부 PHC말뚝의 내부로 콘크리트를 타설한 후, 철골기둥을 상부 PHC말뚝의 내부로 인입 지지시켜 놓는 단계와; 콘크리트의 양생 후 상부 PHC말뚝에 연결된 착탈식 보조말뚝을 제거시키는 단계와; 케이싱이 인발되어 나간 케이싱 홀을 통해 철골기둥의 둘레로 토사를 채워 되메우기를 실시하는 단계;를 포함하여 시공되는 것을 특징으로 한다.Rotating and fastening the removable auxiliary pile to the upper PHC pile introduced into the first service hole in the ground; After lifting the upper PHC pile through the removable auxiliary pile, the step of welding the upper PHC pile to the lower PHC pile introduced into the second service hole; performing casing drilling to form a casing hole to a predetermined depth in the rock layer using an auger drill and a casing; A step of performing vertical stirring through an auger drill after filling the first cement grout to a certain depth in the end of the casing hole; Lifting the lower PHC piles, the upper PHC piles and the removable auxiliary piles located in the second service hole, introducing them into the casing where the primary cement grout is filled, and then performing hard hitting with a drop hammer or hydraulic hammer; ; Reversing the removable auxiliary pile to release the connection from the upper PHC pile; After drawing the casing, injecting the secondary cement grout to the outer peripheral surface of each of the lower PHC pile and the upper PHC pile; After pouring concrete into the upper PHC pile, the step of inserting and supporting the steel column into the inside of the upper PHC pile; removing the removable auxiliary pile connected to the upper PHC pile after curing of the concrete; It is characterized in that it is constructed including; filling the perimeter of the steel column with soil and backfilling through the casing hole from which the casing is drawn out.

본 발명의 다른 실시 예에 따른 착탈식 보조말뚝용 상부 PHC말뚝을 사용하여 PHC 역타 기초파일을 시공하는 방법은, 착탈식 보조말뚝용 상부 PHC말뚝을 사용하여 PHC 역타 기초파일을 시공하는 방법에 있어서, 지면의 제1서비스홀에 인입시킨 상부 PHC말뚝에 착탈식 보조말뚝을 회전 체결시켜 놓는 단계와; 착탈식 보조말뚝을 통해 상부 PHC말뚝을 인양한 후, 제2서비스홀에 인입되어 있는 하부 PHC말뚝에 상부 PHC말뚝을 용접 이음하는 단계와; 오거드릴과 케이싱을 사용하여 케이싱 홀을 암반층 일정 깊이만큼 실시하는 단계와; 케이싱 홀의 막장에 일정 깊이만큼 1차 시멘트 그라우트 충진 후 오거드릴을 통해 상하교반을 실시하는 단계와; 제2서비스홀에 위치되어 있는 하부 PHC말뚝, 상부 PHC말뚝 및 착탈식 보조말뚝을 인양하여 1차 시멘트 그라우트 충진이 이루어진 상기 케이싱의 내부로 인입시킨 후, 드롭햄머 또는 유압햄머로 경타를 실시하는 단계와; 착탈식 보조말뚝을 역회전시켜 상부 PHC말뚝으로부터 연결을 해제시켜 놓는 단계와; 케이싱을 인발한 후, 2차 시멘트 그라우트를 하부 PHC말뚝과 상부 PHC말뚝의 각기 외주면으로 주입하는 단계와; 상부 PHC말뚝에 연결된 착탈식 보조말뚝을 제거시키는 단계와; 케이싱 홀을 통해 상부 PHC말뚝의 상부로 토사를 채워 되메우기를 실시하는 단계;를 포함하여 시공되는 것을 특징으로 한다.The method of constructing a PHC turning foundation pile using an upper PHC pile for a removable auxiliary pile according to another embodiment of the present invention is a method of constructing a PHC turning foundation pile using an upper PHC pile for a removable auxiliary pile, the ground Rotating and fastening the removable auxiliary pile to the upper PHC pile introduced into the first service hole of the; After lifting the upper PHC pile through the removable auxiliary pile, the step of welding the upper PHC pile to the lower PHC pile introduced into the second service hole; performing a casing hole to a certain depth of the rock layer using an auger drill and a casing; A step of performing vertical stirring through an auger drill after filling the first cement grout to a certain depth in the end of the casing hole; Lifting the lower PHC piles, the upper PHC piles and the removable auxiliary piles located in the second service hole, introducing them into the casing where the primary cement grout is filled, and then performing hard hitting with a drop hammer or hydraulic hammer; ; Reversing the removable auxiliary pile to release the connection from the upper PHC pile; After drawing the casing, injecting the secondary cement grout to the outer peripheral surface of each of the lower PHC pile and the upper PHC pile; removing the removable auxiliary pile connected to the upper PHC pile; It is characterized in that it is constructed including; filling the upper part of the upper PHC pile through the casing hole and performing backfilling.

또한, 1차 시멘트 그라우트의 시공은 선단에 잔존해 있는 굴착 슬라임으로 인한 잔류침하를 방지하기 위해 굴착하단으로부터 일정 높이(2M~3M)까지 오거비트를 올린 후 고농도(물-시멘트 비 45%~70%) 1차 시멘트그라우트액을 2M이상 충진 후 상하 왕복하면서 교반을 실시하는 것을 특징으로 한다.In addition, in the construction of the primary cement grout, the auger bit is raised from the bottom of the excavation to a certain height (2M~3M) from the bottom of the excavation to prevent residual settlement due to the excavated slime remaining at the tip, and then a high concentration (water-cement ratio of 45%~70) %) It is characterized in that the primary cement grout solution is filled with 2M or more and then stirred while reciprocating up and down.

또한, 상부 PHC말뚝의 내부에 설치된 철골기둥의 시공 높이가 일정하지 않는 경우, 해당 철골기둥(50)의 상단에 추가적으로 2차 철골기둥을 연결 설치하는 단계가 더 포함된 것을 특징으로 한다.In addition, when the construction height of the steel column installed inside the upper PHC pile is not constant, the step of additionally connecting and installing the secondary steel column to the upper end of the corresponding steel column 50 is further included.

본 발명의 착탈식 보조말뚝용 상부 PHC말뚝 및 이를 적용한 PHC 역타 기초파일의 시공 방법에 따르면, 시공 중 착탈식 보조말뚝(30)과 상부 PHC 말뚝 체결용 고장력 볼트(40)의 연결 너트를 상부 PHC 말뚝측 두부보강철판(220)의 강봉(240)이 체결된 땅콩 모양의 너트를 사용하지 않고 별도의 매립 너트(260)가 두부보강 철판(30) 내측에 다수개 설치되어 착탈식 보조말뚝(30)과의 결합이 견고하며 PHC 말뚝(10과 20)의 인양시 낙하없이 안전하고 용이하게 실시할 수 있다.According to the construction method of the upper PHC pile for removable auxiliary piles of the present invention and the PHC reverse rudder foundation pile applying the same, the connection nut of the detachable auxiliary pile 30 and the high tension bolt 40 for fastening the upper PHC pile side during construction is applied to the upper PHC pile side. Instead of using a peanut-shaped nut to which the steel bar 240 of the head reinforcing steel plate 220 is fastened, a plurality of separate embedded nuts 260 are installed inside the head reinforcing steel plate 30, so that The combination is strong and it can be safely and easily carried out without falling when lifting the PHC piles (10 and 20).

