KR20190001087A - Brick wall partition for seismic reinforcement and method for construction thereof - Google Patents

Brick wall partition for seismic reinforcement and method for construction thereof Download PDF

Info

Publication number
KR20190001087A
KR20190001087A KR1020170080503A KR20170080503A KR20190001087A KR 20190001087 A KR20190001087 A KR 20190001087A KR 1020170080503 A KR1020170080503 A KR 1020170080503A KR 20170080503 A KR20170080503 A KR 20170080503A KR 20190001087 A KR20190001087 A KR 20190001087A
Authority
KR
South Korea
Prior art keywords
stiffener
vertical
brick
horizontal
bricks
Prior art date
Application number
KR1020170080503A
Other languages
Korean (ko)
Other versions
KR102127735B1 (en
Inventor
윤인구
Original Assignee
윤인구
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 윤인구 filed Critical 윤인구
Priority to KR1020170080503A priority Critical patent/KR102127735B1/en
Publication of KR20190001087A publication Critical patent/KR20190001087A/en
Application granted granted Critical
Publication of KR102127735B1 publication Critical patent/KR102127735B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4178Masonry wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/42Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities
    • E04B2/44Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities using elements having specially-designed means for stabilising the position; Spacers for cavity walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0222Replacing or adding wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2002/0202Details of connections
    • E04B2002/0243Separate connectors or inserts, e.g. pegs, pins or keys

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Finishing Walls (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to a brick wall partition for seismic reinforcement and a method for construction thereof and, more specifically, provides a brick wall partition for seismic reinforcement and a method for construction thereof, wherein a vertical reinforcement material and a horizontal reinforcement material are connected with a connection clip to be fitted to a width or a height of a brick wall for construction to be quickly and conveniently performed. To achieve this, according to the present invention, provided are the brick wall partition for seismic reinforcement and the method for construction thereof, wherein the brick wall partition comprises: a plurality of bricks; a pair of vertical reinforcement materials; a pair of horizontal reinforcement materials; and a first connection clip and a second connection clip.

Description

내진보강형 칸막이 벽돌벽 및 그 시공방법{Brick wall partition for seismic reinforcement and method for construction thereof}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a brick wall,

본 발명은 내진보강형 칸막이 벽돌벽 및 그 시공방법 관한 것으로, 건축물의 내부 공간을 구획하기 위해 벽돌을 조적하여 칸막이 벽돌벽을 형성하되, 수직 나선형 보강재를 이용하여 천장과 바닥면에 고정되도록 하고 수평 나선형 보강재를 통해 내력벽에 고정될 수 있도록 함으로써 외부충격에 대해 견고히 지지될 수 있도록 하는 내진보강형 칸막이 벽돌벽 및 그 시공방법에 관한 것이다.The present invention relates to an anti-breaking steel partition brick wall and a method of constructing the same. The brick wall is formed by partitioning bricks to divide an interior space of a building. The partition wall is formed by vertically- The present invention relates to a partition wall of a partition wall and a method of constructing the partition wall, and more particularly, to a partition wall capable of being fixed to an internal wall by means of a spiral reinforcement.

일반적으로 조적식 건축구조물은 벽돌 또는 콘크리트 블록을 모르타르로 점착하여 쌓는 구조로서, 주택이나 창고 및 빌라 등과 같은 건물의 벽체축조에 쓰이고, 내습 및 내구성이 좋으며 내화구조이고 경제적이어서 가장보편적인 방식으로 평가된다.Generally, masonry type building structure is a structure that builds up brick or concrete block by mortar adhesion. It is used for building walls of houses such as houses, warehouses and villas, is resistant to moisture and durability, is refractory and economical and is evaluated in the most common way do.

상기 벽돌을 이용한 조적식 건축구조물로는 건축물의 외부에 조적되도록 시공되어 외기에 대하여 건물의 내부를 보호하는 역할을 하거나 보온이나 통기 차양 등이 이루어지도록 하는 외부벽돌벽과, 건축물의 내부에 시공되어 공간을 구획하는 칸막이 형태의 내부벽돌벽을 포함하여 구성할 수 있다.The brick-type building structure includes an outer brick wall which is installed to be coherent on the outside of the building and serves to protect the inside of the building against the outside air or to perform a warming or ventilation shaking, And an inner brick wall in the form of a partition for partitioning the space.

상기 외부벽돌벽은 내력벽에 설치되는 지지수단을 통해 벽돌이 지지되도록 조적되어 형성됨으로써 내력벽에 연결된 상태로 설치되기 때문에 구조적인 안정성이 우수하다.The outer brick wall is formed in a coarse manner so as to support bricks through supporting means provided on a proof wall, so that the outer brick wall is installed in a state of being connected to a proof wall.

한편 상기 내부벽돌벽은 통상 건축물의 내부를 구획하도록 설치되는데, 이러한 내부벽돌벽은 통상 공간을 구획하기 위해 공간을 가로지르도록 설치됨으로써 내력벽이나 천장과 바닥면에 고정하는 것이 매우 번거롭고 어려운 문제점이 있다.On the other hand, the inner brick wall is usually provided so as to partition the inside of the building. Such an inner brick wall is installed to cross the space for partitioning the space, so that it is very cumbersome and difficult to fix the wall to the bearing wall, ceiling and floor .

이에 따라 종래에는 내부벽돌벽을 시공하는 과정에서 단순히 벽돌과 모르타르를 통해서만 내부벽돌벽을 형성함으로써 구조적인 안정성이 매우 취약하며 특히 지진과 같은 강한 외부충격에 의해서는 쉽게 무너져 내려 안전사고가 발생되는 문제점이 있다.Accordingly, conventionally, in the process of constructing the inner brick wall, the inner brick wall is formed only through the brick and the mortar, so that the structural stability is very weak. Especially, when the inner brick wall is formed by strong external impact such as earthquake, .

공개특허공보 제10-2009-0032471호Japanese Patent Application Laid-Open No. 10-2009-0032471

상기와 같은 문제점을 해결하기 위한 본 발명의 목적은, 건축물의 내부 공간을 구획하기 위해 벽돌을 조적하여 칸막이 벽돌벽을 형성하되, 수직 나선형 보강재를 이용하여 천장과 바닥면에 고정되도록 하고 수평 나선형 보강재를 통해 내력벽에 고정될 수 있도록 함으로써 외부충격에 대해 견고히 지지될 수 있도록 하고, 벽돌벽의 폭이나 높이에 맞도록 수직보강재와 수평보강재를 연결클립을 이용하여 연결해줌으로써 빠르고 간편한 시공이 이루어지도록 하는 내진보강형 칸막이 벽돌벽 및 그 시공방법을 제공함에 있다.In order to solve the above-mentioned problems, an object of the present invention is to arrange bricks to form a partition brick wall in order to partition an internal space of a building, and to fix the bricks to a ceiling and a floor using a vertical spiral stiffener, So that it can be firmly supported against external impact by connecting the vertical stiffener and the horizontal stiffener to the bridging wall by connecting the vertical stiffener and the horizontal stiffener to the width and height of the brick wall, And a method of constructing the brick wall.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명은, 건축물의 내부에 시공되어 내부 공간을 구획하는 칸막이 벽돌벽에 있어서, 상, 하단이 서로 엇갈리도록 하여 다수단으로 조적됨으로써 칸막이를 형성하는 다수의 벽돌; 상기 벽돌에 형성되는 중공에 끼워지면서 좌, 우로 이웃하는 벽돌들 사이에 개재되도록 설치되어 벽돌들을 지지해주는 보강재몸체와 상기 보강재몸체의 일측단에서 절곡되도록 형성되고 평판형태로 이루어져 천장면 또는 바닥면에 고정되는 고정부로 이루어지고 상기 보강재몸체가 서로 겹쳐지도록 수직 하게 설치되는 한 쌍의 수직 보강재; 상기 벽돌의 조적시 상, 하에 위치하는 벽돌들 사이에 개재되어 수평 방향으로 설치되는 보강재몸체와, 상기 보강재몸체의 일측단에서 절곡되도록 형성되고 평판형태로 이루어져 벽체에 고정되는 고정부로 이루어지고 상기 보강재몸체가 서로 겹쳐지도록 수평하게 설치되는 한 쌍의 수평 보강재; 상기 겹쳐진 수직보강재의 보강재몸체에 끼워지도록 설치되어 수직보강재를 연결해주는 제1연결클립 및 상기 겹쳐진 수평보강재의 보강재몸체에 끼워지도록 설치되어 수평보강재를 연결해주는 제2연결클립을 포함하여 구성된 것을 특징으로 한다.According to an aspect of the present invention, there is provided a partition brick wall for partitioning an interior space of a building, the partition wall having upper and lower ends staggered from each other, A plurality of bricks forming a partition by being combined with each other; A reinforcing material body provided to be interposed between bricks adjacent to the left and right sides of the brick, the reinforcing material body being provided to be bridged at one side of the reinforcing material body, and being formed in a flat plate shape, A pair of vertical stiffeners made of a fixed portion and fixed vertically so that the stiffener bodies overlap each other; A stiffener body disposed between the bricks positioned below and below the masonry of the brick and installed in a horizontal direction, and a fixing part formed to be bent at one end of the stiffener body and fixed to the wall, A pair of horizontal stiffeners installed horizontally so that the stiffener bodies overlap each other; A first connection clip installed to be fitted to the reinforcing body of the overlapped vertical stiffener to connect the vertical stiffener and a second connection clip installed to be fitted to the reinforced body of the overlapped horizontal stiffener to connect the horizontal stiffener. do.

또한 상기 수직보강재와 수평보강재의 보강재몸체는 평판 형태의 금속재를 일정한 피치를 갖도록 나선형으로 꼬아 형성되는 것을 특징으로 한다.Further, the reinforcing member body of the vertical stiffener and the horizontal stiffener is formed by spirally twisting the flat metal member to have a constant pitch.

또한 상기 제1,2 연결클립은, 수직보강재 및 수평보강재의 보강재몸체가 끼워질 수 있도록 일측단에서 내측방향을 향해 절개홈이 형성되어 있는 클립몸체; 상기 절개홈에서 확장되도록 형성되어 상기 수직보강재 및 수평보강재의 보강재몸체가 각각 끼워질 수 있도록 하는 한 쌍의 끼움홈;을 포함하여 구성된 것을 특징으로 한다.The first and second connection clips may include a clip body having a cutout groove formed at one end thereof toward the inner side so as to allow the body of the vertical stiffener and the horizontal stiffener to be fitted therein; And a pair of fitting grooves formed to extend in the cut-out groove and to allow the vertical stiffener and the horizontal stiffener to respectively fit the stiffener body.

또한 상기 제1연결클립은, 수직보강재의 보강재몸체가 끼워질 수 있도록 일측단에서 내측방향을 향해 절개홈이 형성되어 있는 클립몸체와, 상기 절개홈에서 확장되도록 형성되어 상기 수직보강재의 보강재몸체가 각각 끼워질 수 있도록 하는 한 쌍의 끼움홈으로 구성되고, 상기 제2연결클립은 평판형태로 형성되고 수평보강재의 보강재몸체에 걸려질 수 있도록 반원형태로 형성되는 걸림부와, 상기 걸림부의 양단에서 수직하게 연장되되, 일정한 피치를 갖도록 나선형으로 꼬여지도록 형성되고 벽돌의 중공이나 수직줄눈에 끼워지도록 설치되어 모르타르와 일체화되는 꼬임부;를 포함하여 구성되는 것을 특징으로 한다.The first connection clip may include a clip body having a cutout groove formed at an end thereof in an inward direction so as to allow the body of the vertical stiffener to be inserted thereinto and a reinforcement body of the vertical stiffener, Wherein the second connection clip is formed in a flat plate shape and is formed in a semicircular shape so as to be hung on the reinforcing member body of the horizontal reinforcement; And a twist portion formed to be spirally twisted so as to have a constant pitch and to be fitted to the hollow or vertical joint of the brick and integrated with the mortar.

또한 상기 벽돌은, 상기 수평보강재가 삽입될 수 있도록 상, 하부면에 오목한 형태의 수평삽입홈이 형성되고, 상기 수직보강재가 삽입될 수 있도록 좌, 우측면에 오목한 형태의 수직삽입홈이 더 형성되는 것을 특징으로 한다.In addition, the bricks are formed with concave horizontal insertion grooves on the upper and lower surfaces so that the horizontal reinforcement can be inserted therein, and vertical insertion grooves are formed on the left and right sides of the brick so as to insert the vertical reinforcement .

또한 상기 칸막이 벽돌벽에 교차되는 교차형 칸막이 벽돌벽을 더 포함하여 구성할 수 있으며, 상기 교차형 칸막이 벽돌벽의 수평줄눈에는 상기 칸막이 벽돌벽의 수평보강재에 걸려지도록 설치되는 연결보강재가 구비되는 것을 특징으로 한다.Further, it is possible to further comprise an intersection type partition brick wall which intersects the partition brick wall, and a horizontal reinforcement of the partition brick wall is attached to the horizontal stiffener of the partition brick wall .

또한 상기 연결보강재는, 상기 교차형 칸막이 벽돌벽의 수평줄눈에 개재되도록 설치되고 평판형태의 금속재를 일정한 피치를 갖도록 나선형으로 꼬아 형성되는 보강재몸체와, 상기 보강재몸체의 일측단에서 연장되고 상기 수평보강재의 보강재몸체 걸려질 수 있도록 걸림홈이 형성되어 있는 걸림부를 포함하여 구성된 것을 특징으로 한다.The connecting stiffener may include a reinforcing body formed to be interposed in a horizontal joint of the cross-section brick wall and spirally twisted so as to have a predetermined pitch with a flat plate-like metal material, and a reinforcing member extending from one end of the reinforcing- And a latching portion formed with a latching groove for latching the body of the reinforcing member.

한편 본 발명은, 고정수단을 통해 고정부를 바닥에 고정되도록 하여 소정의 간격으로 다수의 수직보강재를 설치하는 수직보강재 바닥설치단계; 상기 바닥으로부터 벽돌과 모르타르를 이용하여 수직줄눈과 수평줄눈을 형성하면서 벽돌을 서로 엇갈리도록 조적하되, 상기 수직보강재의 설치위치에서는 수직보강재에 끼워지도록 하거나 수직보강재가 좌, 우로 이웃하는 벽돌 사이에 개재되도록 하면서 벽돌을 조적하는 벽돌조적단계; 상기 벽돌조적단계를 통해 벽돌을 조적하는 과정에서 소정의 높이 마다 벽돌의 상부에 보강재몸체의 일부분이 겹쳐지도록 하고 고정부를 통해 벽체에 고정되도록 하여 2개의 수평보강재를 설치하고, 상기 겹쳐진 보강재몸체에는 제2연결클립을 끼워 넣어 2개의 수평보강재가 연결되도록 하는 수평보강재 설치단계; 상기 벽돌조적단계와 수평보강재 설치단계를 반복 수행하여 일정 높이까지 벽돌을 조적한 후 상기 바닥에 설치된 수직보강재에 보강재몸체가 겹쳐지도록 하고 고정부를 통해 천장에 고정되도록 다른 수직보강재를 설치하고 서로 겹쳐진 보강재몸체에 제1연결클립을 끼워 넣어 2개의 수직보강재를 연결 고정하는 수직보강재 천장설치단계; 상기 수직보강재에 끼워질 수 있도록 중공의 측면으로 개구부가 형성되어 있는 마감벽돌을 상기 벽돌조적단계를 통해 조적된 벽돌의 상부에 조적되도록 설치하여 천장까지 마감 설치하는 마감벽돌 설치단계;를 포함하여 구성된 것을 특징으로 한다. According to another aspect of the present invention, there is provided a vertical stiffener comprising: a vertical stiffener floor installing step of fixing a fixed portion to a floor through fixing means to install a plurality of vertical stiffeners at predetermined intervals; The vertical stiffener is installed at the installation position of the vertical stiffener so that the vertical stiffener is inserted into the vertical stiffener or the vertical stiffener is interposed between the adjacent bridges at the left and right sides. A brick masonry step to mason the brick while making it possible; A plurality of horizontal stiffeners are installed on the bricks so that a part of the stiffener body overlaps the bricks at predetermined heights and is fixed to the wall through the fixing portions in the process of brick masonry through the brick masonry step, A horizontal stiffener mounting step of inserting the second connecting clip to connect the two horizontal stiffeners; The brick assembling step and the horizontal stiffener mounting step are repeated to arrange the bricks up to a predetermined height, then the vertical stiffener installed on the floor is overlapped with another stiffener body, another vertical stiffener is fixed to the ceiling through the fixing part, A vertical stiffener ceiling mounting step for connecting and fixing two vertical stiffeners by inserting a first connecting clip into the stiffener body; And a finishing brick installing step of finishing a finished brick having an opening on a hollow side surface so as to be fitted to the vertical stiffener so as to be integrated on the upper part of the bricks assembled through the brick making step, .

이상에서 설명한 바와 같이 본 발명에 의하면, 이와 같이 구성되는 본 발명의 칸막이 벽돌벽은, 모르타르를 이용하여 벽돌을 조적하되, 수평보강재와 수직보강재를 설치하여 천장과 바닥면 및 벽체에 칸막이 벽돌벽이 연결되도록 구성함으로써 구조적인 안정성 향상을 통한 내진 성능을 향상시켜 주는 효과가 있다.As described above, according to the present invention, the partition brick wall of the present invention having the above-described structure is constructed such that the bricks are assembled by using mortar, and a horizontal reinforcing material and a vertical reinforcing material are installed to form a partition brick wall So that the seismic performance can be improved by improving the structural stability.

또한 연결클립을 통해 수평보강재와 수직보강재를 간단하게 연결해줌으로써 보강재들의 이음시공이 용이하게 이루어지는 효과가 있다.Also, since the horizontal stiffener and the vertical stiffener are simply connected to each other through the connection clip, the joining of the stiffeners is facilitated.

또한 벽돌에 수평삽입홈과 수직삽입홈을 형성하여 수평보강재 및 수직보강재를 감싸는 모르타르의 주입량이 증가되도록 하여 피복두께가 증가되어 벽돌과 수직보강재 및 수평보강재가 보다 견고하게 일체화됨으로써 벽돌벽의 구조적인 안정성이 향상되는 효과가 있다.In addition, horizontal insertion grooves and vertical insertion grooves are formed in the bricks to increase the injection amount of the mortar surrounding the horizontal stiffeners and vertical stiffeners to increase the covering thickness so that the bricks, the vertical stiffeners and the horizontal stiffeners are more firmly integrated, The stability is improved.

또한 교차형 칸막이 벽돌벽의 시공시 연결보강재를 이용하여 기존의 벽돌벽과 연결되도록 구성함으로써 벽돌벽들이 일체로 서로 연결되어 구조적인 안정성이 보다 향상되어 내진성능을 증가시켜주는 효과를 있는 매우 유용한 발명이다.In addition, it is possible to connect the brick walls to the existing brick walls by using the connecting stiffener at the time of construction of the cross-sectional partition brick wall, so that the brick walls are integrally connected to each other to improve the structural stability, to be.

도 1 은 본 발명에 의한 칸막이 내력벽을 나타낸 사시도,
도 2 는 본 발명에 의한 칸막이 내력벽에서 수직보강재를 연결클립을 이용하여 연결한 상태를 나타낸 예시도
도 3 은 본 발명에 의한 칸막이 내력벽에서 수평보강재를 다른 실시예에 의한 제2연결클립을 이용하여 연결한 상태를 나타낸 예시도,
도 4 는 본 발명에 의한 칸막이 내력벽에서 수직보강재의 설치 상태를 나타낸 정면도,
도 5 는 본 발명에 의한 칸막이 내력벽에서 벽돌에 수직삽입홈과 수평삽입홈을 형성한 상태를 나타낸 사시도,
도 6 은 본 발명에 의한 칸막이 내력벽에 교차형 칸막이 내력벽이 연결될 경우 연결보강재를 설치한 상태를 나타낸 사시도.
1 is a perspective view showing a partition wall of the present invention,
FIG. 2 is a view illustrating a state in which vertical stiffeners are connected to each other using a connecting clip in the partition wall of the partition according to the present invention.
3 is a view illustrating a state in which a horizontal stiffener is connected to a partition wall of a partition according to an embodiment of the present invention by using a second connection clip.
4 is a front view showing an installation state of the vertical stiffener in the partition wall of the partition according to the present invention,
FIG. 5 is a perspective view showing a state in which a vertical insertion groove and a horizontal insertion groove are formed in a brick in a partition wall,
6 is a perspective view illustrating a state in which a connecting stiffener is installed when a crossing bar strength wall is connected to the partition wall.

이하 본 발명의 실시 예인 구성과 그 작용을 첨부도면에 연계시켜 상세히 설명하면 다음과 같다. 또한 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

도 1 은 본 발명에 의한 칸막이 내력벽을 나타낸 사시도, 도 2 는 본 발명에 의한 칸막이 내력벽에서 수직보강재를 연결클립을 이용하여 연결한 상태를 나타낸 예시도, 도 3 은 본 발명에 의한 칸막이 내력벽에서 수평보강재를 다른 실시예에 의한 제2연결클립을 이용하여 연결한 상태를 나타낸 예시도, 도 4 는 본 발명에 의한 칸막이 내력벽에서 수직보강재의 설치 상태를 나타낸 정면도로서,FIG. 1 is a perspective view showing a partition wall in accordance with the present invention, FIG. 2 is an explanatory view showing a state in which a vertical stiffener is connected to a vertical wall of a partition wall according to the present invention by using a connecting clip, FIG. 4 is a front view showing a state in which a vertical stiffener is installed on a partition wall according to an embodiment of the present invention. FIG.

도면에서와 같이 본 발명의 칸막이 내력벽(10)은 서로 엇갈리면서 다수단으로 조적됨으로써 건축물의 내부에 칸막이가 형성되도록 하는 다수의 벽돌(100)과, 상기 벽돌(100)에 형성되는 중공(11)에 끼워지면서 좌, 우로 이웃하는 벽돌(100)들 사이에 개재되도록 설치되고, 천장(30)과 바닥(20)에 고정되어 벽돌(100)들을 지지해주는 한 쌍의 수직보강재(200)와, 상기 벽돌(100)의 조적시 상, 하에 위치하는 벽돌(100)들 사이, 즉 수평줄눈에 개재되도록 설치되고 벽체(40)에 고정됨으로써 상기 벽돌(100)들을 지지해주는 한 쌍의 수평보강재(300)와, 상기 겹쳐진 수직보강재(200)에 끼워지도록 설치되어 수직보강재(200)를 연결해주는 제1연결클립(400) 및 상기 겹쳐진 수평보강재(300)에 끼워지도록 설치되어 수평보강재(300)를 연결해주는 제2연결클립(500)을 포함하여 구성된다.As shown in the drawing, the partition walls 10 of the present invention are divided into a plurality of bricks 100 for forming a partition inside the building by being staggered with each other, and a hollow 11 formed in the brick 100, A pair of vertical stiffeners 200 interposed between the bricks 100 adjacent to the left and right sides and fixed to the ceiling 30 and the floor 20 to support the bricks 100, A pair of horizontal stiffeners 300 for supporting the bricks 100 by being interposed between the bricks 100 positioned under the masonry 100 of the brick 100, that is, the horizontal joint, and being fixed to the wall 40, A first connection clip 400 installed to be fitted to the overlapped vertical stiffener 200 to connect the vertical stiffener 200 and a second connection clip 400 connected to the horizontal stiffener 300 to be fitted to the overlapped horizontal stiffener 300, And a second connection clip (500).

상기 벽돌(100)은 도면에서와 같이 3개의 중공(110)이 형성되어 있으나 경우에 따라 중심부에만 중공을 형성하여 구성할 수 있으며, 구멍의 개수는 한정하지 않는다. 또한 콘크리트, 황토 등 다양한 재질로 제작될 수 있다. The brick 100 is formed with three hollows 110 as shown in the drawing, but it may be formed by forming a hollow only in the central portion depending on the case, and the number of the holes is not limited. Also, it can be made of various materials such as concrete and loess.

상기 한 쌍의 수직보강재(200)는 벽돌(100)에 형성되는 중공(110)에 끼워지면서 좌, 우로 이웃하는 벽돌(100)들 사이에 개재되도록 설치되어 벽돌(100)들 지지해주는 보강재몸체(210)와, 상기 보강재몸체(210)의 일측단에서 절곡되도록 형성되고 평판형태로 형성되어 천장(30) 또는 바닥(40)에 고정못이나 피스 등과 같은 고정부재를 통해 고정되는 고정부(220)로 구성된다.The pair of vertical stiffeners 200 are installed in the hollows 110 of the bricks 100 and are disposed between the adjacent bricks 100 to support the bricks 100, A fixing part 220 formed to be bent at one end of the reinforcing material body 210 and formed in a flat plate shape and fixed to the ceiling 30 or the floor 40 through a fixing member such as a fixing nail or a piece, .

이러한 수직보강재(200)는 하나의 수평보강재(300)가 고정부(220)를 통해 바닥(20)에 고정되고 보강재몸체(210)에는 상기 벽돌(100)의 중공(110)을 통해 끼워지거나 좌, 우 방향으로 이웃하는 벽돌(100)들 사이에 개재되도록 위치하고, 다른 하나의 수직보강재(200)는 고정부(220)를 통해 천장(30)에 고정되고 보강재몸체(210)는 상기 바닥(20)에 고정되어 있는 수직보강재(200)의 보강재몸체(210)와, 겹쳐진 상태에서 상기 제1연결클립(400)을 통해 연결되도록 설치되는 것이다.The vertical stiffener 200 includes a horizontal stiffener 300 fixed to the floor 20 through a fixing portion 220 and a stiffener body 210 inserted into the hollow 110 of the brid 100, And the other vertical stiffener 200 is fixed to the ceiling 30 through the fixing portion 220 and the stiffener body 210 is positioned between the bridges 100 adjacent to the bottom 20 And the reinforcing member body 210 of the vertical stiffener 200 fixed to the first connection clip 400 in a superimposed state.

이와 같이 수직보강재(200)는 천장(30)과 바닥(20)에 고정되도록 설치됨으로써 구조적인 안정성이 향상되고 이로 인해 지진과 같은 외력의 발생시 벽돌(100)들이 전도되는 것을 방지하여 내진성능을 향상시켜 주게 되는 것이다.Since the vertical stiffener 200 is installed to be fixed to the ceiling 30 and the floor 20, the structural stability is improved, thereby preventing the bricks 100 from being conducted when an external force such as an earthquake occurs, .

한편 상기 수평보강재(300)는 상, 하로 조적되는 벽돌(100)들의 사이, 즉 수평줄눈상에 개재되도록 설치되는 보강재몸체(310)와, 상기 보강재몸체(310)의 일측단에서 절곡되도록 형성되고 평판형태로 형성되어 벽체에 고정못이나 피스 등과 같은 고정부재를 통해 고정되는 고정부(320)를 포함하여 구성된다.The horizontal stiffener 300 is formed to be folded at one side of the stiffener main body 310 and a stiffener main body 310 interposed between the bricks 100 to be assembled up and down, And a fixing part 320 formed in a flat plate shape and fixed to the wall through a fixing member such as a fixing nail or a piece.

이와 같이 구성되는 하나의 수평보강재(300)가 일측의 벽체(40)에 고정부(320)를 통해 고정되고, 다른 하나의 수평보강재(300)는 고정부(320)를 통해 이웃하는 다른 벽체(40)에 고정되며 보강재몸체(310)가 겹쳐진 상태에서 제2연결클립(500)을 통해 연결됨으로써 벽돌벽이 2개의 벽체(40)에 고정될 수 있도록 구성함으로써 벽돌벽의 안정적인 시공이 가능하도록 하며 내진 성능을 향상시켜 주게 되는 것이다.One horizontal stiffener 300 configured as described above is fixed to the one wall 40 through the fixing portion 320 and the other horizontal stiffener 300 is fixed to the other wall 40 and the reinforcing member body 310 are connected to each other through the second connection clip 500 in a superimposed state so that the brick wall can be fixed to the two walls 40 so that the brick wall can be stably installed Thereby improving seismic performance.

한편 상기 수평보강재(300) 및 수직보강재(200)의 보강재몸체(310)(210)는 평판형태의 금속재를 일정한 피치를 갖도록 나선형으로 꼬아 형성된다.The horizontal stiffener 300 and the stiffener bodies 310 and 210 of the vertical stiffener 200 are spirally twisted to have a predetermined pitch.

이렇게 보강재몸체(310)(210)가 나선형으로 꼬여지도록 형성됨으로써 휨강도가 매우 향상되고 이로 인해 벽돌벽에 가해지는 처짐과 횡력에 대하여 안정적으로 지지함으로써 벽돌(100)을 견고하게 지지할 수 있게 되는 것이다.Since the reinforcing body 310 and the reinforcing body 310 are formed so as to be spirally twisted, the bending strength is greatly improved, thereby stably supporting the brick 100 against deflection and lateral force applied to the brick wall .

또한 나선형으로 꼬여짐으로써 벽돌(100) 조적시 도포되는 모르타르와의 부착력이 보다 증가되어 벽돌(100)과 일체화됨으로써 견고한 벽돌벽이 형성될 수 있도록 구성되는 것이다.Further, since the bristles are twisted in a helical shape, the adhesion force with the mortar applied when the bricks 100 are assembled is further increased and integrated with the bricks 100, so that a solid brick wall can be formed.

한편 상기 제1연결클립(400)은 서로 겹쳐진 수직보강재(200)의 보강재몸체(210)가 끼워질 수 있도록 일측단에서 내측방향을 향해 절개홈(420)이 형성되어 있는 클립몸체(410)와, 상기 절개홈(420)으로 끼워진 2개의 보강재몸체(210)가 걸려질 수 있도록 절개홈(420)에서 확장되도록 형성되는 한 쌍의 끼움홈(430)을 포함하여 구성된다.The first connection clip 400 includes a clip body 410 having a cutout groove 420 formed at one end thereof so as to be inserted in the vertical stiffener body 200 of the vertical stiffener 200, And a pair of fitting grooves 430 formed to extend in the incision groove 420 so that two stiffener bodies 210 inserted into the incision groove 420 can be caught.

이와 같이 구성되는 제1연결클립(400)은 수평줄눈 사이에 개재되도록 위치하고 겹쳐져 있는 수직보강재(200)의 보강재몸체(210)(310)에 끼워져 수직보강재(200)를 견고하게 연결해줌으로써 수직보강재(200)들이 일체화되도록 하여 구조적인 견고함이 향상되도록 하는 것이다.The first connection clip 400 constructed as described above is inserted into the horizontal joints and is fitted to the reinforcing member bodies 210 and 310 of the overlapped vertical stiffener 200 to firmly connect the vertical stiffener 200, 200 are integrated so as to improve the structural rigidity.

또한 제1실시예에 의한 제2연결클립(500)은 상기 제1연결클립과 동일한 형태로 형성되는 것으로 서로 겹쳐진 수평보강재(300)의 보강재몸체(310)가 끼워질 수 있도록 일측단에서 내측방향을 향해 절개홈(520)이 형성되어 있는 클립몸체(510)와, 상기 절개홈(520)으로 끼워진 2개의 보강재몸체(310)가 걸려질 수 있도록 절개홈(520)에서 확장되도록 형성되는 한 쌍의 끼움홈(530)을 포함하여 구성된다.The second connection clip 500 according to the first embodiment is formed in the same shape as the first connection clip. The second connection clip 500 according to the first embodiment is formed so that the reinforcing member body 310 of the horizontal stiffener 300, which are overlapped with each other, A clip body 510 having a cutout groove 520 formed in the cutout groove 520 and a pair of reinforcing members 510 extending in the cutout groove 520 so as to be engaged with the cutout groove 520, (Not shown).

이러한 제2연결클립(500)은 수직줄눈 사이에 개재되도록 위치하고 겹쳐져 있는 수평보강재(300)의 보강재몸체(310)에 끼워져 수평보강재(300)를 견고하게 연결해줌으로서 수평보강재(300)들이 일체화되도록 하여 구조적인 견고함이 향상되도록 하는 것이다.The second connection clip 500 is interposed between the vertical joints and is fitted to the reinforcing body 310 of the overlapped horizontal stiffener 300 to firmly connect the horizontal stiffener 300 so that the horizontal stiffeners 300 are integrated Thereby improving the structural rigidity.

한편 다른 실시예에 의한 제2연결클립(500)은, 도 3 에서와 같이 평판형태로 형성되고 수평보강재(300)의 보강재몸체에 걸려질 수 있도록 반원형태로 형성되는 걸림부(540)와, 상기 걸림부(540)의 양단에서 수직하게 연장되되, 일정한 피치를 갖도록 나선형으로 꼬여지도록 형성되고 벽돌(100)의 중공(110)이나 수직줄눈에 끼워지도록 설치되어 모르타르와 일체화되는 꼬임부(550)를 포함하여 구성할 수 있다.Meanwhile, the second connection clip 500 according to another embodiment has a latching part 540 formed in a flat plate shape as shown in FIG. 3 and formed in a semicircular shape so as to be hooked on the reinforcing body of the horizontal stiffener 300, A twist portion 550 formed to be spirally twisted so as to have a constant pitch and to be fitted to the hollow 110 or the vertical joint of the brick 100 and integrated with the mortar, As shown in FIG.

이러한 제2연결클립(500)은 수직줄눈 사이에 개재되도록 설치되거나, 또는 벽돌(100)에 형성되는 중공(110)에 삽입되도록 설치하여 수평보강재(300)를 연결해주게 된다.The second connection clip 500 is interposed between the vertical joints or inserted into the hollow 110 formed in the brick 100 to connect the horizontal stiffener 300.

또한 상기 벽돌(100)에 형성되는 중공(110)에 설치될 경우에는 중공(110)의 내부에 모르타르를 주입하여 제2연결클립(500)이 견고하게 고정될 수 있도록 한다.In addition, when installed in the hollow 110 formed in the brick 100, mortar is injected into the hollow 110 so that the second connection clip 500 can be firmly fixed.

이러한 다른 실시예에 의한 연결클립은 수평보강재(300)를 연결해주되, 꼬임부에 의해 모르타르와의 일체화 효율이 향상되어 매우 견고하게 수평보강재(300)를 고정해주게 되는 것이다.The connection clip according to another embodiment connects the horizontal stiffener 300, but the integrated efficiency with the mortar is improved by the twist portion, and the horizontal stiffener 300 is fixed very firmly.

한편 상기 제2연결클립(500)은 수평보강재(300)가 겹쳐지지 않은 상태에서도 수평보강재(300)의 보강재몸체(310)에 끼워져 벽돌(100)의 중공(110)이나 수직줄눈에 개재되도록 설치되어 수평보강재(300)와 벽돌(100)이 보다 견고하게 일체화되도록 하여 구조적인 안정성을 향상시켜 내진 효율이 증가되도록 한다.The second connection clip 500 is inserted into the hollow 110 of the brick 100 or a vertical joint of the brick 100 in a state where the horizontal stiffener 300 is not overlapped with the stiffener body 310 of the horizontal stiffener 300 So that the horizontal stiffener 300 and the brick 100 are more firmly integrated so as to improve the structural stability and increase the seismic efficiency.

한편 본 발명은 도 5 에서와 같이 상기 벽돌(100)은 다수의 중공(110)이 형성될 수 있으며, 또한 상기 수평보강재(300)가 삽입될 수 있도록 상, 하부면에 오목한 형태의 수평삽입홈(130)이 형성되고, 상기 수직보강재(200)가 삽입될 수 있도록 좌, 우측면에 오목한 형태의 수직삽입홈(120)이 더 형성할 수 있다.As shown in FIG. 5, the brick 100 may have a plurality of hollows 110 formed thereon. In addition, the horizontal reinforcement 300 may be inserted into the upper and lower surfaces of the brick 100, A vertical insertion groove 120 may be formed on the left and right sides of the vertical stiffener 200 so that the vertical stiffener 200 can be inserted.

이렇게 벽돌(100)에 수평삽입홈(130)과 수직삽입홈(120)을 더 형성하고 모르타르가 주입됨으로써 수직보강재(200)와 수평보강재(300)를 감싸는 모르타르의 주입량이 증가되어 피복두께 증가로 인해 벽돌(100)과 수직보강재(200) 및 수평보강재(300)가 보다 견고하게 일체화됨으로써 벽돌벽의 구조적인 안정성이 향상되는 것이다.The horizontal insertion slot 130 and the vertical insertion slot 120 are further formed in the brick 100 and the injection amount of the mortar surrounding the vertical stiffener 200 and the horizontal stiffener 300 is increased by the injection of the mortar, The structural stability of the brick wall improves because the brick 100, the vertical stiffener 200, and the horizontal stiffener 300 are more firmly integrated.

한편 본 발명은 도 6 에서와 같이 칸막이 벽돌벽(10)에 교차되는 교차형 칸막이 벽돌벽(11)을 더 포함하여 구성할 수 있으며, 상기 교차형 칸막이 벽돌벽(11)의 수평줄눈에는 상기 칸막이 벽돌벽(10)의 수평보강재(300)에 걸려지도록 설치되어 벽돌벽들이 일체화되도록 하는 연결보강재(600)를 더 포함하여 구성할 수 있다.In the meantime, the present invention can further include an intersection type partition brick wall 11 that intersects the partition brick wall 10 as shown in FIG. 6, and the horizontal joint of the cross type partition brick wall 11 includes And a connection stiffener 600 installed to be hooked on the horizontal stiffener 300 of the brick wall 10 to integrate the brick walls.

상기 연결보강재(600)는 상기 교차형 칸막이 벽돌벽(11)의 수평줄눈에 개재되도록 설치되고 평판형태의 금속재를 일정한 피치를 갖도록 나선형으로 꼬아 형성되는 보강재몸체(610)와, 상기 보강재몸체(610)의 일측단에서 연장되고 상기 수평보강재(300)의 보강재몸체(310) 걸려질 수 있도록 걸림홈(630)이 형성되어 있는 걸림부(620)를 포함하여 구성된다.The connecting stiffener 600 includes a stiffener body 610 interposed in a horizontal joint of the cross-section partition brick wall 11 and spirally formed so as to have a predetermined pitch with a flat plate-shaped metal material. The stiffener body 610 And a latching part 620 extending from one end of the horizontal stiffener 300 and having a latching groove 630 for latching the stiffener body 310 of the horizontal stiffener 300.

이러한 연결보강재(600)는 교차되는 2개의 칸막이 벽돌벽을 서로 연결시켜 줌으로써 벽돌벽들의 구조적인 견고함과 안정성이 향상되도록 하는 것이다.The connecting stiffener 600 connects the two crossing brick walls to each other to improve the structural rigidity and stability of the brick walls.

이와 같이 구성되는 본 발명의 칸막이 벽돌벽은, 모르타르를 이용하여 벽돌(100)을 조적하되, 수평보강재(300)와 수직보강재(200)를 설치하여 천장과 바닥(20) 및 벽체(40)에 칸막이 벽돌벽이 연결되도록 구성함으로써 구조적인 안정성 향상을 통한 내진 성능을 향상시켜 주게 되는 것이다.The partition brick wall of the present invention having the above-described structure is constructed such that the brick 100 is assembled using mortar, and the horizontal stiffener 300 and the vertical stiffener 200 are installed on the ceiling and the floor 20 and the wall 40 And the partition brick walls are connected to each other, thereby improving seismic performance by improving structural stability.

또한 연결클립을 통해 수평보강재(300)와 수직보강재(200)를 간단하게 연결해줌으로써 보강재들의 이음시공이 용이하게 이루어지게 된다.Further, the horizontal stiffener 300 and the vertical stiffener 200 are simply connected to each other through the connection clip, thereby facilitating the joining of the stiffeners.

또한 벽돌(100)에 수평삽입홈(130)과 수직삽입홈(120)을 형성하여 수평보강재(300) 및 수직보강재(200)를 감싸는 모르타르의 주입량이 증가되도록 하여 피복두께가 증가되어 벽돌(100)과 수직보강재(200) 및 수평보강재(300)가 보다 견고하게 일체화됨으로써 벽돌벽의 구조적인 안정성이 향상되는 것이다.The horizontal insertion slot 130 and the vertical insertion slot 120 are formed in the brick 100 to increase the injection amount of the mortar surrounding the horizontal stiffener 300 and the vertical stiffener 200, And the vertical stiffener 200 and the horizontal stiffener 300 are integrated more firmly, the structural stability of the brick wall is improved.

또한 교차형 칸막이 벽돌벽(11)의 시공시 연결보강재(600)를 이용하여 기존의 벽돌벽과 연결되도록 구성함으로써 벽돌벽들이 일체로 서로 연결되어 구조적인 안정성이 보다 향상되어 내진성능이 증가되는 것이다.Also, since the bridge bridges 11 are connected to the existing brick walls by using the connecting stiffener 600, the brick walls are integrally connected to each other to improve the structural stability, thereby increasing the seismic performance .

이와 같이 구성되는 본 발명의 벽돌벽 시공과정을 설명하면, 수평보강재 바닥설치단계와, 벽돌조적단계와, 수평보강재 설치단계와, 수직보강재 천장설치단계와, 마감벽돌 설치단계를 포함하여 구성된다.The brick wall construction process according to the present invention includes the steps of installing a horizontal reinforcement, installing a brick, installing a horizontal reinforcement, installing a ceiling of a vertical reinforcement, and installing a finished brick.

상기 수평보강재 바닥설치단계는, 설계된 위치에 맞도록 바닥(20)에 수직보강재(200)를 설치하는 과정으로, 고정수단을 이용하여 고정부(220)를 바닥에 고정하는 과정을 통해 다수의 수직보강재(200)를 소정의 간격으로 설치하는 것이다.The step of installing the horizontal stiffener is a process of installing the vertical stiffener 200 on the floor 20 so as to fit the designed position and fixing the fixed stiffener 220 to the floor using fixing means, And the stiffeners 200 are installed at predetermined intervals.

상기 벽돌조적단계는, 바닥(20)으로부터 벽돌(100)과 모르타르를 이용하여 수직줄눈과 수평줄눈을 형성하면서 벽돌(100)을 서로 엇갈리도록 조적하되, 상기 수직보강재(200)의 설치위치에서는 수직보강재(200)의 보강재몸체(210)에 중공이 끼워지도록 하거나 보강재몸체(210)가 좌, 우로 이웃하는 벽돌(100) 사이에 개재되도록 하면서 벽돌(100)을 조적하는 과정이다.The brick masonry is constructed such that the bricks 100 are staggered from each other while forming a vertical joint and a horizontal joint using the bricks 100 and the mortar from the floor 20. In the installation position of the vertical stiffener 200, The bricks 100 are assembled in such a manner that the hollow is inserted into the reinforcing member body 210 of the reinforcing member 200 or the reinforcing member body 210 is interposed between the bricks 100 adjacent to the left and right sides.

상기 수평줄눈은 모르타르에 의해 상, 하에 위치하는 벽돌들 사이에 형성되는 것이고, 수직줄눈은 모르타르에 의해 좌, 우로 이웃하는 벽돌들 사이에 형성되는 것이다.The horizontal joint is formed between the bricks located above and below by the mortar, and the vertical joint is formed between the bricks adjacent to the left and right by the mortar.

한편 상기 수평보강재 설치단계는, 벽돌조적단계를 통해 벽돌(100)을 조적하는 과정에서 소정의 높이 마다 벽돌(100)의 상부에 2개의 수평보강재(300)를 설치하고 각각의 수평보강재(300)는 마주하는 벽체(40)에 각각 고정하는 과정이다.In the step of installing the horizontal stiffener, two horizontal stiffeners 300 are installed on the bricks 100 at predetermined heights in the process of assembling the bricks 100 through the bridging step, Are fixed to the wall 40 facing each other.

이때 상기 수평보강재(300)는 보강재몸체(310)의 일부분이 겹쳐지도록 한 후 고정부(320)를 벽체에 밀착시키고 고정부재를 통해 고정부(320)를 벽체(40)에 고정하여 설치된다.At this time, the horizontal stiffener 300 is installed by fixing a part of the reinforcing body 310 to the wall body 40 by fixing the fixing part 320 to the wall body while closely contacting the fixing part 320 with the fixing part.

또한 보강재몸체(310)가 겹쳐진 부분에는 상기 제2연결클립(500)을 끼워 넣어 2개의 수평보강재(300)들이 연결되도록 한다.Also, the second connection clip 500 is inserted into the overlapped portion of the reinforcing body 310 so that the two horizontal stiffeners 300 are connected to each other.

상기 제2연결클립(500)은 벽돌(100)에 형성된 중공(110)에 끼워지거나 좌, 우로 이웃하는 벽돌(100)들 사이에 개재되도록 설치할 수 있다.The second connection clip 500 may be installed in the hollow 110 formed in the brick 100 or interposed between the bricks 100 adjacent to the left and right sides.

또한 상기 벽돌(100)의 중공(110)에 제2연결클립(500)이 설치될 경우에는 중공(110)의 내부에 모르타르를 채워 넣어 제2연결클립(500)이 모르타르에 의해 벽돌(100)에 견고히 일체화될 수 있도록 한다.When the second connection clip 500 is installed in the hollow 110 of the brick 100, the second connection clip 500 is filled with the mortar inside the hollow 110, As shown in FIG.

한편 수직보강재 천장설치단계는, 상기 벽돌조적단계와 수평보강재 설치단계를 반복 수행하여 일정 높이까지 벽돌(100)을 조적한 후 상기 바닥(20)에 설치된 수직보강재(200)의 보강재몸체(210)에 보강재몸체(210)가 겹쳐지도록 하고 고정부(220)를 통해 천장(30)에 고정되도록 다른 수직보강재(200)를 설치하고 서로 겹쳐진 보강재몸체(210)에 제1연결클립(400)을 끼워 넣어 2개의 수직보강재(200)를 연결 고정하는 과정이다.The step of installing the vertical stiffener ceiling may be carried out by repeating the step of assembling the bricks and the step of installing the horizontal stiffeners so that the bricks 100 are assembled up to a certain height, Another vertical stiffener 200 is installed on the ceiling 30 so that the stiffener body 210 is overlapped with the stiffener body 220 and the first connecting clip 400 is inserted into the stiffener body 210, And the two vertical stiffeners 200 are connected and fixed.

상기 제1연결클립(400)은 수평줄눈 사이에 개재되도록 하여 상기 2개의 수직보강재(200)를 연결해주게 되는 것이다.The first connection clip 400 is interposed between horizontal joints to connect the two vertical stiffeners 200.

한편 상기 마감벽돌 설치단계는, 도 4 에서와 같이 상기 수직보강재(200)에 끼워질 수 있도록 중공(110)의 측면으로 개구부(111)가 형성되어 있는 마감벽돌(101)을 상기 벽돌조적단계를 통해 조적된 벽돌(100)의 상부에 조적되도록 설치하여 천장까지 마감 설치하는 과정이다.4, the finishing bricks 101 may be formed with openings 111 formed in side surfaces of the hollows 110 so as to be fitted into the vertical stiffeners 200, And then installed on the upper part of the brick 100 to finish the installation up to the ceiling.

상기 마감벽돌(101)은 수직보강재(200)를 천장(30)에 고정할 경우 수직보강재(200)에 벽돌(100)을 끼워 넣을 수 없기 때문에 수직보강재(200)의 측면으로 끼워질 수 있도록 중공(110)에 개구부(111)를 형성한 벽돌이며, 이러한 마감벽돌(101)을 이용하여 벽돌벽 상단의 2~3개 단 정도를 설치하여 벽돌벽을 마감할 수 있게 되는 것이다.Since the brick 100 can not be inserted into the vertical stiffener 200 when the vertical stiffener 200 is fixed to the ceiling 30, the finished bricks 101 can be inserted into the side walls of the vertical stiffener 200, The brick wall can be closed by providing two or three steps at the upper end of the brick wall by using the finished brick 101. [

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.

(10) : 칸막이 벽돌벽 (11) : 교차형 칸막이 벽돌벽
(20) : 바닥 (30) : 천장
(40) : 벽체 (100) : 벽돌
(101) : 마감벽돌 (110) : 중공
(111) : 개구부 (120) : 수직삽입홈
(130) : 수평삽입홈 (200) : 수직보강재
(210) : 보강재몸체 (220) : 고정부
(300) : 수평보강재 (310) : 보강재몸체
(320) : 고정부 (400) : 제1연결클립
(410) : 클립몸체 (420) : 절개홈
(430) : 끼움홈 (500) : 제2연결클립
(510) : 클립몸체 (520) : 절개홈
(530) : 끼움홈 (540) : 걸림부
(550) : 꼬임부 (600) : 연결보강재
(610) : 보강재몸체 (620) : 걸림부
(630) : 걸림홈
(10): partition brick wall (11): intersecting partition brick wall
(20): Floor (30): Ceiling
(40): wall (100): brick
(101): Finish brick (110): hollow
(111): opening (120): vertical insertion groove
(130): horizontal insertion groove (200): vertical stiffener
(210): Reinforcing body (220): Fixing part
(300): Horizontal stiffener (310): Stiffener body
(320): fixing part (400): first connection clip
(410): clip body (420): incision groove
(430): fitting groove (500): second connecting clip
(510): clip body (520): incision groove
(530): fitting groove (540): engaging portion
(550): twist portion (600): connection stiffener
(610): Reinforcing body (620): Fixing part
(630)

Claims (8)

건축물의 내부에 시공되어 내부 공간을 구획하는 칸막이 벽돌벽에 있어서,
상, 하단이 서로 엇갈리도록 하여 다수단으로 조적됨으로써 칸막이를 형성하는 다수의 벽돌;
상기 벽돌에 형성되는 중공에 끼워지면서 좌, 우로 이웃하는 벽돌들 사이에 개재되도록 설치되어 벽돌들을 지지해주는 보강재몸체와 상기 보강재몸체의 일측단에서 절곡되도록 형성되고 평판형태로 이루어져 천장면 또는 바닥에 고정되는 고정부로 이루어지고 상기 보강재몸체가 서로 겹쳐지도록 수직 하게 설치되는 한 쌍의 수직 보강재;
상기 벽돌의 조적시 상, 하에 위치하는 벽돌들 사이에 개재되어 수평 방향으로 설치되는 보강재몸체와, 상기 보강재몸체의 일측단에서 절곡되도록 형성되고 평판형태로 이루어져 벽체에 고정되는 고정부로 이루어지고 상기 보강재몸체가 서로 겹쳐지도록 수평하게 설치되는 한 쌍의 수평 보강재;
상기 겹쳐진 수직보강재의 보강재몸체에 끼워지도록 설치되어 수직보강재를 연결해주는 제1연결클립 및 상기 겹쳐진 수평보강재의 보강재몸체에 끼워지도록 설치되어 수평보강재를 연결해주는 제2연결클립을 포함하여 구성된 것을 특징으로 하는 내진보강형 칸막이 벽돌벽.
A partition brick wall which is installed inside the building to divide the interior space,
A plurality of bricks forming a partition by being staggered by multiple means so that upper and lower ends are staggered;
A reinforcing material body provided to be interposed between bricks adjacent to the left and right sides of the brick to be bridged and to be bridged at one end of the reinforcing material body, A pair of vertical stiffeners made of a fixed portion and vertically installed so that the stiffener bodies overlap each other;
A stiffener body disposed between the bricks positioned below and below the masonry of the brick and installed in a horizontal direction, and a fixing part formed to be bent at one end of the stiffener body and fixed to the wall, A pair of horizontal stiffeners installed horizontally so that the stiffener bodies overlap each other;
A first connection clip installed to be fitted to the reinforcing body of the overlapped vertical stiffener to connect the vertical stiffener and a second connection clip installed to be fitted to the reinforced body of the overlapped horizontal stiffener to connect the horizontal stiffener. My progressive steel partition wall with bricks.
제 1 항에 있어서,
상기 수직보강재와 수평보강재의 보강재몸체는 평판 형태의 금속재를 일정한 피치를 갖도록 나선형으로 꼬아 형성되는 것을 특징으로 하는 내진보강형 칸막이 벽돌벽.
The method according to claim 1,
Wherein the stiffener body of the vertical stiffener and the horizontal stiffener is spirally twisted to have a flat plate-like metal material with a predetermined pitch.
제 2 항에 있어서,
상기 제1,2 연결클립은
수직보강재 및 수평보강재의 보강재몸체가 끼워질 수 있도록 일측단에서 내측방향을 향해 절개홈이 형성되어 있는 클립몸체;
상기 절개홈에서 확장되도록 형성되어 상기 수직보강재 및 수평보강재의 보강재몸체가 각각 끼워질 수 있도록 하는 한 쌍의 끼움홈;을 포함하여 구성된 것을 특징으로 하는 내진보강형 칸막이 벽돌벽.
3. The method of claim 2,
The first and second connection clips
A clip body having a cutout groove formed at one end thereof toward an inner side so that the stiffener body of the vertical stiffener and the horizontal stiffener can be fitted;
And a pair of fitting grooves formed to extend from the cut-out grooves so that the stiffener bodies of the vertical stiffeners and the horizontal stiffeners can be respectively fitted.
제 2 항에 있어서,
상기 제1연결클립은, 수직보강재의 보강재몸체가 끼워질 수 있도록 일측단에서 내측방향을 향해 절개홈이 형성되어 있는 클립몸체와, 상기 절개홈에서 확장되도록 형성되어 상기 수직보강재의 보강재몸체가 각각 끼워질 수 있도록 하는 한 쌍의 끼움홈으로 구성되고,
상기 제2연결클립은 평판형태로 형성되고 수평보강재의 보강재몸체에 걸려질 수 있도록 반원형태로 형성되는 걸림부와, 상기 걸림부의 양단에서 수직하게 연장되되, 일정한 피치를 갖도록 나선형으로 꼬여지도록 형성되고 벽돌의 중공이나 수직줄눈에 끼워지도록 설치되어 모르타르와 일체화되는 꼬임부;를 포함하여 구성되는 것을 특징으로 하는 내진보강형 칸막이 벽돌벽.
3. The method of claim 2,
The first connection clip includes a clip body having a cutout groove formed at one end thereof so as to extend inward from the vertical stiffener so as to allow the stiffener body to be inserted therein, And a pair of fitting grooves for fitting the fitting portions,
The second connection clip is formed in a flat plate shape and is formed in a semicircular shape so as to be hooked on the reinforcing member body of the horizontal reinforcement. The second connection clip is formed to be spirally twisted so as to have a constant pitch, And a twist portion which is fitted to the hollow or vertical joint of the brick so as to be integrated with the mortar.
제 1 항에 있어서,
상기 벽돌은
상기 수평보강재가 삽입될 수 있도록 상, 하부면에 오목한 형태의 수평삽입홈이 형성되고, 상기 수직보강재가 삽입될 수 있도록 좌, 우측면에 오목한 형태의 수직삽입홈이 더 형성되는 것을 특징으로 하는 내진보강형 칸막이 벽돌벽.
The method according to claim 1,
The brick
A vertical insertion groove is formed on the upper and lower surfaces so that the horizontal reinforcing member can be inserted therein and a vertical insertion groove is formed on the left and right sides of the vertical insertion member so that the vertical reinforcing member can be inserted. Progressive steel partition wall with bricks.
제 1 항에 있어서,
상기 칸막이 벽돌벽에 교차되는 교차형 칸막이 벽돌벽을 더 포함하여 구성할 수 있으며, 상기 교차형 칸막이 벽돌벽의 수평줄눈에는 상기 칸막이 벽돌벽의 수평보강재에 걸려지도록 설치되는 연결보강재가 구비되는 것을 특징으로 하는 내진보강형 칸막이 벽돌벽.
The method according to claim 1,
And a connecting stiffener which is installed to be hung on a horizontal stiffener of the partition brick wall is provided on a horizontal joint of the cross-type partition brick wall. My progressive steel partition wall with bricks.
제 6 항에 있어서,
상기 연결보강재는
상기 교차형 칸막이 벽돌벽의 수평줄눈에 개재되도록 설치되고 평판형태의 금속재를 일정한 피치를 갖도록 나선형으로 꼬아 형성되는 보강재몸체와, 상기 보강재몸체의 일측단에서 연장되고 상기 수평보강재의 보강재몸체 걸려질 수 있도록 걸림홈이 형성되어 있는 걸림부를 포함하여 구성된 것을 특징으로 하는 내진보강형 칸막이 벽돌벽.
The method according to claim 6,
The connecting stiffener
A reinforcing member body disposed in a horizontal joint of the cross-section brick wall and spirally formed so as to have a predetermined pitch so as to have a flat plate-shaped metal member; and a reinforcement member extending from one end of the reinforcing member body, And an engaging portion having an engaging groove formed therein.
고정수단을 통해 고정부를 바닥에 고정되도록 하여 소정의 간격으로 다수의 수직보강재를 설치하는 수직보강재 바닥설치단계;
상기 바닥으로부터 벽돌과 모르타르를 이용하여 수직줄눈과 수평줄눈을 형성하면서 벽돌을 서로 엇갈리도록 조적하되, 상기 수직보강재의 설치위치에서는 수직보강재에 끼워지도록 하거나 수직보강재가 좌, 우로 이웃하는 벽돌 사이에 개재되도록 하면서 벽돌을 조적하는 벽돌조적단계;
상기 벽돌조적단계를 통해 벽돌을 조적하는 과정에서 소정의 높이 마다 벽돌의 상부에 보강재몸체의 일부분이 겹쳐지도록 하고 고정부를 통해 벽체에 고정되도록 하여 2개의 수평보강재를 설치하고, 상기 겹쳐진 보강재몸체에는 제2연결클립을 끼워 넣어 2개의 수평보강재가 연결되도록 하는 수평보강재 설치단계;
상기 벽돌조적단계와 수평보강재 설치단계를 반복 수행하여 일정 높이까지 벽돌을 조적한 후 상기 바닥에 설치된 수직보강재에 보강재몸체가 겹쳐지도록 하고 고정부를 통해 천장에 고정되도록 다른 수직보강재를 설치하고 서로 겹쳐진 보강재몸체에 제1연결클립을 끼워 넣어 2개의 수직보강재를 연결 고정하는 수직보강재 천장설치단계;
상기 수직보강재에 끼워질 수 있도록 중공의 측면으로 개구부가 형성되어 있는 마감벽돌을 상기 벽돌조적단계를 통해 조적된 벽돌의 상부에 조적되도록 설치하여 천장까지 마감 설치하는 마감벽돌 설치단계;를 포함하여 구성된 것을 특징으로 하는 내진보강형 칸막이 벽돌벽의 시공방법.
















Installing a plurality of vertical stiffeners at predetermined intervals by fixing the fixing portion to the floor through fixing means;
The vertical stiffener is installed at the installation position of the vertical stiffener so that the vertical stiffener is inserted into the vertical stiffener or the vertical stiffener is interposed between the adjacent bridges at the left and right sides. A brick masonry step to mason the brick while making it possible;
A plurality of horizontal stiffeners are installed on the bricks so that a part of the stiffener body overlaps the bricks at predetermined heights and is fixed to the wall through the fixing portions in the process of brick masonry through the brick masonry step, A horizontal stiffener mounting step of inserting the second connecting clip to connect the two horizontal stiffeners;
The brick assembling step and the horizontal stiffener mounting step are repeated to arrange the bricks up to a predetermined height, then the vertical stiffener installed on the floor is overlapped with another stiffener body, another vertical stiffener is fixed to the ceiling through the fixing part, A vertical stiffener ceiling mounting step for connecting and fixing two vertical stiffeners by inserting a first connecting clip into the stiffener body;
And a finishing brick installing step of finishing a finished brick having an opening on a hollow side surface so as to be fitted to the vertical stiffener so as to be integrated on the upper part of the bricks assembled through the brick making step, Wherein the brick wall is formed of a steel plate.
















KR1020170080503A 2017-06-26 2017-06-26 Brick wall partition for seismic reinforcement and method for construction thereof KR102127735B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170080503A KR102127735B1 (en) 2017-06-26 2017-06-26 Brick wall partition for seismic reinforcement and method for construction thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170080503A KR102127735B1 (en) 2017-06-26 2017-06-26 Brick wall partition for seismic reinforcement and method for construction thereof

Publications (2)

Publication Number Publication Date
KR20190001087A true KR20190001087A (en) 2019-01-04
KR102127735B1 KR102127735B1 (en) 2020-06-29

Family

ID=65017709

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170080503A KR102127735B1 (en) 2017-06-26 2017-06-26 Brick wall partition for seismic reinforcement and method for construction thereof

Country Status (1)

Country Link
KR (1) KR102127735B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318484A (en) * 2019-07-22 2019-10-11 金螳螂精装科技(苏州)有限公司 A kind of assembled clear water brick partition mounting structure
KR102197300B1 (en) * 2020-07-27 2020-12-31 현종구 Seismic reinforcement repair device for brick wall, manufacturing method and construction method using the same
US20210062523A1 (en) * 2019-09-04 2021-03-04 Mojeon Industrial. Co., Ltd. Anti-seismic performance reinforcement and crack repair structure of masonry structure and construction method of same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090032471A (en) 2007-09-28 2009-04-01 성균관대학교산학협력단 Pilling type brick
KR20180114597A (en) * 2017-04-11 2018-10-19 윤홍노 Brick structure for connecting open top of brick wall and construction method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090032471A (en) 2007-09-28 2009-04-01 성균관대학교산학협력단 Pilling type brick
KR20180114597A (en) * 2017-04-11 2018-10-19 윤홍노 Brick structure for connecting open top of brick wall and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318484A (en) * 2019-07-22 2019-10-11 金螳螂精装科技(苏州)有限公司 A kind of assembled clear water brick partition mounting structure
US20210062523A1 (en) * 2019-09-04 2021-03-04 Mojeon Industrial. Co., Ltd. Anti-seismic performance reinforcement and crack repair structure of masonry structure and construction method of same
US11525272B2 (en) * 2019-09-04 2022-12-13 Mojeon Industrial. Co., Ltd. Anti-seismic performance reinforcement and crack repair structure of masonry structure and construction method of same
KR102197300B1 (en) * 2020-07-27 2020-12-31 현종구 Seismic reinforcement repair device for brick wall, manufacturing method and construction method using the same

Also Published As

Publication number Publication date
KR102127735B1 (en) 2020-06-29

Similar Documents

Publication Publication Date Title
KR20190001087A (en) Brick wall partition for seismic reinforcement and method for construction thereof
KR101371098B1 (en) Reinforcement structure of masonry wall
US10683665B2 (en) Metal framing components for wall panels
JP6336682B2 (en) Building blocks for wall structures
KR101287301B1 (en) Rib frmae for the roof pannels
KR200432623Y1 (en) Light weight wall supporting unit
KR102058423B1 (en) Direct vision type brick wall and construction method thereof
KR20120121628A (en) Column structural form
KR102198165B1 (en) Aseismicity wall permanent form unit and Wall construction method using the same
JPH1181336A (en) Embedded concrete form
KR102352117B1 (en) Aseismatic Reinforcing Device for Masonry Wall
RU2327015C2 (en) Block of fixed casing
JP4024489B2 (en) Engaging member engaged with base member, base member assembly, and base member assembly method
JP5042796B2 (en) Independent pillar for steel house, steel house using the same, and panel method
RU2242570C1 (en) Wall structure
KR20100004708A (en) Length adjustable connector for two parallel insulation panel, and the insulation panel block using the same
KR101385554B1 (en) Prefabricated construction using half slab
KR100344689B1 (en) A Corner Member for Constructing a Concrete Structure
KR102152059B1 (en) Lintel structure of brick wall and construction method thereof
KR102485934B1 (en) Slab-connected partition wall with fastening reinforcement structure applied
KR100703545B1 (en) Expansion joint
KR102282046B1 (en) Inside wall and inside wall construction method using the same
RU63383U1 (en) COMBINATION ASSEMBLY WITH REINFORCED CONCRETE COLUMN
KR102635026B1 (en) A Continuous Device for Horizontal Bar in PC Wall
KR200494014Y1 (en) Fireproof cladding assembly for easy construction

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant