KR20200055421A KR1020180139054A KR20180139054A KR20200055421A KR 20200055421 A KR20200055421 A KR 20200055421A KR 1020180139054 A KR1020180139054 A KR 1020180139054A KR 20180139054 A KR20180139054 A KR 20180139054A KR 20200055421 A KR20200055421 A KR 20200055421A
Authority
KR
South Korea
Prior art keywords
pipe
support
hole processing
lifting
support pipe
Prior art date
Application number
KR1020180139054A
Other languages
Korean (ko)
Other versions
KR102217840B1 (en
Inventor
최호천
정진홍
Original Assignee
(주)티케이인더스트리
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)티케이인더스트리 filed Critical (주)티케이인더스트리
Priority to KR1020180139054A priority Critical patent/KR102217840B1/en
Publication of KR20200055421A publication Critical patent/KR20200055421A/en
Application granted granted Critical
Publication of KR102217840B1 publication Critical patent/KR102217840B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B39/00General-purpose boring or drilling machines or devices; Sets of boring and/or drilling machines
    • B23B39/16Drilling machines with a plurality of working-spindles; Drilling automatons
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B47/00Constructional features of components specially designed for boring or drilling machines; Accessories therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B2215/00Details of workpieces
    • B23B2215/72Tubes, pipes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B2260/00Details of constructional elements
    • B23B2260/004Adjustable elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)
  • Drilling And Boring (AREA)

Abstract

Disclosed is a hole machining device for a construction support pipe. According to an embodiment, a hole machining device for a construction support pipe comprises: a base including vertical legs supported by the ground surface and a horizontal upper plate part; a mounting part which is mounted on an upper portion of the upper plate part and has a vertical insertion groove to be formed in a ″U″ shape so that a pipe is inserted and fixed thereto; drilling parts which are mounted on upper portions of the upper plate part, are symmetrically formed on both sides of the mounting part, and each has a drill bit for drilling the pipe and a power source for rotating the drill bit; a lifting part formed on a lower portion of the upper plate part and includes a support disposed on a lower portion of the mounting part to support the pipe, and a cylinder unit for lifting the support; and a control unit for turning on/off the power source of the drilling part or the lifting operation of the lifting part. Therefore, the hole machining device enables a plurality of holes to be simultaneously formed in a support pipe at the same intervals, thereby ensuring the safety of a worker and reducing a burden of expenses.

Description

건축용 서포트 파이프의 홀 가공장치{Hole Forming Device for Construction Support Pipe}Hole forming device for construction support pipes

개시되는 내용은 건축용 서포트 파이프의 홀 가공장치에 관한 것으로, 더욱 상세하게는 건물 공사 과정에서 천장과 바닥을 지지하는 건축용 서포트에 길이 조절이 가능하도록 홀을 형성하는 건축용 서포트 파이프의 홀 가공장치에 관한 것이다. Disclosed is a hole processing apparatus for a support pipe for construction, and more particularly, a hole processing apparatus for a construction support pipe for forming a hole so that a length can be adjusted to a construction support supporting a ceiling and a floor during a building construction process. will be.

본 명세서에서 달리 표시되지 않는 한, 이 섹션에 설명되는 내용들은 이 출원의 청구항들에 대한 종래 기술이 아니며, 이 섹션에 포함된다고 하여 종래 기술이라고 인정되는 것은 아니다.Unless otherwise indicated herein, the content described in this section is not prior art to the claims of this application and is not admitted to be prior art by inclusion in this section.

건설현장의 재해를 줄이기 위한 정부에서 사업 지속하고 있으나 소규모 건설공사 현장의 재해발생은 답보 상태이고, 건설 산업은 3D 업종이라는 인식으로 인하여 숙련 근로자가 건설공사장을 이탈함으로써 건설현장의 인력부족과 근로자의 고령화가 증가하는 추세이며, 이와 더불어 미숙련 근로자, 외국인 근로자의 건설공사 재해는 해마다 증가하는 추세이다.Although the government continues to do business to reduce the accidents at the construction site, the occurrence of disasters at small construction sites is in a state of return, and due to the perception that the construction industry is a 3D industry, skilled workers leave the construction site, resulting in shortage of manpower and workers The aging trend is increasing, and the construction accidents of unskilled and foreign workers are increasing year by year.

서포트 파이프는 빌딩, 아파트 등의 건축물, 탑 등의 공작물, 교량 등의 철골 철근 콘크리트 구조물의 형틀을 지지하여 구조물이 안전하고 정확하게 시공하는 용도로 사용된다. The support pipe is used to support the formwork of steel reinforced concrete structures such as buildings, apartments and other structures, towers, and bridges, so that the structure can be safely and accurately constructed.

가설공사의 특성상 서포트 파이프의 설치 및 해체가 빈번하고, 부재의 구조가 간단하므로 안정성이 부족한 단점이 있었다. Due to the nature of the temporary construction, support pipes are frequently installed and dismantled, and the structure of the member is simple, so there is a shortage of stability.

이러한 이유로 서포트 파이프의 파손에 의해 재해가 빈번하게 발생하며 특히 고소 작업에 따른 작업자의 추락위험과 사망재해와 같은 중대재해로 직결되므로 안전관리가 절실히 필요하다. For this reason, accidents are frequently caused by damage to the support pipes, and safety management is urgently needed, as it is directly related to the serious accidents such as the risk of the worker's fall and the fatality caused by the aerial work.

건축용 서포트 파이프는 내관과 외관으로 이루어지며, 내,외관에 일렬로 다수의 높이 조절구멍이 형성되어 상하 높이를 조절할 수 있게 되어 있다. The construction support pipe is made up of an inner tube and an exterior, and a number of height adjusting holes are formed in a row on the inner and outer tubes to adjust the height up and down.

종래에는 수작업에 의해 드릴 가공으로 내관에 다수의 구멍을 천공하였으나 이러한 수작업은 숙련된 작업자에 의존하게 되어 작업효율이 낮고 불량이 발생되는 문제점이 있었다. Conventionally, a number of holes were drilled in the inner tube by drilling by hand, but such manual work relies on skilled workers, resulting in low work efficiency and defects.

한국 특허출원 10-2004-0086303호.Korean Patent Application No. 10-2004-0086303.

개시되는 내용은 파이프 서포트에 대한 홀가공을 동시에 동일 간격으로 다수개를 형성할 수 있도록 하여 비용 부담을 낮출 수 있고, 불량 발생을 방지할 수 있어 작업효율이 향상될 수 있는 건축용 서포트 파이프의 홀 가공장치를 제공하는데 그 목적이 있다. Disclosed is a hole processing of a construction support pipe that can reduce the cost burden by preventing the occurrence of defects by allowing a plurality of hole processing for the pipe support to be simultaneously formed at the same interval. The purpose is to provide a device.

실시예의 목적은, 지면에 지지되는 수직의 다리와, 수평의 상판부로 구성된 기대; 상판부의 상부에 장착되며, 수직방향의 삽입홈이 형성되어 'U'자 형상으로 되어 파이프가 삽입 고정되는 거치부; 상판부의 상부에 장착되며, 상기 거치부의 양측에 대칭되게 형성되며, 상기 파이프를 천공하는 드릴비트와, 상기 드릴비트를 회전시키는 동력원이 구비된 천공부; 상판부의 하부에 형성되며, 상기 거치부의 하부에 배치되며 상기 파이프를 지지하는 받침대와, 상기 받침대를 승강시키는 실린더유닛으로 이루어진 승강부; 천공부의 동력원을 온-오프하거나 또는 승강부의 승강작동을 온-오프 하는 제어부;를 포함하는 건축용 서포트 파이프의 홀 가공장치에 의해 달성될 수 있다. The objective of the embodiment is: a base composed of a vertical leg supported on the ground and a horizontal top plate; It is mounted on the top of the upper plate portion, a vertical insertion groove is formed in the 'U' shaped to be fixed to the pipe is inserted; It is mounted on the upper portion of the upper plate, is formed symmetrically on both sides of the mounting portion, a drill bit for drilling the pipe, and a drilling unit provided with a power source for rotating the drill bit; It is formed on the lower portion of the upper plate, the lower portion is disposed on the lower portion of the support portion for supporting the pipe, and the lifting portion consisting of a cylinder unit for lifting the base; Control unit for turning on or off the power source of the drilling portion or on / off the lifting operation of the lifting portion; it can be achieved by a hole processing device for a construction support pipe.

거치부는 상기 삽입홈이 'U'자 형상으로 형성된 거치대와, 상기 거치대의 양측 상부에 절첩가능하게 힌지 결합되어 횡방향으로 펼쳐지는 제1,2지지부재를 포함하고, 제1,2지지부재는 소정의 경사각을 갖도록 경사지게 형성된다. The mounting portion includes a holder in which the insertion groove is formed in an 'U' shape, and first and second supporting members that are hingedly coupled to both upper portions of the holder and spread in the transverse direction, and the first and second supporting members are It is formed to be inclined to have a predetermined inclination angle.

삽입홈은 상부는 폭이 넓고 하부로 갈수록 폭이 좁아지도록 형성되며, 하단부에 파이프가 끼워져 고정될 수 있다. The insertion groove is formed such that the upper part is wider and narrower toward the lower part, and a pipe may be fitted to the lower part to be fixed.

승강부를 전후방향으로 이동시켜 파이프의 양단부에 지지되는 위치를 조절하는 위치조절부가 더 포함되고, 위치조절부는 상판부의 상부에 장착되는 실린더유닛과, 상기 실린더유닛에 결합되어 출몰작동되는 로드를 포함하고, 로드의 단부에 승강부의 받침대가 결합되며, 승강부의 받침대가 슬라이드 되도록 상판부의 상부에 길이방향으로 이동홈이 형성되어 이루어진다. Further comprising a position adjustment unit for moving the lifting portion in the front-rear direction to adjust the position supported at both ends of the pipe, the position adjustment unit includes a cylinder unit mounted on the upper portion of the upper plate portion, and a rod coupled to the cylinder unit to appear and operate. , The base of the lifting portion is coupled to the end of the rod, and the moving groove is formed in the longitudinal direction on the upper portion of the upper plate so that the base of the lifting portion slides.

또한 천공부를 승강시켜 드릴비트의 높이를 조절하는 높이조절부가 더 포함되며, 높이조절부는 기대에 수직하게 장착된 메인실린더유닛과, 상기 메인실린더유닛에 결합되어 수직으로 출몰작동하는 로드로 구성되고, 로드의 상단이 천공부에 형성된 브라켓에 결합되어 이루어진다. In addition, a height adjustment unit for adjusting the height of the drill bit by elevating the perforation is further included, and the height adjustment unit is composed of a main cylinder unit mounted perpendicular to the base and a rod coupled to the main cylinder unit to vertically appear and operate. , The upper end of the rod is made of a bracket formed in the perforated portion.

개시된 실시예에 따르면, 파이프 서포트에 대한 홀가공을 동시에 동일 간격으로 다수개를 형성할 수 있도록 하여 비용 부담을 낮출 수 있고, 불량 발생을 방지할 수 있어 작업효율이 향상될 수 있는 효과가 있다.According to the disclosed embodiment, it is possible to reduce the cost burden by allowing a plurality of hole processing for the pipe support to be simultaneously formed at the same interval, and it is possible to prevent the occurrence of defects, thereby improving work efficiency.

도 1은 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치를 나타낸 정면도,
도 2는 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치를 나타낸 측면도,
도 3은 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치를 나타낸 평면도,
도 4는 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치를 나타낸 부분 확대 정면도,
도 5는 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치에서 '위치조절부'를 보여주는 확대 사시도,
도 6은 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치에서 '간격조절부'의 작동을 나타낸 확대도.
1 is a front view showing a hole processing apparatus for a building support pipe according to an embodiment,
Figure 2 is a side view showing a hole processing apparatus for a building support pipe according to an embodiment,
3 is a plan view showing a hole processing apparatus for a building support pipe according to an embodiment,
Figure 4 is a partially enlarged front view showing a hole processing apparatus for a building support pipe according to an embodiment,
Figure 5 is an enlarged perspective view showing a 'position adjustment unit' in the hole processing apparatus of the building support pipe according to the embodiment,
Figure 6 is an enlarged view showing the operation of the 'gap adjustment unit' in the hole processing apparatus for a building support pipe according to the embodiment.

이하 바람직한 실시예를 첨부된 도면을 토대로 상세하게 설명하면 다음과 같다.Hereinafter, preferred embodiments will be described in detail with reference to the accompanying drawings.

하기에서 설명될 실시예는 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 발명을 용이하게 실시할 수 있을 정도로 상세하게 설명하기 위한 것이며, 이로 인해 본 발명의 기술적인 사상 및 범주가 한정되는 것을 의미하지는 않는다.The embodiments to be described below are intended to be described in detail to the extent that one of ordinary skill in the art to which the present invention pertains can easily implement the invention, thereby limiting the technical spirit and scope of the present invention. Does not mean

또한, 도면에 도시된 구성요소의 크기나 형상 등은 설명의 명료성과 편의상 과장되게 도시될 수 있으며, 본 발명의 구성 및 작용을 고려하여 특별히 정의된 용어들은 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있고, 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 함을 밝혀둔다. In addition, the size or shape of the components shown in the drawings may be exaggerated for clarity and convenience of description, and terms specifically defined in consideration of the configuration and operation of the present invention may vary depending on the intention or custom of the user or operator It is noted that definitions of these terms should be made based on the contents throughout the specification.

첨부된 도면 중에서, 도 1은 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치를 나타낸 정면도, 도 2는 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치를 나타낸 측면도, 도 3은 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치를 나타낸 평면도, 도 4는 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치를 나타낸 부분 확대 정면도, 도 5는 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치에서 '위치조절부'를 보여주는 확대 사시도, 도 6은 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치에서 '간격조절부'의 작동을 나타낸 확대도이다.Among the accompanying drawings, FIG. 1 is a front view showing a hole processing apparatus for a construction support pipe according to an embodiment, FIG. 2 is a side view showing a hole processing apparatus for a construction support pipe according to an embodiment, and FIG. 3 is for construction according to an embodiment The top view showing the hole processing apparatus of the support pipe, FIG. 4 is a partially enlarged front view showing the hole processing apparatus of the construction support pipe according to the embodiment, and FIG. 5 is the 'position adjustment unit' in the hole processing apparatus of the construction support pipe according to the embodiment. Enlarged perspective view showing ', Figure 6 is an enlarged view showing the operation of the' gap adjustment unit 'in the hole processing apparatus for a building support pipe according to the embodiment.

도 1 내지 도 5에 도시된 바와 같이, 실시예에 따르는 건축용 서포트 파이프의 홀 가공장치는, 지면에 지지되는 수직의 다리(120)와, 수평의 상판부(140)로 구성된 기대(100); 상판부(140)의 상부에 장착되며, 수직방향의 삽입홈(210)이 형성되어 'U'자 형상으로 되어 파이프(P)가 삽입 고정되는 거치부(200); 상판부(140)의 상부에 장착되며, 상기 거치부(200)의 양측에 대칭되게 형성되며, 파이프(P)를 천공하는 드릴비트(320)와, 상기 드릴비트(320)를 회전시키는 동력원(340)이 구비된 천공부(300); 상판부(140)의 하부에 형성되며, 거치부(200)의 하부에 배치되며 파이프(P)를 지지하는 받침대(420)와, 받침대(420)를 승강시키는 실린더유닛(440)으로 이루어진 승강부(400);를 포함하여 구성된다.1 to 5, the hole processing apparatus of the building support pipe according to the embodiment includes: a vertical leg 120 supported on the ground and a base 100 composed of a horizontal top plate 140; It is mounted on the upper portion of the top plate 140, the insertion groove 210 in the vertical direction is formed in a 'U' shape, the pipe (P) is fixed to the insertion portion 200; It is mounted on the upper portion of the upper plate 140, is formed symmetrically on both sides of the mounting portion 200, a drill bit 320 for drilling a pipe (P), and a power source for rotating the drill bit 320 (340) ) Is provided with a perforated portion 300; It is formed on the lower portion of the upper plate portion 140, is disposed on the lower portion of the mounting portion 200, and supports the pipe (P) 420, and the lifting unit consisting of a cylinder unit 440 for lifting the base (420) ( 400).

기대(100)는 복수개의 다리(120)가 지면에 설치되고, 이들 복수개의 다리(120)의 상부에 상판부(140)가 장착된다. The base 100 has a plurality of legs 120 is installed on the ground, the upper plate portion 140 is mounted on the top of the plurality of legs 120.

상판부(140)는 거치부(200)와 천공부(300) 및 승강부(400)가 상부에 안착되어 파이프(P)의 천공 작업이 이루어지는 작업대가 된다. The upper plate part 140 is a work table where the mounting part 200, the perforating part 300, and the lifting part 400 are seated on the upper part to perform the perforating work of the pipe P.

전술한 거치부(200)는 파이프(P)를 고정하여 천공 작업이 정확하게 실시될 수 있도록 하는 것으로 파이프(P)가 끼움결합될 수 있는 삽입홈(210)이 'U'자 형상으로 형성되고, 상단 양측에 레일(221,222)이 형성된 거치대(220)를 포함한다. The above-described mounting portion 200 is fixed to the pipe (P) so that the drilling operation can be accurately performed, the insertion groove 210 into which the pipe (P) can be fitted is formed in a 'U' shape, Rails (221,222) on both sides of the upper end includes a mount (220).

또한 거치대(220)의 양측 상부의 양측에 레일(221,222)에는 각기 절첩가능하게 힌지 결합되어 횡방향으로 펼쳐지는 제1,2지지부재(226,227)를 포함할 수 있다.In addition, rails 221 and 222 on both sides of the upper side of the cradle 220 may include first and second support members 226 and 227 that are hinged to each other and are spread in the lateral direction.

제1,2지지부재(226,227)는 소정의 경사각을 갖도록 경사지게 형성되어 이루어진다. The first and second support members 226 and 227 are formed to be inclined to have a predetermined inclination angle.

바람직하게는 제1,2지지부재(226,227)는 약 3˚∼5˚의 경사각을 갖도록 형성된다. Preferably, the first and second support members 226 and 227 are formed to have an inclination angle of about 3 ° to 5 °.

제1,2지지부재(226,227)는 소정 길이를 갖는 바 타입이며, 제1지지부재(226)는 거치대(220)의 일측 상단에 레일(221)에 힌지 결합되고, 제2지지부재(227)는 거치대(220)의 타측 상단 레일(222)에 힌지 결합된다. The first and second support members 226 and 227 are bar types having a predetermined length, and the first support member 226 is hinged to the rail 221 at the upper end of one side of the cradle 220 and the second support member 227 Is hinged to the other upper rail 222 of the cradle 220.