또한, 상부 PHC말뚝(20)에는 하단에 철골기둥 거치용 막음철판(270)이 설치되어 철골 기둥(50)의 설치 지지력이 증가된다. 또한 PHC 역타 기초파일(1000)은 시공 중에 철골기둥 거치용 막음철판(270)에는 에어홀(271a)이 형성되어 착탈식 보조말뚝(30)과 연결된 상부 PHC말뚝(20) 및 하부 PHC 말뚝(10)을 케이싱 내부로 삽입 시 하부 PHC 말뚝(10)의 내부에 차는 공기압을 용이하게 제거시킬 수 있어 하부 PHC 말뚝(10)의 하부에 소일시멘트를 합성시킬 수 있다. 또한 상부 PHC말뚝(20)은 PHC말뚝 본체(210)에 매립된 추가 원형 보강근(250)에 의해 전단보강이 이루어져 종방향 균열을 효과적으로 방지할 수 있어 철골 기둥(50)의 수직하중을 증가시킬 수 있고, 축방향 작업하중으로 인해 발생되는 수평방향 하중을 보강할 수 있다.In addition, the upper PHC pile 20 is installed at the lower end of the steel column for mounting a blocking iron plate 270 to increase the installation support force of the steel frame column (50). In addition, in the PHC reverse pounding foundation pile 1000, an air hole 271a is formed in the blocking iron plate 270 for mounting the steel pillar during construction, and the upper PHC pile 20 and the lower PHC pile 10 connected to the removable auxiliary pile 30. When inserting into the casing, it is possible to easily remove the pneumatic pressure inside the lower PHC pile 10 , so that soil cement can be synthesized in the lower part of the lower PHC pile 10 . In addition, the upper PHC pile 20 is shear-reinforced by the additional circular reinforcing bar 250 embedded in the PHC pile body 210 to effectively prevent longitudinal cracking, thereby increasing the vertical load of the steel column 50. In addition, it is possible to reinforce the horizontal load generated by the axial working load.

본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1은 본 발명의 제1 실시 예에 적용되는 착탈식 보조말뚝용 상부 PHC말뚝이 하부 PHC 말뚝과 착탈식 보조말뚝에 연결된 상태도.
도 2는 도 1의 'A'부 확대도.
도 3은 도 1의 'B'부 확대도.
도 4는 도 1에 도시된 착탈식 보조말뚝용 상부 PHC말뚝의 평면도.
도 5는 도 1의 착탈식 보조말뚝용 상부 PHC말뚝에 적용된 철골기둥 거치용 막음철판, 콘크리트 막음용 메탈라스 철망, 십자형 보강리브의 평면도.
도 6a 내지 도 6j는 도 1에 도시된 착탈식 보조말뚝용 상부 PHC말뚝과 하부 PHC 말뚝을 이용한 PHC 역타 기초파일의 순차적인 시공순서도.
도 7은 본 발명의 제2 실시 예에 적용되는 착탈식 보조말뚝용 상부 PHC말뚝이 하부 PHC 말뚝과 착탈식 보조말뚝에 연결된 상태도.
도 8a 및 도 8b는 도 7에 도시된 착탈식 보조말뚝용 상부 PHC말뚝과 하부 PHC 말뚝을 이용한 PHC 역타 기초파일의 시공 과정 중 시멘트 그라우트 주입 단계와 토사 되메우기 단계를 각기 나타낸 시공상태도.
The following drawings attached to this specification illustrate preferred embodiments of the present invention, and serve to further understand the technical spirit of the present invention together with the detailed description of the present invention, so the present invention is limited to the matters described in the accompanying drawings It should not be construed as being limited.
1 is a state diagram in which the upper PHC pile for the removable auxiliary pile applied to the first embodiment of the present invention is connected to the lower PHC pile and the removable auxiliary pile.
2 is an enlarged view of part 'A' of FIG. 1;
3 is an enlarged view of part 'B' of FIG. 1 .
Figure 4 is a plan view of the upper PHC pile for the removable auxiliary pile shown in Figure 1.
Figure 5 is a plan view of the iron plate for holding the steel column applied to the upper PHC pile for the removable auxiliary pile of Figure 1, the metal lath wire mesh for blocking the concrete, and a cross-shaped reinforcing rib.
Figures 6a to 6j is a sequential construction flow chart of the PHC reverse rudder foundation pile using the upper PHC pile and the lower PHC pile for the removable auxiliary pile shown in FIG.
7 is a state diagram in which the upper PHC pile for the removable auxiliary pile applied to the second embodiment of the present invention is connected to the lower PHC pile and the removable auxiliary pile.
Figures 8a and 8b are construction state diagrams respectively showing the cement grout injection step and the soil backfill step during the construction process of the PHC reverse pounding foundation pile using the upper PHC pile and the lower PHC pile for the removable auxiliary pile shown in FIG.

아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다.Hereinafter, the present invention will be described in detail with reference to the embodiments shown in the accompanying drawings, but the presented embodiments are illustrative for a clear understanding of the present invention, and the present invention is not limited thereto.

본 발명에 따른 착탈식 보조말뚝용 상부 PHC말뚝(20)은 하부로 하부 PHC 말뚝(10)과 용접되어 연결되고 상부로 착탈식 보조말뚝(강관말뚝)(30)과 연결되어 역타 공법에 사용된다. 착탈식 보조말뚝용 상부 PHC말뚝(20)은 철골기둥이 설치되는 철골 기둥식과 철골기둥이 설치되지 않는 일반 기둥식으로 제작될 수 있다.The upper PHC pile 20 for removable auxiliary piles according to the present invention is connected by welding with the lower PHC pile 10 at the bottom and is connected to the removable auxiliary pile (steel pipe pile) 30 at the top and is used in the reverse punching method. The upper PHC pile 20 for the removable auxiliary pile may be manufactured in a steel column type in which a steel column is installed and a general column type in which a steel column is not installed.

<제 1 실시 예><First embodiment>

도 1 내지 도 5와 같이 제 1실시 예에 따른 착탈식 보조말뚝용 상부 PHC말뚝(20)은 철골 기둥식에 적용될 수 있도록 구성된 것이다.1 to 5, the upper PHC pile 20 for a removable auxiliary pile according to the first embodiment is configured to be applied to a steel column type.

착탈식 보조말뚝용 상부 PHC말뚝(20)은 타설 콘크리트를 원심 성형하여 이루어진 PHC말뚝 본체(210)와, PHC말뚝 본체(210)의 상면 및 하면에 각기 원판상으로 설치되어 원형 배열된 다수의 땅콩구멍(221)을 갖고 두부를 보강하는 상,하부 두부보강철판(220,220a)과, PHC말뚝 본체(210)의 상부 및 하부 둘레로 각기 원통링 형태로 설치된 상,하부 PHC 말뚝 연결밴드(230,230a)와, PHC말뚝 본체(210)의 둘레로 땅콩구멍(221)을 따라 원형 배열되어 프리스트레스가 도입되어 있는 강봉(240)과, 원형 또는 나선형을 이루어 상기 강봉(240)과 접합되어 축하중에서 발생된 수평하중에 대한 저항을 보강하는 원형 보강근(250)과, PHC말뚝 본체(210)의 상면에 착탈식 보조말뚝(30)과 고장력 볼트(40)로 체결하기 위해 매립되어 설치된 착탈식 보조말뚝 연결용 너트(260)와, PHC말뚝 본체(210)의 하부측 하부 두부보강철판(220a)에 접합되어지고, 착탈식 보조말뚝용 상부 PHC말뚝(20)의 케이싱 내 삽입시 그 내부에 채워지는 공기압을 제거하기 위한 에어홀(271)을 갖는 철골기둥 거치용 막음철판(270)과, 에어홀(271)에 위치하여 철골기둥 거치용 막음철판(270)에 접합되어 콘크리트가 에어홀(271)을 통하여 빠져나가지 못하도록 하는 콘크리트 막음용 메탈라스 철망(280)과, 철골거치용 막음철판(270)의 하면에 에어홀(271)을 지나가도록 +자 형으로 설치되어 철골기둥 거치용 막음철판(270)을 보강하는 십자형 보강리브(290)로 구성된다.The upper PHC pile 20 for the removable auxiliary pile is a PHC pile body 210 made by centrifugally molding poured concrete, and a plurality of peanut holes installed in a circular shape on the upper and lower surfaces of the PHC pile body 210, respectively. Upper and lower head reinforcing steel plates 220 and 220a having 221 and reinforcing the head, and upper and lower PHC pile connection bands 230 and 230a installed in a cylindrical ring shape around the upper and lower circumferences of the PHC pile body 210, respectively And, the PHC pile body 210 is circularly arranged along the peanut hole 221 and the prestress is introduced, and the steel rod 240 is formed in a circular or spiral form and is joined to the steel rod 240 to generate a horizontal load generated from the shaft. A circular reinforcing bar 250 for reinforcing resistance to load, and a removable auxiliary pile connection nut 260 embedded in the upper surface of the PHC pile body 210 for fastening with the removable auxiliary pile 30 and high tension bolt 40 ) and the lower side of the PHC pile body 210, which is joined to the lower head reinforcing steel plate 220a, and is inserted into the casing of the upper PHC pile 20 for a removable auxiliary pile. Air to remove the air pressure filled therein The steel column mounting plate 270 having a hole 271 and the iron frame plate 270 for mounting the steel frame are located in the air hole 271 and are joined to the steel column pole mounting plate 270 to prevent concrete from escaping through the air hole 271. Cross-shaped reinforcement that is installed in a +-shape to pass through the air hole 271 on the lower surface of the metal lath wire mesh 280 for concrete blocking and the blocking iron plate 270 for holding the steel frame to reinforce the blocking iron plate 270 for mounting the steel column. Consists of ribs (290).

여기서, 착탈식 보조말뚝 연결용 너트(260)는 땅콩구멍(221)의 회전 직경 상에 착탈식 보조말뚝(30)과 체결이 용이한 위치에 하부 PHC 말뚝(10)과 상부 PHC말뚝(20)의 총무게를 안전하게 인양할 수 있도록 다수개가 원형 배열되어 있다. 십자형 보강리브(290)는 ㄱ형강, 철판 등으로 제작될 수 있다.Here, the nut 260 for connecting the removable auxiliary pile is a total of the lower PHC pile 10 and the upper PHC pile 20 at a position where it is easy to fasten with the removable auxiliary pile 30 on the rotation diameter of the peanut hole 221 . Many are arranged in a circle so that the weight can be safely lifted. The cross-shaped reinforcing rib 290 may be made of a steel plate, a steel plate, or the like.

이같이 상부 PHC말뚝(20)에는 착탈식 보조말뚝 연결용 너트(260)가 상부 두부보강철판(220)의 밑면에 별도로 설치되어 고중량의 PHC말뚝 인양을 안전하게 수행할 수 있다. 즉, 기존 땅콩모양의 너트는 고중량의 PHC말뚝 인양 시 비폐합 너트모양의 벌어짐 현상 발생으로 중량물 낙하사고가 발생하였으나 본 발명은 이러한 낙하사고를 방지할 수 있는 것이다.As such, the upper PHC pile 20 has a detachable auxiliary pile connection nut 260 installed separately on the underside of the upper head reinforcing steel plate 220 to safely lift the heavy PHC pile. That is, the existing peanut-shaped nut caused a heavy object fall accident due to the occurrence of a non-closing nut-shaped splintering phenomenon when lifting a high-weight PHC pile, but the present invention can prevent such a fall accident.

또한, 콘크리트 막음용 메탈라스 철망(280)은 메탈라스 망으로 제작되거나 회전개폐형 철판이 될 수 있다. 그 외 콘크리트 막음용 메탈라스 철망(280)은 착탈식 보조말뚝과 체결된 상부 PHC말뚝(20)을 삽입 후 채움콘크리트 타설 전에 착탈식 보조말뚝 내부를 통해 별도 삽입되어 에어홀(271)을 막을 수 있는 다른 막음수단이 될 수 있다.In addition, the metal lath wire mesh 280 for blocking concrete may be made of a metal lath mesh or may be a rotational opening/closing type iron plate. In addition, the metal lath wire mesh 280 for blocking concrete is separately inserted through the inside of the removable auxiliary pile before the filling concrete is poured after inserting the upper PHC pile 20 fastened with the removable auxiliary pile to block the air hole 271. It can be a means of blocking.

이와 같이 구성된 제 1실시 예에 따른 착탈식 보조말뚝용 상부 PHC말뚝(20)을 사용하여 PHC 역타 기초파일(1000)을 시공하는 방법을 설명한다.A method of constructing the PHC reverse rudder foundation pile 1000 using the upper PHC pile 20 for a removable auxiliary pile according to the first embodiment configured as described above will be described.

먼저, 도 6a와 같이 지면(500)의 제1서비스홀(501)에 인입시킨 상부 PHC말뚝(20)에 착탈식 보조말뚝(30)을 회전 체결시켜 놓는다. 이때 상부 PHC말뚝(20)의 착탈식 보조말뚝 연결용 너트(260)에 체결된 고장력볼트(40)가 착탈식 보조말뚝(30)의 하단에 체결된다.First, as shown in FIG. 6a , the detachable auxiliary pile 30 is rotationally fastened to the upper PHC pile 20 introduced into the first service hole 501 of the ground 500 . At this time, the high tension bolt 40 fastened to the nut 260 for connecting the removable auxiliary pile of the upper PHC pile 20 is fastened to the lower end of the removable auxiliary pile 30 .

그 다음, 도 6b와 같이 착탈식 보조말뚝(30)을 통해 상부 PHC말뚝(20)을 인양한 후, 제2서비스홀(502)에 인입되어 있는 하부 PHC말뚝(10)에 상부 PHC말뚝(20)을 동일축상에 놓여지도록 용접 이음한다. 따라서 하부 PHC말뚝(10)과 상부 PHC말뚝(20)은 일체로 연결된다.Then, after lifting the upper PHC pile 20 through the removable auxiliary pile 30 as shown in FIG. 6b , the upper PHC pile 20 is placed on the lower PHC pile 10 that is introduced into the second service hole 502 . are welded so that they lie on the same axis. Therefore, the lower PHC pile 10 and the upper PHC pile 20 are integrally connected.

그 다음, 도 6c와 같이 오거드릴(70)과 케이싱(72)을 사용하여 케이싱 홀(72a)을 암반층 일정 깊이만큼 형성시키는 케이싱 천공작업이 이루어진다.Next, as shown in FIG. 6c , a casing drilling operation is performed to form the casing hole 72a to a certain depth of the rock layer using the auger drill 70 and the casing 72 .

그 다음, 도 6d와 같이 케이싱 홀(72a)의 막장에 일정 깊이만큼 1차 시멘트 그라우트(1100) 충진 후 오거드릴(70)을 통해 상하교반을 실시한다. 따라서 1차 시멘트 그라우트(1100)는 오거드릴(70)의 상하교반을 통해 소일시멘트화 된다.Next, as shown in FIG. 6d , after filling the first cement grout 1100 to a predetermined depth in the last length of the casing hole 72a, vertical stirring is performed through the auger drill 70 . Therefore, the primary cement grout 1100 is soil-cemented through vertical stirring of the auger drill 70 .

여기서, 1차 시멘트 그라우트 시공은 선단에 잔존해 있는 굴착(천공) 슬라임으로 인한 잔류침하를 방지하기 위해 굴착하단으로부터 일정 높이(2M~3M)까지 오거비트를 올린 후 고농도(물-시멘트(w/c)비 45%~70%) 1차 시멘트그라우트액을 2M이상 충진 후 상하 왕복하면서 교반을 실시한다. 따라서 선단의 잔존 슬라임과 고농도 1차 시멘트그라우트액으로 교반된 소일시멘트의 강도를 선단지지 지반인 풍화암 동등 이상으로 개량하여 지지력을 상승시킴으로써 PHC 파일의 잔류침하를 방지할 수 있다.Here, in the first cement grout construction, the auger bit is raised from the bottom of the excavation to a certain height (2M~3M) from the bottom of the excavation to prevent residual settlement due to the excavation (perforation) slime remaining at the tip, and then a high concentration (water-cement (w/ c) Ratio 45%~70%) After filling 2M or more of the primary cement grout solution, perform stirring while reciprocating up and down. Therefore, it is possible to prevent residual settlement of PHC piles by improving the strength of the soil cement stirred with the residual slime at the tip and the high-concentration primary cement grout solution to be equal to or higher than the weathered rock that is the supporting ground of the tip to increase the bearing capacity.

그 다음, 도 6e와 같이 제2서비스홀(502)에 위치되어 있는 하부 PHC말뚝(10), 상부 PHC말뚝(20) 및 착탈식 보조말뚝(30)을 인양하여 1차 시멘트 그라우트(1100) 충진이 이루어진 상기 케이싱(72)의 내부로 인입시킨 후, 드롭햄머 또는 유압햄머로 경타를 실시한다. 따라서 하부 PHC말뚝(10)은 그의 하부 내부로 소일시멘트가 채워진 상태로 직립 상태를 유지하게 된다.Next, the primary cement grout 1100 filling is performed by lifting the lower PHC pile 10, the upper PHC pile 20 and the removable auxiliary pile 30 located in the second service hole 502 as shown in FIG. 6e. After being drawn into the inside of the casing 72 made, it is hit with a drop hammer or a hydraulic hammer. Therefore, the lower PHC pile 10 is maintained in an upright state with the soil cement filled into its lower interior.

그 다음, 도 6f와 같이 착탈식 보조말뚝(30)을 역회전시켜 상부 PHC말뚝(20)으로부터 연결을 해제시켜 놓는다. 따라서 고장력볼트(40)가 착탈식 보조말뚝(30)으로부터 분리될 수 있는 준비를 마치게 된다.Then, as shown in FIG. 6f, the detachable auxiliary pile 30 is reversely rotated to release the connection from the upper PHC pile 20. Therefore, the high tension bolt 40 is ready to be separated from the removable auxiliary pile (30).

그 다음, 도 6g와 같이 케이싱(72)을 인발한 후, 2차 시멘트 그라우트(1200)를 하부 PHC말뚝(10)과 상부 PHC말뚝(20)의 각기 외주면으로 주입하여 놓는다. 따라서 2차 시멘트 그라우트(1200)가 양생되면 하부 PHC말뚝(10)과 상부 PHC말뚝(20)은 케이싱 홀(72a)에서 2차 시멘트 그라우트(1200)와 일체된 형태를 유지하게 된다.Next, after the casing 72 is drawn out as shown in FIG. 6g , the secondary cement grout 1200 is injected into the outer peripheral surfaces of the lower PHC piles 10 and the upper PHC piles 20 , respectively. Therefore, when the secondary cement grout 1200 is cured, the lower PHC pile 10 and the upper PHC pile 20 maintain an integrated form with the secondary cement grout 1200 in the casing hole 72a.

그 다음, 도 6h와 같이 상부 PHC말뚝(20)의 내부로 콘크리트(22)를 타설한 후, 철골기둥(50)을 상부 PHC말뚝(20)의 내부로 인입 지지시켜 놓는다. 이때 철골기둥(50)은 하단이 철골기둥 거치용 막음철판(270)에 안정되게 거치된다. 철골기둥(50)은 상부 PHC말뚝(20)에 삽입되어 있는 구간으로 전단연결재(501)가 설치된 것이 바람직하다. Next, after pouring the concrete 22 into the interior of the upper PHC pile 20 as shown in FIG. 6h , the steel column 50 is supported by pulling into the interior of the upper PHC pile 20 . At this time, the steel column 50 is stably mounted to the lower end of the steel column pole blocking iron plate 270 . The steel column 50 is a section inserted into the upper PHC pile 20, and it is preferable that the shear connector 501 is installed.

그 다음, 도 6i와 같이 콘크리트(22)의 양생 후 상부 PHC말뚝(20)에 연결된 착탈식 보조말뚝(30)을 분리시켜 케이싱 홀(72a)에서 제거시킨다.Then, after curing the concrete 22, as shown in FIG. 6i, the detachable auxiliary pile 30 connected to the upper PHC pile 20 is separated and removed from the casing hole 72a.

그 다음, 도 6j와 같이 케이싱(72)이 인발되어 나간 케이싱 홀(72a)을 통해 철골기둥(50)의 둘레로 토사(G)를 채워 되메우기를 실시한다.Then, backfilling is performed by filling the perimeter of the steel column 50 through the casing hole 72a from which the casing 72 is drawn out, as shown in FIG. 6j .

따라서 지반에는 하부 PHC말뚝(10), 하부 PHC말뚝(10)과 일체된 상부 PHC말뚝(20) 그리고 상부 PHC말뚝(20)에 합성된 철골기둥(50)으로 이루어진 PHC 역타 기초파일(1000)이 시공된다.Therefore, in the ground, the PHC reverse pounding foundation pile 1000 consisting of the lower PHC pile 10, the upper PHC pile 20 integrated with the lower PHC pile 10, and the steel column 50 synthesized in the upper PHC pile 20 is is constructed

한편, 제 1실시 예에서 상부 PHC말뚝(20)의 내부에 설치된 철골기둥(50)의 시공 높이가 일정하지 않는 경우, 도 9a 및 도 9b와 같이 해당 철골기둥(50)의 상단에 추가적으로 2차 철골기둥(52)을 연결하여 설치하는 단계를 가질 수 있다. On the other hand, in the first embodiment, when the construction height of the steel column 50 installed inside the upper PHC pile 20 is not constant, as shown in FIGS. It may have a step of connecting and installing the steel pillars (52).

즉, 2차 철골기둥(52)의 하부에 용접으로 접합된 접합 철물(521)을 철골기둥(50)의 상단부에 삽입시킨 후, 철골기둥(50)의 상단부와 접합 철물(521)에 인양용 강봉(54)을 삽입하여 2차 철골기둥(52)이 철골기둥(50)에 연장되어져 설치되는 단계이다. 이로써 철골기둥(50)의 일정하지 않는 시공 높이를 2차 철골기둥(52)의 추가 설치를 통해 일정하게 할 수 있는 것이다. 여기서 착탈식 보조말뚝(30)의 상단에 거치시킨 앵글 가이드(56)를 통해 2차 철골기둥(52)의 설치 안내를 받을 수 있다.That is, after inserting the junction hardware 521 joined by welding to the lower part of the secondary steel frame 52 to the upper end of the steel frame 50, the upper end of the steel frame 50 and the joint hardware 521 for lifting By inserting the steel rod 54, the secondary steel column 52 is extended to the steel column 50 and installed. Thereby, the non-constant construction height of the steel column 50 can be made constant through the additional installation of the secondary steel column 52 . Here, through the angle guide 56 mounted on the upper end of the removable auxiliary pile 30, the installation guide of the secondary steel column 52 can be received.

이와 같이 제 1실시 예에 따라 시공된 PHC 역타 기초파일(1000)은 시공 중 상부 PHC말뚝(20)의 상부에 고장력 볼트(40)가 체결되는 매립 너트(260)가 설치되어 착탈식 보조말뚝(30)과의 착탈 결합을 용이하게 실시할 수 있다. 또한 매립 너트(260)에 인양볼트를 체결하여 상부 PHC말뚝(20)의 인양을 용이하게 할 수 있다. 또한, 상부 PHC말뚝(20)에는 하단에 철골기둥 거치용 막음철판(270)이 설치되어 철골 기둥(50)의 설치 지지력이 확보된다. 또한 PHC 역타 기초파일(1000)은 시공 중에 철골기둥 거치용 막음철판(270)에는 에어홀(271a)이 형성되어 착탈식 보조말뚝(30)과 연결된 상부 PHC말뚝(20) 및 하부 PHC 말뚝(10)을 케이싱 내부로 삽입 시 하부 PHC 말뚝(10)의 내부에 차는 공기압을 용이하게 제거시킬 수 있다. 또한 상부 PHC말뚝(20)은 PHC말뚝 본체(210)에 매립된 원형 보강근(250)에 의해 전단보강이 이루어져 종방향 균열을 효과적으로 방지할 수 있다. 또한 PHC 역타 기초파일(1000)은 철골 기둥(50)이 상부 PHC말뚝(20)의 상단보다 높게 설치되어 역타 공법에 유용하게 활용할 수 있다.As described above, in the PHC reverse rudder foundation pile 1000 constructed according to the first embodiment, the embedded nut 260 to which the high-tensile bolt 40 is fastened is installed on the upper part of the upper PHC pile 20 during construction, so that the removable auxiliary pile 30 ) and can be easily attached to and detached from. In addition, it is possible to facilitate the lifting of the upper PHC pile 20 by fastening the lifting bolt to the buried nut 260 . In addition, the upper PHC pile 20 is provided with a blocking iron plate 270 for mounting the steel frame at the lower end to secure the installation support force of the steel frame pillar 50 . In addition, in the PHC reverse pounding foundation pile 1000, an air hole 271a is formed in the blocking iron plate 270 for mounting the steel pillar during construction, and the upper PHC pile 20 and the lower PHC pile 10 connected to the removable auxiliary pile 30. When inserting into the casing, it is possible to easily remove the pneumatic pressure inside the lower PHC pile 10 . In addition, the upper PHC pile 20 is shear-reinforced by the circular reinforcing bar 250 embedded in the PHC pile body 210 to effectively prevent longitudinal cracking. In addition, the PHC reversing foundation pile 1000 has a steel frame 50 installed higher than the upper end of the upper PHC pile 20, so it can be usefully utilized in the reversing method.

<제 2 실시 예><Second embodiment>

한편, 본 발명의 제 2실시 예에 따른 착탈식 보조말뚝용 상부 PHC말뚝(20)을 사용하여 PHC 역타 기초파일(1000)을 시공하는 방법은 일반 기둥식으로 철골기둥(50)의 설치 단계를 중간에 생략한 것이다. 물론, 철골기둥(50)의 설치시 필요한 콘크리트의 타설도 함께 생략된다. 또한 도 1에 도시된 철골기둥 거치용 막음철판(270), 콘크리트 막음용 메탈라스 철망(280), 십자형 보강리브(290)가 제거된 형태로서 도 7과 같이 상부 PHC말뚝(20)은 하부가 개방된 구조를 갖고 하부 PHC말뚝과 용접되어져 시공된다.On the other hand, the method of constructing the PHC reverse rudder foundation pile 1000 using the upper PHC pile 20 for a removable auxiliary pile according to the second embodiment of the present invention is a general column type of the installation step of the steel column 50 in the middle. is omitted in Of course, the pouring of concrete required for the installation of the steel column 50 is also omitted. In addition, as shown in FIG. 1, the blocking iron plate 270 for holding the steel column, the metal lath wire mesh 280 for concrete blocking, and the cross-shaped reinforcing rib 290 are removed, and as shown in FIG. 7, the upper PHC pile 20 is the lower part It has an open structure and is welded to the lower PHC pile for construction.

따라서 제 2실시 예는 제 1실시 예에서 서술한 제 1단계 내지 제 7단계는 동일한 방법으로 이루어진다.Accordingly, in the second embodiment, the first to seventh steps described in the first embodiment are performed in the same way.

즉, 지면(500)의 제1서비스홀(501)에 인입시킨 상부 PHC말뚝(20)에 착탈식 보조말뚝(30)을 회전 체결시켜 놓는 제 1단계, 착탈식 보조말뚝(30)을 통해 상부 PHC말뚝(20)을 인양한 후, 제2서비스홀(502)에 인입되어 있는 하부 PHC말뚝(10)에 상부 PHC말뚝(20)을 용접 이음하는 제 2단계, 오거드릴(70)과 케이싱(72)을 사용하여 케이싱 홀(72a)을 암반층 일정 깊이만큼 실시하는 제 3단계, 케이싱 홀(72a)의 막장에 일정 깊이만큼 1차 시멘트 그라우트(1100) 충진 후 오거드릴(70)을 통해 상하교반을 실시하는 제 4단계, 제2서비스홀(502)에 위치되어 있는 하부 PHC말뚝(10), 상부 PHC말뚝(20) 및 착탈식 보조말뚝(30)을 인양하여 1차 시멘트 그라우트(1100) 충진이 이루어진 상기 케이싱(72)의 내부로 인입시킨 후, 드롭햄머 또는 유압햄머로 경타를 실시하는 제 5단계, 착탈식 보조말뚝(30)을 역회전시켜 상부 PHC말뚝(20)으로부터 연결을 해제시켜 놓는 제 6단계, 케이싱(72)을 인발한 후, 2차 시멘트 그라우트(1200)를 하부 PHC말뚝(10)과 상부 PHC말뚝(20)의 각기 외주면으로 주입하는 제 7단계는 제 1실시 예와 동일하게 이루어진다.That is, the first step of rotating and fastening the removable auxiliary pile 30 to the upper PHC pile 20 introduced into the first service hole 501 of the ground 500, the upper PHC pile through the removable auxiliary pile 30 After lifting (20), the second step of welding the upper PHC pile (20) to the lower PHC pile (10) introduced into the second service hole (502), the auger drill (70) and the casing (72) The third step of carrying out the casing hole 72a to a certain depth of the rock layer using In the fourth step, the primary cement grout 1100 filling is made by lifting the lower PHC pile 10, the upper PHC pile 20 and the removable auxiliary pile 30 located in the second service hole 502. After entering the casing 72, a fifth step of performing hard hitting with a drop hammer or a hydraulic hammer, a sixth step of releasing the connection from the upper PHC pile 20 by reversely rotating the removable auxiliary pile 30 , After drawing the casing 72, the seventh step of injecting the secondary cement grout 1200 into the outer peripheral surfaces of the lower PHC piles 10 and the upper PHC piles 20, respectively, is performed in the same manner as in the first embodiment.

이후, 제 8단계로서 도 8a와 같이 상부 PHC말뚝(20)에 연결된 착탈식 보조말뚝(30)을 제거시키고, 제 9 단계로서 도 8b와 같이 케이싱 홀(72a)을 통해 상부 PHC말뚝(20)의 상부로 토사를 채워 되메우기를 실시하는 단계를 포함하여 시공되는 것이다.Then, as an eighth step, remove the removable auxiliary pile 30 connected to the upper PHC pile 20 as shown in FIG. 8A, and as a ninth step, through the casing hole 72a as shown in FIG. 8B of the upper PHC pile 20 It will be constructed including the step of backfilling by filling the upper part with soil.

이와 같이 제 2실시 예에 따라 시공된 PHC 역타 기초파일(1000)의 경우도 시공 중 상부 PHC말뚝(20)의 상부에 고장력 볼트(40)가 체결되는 매립 너트(260)가 설치되어 착탈식 보조말뚝(30)과의 착탈 결합을 용이하게 실시할 수 있다. 또한, 상부 PHC말뚝(20)에는 하단에 철골기둥 거치용 막음철판(270)이 설치되어 철골 기둥(50)의 설치 지지력이 확보된다. 또한 PHC 역타 기초파일(1000)은 시공 중에 철골기둥 거치용 막음철판(270)에는 에어홀(271a)이 형성되어 착탈식 보조말뚝(30)과 연결된 상부 PHC말뚝(20) 및 하부 PHC 말뚝(10)을 케이싱 내부로 삽입 시 하부 PHC 말뚝(10)의 내부에 차는 공기압을 용이하게 제거시킬 수 있다. 또한 상부 PHC말뚝(20)은 PHC말뚝 본체(210)에 매립된 원형 보강근(250)에 의해 전단보강이 이루어져 종방향 균열을 효과적으로 방지할 수 있다.As such, in the case of the PHC reverse rudder foundation pile 1000 constructed according to the second embodiment, the embedded nut 260 to which the high-tensile bolt 40 is fastened is installed on the upper part of the upper PHC pile 20 during construction, so that a removable auxiliary pile is installed. Detachable coupling with (30) can be easily performed. In addition, the upper PHC pile 20 is provided with a blocking iron plate 270 for mounting the steel frame at the lower end to secure the installation support force of the steel frame pillar 50 . In addition, in the PHC reverse pounding foundation pile 1000, an air hole 271a is formed in the blocking iron plate 270 for mounting a steel column during construction, and the upper PHC pile 20 and the lower PHC pile 10 connected to the removable auxiliary pile 30. When inserting into the casing, it is possible to easily remove the pneumatic pressure inside the lower PHC pile 10 . In addition, the upper PHC pile 20 is shear-reinforced by the circular reinforcing bar 250 embedded in the PHC pile body 210 to effectively prevent longitudinal cracking.

지금까지 본 발명은 제시된 실시 예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시 예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. So far, the present invention has been described in detail with reference to the presented embodiments, but those of ordinary skill in the art can make various modifications and variations of the invention without departing from the technical spirit of the present invention with reference to the presented embodiments. will be. The present invention is not limited by such variations and modifications, but only by the claims appended hereto.

10: 하부 PHC 말뚝
20: 상부 PHC말뚝
30: 착탈식 보조말뚝
40: 고장력 볼트
210: PHC말뚝 본체
220,220a: 상,하부 두부보강철판
230,230a: 상,하부 PHC 말뚝 연결밴드
240: 강봉
250: 원형 보강근
260: 착탈식 보조말뚝 연결용 너트
270: 철골기둥 거치용 막음철판
280: 콘크리트 막음용 메탈라스 철망
290: 십자형 보강리브
10: lower PHC pile
20: upper PHC pile
30: removable auxiliary pile
40: high tension bolt
210: PHC pile body
220,220a: upper and lower head reinforcing steel plate
230,230a: upper and lower PHC pile connection bands
240: steel bar
250: circular reinforcing bar
260: Nuts for connecting removable auxiliary piles
270: iron plate for steel column mounting
280: metal lath wire mesh for blocking concrete
290: cross-shaped reinforcing rib

Claims (7)

하부로 하부 PHC 말뚝(10)과 용접되어 연결되고 상부로 착탈식 보조말뚝(30)과 연결되어 역타 공법에 사용되는 착탈식 보조말뚝용 상부 PHC말뚝(20)에 있어서,
타설 콘크리트를 원심 성형하여 이루어진 PHC말뚝 본체(210)와;
상기 PHC말뚝 본체(210)의 상면 및 하면에 각기 원판상으로 설치되어 원형 배열된 다수의 땅콩구멍(221)을 갖고 두부를 보강하는 상,하부 두부보강철판(220,220a)과;
상기 PHC말뚝 본체(210)의 상부 및 하부 둘레로 각기 원통링 형태로 설치된 상,하부 PHC 말뚝 연결밴드(230,230a)와;
상기 PHC말뚝 본체(210)의 둘레로 땅콩구멍(221)을 따라 원형 배열되어 프리스트레스가 도입되어 있는 강봉(240)과;
원형 또는 나선형을 이루어 상기 강봉(240)과 접합되어 축하중에서 발생된 수평하중에 대한 저항을 보강하는 원형 보강근(250)과;
상기 PHC말뚝 본체(210)의 상면에 착탈식 보조말뚝(30)과 고장력 볼트(40)로 체결하기 위해 매립되어 설치된 착탈식 보조말뚝 연결용 너트(260);를 포함하여 구성된 것을 특징으로 하는 착탈식 보조말뚝용 상부 PHC말뚝.
In the upper PHC pile (20) for the removable auxiliary pile used in the reverse drilling method by being welded and connected to the lower PHC pile (10) and connected to the removable auxiliary pile (30) at the top,
A PHC pile body 210 made by centrifugally molding cast concrete;
Upper and lower head reinforcing steel plates 220 and 220a for reinforcing the head and having a plurality of peanut holes 221 arranged in a circular plate shape on the upper and lower surfaces of the PHC pile body 210, respectively;
Upper and lower PHC pile connection bands (230 and 230a) respectively installed in a cylindrical ring shape around the upper and lower circumferences of the PHC pile body 210;
The PHC pile body 210 and the steel bar 240 is arranged in a circular arrangement along the peanut hole 221 around the prestress is introduced;
a circular reinforcing bar 250 formed in a circle or spiral form and joined to the steel bar 240 to reinforce resistance to a horizontal load generated from an axial load;
Removable auxiliary pile comprising a; removable auxiliary pile connection nut 260 installed to be embedded in the upper surface of the PHC pile body 210 for fastening with a removable auxiliary pile 30 and a high tension bolt 40; For upper PHC piles.
제 1항에 있어서,
상기 상부 PHC말뚝(20)내로 삽입되는 철골기둥(50)의 거치를 위해 PHC말뚝 본체(210)의 하부측 하부 두부보강철판(220a)에 접합되어지고, 상부 PHC말뚝(20)의 케이싱 내 삽입시 그 내부에 채워지는 공기압을 제거하기 위한 에어홀(271)을 갖는 철골기둥 거치용 막음철판(270)과;
상기 에어홀(271)에 위치하여 철골기둥 거치용 막음철판(270)에 접합되어 콘크리트가 에어홀(271)을 통하여 빠져나가지 못하도록 하는 콘크리트 막음용 메탈라스 철망(280)과;
상기 철골거치용 막음철판(270)의 하면에 에어홀(271)을 지나가도록 +자 형으로 설치되어 철골기둥 거치용 막음철판(270)을 보강하는 십자형 보강리브(290);를 더 포함한 것을 특징으로 하는 착탈식 보조말뚝용 상부 PHC말뚝.
The method of claim 1,
It is joined to the lower head reinforcing steel plate 220a of the lower side of the PHC pile body 210 for mounting of the steel pillar 50 inserted into the upper PHC pile 20, and is inserted into the casing of the upper PHC pile 20. a shielding iron plate 270 for mounting a steel frame having an air hole 271 for removing the air pressure filled therein;
It is located in the air hole (271) and is joined to the iron plate (270) for mounting the steel frame and prevents the concrete from escaping through the air hole (271);
Cross-shaped reinforcing ribs 290 for reinforcing the blocking iron plate 270 for steel column mounting by being installed in a +-shape so as to pass through the air hole 271 on the lower surface of the blocking iron plate 270 for steel frame mounting; Upper PHC piles for removable auxiliary piles.
제 1항에 있어서,
착탈식 보조말뚝 연결용 너트(260)는 땅콩구멍(221)의 회전 직경 상에 착탈식 보조말뚝(30)과 체결이 용이한 위치에 하부 PHC 말뚝(10)과 상부 PHC말뚝(20)의 총무게를 안전하게 인양할 수 있도록 다수개가 원형 배열되어 있는 것을 특징으로 하는 착탈식 보조말뚝용 상부 PHC말뚝.
The method of claim 1,
Removable auxiliary pile connection nut 260 is the total weight of the lower PHC pile 10 and the upper PHC pile 20 at a position where it is easy to fasten with the removable auxiliary pile 30 on the rotation diameter of the peanut hole 221 . Upper PHC piles for removable auxiliary piles, characterized in that a plurality of them are arranged in a circle so that they can be safely lifted.
청구항 제 2항 및 제 3항 중 어느 한 항에서 택일된 착탈식 보조말뚝용 상부 PHC말뚝(20)을 사용하여 PHC 역타 기초파일(1000)을 시공하는 방법에 있어서,
지면(500)의 제1서비스홀(501)에 인입시킨 상부 PHC말뚝(20)에 착탈식 보조말뚝(30)을 회전 체결시켜 놓는 단계와;
착탈식 보조말뚝(30)을 통해 상부 PHC말뚝(20)을 인양한 후, 제2서비스홀(502)에 인입되어 있는 하부 PHC말뚝(10)에 상부 PHC말뚝(20)을 용접 이음하는 단계와;
오거드릴(70)과 케이싱(72)을 사용하여 케이싱 홀(72a)을 암반층 일정 깊이만큼 형성시키는 케이싱 천공을 실시하는 단계와;
케이싱 홀(72a)의 막장에 일정 깊이만큼 1차 시멘트 그라우트(1100) 충진 후 오거드릴(70)을 통해 상하교반을 실시하는 단계와;
제2서비스홀(502)에 위치되어 있는 하부 PHC말뚝(10), 상부 PHC말뚝(20) 및 착탈식 보조말뚝(30)을 인양하여 1차 시멘트 그라우트(1100) 충진이 이루어진 상기 케이싱(72)의 내부로 인입시킨 후, 드롭햄머 또는 유압햄머로 경타를 실시하는 단계와;
착탈식 보조말뚝(30)을 역회전시켜 상부 PHC말뚝(20)으로부터 연결을 해제시켜 놓는 단계와;
케이싱(72)을 인발한 후, 2차 시멘트 그라우트(1200)를 하부 PHC말뚝(10)과 상부 PHC말뚝(20)의 각기 외주면으로 주입하는 단계와;
상부 PHC말뚝(20)의 내부로 콘크리트(22)를 타설한 후, 철골기둥(50)을 상부 PHC말뚝(20)의 내부로 인입 지지시켜 놓는 단계와;
콘크리트(22)의 양생 후 상부 PHC말뚝(20)에 연결된 착탈식 보조말뚝(30)을 제거시키는 단계와;
케이싱(72)이 인발되어 나간 케이싱 홀(72a)을 통해 철골기둥(50)의 둘레로 토사(G)를 채워 되메우기를 실시하는 단계;를 포함하여 시공되는 것을 특징으로 하는 착탈식 보조말뚝용 상부 PHC말뚝을 적용한 PHC 역타 기초파일의 시공 방법.
In the method of constructing a PHC reverse rudder foundation pile 1000 using the upper PHC pile 20 for a removable auxiliary pile selected in any one of claims 2 and 3,
The step of rotating and fastening the removable auxiliary pile 30 to the upper PHC pile 20 introduced into the first service hole 501 of the ground 500;
After lifting the upper PHC pile 20 through the removable auxiliary pile 30, welding the upper PHC pile 20 to the lower PHC pile 10 that is introduced into the second service hole 502 by welding;
performing casing drilling to form a casing hole (72a) by a predetermined depth in the rock layer using the auger drill (70) and the casing (72);
A step of performing vertical stirring through the auger drill 70 after filling the first cement grout 1100 to a predetermined depth in the length of the casing hole 72a;
The lower PHC pile 10, the upper PHC pile 20 and the removable auxiliary pile 30 located in the second service hole 502 are lifted and the primary cement grout 1100 filling is made of the casing 72. After retracting the inside, performing hard hitting with a drop hammer or hydraulic hammer;
Reversing the removable auxiliary pile 30 to release the connection from the upper PHC pile 20;
After drawing the casing 72, injecting the secondary cement grout 1200 into the outer peripheral surfaces of the lower PHC piles 10 and the upper PHC piles 20, respectively;
After pouring the concrete 22 into the upper PHC pile 20, the step of supporting the steel column 50 into the inside of the upper PHC pile 20;
removing the removable auxiliary pile 30 connected to the upper PHC pile 20 after curing the concrete 22;
Removable upper PHC for auxiliary piles for construction, characterized in that the casing 72 is constructed including; Construction method of PHC reverse rudder foundation pile applied with piles.
청구항 제 1항의 착탈식 보조말뚝용 상부 PHC말뚝(20)을 사용하여 PHC 역타 기초파일(1000)을 시공하는 방법에 있어서,
지면(500)의 제1서비스홀(501)에 인입시킨 상부 PHC말뚝(20)에 착탈식 보조말뚝(30)을 회전 체결시켜 놓는 단계와;
착탈식 보조말뚝(30)을 통해 상부 PHC말뚝(20)을 인양한 후, 제2서비스홀(502)에 인입되어 있는 하부 PHC말뚝(10)에 상부 PHC말뚝(20)을 용접 이음하는 단계와;
오거드릴(70)과 케이싱(72)을 사용하여 케이싱 홀(72a)을 암반층 일정 깊이만큼 실시하는 단계와;
케이싱 홀(72a)의 막장에 일정 깊이만큼 1차 시멘트 그라우트(1100) 충진 후 오거드릴(70)을 통해 상하교반을 실시하는 단계와;
제2서비스홀(502)에 위치되어 있는 하부 PHC말뚝(10), 상부 PHC말뚝(20) 및 착탈식 보조말뚝(30)을 인양하여 1차 시멘트 그라우트(1100) 충진이 이루어진 상기 케이싱(72)의 내부로 인입시킨 후, 드롭햄머 또는 유압햄머로 경타를 실시하는 단계와;
착탈식 보조말뚝(30)을 역회전시켜 상부 PHC말뚝(20)으로부터 연결을 해제시켜 놓는 단계와;
케이싱(72)을 인발한 후, 2차 시멘트 그라우트(1200)를 하부 PHC말뚝(10)과 상부 PHC말뚝(20)의 각기 외주면으로 주입하는 단계와;
상부 PHC말뚝(20)에 연결된 착탈식 보조말뚝(30)을 제거시키는 단계와;
케이싱 홀(72a)을 통해 상부 PHC말뚝(20)의 상부로 토사를 채워 되메우기를 실시하는 단계;를 포함하여 시공되는 것을 특징으로 하는 착탈식 보조말뚝용 상부 PHC말뚝을 적용한 PHC 역타 기초파일의 시공 방법.
In the method of constructing the PHC reverse rudder foundation pile 1000 using the upper PHC pile 20 for the removable auxiliary pile of claim 1,
The step of rotating and fastening the removable auxiliary pile 30 to the upper PHC pile 20 introduced into the first service hole 501 of the ground 500;
After lifting the upper PHC pile 20 through the removable auxiliary pile 30, welding the upper PHC pile 20 to the lower PHC pile 10 that is introduced into the second service hole 502 by welding;
Using the auger drill 70 and the casing 72 to perform the casing hole (72a) to a certain depth of the rock layer;
A step of performing vertical stirring through the auger drill 70 after filling the first cement grout 1100 to a predetermined depth in the length of the casing hole 72a;
The lower PHC pile 10, the upper PHC pile 20 and the removable auxiliary pile 30 located in the second service hole 502 are lifted and the primary cement grout 1100 filling is made of the casing 72. After retracting the inside, performing hard hitting with a drop hammer or hydraulic hammer;
Reversing the removable auxiliary pile 30 to release the connection from the upper PHC pile 20;
After drawing the casing 72, injecting the secondary cement grout 1200 into the outer peripheral surfaces of the lower PHC piles 10 and the upper PHC piles 20, respectively;
removing the removable auxiliary pile 30 connected to the upper PHC pile 20;
A method of constructing a PHC reverse pounding foundation pile to which an upper PHC pile for a removable auxiliary pile is applied, characterized in that it includes; .
제 4항 또는 제 5항 중 어느 한 항에 있어서,
1차 시멘트 그라우트(1100)의 시공은 선단에 잔존해 있는 굴착(천공) 슬라임으로 인한 잔류침하를 방지하기 위해 굴착하단으로부터 일정 높이(2M~3M)까지 오거비트를 올린 후 고농도(물-시멘트(w/c)비 45%~70%) 1차 시멘트그라우트액을 2M이상 충진 후 상하 왕복하면서 교반을 실시하는 것을 특징으로 하는 착탈식 보조말뚝용 상부 PHC말뚝을 적용한 PHC 역타 기초파일의 시공 방법.
6. The method of any one of claims 4 or 5,
The construction of the primary cement grout 1100 is performed after raising the auger bit from the bottom of the excavation to a certain height (2M~3M) from the bottom of the excavation in order to prevent residual settlement due to the excavation (perforation) slime remaining at the tip. w/c) Ratio 45%~70%) A method of constructing a PHC reverse pounding foundation pile using an upper PHC pile for a detachable auxiliary pile, characterized in that after filling 2M or more of the primary cement grout liquid, agitation is performed while reciprocating up and down.
제 4항에 있어서,
상부 PHC말뚝(20)의 내부에 설치된 철골기둥(50)의 시공 높이가 일정하지 않는 경우, 해당 철골기둥(50)의 상단에 추가적으로 2차 철골기둥(52)을 연결 설치하는 단계가 더 포함된 것을 특징으로 하는 착탈식 보조말뚝용 상부 PHC말뚝을 적용한 PHC 역타 기초파일의 시공 방법.
5. The method of claim 4,
When the construction height of the steel column 50 installed inside the upper PHC pile 20 is not constant, the step of additionally connecting and installing the secondary steel column 52 to the top of the corresponding steel column 50 is further included A method of constructing a PHC reverse rudder foundation pile applying an upper PHC pile for a removable auxiliary pile, characterized in that.
KR1020210015433A 2021-02-03 2021-02-03 Upper PHC Pile for removeable auxiliary pile and construction method of PHC top-down foundation pile using of the same KR102502549B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210015433A KR102502549B1 (en) 2021-02-03 2021-02-03 Upper PHC Pile for removeable auxiliary pile and construction method of PHC top-down foundation pile using of the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210015433A KR102502549B1 (en) 2021-02-03 2021-02-03 Upper PHC Pile for removeable auxiliary pile and construction method of PHC top-down foundation pile using of the same

Publications (2)

Publication Number Publication Date
KR20220111990A true KR20220111990A (en) 2022-08-10
KR102502549B1 KR102502549B1 (en) 2023-02-23

Family

ID=82846748

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210015433A KR102502549B1 (en) 2021-02-03 2021-02-03 Upper PHC Pile for removeable auxiliary pile and construction method of PHC top-down foundation pile using of the same

Country Status (1)

Country Link
KR (1) KR102502549B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05339939A (en) * 1992-06-11 1993-12-21 Mitani Sekisan Co Ltd Anchorage of reinforcing steel cage and pile end plate in prc pile and pile end plate for prc pipe
JP2017002628A (en) * 2015-06-12 2017-01-05 ジャパンパイル株式会社 Soil cement shielding device, pile foundation and pile foundation construction method
KR101766165B1 (en) 2016-12-09 2017-08-10 권정희 Column Pile Construction Method Using And Top-Down Method Using Thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05339939A (en) * 1992-06-11 1993-12-21 Mitani Sekisan Co Ltd Anchorage of reinforcing steel cage and pile end plate in prc pile and pile end plate for prc pipe
JP2017002628A (en) * 2015-06-12 2017-01-05 ジャパンパイル株式会社 Soil cement shielding device, pile foundation and pile foundation construction method
KR101766165B1 (en) 2016-12-09 2017-08-10 권정희 Column Pile Construction Method Using And Top-Down Method Using Thereof

Also Published As

Publication number Publication date
KR102502549B1 (en) 2023-02-23

Similar Documents

Publication Publication Date Title
KR101014796B1 (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
EP3318677B1 (en) Method for forming a reinforced pile and use of an accessory therein
KR101311803B1 (en) Slurry wall underpinning construction method using underpinning concrete tube with uneven surface
JP2008231810A (en) Underground structure construction method
KR100618597B1 (en) Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this
CN107620309A (en) Foundation pit supporting method
KR20210012525A (en) Steel structures and top-down method using it
KR102223856B1 (en) Foundation structure of waste landfill site and construction method thereof
JP3453664B2 (en) Shaft construction method
JP2007308951A (en) Method of constructing outer peripheral column by inverted construction method
JP6336850B2 (en) Pile head reinforcement method for foundation pile
KR101765879B1 (en) Composite block for ground reinforcement and reinforceing method of the foundation bottom using the same
KR102502549B1 (en) Upper PHC Pile for removeable auxiliary pile and construction method of PHC top-down foundation pile using of the same
EP1283307A2 (en) Method of forming enlarged pile heads
JP5378066B2 (en) Mountain fastening method
CN109989415B (en) Construction method of fabricated foundation
KR101257905B1 (en) Method for constructing foundation work
JP3827309B2 (en) Auxiliary pile method and embedded pile method
JP2017197910A (en) Construction method of earth retaining wall structure, and earth retaining wall structure
JP5027752B2 (en) Construction method of underground floor pillar and underground floor pillar
JP6616180B2 (en) Construction method of foundation pile with reinforced pile head
KR102601694B1 (en) Method for demolishing underground building
KR20190127507A (en) lifting device for PHC pile and piling method of PHC pile using the same
JP2011220009A (en) Erection method of permanent sub-substructural column
JP3637945B2 (en) Construction method of base-isolated building by reverse driving method

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right