KR20190000663U - Turbine wicket gate disassembly extraction device - Google Patents

Turbine wicket gate disassembly extraction device Download PDF

Info

Publication number
KR20190000663U
KR20190000663U KR2020170004708U KR20170004708U KR20190000663U KR 20190000663 U KR20190000663 U KR 20190000663U KR 2020170004708 U KR2020170004708 U KR 2020170004708U KR 20170004708 U KR20170004708 U KR 20170004708U KR 20190000663 U KR20190000663 U KR 20190000663U
Authority
KR
South Korea
Prior art keywords
gate
beams
trolley
turbine
hoist
Prior art date
Application number
KR2020170004708U
Other languages
Korean (ko)
Inventor
신세용
Original Assignee
한전케이피에스 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한전케이피에스 주식회사 filed Critical 한전케이피에스 주식회사
Priority to KR2020170004708U priority Critical patent/KR20190000663U/en
Publication of KR20190000663U publication Critical patent/KR20190000663U/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • B66C17/06Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes
    • B66C17/12Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes for handling workpieces, e.g. ingots, which require to be supported temporarily within, or withdrawn from, a treatment chamber, e.g. tong cranes, soaking-pit cranes, stripper cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • B66C1/34Crane hooks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00Trolleys or crabs, e.g. operating above runways
    • B66C11/02Trolleys or crabs, e.g. operating above runways with operating gear or operator's cabin suspended, or laterally offset, from runway or track
    • B66C11/04Underhung trolleys
    • B66C11/06Underhung trolleys running on monorails

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

본 고안은 수력발전소 내 수차 터빈의 위켓 게이트의 분해 인출 시 작업효율의 향상과 작업의 안정성 및 편의성 증대와 정비의 신뢰성을 확보하고 안전사고의 예방이 가능한 수차터빈 위켓 게이트 분해 인출장치에 관한 것이다.
본 고안은 수차터빈이 설치된 공간의 가장자리에 복수의 고정프레임을 세워 설치하고, 양측에 위치하는 상기 고정프레임엔 수평전후방향으로 전후방향비임을 양측에 각각 설치하고, 양측의 전후방향비임의 상부엔 전후방향비임을 타고 전후방향으로 움직일 수 있게 좌우방향비임을 설치하고, 상기 좌우방향비임엔 좌우방향으로 움직일 수 있게 트롤리를 설치하고, 상기 트롤리엔 위켓 게이트를 인양하기 위한 호이스트를 설치하며, 상기 호이스트의 후크엔 와이어를 걸어 위켓 게이트를 들어올리되, 상기 와이어의 양측 끝부분은 위켓 게이트에 설치된 섀클에 고정 설치하여 구성되는 수차 터빈 위켓 게이트 분해 인출장치를 제공함을 특징으로 한다.
The present invention relates to an aberration turbine whitet gate disassembling and withdrawing device capable of improving work efficiency, improving work stability and convenience, securing reliability of maintenance, and preventing a safety accident when disassembling and withdrawing a whip gate of a turbine in a hydroelectric power plant.
In the present invention, a plurality of fixed frames are installed upright on the edge of a space in which an aberration turbine is installed, and the forward and backward beams are installed on both sides of the fixed frame located on both sides, A trolley is installed so as to move in the left and right direction of the left and right beams, a hoist for lifting the trolley and jacket gate is installed, And the jacket gate is lifted by hooking the wire of the hook of the wire, and the both ends of the wire are fixed to the shackle installed on the jacket gate.

Description

수차 터빈 위켓 게이트 분해 인출 장치{Turbine wicket gate disassembly extraction device}[0001] The present invention relates to a turbine wicket gate disassembly extraction device,

본 고안은 수력발전소 내 수차 터빈의 위켓 게이트의 분해 인출 시 작업효율의 향상과 작업의 안정성 및 편의성 증대와 정비의 신뢰성을 확보하고 안전사고의 예방이 가능한 수차터빈 위켓 게이트 분해 인출장치에 관한 것이다.The present invention relates to an aberration turbine whitet gate disassembling and withdrawing device capable of improving work efficiency, improving work stability and convenience, securing reliability of maintenance, and preventing a safety accident when disassembling and withdrawing a whip gate of a turbine in a hydroelectric power plant.

일반적으로 수력발전소의 수차터빈에 있어서 고중량체인 위켓 게이트의 분해 인출 시 체인블록, 아이볼트 등 다량의 장비를 이용하여 작업을 수행하고 있으나, 숙련된 작업을 요하기 때문에 안전사고의 위험이 있고 비숙련 기술자에게 작업을 감당하기가 어려운 단점이 이 있으며, 위켓 게이트의 분해 작업시 이를 둘러싸고 있는 패킹이나, 스템, 부싱 등에 손상을 발생시키게 되는 등 여러 문제점이 있는 실정이다.Generally, in hydro turbine of hydroelectric power plants, when the top gate chain is disassembled and withdrawn in the heavy weight chain, the chain block, eye bolt, etc. are used for a large amount of equipment. However, since it requires skilled work, There are disadvantages that it is difficult for a technician to handle the work, and there are various problems such as causing damage to the packing, stem, and bushing surrounding the dissipating work of the whip gate.

1. 공개특허공보 공개번호 제10-2017-0007298호(공개일자: 2017.01.18.)1. Published Patent Publication No. 10-2017-0007298 (published on January 17, 2017). 2. 공개특허공보 공개번호 제10-2003-0037092호(공개일자: 2001.06.10.)2. Published Patent Publication No. 10-2003-0037092 (Published on Jun. 10, 2001)

본 고안은 이와 같은 종래의 문제점을 해소하기 위하여 연구 개발이 이루어진 것으로 다음과 같은 목적을 갖는다.The present invention has been accomplished in order to solve such conventional problems, and has the following purpose.

본 고안의 목적은 전용 장비로서 수차터빈이 설치된 공간의 상부위치에 I형강을 설치하고, 상기 I형강에 호이스트 롤러를 조립 설치하고, 트롤리와 함께 호이스트와 체인블럭을 병용하여 수차 터빈 위켓 게이트 분해 인출이 가능하도록 하는 장치를 제공하고자 함에 있다.The objective of the present invention is to provide a turbine with an I-shaped section, an I-shaped section, and a trolley in combination with a trolley and a chain block, And to provide a device capable of enabling the device to be used.

본 고안은 이와 같은 목적을 달성하기 위하여, 수차터빈이 설치된 공간의 가장자리에 복수의 고정프레임을 세워 설치하고, 양측에 위치하는 상기 고정프레임엔 수평전후방향으로 전후방향비임을 양측에 각각 설치하고, 양측의 전후방향비임의 상부엔 전후방향비임을 타고 전후방향으로 움직일 수 있게 좌우방향비임을 설치하고, 상기 좌우방향비임엔 좌우방향으로 움직일 수 있게 트롤리를 설치하고, 상기 트롤리엔 위켓 게이트를 인양하기 위한 호이스트를 설치하며, 상기 호이스트의 후크엔 와이어를 걸어 위켓 게이트를 들어올리되, 상기 와이어의 양측 끝부분은 위켓 게이트에 설치된 섀클에 고정 설치하여 구성되는 수차 터빈 위켓 게이트 분해 인출장치를 제공한다.In order to achieve the above object, the present invention provides a turbine having a plurality of fixed frames installed at the edge of a space provided with an aberration turbine, a fixed frame located on both sides of the turbine, A trolley is installed on the upper portion of the front and rear beams on both sides so as to move in the forward and backward directions in the forward and backward directions and move in the left and right direction of the left and right beams, A hoist for hoisting the hoist, a hoist gate being lifted by hooking the hoist wire of the hoist, and both side ends of the hoist being secured to a shackle installed on the whip gate.

그리하여 본 고안에 의하면, 위켓 게이트를 분해 인양하는 작업이 종래보다 아주 쉽게 이루어질 수 있게 되어 비숙련자라도 작업이 가능하고 작업시간이 단축되어 작업효율성이나 작업품질을 향상시킬 수 있고, 작업의 안전성을 확보하면서, 공기의 단축과 함께 안전사고를 예방할 수 있게 되는 등 우수한 효과를 갖게 된다.As a result, according to the present invention, it is possible to easily disassemble and remove the jacket gate, so that it is possible to perform work even if it is unskilled, the work time can be shortened, work efficiency and work quality can be improved, It is possible to prevent safety accidents as well as to shorten the air.

도 1은 본 고안의 바람직한 일례로서 정면도,
도 2는 도 1의 측면도,
도 3은 본 고안에 적용되는 구조 프레임의 예시도.
1 is a front view showing a preferred example of the present invention,
Fig. 2 is a side view of Fig. 1,
3 is an exemplary view of a structural frame applied to the present invention;

이하, 첨부된 도면을 참조하여 본 고안의 바람직한 예를 중심으로 상세하고도 구체적으로 살펴보기로 한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 고안의 바람직한 예에 의하면, 수차터빈이 설치된 공간의 가장자리에 복수의 고정프레임(1,1)을 세워 설치하고, 양측에 위치하는 상기 고정프레임(1,1)엔 수평전후방향으로 전후방향비임(2,2)을 양측에 각각 설치하고, 양측의 전후방향비임(2,2)의 상부엔 전후방향비임(2,2)을 타고 전후방향으로 움직일 수 있게 좌우방향비임(3)을 설치하고, 상기 좌우방향비임(3)엔 좌우방향으로 움직일 수 있게 트롤리(4)를 설치하고, 상기 트롤리(4)엔 위켓 게이트(100)를 인양하기 위한 호이스트(5)를 설치하며, 상기 호이스트(5)에 의하여 위켓 게이트(100)를 들어올릴 수 있게 구성된다.According to a preferred example of the present invention, a plurality of fixed frames (1, 1) are installed upright on the edge of a space provided with an aberration turbine, and the fixed frames (1, (2, 2) are installed on both sides, and the left and right beams (3) are installed so as to be movable in the forward and backward direction on the front and rear direction beams (2,2) A trolley 4 is installed so as to move left and right in the left and right direction beams 3 and a hoist 5 for hoisting a wicket gate 100 of the trolley 4 is installed, So that the jacket gate 100 can be lifted.

이때, 상기 호이스트(5)의 후크(50)엔 와이어(52)를 걸어 위켓 게이트(100)를 들어올리되, 상기 와이어(52)의 양측 끝부분은 위켓 게이트(100)에 설치된 섀클(54)에 고정 설치하여 구성된다.At this time, the hook 50 of the hoist 5 is hooked up to lift up the wicket gate 100. Both ends of the wire 52 are connected to the shackle 54 installed on the wicket gate 100, As shown in Fig.

다음, 수차터빈이 설치된 공간의 가장자리에 세워 설치되는 복수의 고정프레임(1,1)은 수차터빈의 상부 위치에서 인출작업이 이루어질 수 있는 작업공간을 확보하기 위한 것으로서, 기둥 역할을 수행하게 되며 비임이나 기타 강체 형태의 구조체를 사용하게 된다.Next, a plurality of fixed frames (1, 1) installed upright on the edge of the space in which the aberration turbine is installed are for securing a work space in which the drawing operation can be performed at an upper position of the aberration turbine, Or other rigid body structure.

또한, 상기 고정프레임(1,1)의 상부에 수평전후방향으로 고정 설치되는 전후방향비임(2,2)은 그 상부에 좌우방향비임(3)을 설치하기 위하여 수평으로 각각 고정 설치되는 것으로서 이 또한 비임이나 기타 강체의 구조체를 사용하게 된다.Further, the front and rear beams (2, 2) fixed to the upper portion of the fixed frame (1, 1) in the horizontal front and rear direction are fixedly installed horizontally on the upper portion thereof in order to install the right and left beams (3) It also uses beams or other rigid structures.

또한, 양측의 전후방향비임(2,2)의 상부엔 전후방향비임(2,2)을 타고 전후방향으로 움직일 수 있게 설치되는 좌우방향비임(3)은 구동모터(30)에 의하여 구동롤러(32)를 구동시켜 대향측 공전롤러(34)와 함께 전후방향비임(2,2)를 타고 전후방향으로 움직일 수 있게 구성된다.The right and left direction beams 3 mounted on the upper parts of the front and rear beams 2 and 2 on both sides in the forward and backward direction beams 2 and 2 so as to be movable in the forward and backward directions are driven by the driving motor 30, 32 so as to move in the forward and backward directions along the forward and backward beams (2,2) together with the opposing side revolving roller (34).

또한, 상기 트롤리(4)는 좌우방향비임(3)의 중간에 설치되고 구동모터(40)에 의하여 롤러(42)를 구동시켜 좌우방향으로 움직일 수 있게 구성된다.The trolley 4 is installed in the middle of the left and right beams 3 and is configured to be able to move in the left and right direction by driving the roller 42 by the driving motor 40.

또한, 상기 트롤리(4)의 하부에 결합 설치되는 호이스트(5)는 후크(50)를 이용하여 와이어(52)로 위켓 게이트(100)를 들어 올리되, 와이어(52)의 양측 끝부분은 위켓 게이트(100)에 설치된 섀클(54)에 고정 설치하여 위켓 게이트(100)를 들어 올릴 수 있게 구성된다.The hoist 5 attached to the lower part of the trolley 4 lifts the wicket gate 100 with the wire 52 by using the hook 50. Both ends of the wire 52 are connected to the wicket And is configured to be fixed to the shackle (54) provided on the gate (100) to lift the whip gate (100).

전술한 바와 같이 이루어지는 본 고안은 다음과 같이 작동이 이루어지게 된다.The present invention as described above is operated as follows.

우선, 분해 인출하고자 하는 위켓 게이트(100)가 위치하는 상부 위치로 트롤리(4)를 위치시키기 위하여 좌우방향비임(3)을 전후방향비임(2)의 상부에서 구동모터(30)의 구동에 의한 구동롤러(32)의 작동에 의하여 위치를 이동시키고, 트롤리(4)는 구동모터(40)에 의하여 롤러(42)의 구동에 의한 위치이동을 행하게 된다. 이와 같이 좌우방향비임(3)과 트롤리(4)의 위치이동에 의한 X-Y 방향 수평 위치의 이동이 가능하게 된다.The left and right beams 3 are moved by the driving motor 30 at the upper part of the front and rear direction beam 2 in order to position the trolley 4 to the upper position where the toe gate 100 to be disassembled and withdrawn is located The position of the trolley 4 is moved by the operation of the driving roller 32 and the trolley 4 is moved by the driving motor 40 by the driving of the roller 42. [ In this way, it is possible to move the horizontal position in the X-Y direction by the movement of the lateral beams 3 and the trolley 4.

다음, 트롤리(4)가 분해 인출하고자 하는 위켓 게이트(100)의 직상부에 위치하게 되면, 호이스트(5)를 구동시키기 전에 븐해 인출하고자 하는 위켓 게이트(100)의 상부에 미리 설치된 섀클(54)에 와이어(52) 양측 끝부분을 고정 설치하고 와이어(52)의 중간부분은 하강시킨 호이스트(5)의 후크(50)에 걸어 위켓 게이트(100)를 분해 인출을 위한 준비작업을 마친다.When the trolley 4 is positioned directly above the toe gate 100 to be disassembled and drawn out, the shackle 54 previously installed on the top gate 100 to be drawn out before driving the hoist 5, And the intermediate portion of the wire 52 is hooked on the hook 50 of the lowered hoist 5 to complete the preparatory work for disassembling and withdrawing the wicket gate 100. [

이와 같이 위켓 게이트(100)의 분해 인출을 위한 준비작업이 완료되면, 호이스트(5)를 가동시켜 후크(52)를 들어올리게 되면 수차터빈으로부터 위켓 게이트(100)는 서서히 들어 올려지고 수차터빈으로부터 분리되게 된다.When the hoist 5 is operated to raise the hook 52, the wicket gate 100 is slowly lifted from the aberration turbine and is separated from the aberration turbine .

이와 같이 분리된 위켓 게이트(100)는 트롤리(4) 및 좌우방향비임(3)의 위치 이동에 의하여 원하는 위치로 위치를 이동시킨 다음에는 별도로 마련한 거치대나 적정한 위치로 거치시켜 다음의 필요한 정비작업을 수행하면 된다.After the wicket gate 100 is moved to a desired position by the movement of the trolley 4 and the right and left beams 3, the wicket gate 100 is mounted in a separate stand or a proper position to perform the following necessary maintenance work You can do it.

물론, 정비 작업이 이루어진 후에 다시 조립하고자 하는 경우엔 전술한 분해 인출작업과는 역순으로 호이스트(5), 트롤리(4) 및 좌우방향비임(3)을 이용하여 적절히 조립작업을 수행하면 된다.Of course, in the case of reassembling after the maintenance work is performed, the assembling operation may be appropriately performed using the hoist 5, the trolley 4, and the right and left beams 3 in the reverse order to the above-described decomposition drawing operation.

그리하여 본 고안에 의하면, 위켓 게이트(100)를 분해 인양하는 작업이 종래보다 아주 쉽게 이루어질 수 있게 되어 비숙련자라도 작업이 가능하고 작업시간이 단축되어 작업효율성이나 작업품질을 향상시킬 수 있고, 작업의 안전성을 확보하면서, 공기의 단축과 함께 안전사고를 예방할 수 있게 되는 등 우수한 효과를 갖게 된다.As a result, according to the present invention, the work for disassembling and lifting the wicket gate 100 can be performed more easily than before, so that it is possible to perform work even for unskilled persons, shorten the work time, improve the work efficiency and work quality, It is possible to prevent safety accidents while shortening the air while ensuring safety.

1: 고정프레임, 2: 전후방향비임,
3: 좌우방향비임, 4: 트롤리,
5: 호이스트, 30, 40: 구동모터,
32: 구동롤러, 34: 공전롤러,
42: 롤러, 50: 후크,
52: 와이어, 54: 섀클,
100: 위켓 게이트
1: fixed frame, 2: forward / backward beam,
3: left and right beam, 4: trolley,
5: hoist, 30, 40: driving motor,
32: drive roller, 34: idle roller,
42: roller, 50: hook,
52: wire, 54: shackle,
100: Wicket gate

Claims (3)

수차터빈이 설치된 공간의 가장자리에 복수의 고정프레임(1,1)을 세워 설치하고,
양측에 위치하는 상기 고정프레임(1,1)엔 수평전후방향으로 전후방향비임(2,2)을 양측에 각각 설치하고,
양측의 전후방향비임(2,2)의 상부엔 전후방향비임(2,2)을 타고 전후방향으로 움직일 수 있게 좌우방향비임(3)을 설치하고,
상기 좌우방향비임(3)엔 좌우방향으로 움직일 수 있게 트롤리(4)를 설치하고,
상기 트롤리(4)엔 위켓 게이트(100)를 인양하기 위한 호이스트(5)를 설치하며,
상기 호이스트(5)에 의하여 위켓 게이트(100)를 들어 올릴 수 있게 구성되는 것을 특징으로 하는 수차 터빈 위켓 게이트 분해 인출장치.
A plurality of fixed frames (1, 1) are installed upright on the edge of the space where the aberration turbine is installed,
The front and rear beams (2, 2) are provided on both sides of the fixed frame (1, 1) on both sides in the horizontal front and rear direction,
The right and left direction beams 3 are installed so as to be movable in the forward and backward directions on the forward and backward beams 2, 2 at the upper portions of the forward and backward beams 2,
The trolley (4) is provided so as to be movable in the left and right direction in the left and right direction beam (3)
A hoist (5) for hoisting the wicket gate (100) is installed on the trolley (4)
And is configured to lift the wicket gate (100) by the hoist (5).
제1항에 있어서,
상기 호이스트(5)의 후크(50)엔 와이어(52)를 걸어 위켓 게이트(100)를 들어올리되,
상기 와이어(52)의 양측 끝부분은 위켓 게이트(100)에 설치된 섀클(54)에 고정 설치하여 구성되는 것을 특징으로 하는 수차 터빈 위켓 게이트 분해 인출장치.
The method according to claim 1,
A hook (50) of the hoist (5) is hooked on a wire (52) to raise the jacket gate (100)
Wherein both ends of the wire (52) are fixedly mounted on a shackle (54) provided on the whip gate (100).
제1항에 있어서,
상기 좌우방향비임(3)은 구동모터(30)에 의하여 구동롤러(32)를 구동시켜 대향측 공전롤러(34)와 함께 전후방향비임(2,2)를 타고 전후방향으로 움직일 수 있게 구성되고,
상기 트롤리(4)는 좌우방향비임(3)의 중간에 설치되고 구동모터(40)에 의하여 롤러(42)를 구동시켜 좌우방향으로 움직일 수 있게 구성되는 것을 특징으로 하는 수차 터빈 위켓 게이트 분해 인출장치.
The method according to claim 1,
The right and left direction beams 3 are configured to be able to move in the forward and backward directions along the forward and backward beams 2 and 2 together with the opposing side revolving roller 34 by driving the driving roller 32 by the driving motor 30 ,
The trolley (4) is installed in the middle of the right and left direction beam (3) and is configured to be able to move in the left and right direction by driving the roller (42) by the driving motor (40) .
KR2020170004708U 2017-09-06 2017-09-06 Turbine wicket gate disassembly extraction device KR20190000663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020170004708U KR20190000663U (en) 2017-09-06 2017-09-06 Turbine wicket gate disassembly extraction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020170004708U KR20190000663U (en) 2017-09-06 2017-09-06 Turbine wicket gate disassembly extraction device

Publications (1)

Publication Number Publication Date
KR20190000663U true KR20190000663U (en) 2019-03-14

Family

ID=65728901

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020170004708U KR20190000663U (en) 2017-09-06 2017-09-06 Turbine wicket gate disassembly extraction device

Country Status (1)

Country Link
KR (1) KR20190000663U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102637379B1 (en) 2023-07-06 2024-02-19 주식회사 삼신 Cast lever remover for wicket gate
KR102658443B1 (en) 2023-06-27 2024-05-13 주식회사 삼신 Wicket gate bush removal device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102658443B1 (en) 2023-06-27 2024-05-13 주식회사 삼신 Wicket gate bush removal device
KR102637379B1 (en) 2023-07-06 2024-02-19 주식회사 삼신 Cast lever remover for wicket gate

Similar Documents

Publication Publication Date Title
KR101344289B1 (en) The pole fittings changing method use lifting apparatus
JP4896784B2 (en) Wind turbine tower nacelle mounting method and apparatus
CN107988943B (en) Highway height limiting portal frame and height limiting adjusting method thereof
CN108792971A (en) A kind of chemical equipment overhaul boom hoisting
CN102777030A (en) Method for building up formwork construction platform of lift shaft
KR20190000663U (en) Turbine wicket gate disassembly extraction device
CN106088609A (en) A kind of integral lifting method of large span steel structure vestibule
CN202785364U (en) Movable dual-door-type mast hoisting device
CN208200190U (en) Lifting equipment is used in power equipment installation
CN106185677A (en) A kind of hoisting mechanism and the jacking system of large-sized structural parts based on this mechanism
CN201250058Y (en) Improved lifting trolley
JP2004150143A (en) Assembling device for columnar structure
CN108625800B (en) Multifunctional derrick for shaft construction
CN204096935U (en) Lifting mechanism and use the hoisting crane of this lifting mechanism
CN204492830U (en) The supporting job platform of a kind of colliery driving suspension device
KR20130073117A (en) Tower structure construction process
KR200482885Y1 (en) Vertical type motor component lifting support device for disassemble and assemble
CN211034868U (en) Steel reinforcement cage hoist device
CN114105058A (en) Cable trench cover plate opening tool
KR102204933B1 (en) Apparatus for elevating work table
CN217106054U (en) Safe operation platform for truss high-altitude construction
KR100640295B1 (en) Pin jig for curved block supporting of ship
CN111576183A (en) Construction method for longitudinally moving and erecting box girder
CN208054843U (en) Wind-power electricity generation machine platform bolt replaces moveable platform
CN203822522U (en) Auxiliary device for bolted connection between main shaft and runner of mixed-flow water turbine

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application