바람직하게는 도 1을 기준으로 보면, 제1,2지지부재(226,227)는 우측으로 하향 경사지게 형성된다.Preferably, referring to Figure 1, the first and second support members 226 and 227 are formed to be inclined downward to the right.

따라서 제1지지부재(226)에 안착된 파이프(P)가 우측으로 굴러서 삽입홈(210)에 인입될 수 있다.Therefore, the pipe P seated on the first support member 226 may be rolled to the right to be inserted into the insertion groove 210.

이후 승강부(400)에 의해 상승된 파이프(P)가 제2지지부재(227)에 안착되어 우측으로 굴러가서 배출될 수 있다. Thereafter, the pipe P raised by the lift 400 may be seated on the second support member 227 and rolled to the right to be discharged.

한편 거치대(220)의 삽입홈(210)은 상부는 폭이 넓고 하부로 갈수록 폭이 좁아지도록 형성되며, 삽입홈(210)의 하단부에 파이프(P)가 끼워져 고정될 수 있도록 한다. On the other hand, the insertion groove 210 of the cradle 220 is formed such that the upper portion is wider and narrower toward the lower portion, and the pipe P is inserted into the lower end of the insertion groove 210 to be fixed.

파이프(P)의 직경에 따라 삽입홈(210)의 적정한 위치에 끼움 결합될 것이다. Depending on the diameter of the pipe (P), it will be fitted into the proper position of the insertion groove (210).

예를들어 파이프(P)의 직경이 작은 것은 삽입홈(210)의 최하부까지 내려가서 삽입될 것이고, 파이프(P)의 직경이 큰 것은 삽입홈(210)의 상부에 걸쳐져 고정될 것이다. For example, a small diameter of the pipe P will be inserted down to the bottom of the insertion groove 210, and a large diameter of the pipe P will be fixed over the upper portion of the insertion groove 210.

한편 거치대(220)의 상부에는 파이프(P)의 이탈을 막기 위해 록킹부재(224)가 형성된다. Meanwhile, a locking member 224 is formed at an upper portion of the cradle 220 to prevent the pipe P from being detached.

록킹부재(224)는 상기 거치대(220)의 일측 상단에 일단이 힌지 결합되고, 타단은 거치대(220)의 타측 상단에 결합되는 상기 삽입홈(210)을 개폐한다. The locking member 224 has one end hinged to one upper end of the holder 220, and the other end opens and closes the insertion groove 210 coupled to the other upper end of the holder 220.

따라서 파이프(P)가 삽입홈(210)에 삽입된 후 록킹부재(224)를 작동시켜 삽입홈(210)의 상단에 결합하여 폐쇄시킨 다음 드릴작업을 함으로써, 만약에 드릴가공 중 파이프(P)가 상부로 튕겨져 오르더라도 록킹부재(224)에 의해 외부로 튀어나오지 않게 차단될 수 있다. Therefore, after the pipe P is inserted into the insertion groove 210, the locking member 224 is operated to close and close to the top of the insertion groove 210, and then drill is performed. Even if is bounced upward, it may be blocked from protruding outside by the locking member 224.

바람직하게는 천공부(300)는 거치부(200)의 양측에 대칭되게 배치된다. Preferably, the perforations 300 are symmetrically arranged on both sides of the mounting 200.

양측 천공부(300) 각각은, 상기 상판부(140)의 상부에 형성되는 하우징(330)과, 상기 하우징(330) 내에 수용되는 복수의 기어들로 이루어진 감속기(350)와, 상기 감속기(350)의 입력축에 연결되어 회전력을 발휘하는 동력원(340)과, 상기 감속기(350)의 출력축에 연결되는 드릴비트(320)를 포함한다.Each of the two side perforations 300, a housing 330 formed on the upper portion of the upper plate 140, a reducer 350 consisting of a plurality of gears accommodated in the housing 330, and the reducer 350 It includes a power source 340 connected to the input shaft to exert a rotational force, and a drill bit 320 connected to the output shaft of the reduction gear 350.

동력원(340)은 전동모터이며, 전동모터의 회전축에 감속기(350)가 연결된다. The power source 340 is an electric motor, and a reduction gear 350 is connected to a rotation axis of the electric motor.

드릴비트(320)는 파이프(P)의 측면을 향하도록 수평으로 배치되며, 고속 회전에 의해 파이프(P)를 천공 관통하여 구멍을 형성하게 된다. The drill bit 320 is horizontally arranged to face the side of the pipe P, and a hole is formed through the pipe P through the high-speed rotation.

양측 천공부(300)가 각기 파이프(P)의 양측을 천공 관통하여 양측에 구멍을 동시에 형성하되 동일한 위치에 양측 구멍(P-1)이 형성된다. Both side perforations 300 respectively pierce both sides of the pipe P to form holes on both sides at the same time, but both sides of the hole P-1 are formed at the same position.

양측 천공부(300)는 다수의 구멍(P-1)을 동시에 천공할 수 있도록 다수개로 구비됨이 바람직하다. It is preferable that the both side perforations 300 are provided in a plurality so that a plurality of holes P-1 can be simultaneously drilled.

도 3에 도시된 바와 같이, 양측에 대칭 배치되는 한쌍의 천공부(300)가 10~12개로 구성됨으로써 파이프(P)에 동시에 10~12개의 구멍(P-1)을 형성할 수 있는 것이다. As shown in FIG. 3, a pair of 10 to 12 perforations 300 symmetrically arranged on both sides is formed to form 10 to 12 holes P-1 in the pipe P at the same time.

그리고 양측 천공부(300)의 각 하우징(330)의 하부에 브라켓(620a,620b)의 양단부가 힌지 결합되고, 브라켓(620a,620b)의 중간부위에 후술될 간격조절부(600)가 연결된다. In addition, both ends of the brackets 620a and 620b are hinged to the lower portion of each housing 330 of the two side perforations 300, and the gap adjusting unit 600 to be described later is connected to the middle of the brackets 620a and 620b. .

간격조절부(600)는 드릴비트(320)를 전진 또는 후진시키면서 파이프에 대한 천공 동작과 이격 동작을 하도록 한다. The gap adjusting unit 600 allows the drill bit 320 to be drilled or separated from the pipe while moving forward or backward.

도 1 및 도 6에 도시된 바와 같이, 간격조절부(600)는 드릴비트(320)가 연결된 출력축은 감속기(350)의 회전구동시 천천히 전진하면서 파이프(P)와 접촉될 수 있고, 천공이 완료된 후에는 후진하여 드릴비트(320)가 파이프(P)와 이격되도록 한다. As shown in Figure 1 and 6, the gap adjustment unit 600, the drill bit 320 is connected to the output shaft is connected to the pipe (P) while slowly advancing during the rotation of the reducer 350, may be in contact with the drilling After completion, it is reversed so that the drill bit 320 is spaced from the pipe P.

간격조절부(600)는, 기대(100)에 수직하게 장착된 메인실린더유닛(608)과, 상기 메인실린더유닛(608)에 결합되어 수직으로 출몰작동하는 로드(630)로 구성되고, 양측 천공부(300)의 하우징(330)에 각기 힌지 결합되는 브라켓(620a,620b)을 포함하여 구성된다.The gap adjusting part 600 is composed of a main cylinder unit 608 mounted vertically to the base 100, and a rod 630 coupled to the main cylinder unit 608 to vertically appear and operate, and both sides of the cloth It is configured to include brackets 620a and 620b respectively hinged to the housing 330 of the study 300.

그리고 상기 브라켓(620a,620b)이 서로 대칭되게 배열되며 각각의 단부가 중첩되게 배치되고, 이 브라켓(620a,620b)의 중첩된 부위에 상기 로드(630)의 상단이 힌지 결합되어 이루어진다. In addition, the brackets 620a and 620b are arranged symmetrically to each other, and each end is disposed to overlap, and the upper end of the rod 630 is hinged to an overlapped portion of the brackets 620a and 620b.

브라켓(620a,620b) 각각은 대략 'ㄴ'자 형상으로 이루어지고, 상단이 천공부(300)의 하우징에 제3힌지축(h3)으로 힌지결합되고, 중간에는 제2힌지축(h2)으로 상판부(140)에 힌지 결합되며, 하단에는 장공(622)이 형성되어 이 장공(622)에 높이조절부(600)의 로드(630)가 제1힌지축(h1)으로 힌지 결합된다.Each of the brackets 620a and 620b is formed in a substantially 'b' shape, and the upper end is hinged to the housing of the perforated part 300 with a third hinge axis h3, and in the middle with a second hinge axis h2. The upper plate 140 is hinged, and a long hole 622 is formed at the lower end, and the rod 630 of the height adjustment unit 600 is hinged to the long hole 622 with a first hinge axis h1.

따라서 메인실린더유닛(440)에 유압이 공급되면 로드(630)가 상승된다.Therefore, when the hydraulic pressure is supplied to the main cylinder unit 440, the rod 630 is raised.

이에 따라 브라켓(620a,620b)의 하단이 상방으로 회전하여 도 6의 상부에 도시된 바와 같이 수평상태가 되면 양측 드릴비트(320)는 후진하면서 파이프(P)와 이격된다. Accordingly, when the lower ends of the brackets 620a and 620b rotate upward and become horizontal as shown in the upper part of FIG. 6, the drill bits 320 on both sides are spaced apart from the pipe P while reversing.

이와 반대로, 메인실린더유닛(440)의 로드(630)가 하강하면, 브라켓(620a,620b)의 하단이 하방으로 회전하여 도 6의 하부에 도시된 바와 같이 '∨'형상으로 경사를 이루게 되고, 그에 따라 수평상태가 되면 양측 드릴비트(320)는 전진하면서 파이프(P)를 관통하게 된다. On the contrary, when the rod 630 of the main cylinder unit 440 descends, the lower ends of the brackets 620a and 620b rotate downward to make an inclination in the shape of '형' as shown in the lower part of FIG. Accordingly, when in the horizontal state, the drill bits 320 on both sides penetrate the pipe P while advancing.

한편 도시하지 않았으나 천공부(300)를 승강시켜 드릴비트(320)의 높이를 조절하는 높이조절부(미도시)가 더 포함될 수 있다. Meanwhile, although not illustrated, a height adjustment unit (not shown) for adjusting the height of the drill bit 320 by lifting the perforation unit 300 may be further included.

높이조절부는 기대(100)에 수직하게 장착된 실린더유닛과, 상기 실린더유닛에 결합되어 수직으로 출몰작동하는 로드로 구성되고, 로드의 상단이 양측 천공부(300)의 하우징에 연결되어 구성된다.The height adjustment unit is composed of a cylinder unit vertically mounted to the base 100 and a rod coupled to the cylinder unit to vertically appear and operate, and the upper ends of the rods are configured to be connected to the housings of both side perforations 300.

따라서 실린더유닛에 유압이 공급되면 로드가 인출되고, 이에 따라 양측 천공부(300)가 상승하게 되어 드릴비트(320)의 위치가 상승하게 된다. Therefore, when the hydraulic pressure is supplied to the cylinder unit, the rod is drawn out, and accordingly, both side perforations 300 are raised, so that the position of the drill bit 320 is raised.

이와 반대로 실린더유닛에서 유압이 배출되면 로드가 인입되고, 천공부가 하강하게 되어 드릴비트(320)의 위치가 하강하게 되는 것이다.On the contrary, when the hydraulic pressure is discharged from the cylinder unit, the rod is drawn in, and the drilled portion is lowered so that the position of the drill bit 320 is lowered.

이러한 높이조절부의 작동에 의해 드릴비트(320)의 높이를 상승시키거나 하강시켜 천공될 위치를 적절하게 조절할 수 있다. The height of the drill bit 320 may be raised or lowered by the operation of the height adjusting unit to appropriately adjust a position to be drilled.

즉, 높이 조절을 함으로써 파이프(P)의 위치에 맞도록 드릴비트(320)의 높이를 설정하여 파이프(P)의 직경 변동에 따라 삽입홈(210)에 결합된 높이가 달라지더라도 능동적으로 대응하여 드릴비트(320)의 높이가 설정될 수 있다. That is, by adjusting the height, the height of the drill bit 320 is set to fit the position of the pipe P, and thus, even if the height coupled to the insertion groove 210 changes depending on the diameter change of the pipe P, it actively responds. By doing so, the height of the drill bit 320 may be set.

한편 도 2에 도시된 바와 같이, 승강부(400)를 전후방향으로 이동시켜 파이프(P)의 양단부에 지지되는 위치를 조절하는 위치조절부(700)가 더 포함된다. On the other hand, as shown in Figure 2, by moving the lift 400 in the front-rear direction to further include a position adjustment unit 700 for adjusting the position supported on both ends of the pipe (P).

파이프(P)의 길이가 길거나 혹은 짧은 경우 승강부(400)가 적정한 위치(파이프의 양단부를 지지하기 위한 위치임)에 배치될 수 있도록 하기 위해 위치조절부(700)가 구비된다. When the length of the pipe P is long or short, the position adjusting unit 700 is provided to allow the lifting unit 400 to be disposed at an appropriate position (which is a position for supporting both ends of the pipe).

위치조절부(700)는, 상판부(140)의 상부에 장착되는 실린더유닛(720)과, 상기 실린더유닛(720)에 결합되어 출몰작동되는 로드(740)를 포함하고, 로드(740)의 단부에 승강부(400)의 받침대(420)가 결합되며, 승강부(400)의 받침대(420)가 슬라이드 되도록 상판부(140)의 상부에 길이방향으로 이동홈(142)이 형성되어 이루어진다.Position adjustment unit 700 includes a cylinder unit 720 mounted on the upper portion of the top plate 140, and a rod 740 coupled to the cylinder unit 720 to operate and appear, and ends of the rod 740 The base 420 of the lifting unit 400 is coupled to, and the moving groove 142 is formed in the longitudinal direction on the upper portion of the top plate 140 so that the base 420 of the lifting unit 400 slides.

한편 제어부(미도시)는 천공부(300)의 동력원(340)을 온-오프하거나 또는 승강부(400)의 승강작동을 온-오프 하도록 제어하는 것으로, 기대(100)의 외부에 부착된 콘트롤박스에 구비되며 마이컴이 내장된 피씨비와, 각종 버튼 및 스위치로 구성된다. Meanwhile, the control unit (not shown) controls the power source 340 of the perforation unit 300 to be turned on or off, or to control the lifting operation of the lifting unit 400 on-off, and a control attached to the outside of the base 100 It is provided in a box and consists of a PC built-in PC and various buttons and switches.

이와 같이 구성된 본 발명의 작용을 설명하면 다음과 같다.The operation of the present invention configured as described above is as follows.

거치부(200)에 구비된 제1,2지지부재(226,227)를 각각 횡방향으로 전개하여 설치한다.The first and second support members 226 and 227 provided in the mounting unit 200 are deployed in a horizontal direction.

레일(221) 및 제1지지부재(226)에 파이프(P)를 안착시키면 자중으로 굴러서 파이프(P)가 삽입홈(210)에 삽입되어 적정 위치에 끼워져 고정된다.When the pipe (P) is seated on the rail (221) and the first support member (226), the pipe (P) is rolled into its own weight and inserted into the insertion groove (210) to be inserted and fixed in an appropriate position.

이후 높이조절부(600)를 온(on) 작동시켜 천공부(300)의 높이가 적정하게 위치되도록 하여 드릴비트(320)가 파이프(P)의 양측 중앙을 관통하도록 높이를 조절한다.Thereafter, by operating the height adjustment unit 600 on, the height of the perforation unit 300 is properly positioned to adjust the height so that the drill bit 320 penetrates the center of both sides of the pipe P.

이후 천공부(300)를 온(on) 작동시켜 드릴비트(320)가 고속회전하면서 전진하여 파이프(P)의 측면을 관통하여 구멍(P-1)을 형성한 후 후진하여 이격된다. Thereafter, the drill bit 320 is advanced at a high speed by operating the perforation unit 300 on to penetrate the side surface of the pipe P to form a hole P-1, and then reverse to be spaced apart.

구멍 가공을 마친 후 승강부(400)가 온(ON) 작동함으로써 받침대(420)가 파이프(P)를 상승시켜 삽입홈(210)으로 이탈되고, 이탈된 파이프(P)는 레일(222) 및 제2지지부재(227)를 따라 굴러서 배출된다. After the hole is processed, the lifting part 400 is turned on, so that the pedestal 420 rises the pipe P to be separated into the insertion groove 210, and the separated pipe P is a rail 222 and Rolled along the second support member 227 and discharged.

한편 파이프(P)의 길이가 길어지거나 짧아진 경우 위치조절부(700)를 온 작동시켜 승강부(400)가 이동홈(142)을 타고 이동하여 적정한 위치에 배치되도록 한다.On the other hand, if the length of the pipe (P) is longer or shorter, the position adjusting unit 700 is turned on to move the lifting unit 400 on the moving groove 142 so as to be disposed at an appropriate position.

바람직하게는 승강부(400)의 받침대(420)가 파이프(P)의 양 단부에 지지될 수 있는 위치에 놓이도록 한다. Preferably, the pedestal 420 of the lift 400 is placed in a position that can be supported at both ends of the pipe P.

비록 바람직한 실시예와 관련하여 설명되어졌지만, 발명의 요지와 범위로부터 벗어남이 없이 다양한 수정 및 변형이 가능한 것은 당업자라면 용이하게 인식할 수 있을 것이며, 이러한 변경 및 수정은 모두 첨부된 청구범위에 속함은 자명하다.Although described in connection with the preferred embodiment, various modifications and variations can be readily recognized by those skilled in the art without departing from the spirit and scope of the invention, and all such changes and modifications belong to the appended claims. Self-evident

100 : 기대 120 : 다리
140 : 상판부 200 : 거치부
221,222 : 레일 226 : 제1지지부재
227 : 제2지지부재 300 : 천공부
320 : 드릴비트 330 : 하우징
340 : 동력원 350 : 감속기
400 : 승강부 600 : 간격조절부
608 : 메인실린더유닛 630 : 로드
620a,620b : 브라켓 700 : 위치조절부
100: expectations 120: legs
140: top plate 200: mounting portion
221,222: Rail 226: First support member
227: second support member 300: perforated
320: drill bit 330: housing
340: power source 350: reducer
400: elevating section 600: spacing adjustment section
608: main cylinder unit 630: rod
620a, 620b: Bracket 700: Position adjustment unit

Claims (8)

지면에 지지되는 다리와, 상기 다리의 상부에 형성되는 상판부로 구성된 기대;
상기 상판부의 상부에 장착되며, 수직방향으로 형성된 삽입홈에 파이프가 삽입 고정되도록 하는 거치부;
상기 상판부의 상부에 장착되며, 상기 거치부의 양측에 대칭되게 형성되며, 상기 파이프를 천공하는 드릴비트와, 상기 드릴비트를 회전시키는 동력원이 구비된 천공부;
상기 상판부의 하부에 형성되며, 상기 거치부의 하부에 배치되며 상기 파이프를 지지하는 받침대와, 상기 받침대를 승강시키는 실린더유닛으로 이루어진 승강부;
상기 천공부의 동력원을 온-오프하거나 또는 승강부의 승강작동을 온-오프 하는 제어부;
를 포함하는 것을 특징으로 하는 건축용 서포트 파이프의 홀 가공장치.
A base composed of a leg supported on the ground and a top plate formed on an upper portion of the leg;
A mounting portion mounted on an upper portion of the upper plate portion and allowing a pipe to be inserted and fixed into an insertion groove formed in a vertical direction;
It is mounted on the upper portion of the upper plate, is formed symmetrically on both sides of the mounting portion, a drill bit for drilling the pipe, and a drilling unit provided with a power source for rotating the drill bit;
It is formed on the lower portion of the upper plate portion, the lower portion is disposed on the lower portion of the support and the support for the pipe, and the lifting portion consisting of a cylinder unit for lifting the support;
A control unit for turning on / off the power source of the perforation unit or for turning on / off the elevator operation;
Hole processing apparatus for a support pipe for construction, comprising a.
제 1항에 있어서,
상기 거치부는
상기 삽입홈이 'U'자 형상으로 형성된 거치대;
상기 거치대의 양측 상부에 절첩가능하게 힌지 결합되어 횡방향으로 펼쳐지는 제1,2지지부재;를 포함하고,
상기 제1,2지지부재는 경사지게 형성되는 것을 특징으로 하는 건축용 서포트 파이프의 홀 가공장치.
According to claim 1,
The mounting portion
A cradle in which the insertion groove is formed in a 'U'shape;
Includes; first and second support members that are hingedly coupled to the upper sides on both sides of the cradle and spread in the lateral direction;
The first and second support members are formed in an inclined hole processing apparatus for a support pipe for construction.
제 2항에 있어서,
상기 삽입홈은 상부는 폭이 넓고 하부로 갈수록 폭이 좁아지도록 형성되며, 하단부에 파이프가 끼워져 고정될 수 있도록 하는 것을 특징으로 하는 건축용 서포트 파이프의 홀 가공장치.
According to claim 2,
The insertion groove is formed so that the upper part is wider and narrower toward the lower part, and a hole processing device for a construction support pipe is characterized in that a pipe can be fitted and fixed at the lower end.
제 2항에 있어서,
상기 거치대의 상단에 힌지 결합되어 삽입홈을 개폐하는 록킹부재;를 더 포함하는 것을 특징으로 하는 건축용 서포트 파이프의 홀 가공장치.
According to claim 2,
A hole processing device for a construction support pipe further comprising: a locking member that is hinged to the upper end of the cradle to open and close the insertion groove.
제 1항에 있어서,
상기 승강부를 전후방향으로 이동시켜 파이프의 양단부에 지지되는 위치를 조절하는 위치조절부;가 포함되고,
상기 위치조절부는,
상판부의 상부에 장착되는 실린더유닛과, 상기 실린더유닛에 결합되어 출몰작동되는 로드를 포함하며,
상기 로드의 단부에 승강부의 받침대가 결합되고,
상기 승강부의 받침대가 슬라이드 되도록 상판부의 상부에 길이방향으로 이동홈이 형성되어 이루어진 것을 특징으로 하는 건축용 서포트 파이프의 홀 가공장치.
According to claim 1,
Includes; by moving the lifting portion in the front-rear direction to adjust the position supported on both ends of the pipe;
The position adjustment unit,
It includes a cylinder unit mounted on the upper portion of the top plate, and a rod coupled to the cylinder unit to appear and move,
The pedestal of the lifting portion is coupled to the end of the rod,
A hole processing device for a construction support pipe, characterized in that a moving groove is formed in a longitudinal direction on an upper portion of the upper plate portion so that the pedestal of the lifting portion slides.
제 1항에 있어서,
상기 천공부를 승강시켜 드릴비트의 높이를 조절하는 높이조절부;가 포함되고,
상기 높이조절부는
기대에 수직하게 장착된 실린더유닛과, 상기 실린더유닛에 결합되어 수직으로 출몰작동하는 로드로 구성되고,
상기 로드의 상단이 천공부에 형성된 브라켓에 결합되어 이루어진 것을 특징으로 하는 건축용 서포트 파이프의 홀 가공장치.
According to claim 1,
Is included in the height adjustment unit for adjusting the height of the drill bit by elevating the perforation;
The height adjustment unit
Consists of a cylinder unit mounted perpendicular to the base and a rod coupled to the cylinder unit to vertically appear and operate,
A hole processing device for a construction support pipe, characterized in that the upper end of the rod is made of a bracket formed in a perforated portion.
제 1항에 있어서,
상기 드릴비트를 전진 또는 후진시키면서 파이프에 대한 천공 동작과 이격 동작을 하도록 하는 간격조절부;가 포함되고,
상기 간격조절부는
기대에 수직하게 장착된 메인실린더유닛과, 상기 메인실린더유닛에 결합되어 수직으로 출몰작동하는 로드로 구성되고,
양측 천공부의 하우징에 각기 힌지 결합되는 브라켓을 포함하는 것으로,
상기 브라켓이 서로 대칭되게 배열되며 각각의 단부가 중첩되게 배치되고, 상기 브라켓의 중첩된 부위에 상기 로드의 상단이 힌지 결합되어 이루어진 것을 특징으로 하는 건축용 서포트 파이프의 홀 가공장치.
According to claim 1,
Includes; the drill bit forward or reverse while adjusting the gap between the drilling and spacing operation for the pipe;
The gap control unit
Consists of a main cylinder unit mounted perpendicular to the base, and a rod coupled to the main cylinder unit to vertically appear and operate,
It includes a bracket that is hinged to each of the housing on both sides of the perforation,
The brackets are arranged symmetrically to each other, and each end is disposed to overlap, and the upper end of the rod is hinged to the overlapping portion of the bracket, and is a hole processing device for a construction support pipe.
제 7항에 있어서,
상기 브라켓 각각은 'ㄴ'자 형상으로 이루어지고, 상단이 천공부의 하우징에 제3힌지축으로 힌지결합되고,
중간에는 제2힌지축으로 상판부에 힌지 결합되며,
하단에는 장공이 형성되며, 상기 장공에 높이조절부의 로드가 제1힌지축으로 힌지 결합되어 이루어진 것을 특징으로 하는 건축용 서포트 파이프의 홀 가공장치.



The method of claim 7,
Each of the brackets is made of a 'b' shape, the upper end is hinged to the housing of the perforation by a third hinge axis,
In the middle, it is hinged to the top plate with a second hinge axis,
At the bottom, a long hole is formed, and a hole processing device for a construction support pipe, characterized in that the rod of the height adjustment part is hinged to the first hole with a first hinge axis.



KR1020180139054A 2018-11-13 2018-11-13 Hole Forming Device for Construction Support Pipe KR102217840B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180139054A KR102217840B1 (en) 2018-11-13 2018-11-13 Hole Forming Device for Construction Support Pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180139054A KR102217840B1 (en) 2018-11-13 2018-11-13 Hole Forming Device for Construction Support Pipe

Publications (2)

Publication Number Publication Date
KR20200055421A true KR20200055421A (en) 2020-05-21
KR102217840B1 KR102217840B1 (en) 2021-02-19

Family

ID=70910574

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180139054A KR102217840B1 (en) 2018-11-13 2018-11-13 Hole Forming Device for Construction Support Pipe

Country Status (1)

Country Link
KR (1) KR102217840B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112475364A (en) * 2020-11-20 2021-03-12 厦门宗顺建筑工程有限公司 Truss steel roof construction equipment
CN113560620A (en) * 2021-07-30 2021-10-29 建湖中恒机械有限公司 Flange hole drilling equipment that machining precision is high

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05131309A (en) * 1991-11-06 1993-05-28 Miyagawa Kogyo Kk Clamp device for drilling machine for shape steel
JPH06263215A (en) * 1992-12-25 1994-09-20 Norioki Nakabashi Bar loading device for multi-spindle automatic machine
KR20040086303A (en) 2002-01-29 2004-10-08 다우 글로벌 테크놀로지스 인크. Process for reducing α-haloketones to secondary α-haloalcohols
KR100960353B1 (en) * 2008-04-16 2010-05-28 (주)파브텍 Automatic cutting device for pipe
KR101578841B1 (en) * 2014-04-22 2015-12-18 복동규 Guardrail manufacture device
KR101807827B1 (en) * 2017-05-17 2017-12-11 엄용섭 Pipe location control machine of tailstock modification engine lathe and processing method of pipe using the pipe location control machine
KR20180078554A (en) * 2016-12-30 2018-07-10 주식회사 울트라 Clamping apparatus of multi-axis drilling machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05131309A (en) * 1991-11-06 1993-05-28 Miyagawa Kogyo Kk Clamp device for drilling machine for shape steel
JPH06263215A (en) * 1992-12-25 1994-09-20 Norioki Nakabashi Bar loading device for multi-spindle automatic machine
KR20040086303A (en) 2002-01-29 2004-10-08 다우 글로벌 테크놀로지스 인크. Process for reducing α-haloketones to secondary α-haloalcohols
KR100960353B1 (en) * 2008-04-16 2010-05-28 (주)파브텍 Automatic cutting device for pipe
KR101578841B1 (en) * 2014-04-22 2015-12-18 복동규 Guardrail manufacture device
KR20180078554A (en) * 2016-12-30 2018-07-10 주식회사 울트라 Clamping apparatus of multi-axis drilling machine
KR101807827B1 (en) * 2017-05-17 2017-12-11 엄용섭 Pipe location control machine of tailstock modification engine lathe and processing method of pipe using the pipe location control machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112475364A (en) * 2020-11-20 2021-03-12 厦门宗顺建筑工程有限公司 Truss steel roof construction equipment
CN113560620A (en) * 2021-07-30 2021-10-29 建湖中恒机械有限公司 Flange hole drilling equipment that machining precision is high

Also Published As

Publication number Publication date
KR102217840B1 (en) 2021-02-19

Similar Documents

Publication Publication Date Title
KR100857281B1 (en) Anchor Bolt Hole Drilling Apparatus for Ceiling
JP4796195B1 (en) Work scaffold equipment
KR102189173B1 (en) Manufacturing equipment for Construction Pipe Supports
CN101103161A (en) Apparatus for use in the construction of buildings
KR20200055421A (en) Hole Forming Device for Construction Support Pipe
KR102412165B1 (en) Apparatus for drilling on the ceil
US2795222A (en) Wire stone sawing machine
KR101700559B1 (en) Slab dismantlement method and slab dismantlement apparatus for this same
KR20180003980A (en) apparatus for drilling on the ceil
US20090188177A1 (en) Method and apparatus for raising buildings
US3148001A (en) Mobile power-actuated concrete saw with reaction supporting means therefor
KR200493344Y1 (en) Cutter with wire saw
US2178956A (en) Shiftable scaffold apparatus
KR20120094997A (en) Cutter for angle
JPH05248102A (en) Device and method for cutting concrete structure
KR101395277B1 (en) A device for keeping horizontal level of platform
KR100949431B1 (en) Apparatus of hoist crane
JP3796509B2 (en) Equipment for cutting and removing existing expansion joints and their use
JP6055616B2 (en) Curing device for building and curing method
US2965094A (en) Sawing apparatus
KR20210146573A (en) Lifting Apparatus for Working Platform
CN217756806U (en) Lifting device for building site water and electricity construction
CN219543664U (en) Building outer wall perforating device for building engineering
KR101820897B1 (en) Apparatus for constructing a building structure and construction method thereof
JP6173771B2 (en) Building demolition method and building demolition support device used therefor

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant