KR20180060852A - Construction method of retaining wall for underground structures with narrow edge space - Google Patents

Construction method of retaining wall for underground structures with narrow edge space Download PDF

Info

Publication number
KR20180060852A
KR20180060852A KR1020160160845A KR20160160845A KR20180060852A KR 20180060852 A KR20180060852 A KR 20180060852A KR 1020160160845 A KR1020160160845 A KR 1020160160845A KR 20160160845 A KR20160160845 A KR 20160160845A KR 20180060852 A KR20180060852 A KR 20180060852A
Authority
KR
South Korea
Prior art keywords
hole
steel wire
pile
anchor
cap
Prior art date
Application number
KR1020160160845A
Other languages
Korean (ko)
Other versions
KR101928054B1 (en
Inventor
진충환
Original Assignee
보현산업개발 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 보현산업개발 주식회사 filed Critical 보현산업개발 주식회사
Priority to KR1020160160845A priority Critical patent/KR101928054B1/en
Publication of KR20180060852A publication Critical patent/KR20180060852A/en
Application granted granted Critical
Publication of KR101928054B1 publication Critical patent/KR101928054B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a method to construct a retaining wall of underground structures with a narrow edge marginal space, vertically burying an earth anchor (30) on an axial line same as or close to that of a cast-in-place concrete pile (CIP) or PHC piles (50, 80), so as to maintain a resistance force of the pile while remarkably reducing an underground space required for burying the earth anchor (30). According to the present invention, the method comprises: a step of drilling the ground in accordance with an installation position of the retaining wall (100) to form a pile drilling hole (10); a step of forming an anchor drilling hole (20) deeper than the depth of the pile drilling hole (10); a step of inserting the earth anchor (30) into the anchor drilling hole (20) and exposing a steel wire (31) connected to the earth anchor (30) on the ground; a step of installing a tension pipe (41) to form a tension hole (40) in a rebar assembly (40); a step of installing the rebar assembly (40) into the pile drilling hole (10); a step of depositing and curing concrete in the pile drilling hole (10); and a step of passing the steel wire (31) through the tension pipe (41) to apply tension with an earth pressing plate (33) and fix the same.

Description

협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법{CONSTRUCTION METHOD OF RETAINING WALL FOR UNDERGROUND STRUCTURES WITH NARROW EDGE SPACE}TECHNICAL FIELD [0001] The present invention relates to a method of constructing a retaining wall of an underground structure having a narrow margin space,

본 발명은 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법에 관한 것으로서, CIP 파일 또는 PHC 파일과 동축선상 또는 인접하여 수직방향으로 어스앵커를 매립하여 어스앵커의 매립시 요구되는 지하 공간을 현저히 줄이면서도 파일의 내력을 유지할 수 있는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법에 관한 것이다.The present invention relates to a method of constructing a retaining wall for an underground structure having a narrow margin space, and is characterized in that an earth anchor is buried in a vertical direction coaxially with or adjacent to a CIP file or a PHC file, The present invention relates to a method for constructing an earth retaining wall of an underground structure having a narrow margin free space that can maintain a file's strength even though it is significantly reduced.

최근 도심지에서 시공되는 건축물들은 높은 지가와 주차 공간 확보 등의 이유로 지하구조물의 깊이와 규모가 점점 대형화되고 있다. 이에 따라 대규모 지반굴착 및 흙막이 구조물의 중요성이 커지게 되었다. Recently, the depth and scale of underground structures are getting bigger due to high land prices and parking spaces. As a result, the importance of large-scale ground excavation and retaining structures has increased.

흙막이 구조물은 지반굴착 시 공사현장 주변의 토사나 지하수의 유입을 막으면서 토압 및 수압 등의 측압에 저항하는 가설구조물이다. 이 구조물은 벽체를 구성하는 재료와 지보공의 형식 등에 다라 크게 엄지말뚝 및 토류판, 널말뚝, 주열식벽, 지하연속벽식 흙막이 공법들로 구분된다.The retaining structure is a hypothetical structure that resist the side pressure of earth pressure and water pressure while preventing the entrance of soil or groundwater around the construction site when excavating the ground. This structure can be divided into two types, namely, the material constituting the wall, the type of the supporting structure, and the like, and is largely divided into a thumb pile and a soil plate, a sheet pile, a main heating type wall and an underground continuous wall type retention method.

이러한 흙막이 공법 중 H형강과 철근을 콘크리트의 보강재로 사용하여 주열식 벽체를 형성하는 Cast-In-Place Concrete Pile(CIP) 공법이 있다. CIP공법으로 형성된 벽체는 보강재의 사용으로 인해 측압에 대한 강성이 확보됨에 따라 벽체 내에 발생하는 변위가 크지 않아 주변지반에 미치는 영향이 작다. In this method, Cast-In-Place Concrete Pile (CIP) method is used to form a heat-conducting wall by using H-beams and reinforcing bars as reinforcement of concrete. The wall formed by the CIP method has a small impact on the surrounding ground because the displacement generated in the wall is not large due to the rigidity against the side pressure due to the use of the reinforcing material.

따라서 인접 대지까지 근접 시공이 가능하고 특수 장비가 필요 없으며 소음과 진동이 작아 도심지에 적합하여 일반적으로 시공되는 흙막이 공법 중 하나이다.Therefore, it is one of the construction methods that can be constructed close to the adjacent site, does not require any special equipment, is suitable for downtown area due to small noise and vibration.

그러나 CIP 공법은 흙막이 공사와 지하 외벽 공사를 서로 분리하여 시공하므로 시공성 및 경제성이 불리하고 두 번의 공사로 인해 공기가 지연되고 흙막이와 지하외벽이 각자의 공간을 차지하므로 공간활용 면에서도 손실이 발생한다.However, the CIP method is disadvantageous in construction and economical efficiency because it is constructed by separating the soil retaining work and the underground outer wall construction from each other, the air is delayed due to the double construction, and the earth retaining walls and the underground outer wall occupy their respective spaces, .

따라서 이러한 문제점을 해소하기 위하여 PHC 파일 공법이 개발된 바 있다. PHC 파일은 고성능 감수제 등 혼화제를 사용하여 고온·고압 증기양생한 것으로 고강도 콘크리트에 프리스트레스를 도입하여 제작한 말뚝이다. 일반 PC파일에 비해 약 60~70% 이상의 높은 강도를 나타내고 큰 축력을 견딜 수 있다. 또한 휨내력과 타격에 강해 항타중의 파손확률이 적은 장점을 가지고 있어 국내 콘크리트 파일의 약 90% 이상을 점유하고 있다. Therefore, a PHC file method has been developed to solve such a problem. The PHC file is a pile manufactured by introducing a high-strength concrete into a high-temperature and high-pressure steam using an admixture such as a high-performance water reducing agent. Compared to general PC files, it shows high strength of about 60 ~ 70% and can withstand large axial force. Also, it has the advantage of strong resistance to bending strength and impact and low probability of breakage during piling, so it occupies more than 90% of domestic concrete piles.

그런데 이러한 CIP 공법과 PHC 파일 공법 모두 지하구조물의 흙막이 공법으로서, 각 공법의 파일에 가해지는 토압에 견딜 수 있는 내력을 구비하여야 하지만, 지하구조물의 깊이가 깊어지면 각 공법의 파일이 노출되는 부위가 상대적으로 많아지면서 토압에 대한 내력이 약화되는 문제점이 있었다. However, both of the CIP method and the PHC pile method have to have a proof strength to withstand the earth pressure applied to the pile of each method as an earth retaining method of the underground structure. However, when the depth of the underground structure is deepened, There is a problem that the strength against the earth pressure is weakened.

이러한 문제점을 해소하기 위하여 한국등록특허 제10-1494132호(엄지말뚝 상단 지지방식 자립식 흙막이 시설물, 2015.02.10.등록, 이하 '종래기술'이라 칭함)가 발명된 바 있다. In order to solve this problem, Korean Patent No. 10-1494132 (Registered as "Conventional Technology") has been invented.

상기 종래기술은, 엄지말뚝의 상단부가 강선에 의해 지지되는 자립식 구조를 이룸으로서 시공성이 향상되고, 흙막이 엄지말뚝 변위시 언제든지 강선에 대한 재긴장 작업이 가능하도록 하기 위한 것이다.The above-mentioned prior art has a self-supporting structure in which an upper end portion of a thumb pile is supported by a steel wire, thereby improving workability and enabling re-tensioning of the steel wire at any time when the earth retaining pile is displaced.

이를 실현하기 위해 종래기술은, 터파기 구역의 경계부위를 따라 일정 간격으로 근입되어지는 엄지말뚝(1)과; 상기 엄지말뚝(1)의 상단 외측에 구성되는 콘크리트블럭(2)과; 상기 콘크리트블럭(2)의 상부에 안착 구성되며, 일측이 엄지말뚝(1)과 볼트에 의해 체결되어지는 금속재질의 연결대좌(3)와; 상기 엄지말뚝(1)의 외측에 일정 각도의 경사를 이루며 형성된 앵커공에 삽입되어 그라우트재에 의해 정착되어지되, 상부는 연결대좌(3)와 콘크리트블럭(2)을 관통하여 설치되는 강선(4)과; 상기 강선(4)의 상단부를 고정하기 위해 연결대좌(3) 상부에 설치되는 헤드콘과; 상기 헤드콘을 관통한 강선(4)의 외부 노출을 방지하기 위한 강선보호캡(6)을 포함하는 구성을 이룬다.In order to realize this, the prior art includes: a thumb pile 1 inserted at regular intervals along a boundary portion of a terraced section; A concrete block 2 formed at the upper outer side of the thumb pile 1; A connecting pedestal 3 made of metal which is seated on the upper part of the concrete block 2 and has one side fixed to the thumb pile 1 by a bolt; The upper part of the upper part of the pile 1 is inserted into an anchor hole formed at an outer side of the thumb pile 1 at an angle and is fixed by a grout material. )and; A head cone installed on the connection pedestal 3 to fix the upper end of the steel wire 4; And a steel wire protecting cap (6) for preventing external exposure of the steel wire (4) passing through the head cone.

그런데, 종래기술에서는, 일반적인 어스앵커와 마찬가지로, 일정 각도로 경사를 두어 앵커공에 삽입되어 그라우트재에 의해 정착되는 강선이 사용되는데, 경사를 두어 파일보다 깊게 매설되다 보니 인접 대지로의 침입이 문제된다. 특히나 파일이 보다 큰 토압을 견디게 하려면 강선을 보다 완만한 경사로 매설하여야 하는데, 이 때문에 인접 대지로 보다 많이 침범하게 된다. However, in the conventional art, a steel wire which is inserted into an anchor hole with an inclination at an angle and fixed by a grout is used as in an ordinary earth anchor. When the wire is embedded more deeply than the file by inclining it, do. In particular, in order for a file to withstand a larger earth pressure, the steel wire must be laid with a gentle slope, which causes more damage to the adjacent site.

이러한 문제는 지하 구조물을 구축하고자 하는 장소에 인접하여 다른 지하 구조물이 위치한 경우에 특히 중요하다. 왜냐하면, 인접한 지하 구조물에 의해 강선의 경사각도가 제한되어 설계치 이상의 토압을 견디도록 파일을 지지하는 것이 불가능해지기 때문이다.This problem is particularly important when adjacent underground structures are located adjacent to the location where the underground structure is to be constructed. This is because the inclination angle of the steel wire is limited by the adjacent underground structure, and it becomes impossible to support the file so as to withstand the earth pressure higher than the designed value.

본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로서, 본 발명의 목적은 CIP 파일 또는 PHC 파일과 동축선상 또는 인접하여 수직방향으로 어스앵커를 매립하여 어스앵커의 매립시 요구되는 지하 공간을 현저히 줄이면서도 파일의 내력을 유지할 수 있는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법을 제공하는 데 있다.SUMMARY OF THE INVENTION The present invention has been conceived to solve the problems as described above, and it is an object of the present invention to provide a method of embedding an earth anchor in a vertical direction coaxial with or adjacent to a CIP file or a PHC file, The present invention also provides a method for constructing a retaining wall of an underground structure having a narrow margin free space to maintain the strength of a file while reducing the length of the retaining wall.

본 발명의 또 다른 목적은, CIP 파일의 단점인 차수 성능을 향상시키면서 어스앵커의 긴장상태를 보다 강력히 유지할 수 있는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법을 제공하는 데 있다. It is another object of the present invention to provide a method of constructing a retaining wall of an underground structure having a narrow frame margin space capable of more stably maintaining the tension of the earth anchor while improving the order performance, which is a disadvantage of the CIP file.

상기한 바와 같은 목적을 달성하기 위한 본 발명의 특징에 따르면, 본 발명은, 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법에 관한 것으로, 흙막이벽의 설치 위치에 따라 지반을 천공하여 파일-천공홀을 형성하는 단계; 상기 파일-천공홀의 깊이보다 깊게 앵커-천공홀을 형성하는 단계; 상기 앵커-천공홀에 어스앵커를 삽입하고 상기 어스앵커에 연결된 강선을 지상으로 노출시키는 단계; 상기 철근조립체에 인장홀을 형성하기 위한 인장파이프를 설치하는 단계; 상기 파일-천공홀에 철근조립체를 삽입하는 단계; 상기 파일-천공홀에 콘크리트를 타설하여 양생하는 단계; 및 상기 강선을 상기 인장파이프에 통과시켜 지압판으로 긴장시킨 후 고정하는 단계;를 포함한다.According to an aspect of the present invention, there is provided a method for constructing an earth retaining wall of an underground structure having a narrow margin space, the method comprising: drilling the ground according to the installation location of the earth retaining wall, - forming a perforation hole; Forming an anchor-perforation hole deeper than the depth of the pile-perforation hole; Inserting an earth anchor into the anchor-perforation hole and exposing a steel wire connected to the earth anchor to the ground; Providing a tensile pipe for forming a tensile hole in the reinforcing bar assembly; Inserting a reinforcing assembly into the pile-perforation hole; Pouring the concrete into the pile-hole; And a step of passing the steel wire through the tension pipe and straining the steel wire with a support plate, and fixing the steel wire.

이때 상기 앵커-천공홀은 상기 파일-천공홀의 하부에서 지중으로 연장되고, 상기 인장파이프는 상기 파일-천공홀의 길이방향으로 관통되게 배치되며, 상기 강선은 상기 인장파이프를 통과하여 콘크리트가 양생되어 생성된 파일 상에서 상기 지압판으로 긴장된 후 고정될 수 있다. In this case, the anchor-perforation hole extends underground from the bottom of the pile-perforation hole, and the tensile pipe is arranged to penetrate in the longitudinal direction of the pile-perforation hole, and the steel wire passes through the tensile pipe, Lt; RTI ID = 0.0 > file, < / RTI >

이 경우에, 상기 철근조립체는 상기 파일 상으로 노출되게 배근되고, 상기 복수개의 파일 간을 연결하도록 상기 복수개의 파일 상으로 CAP 콘크리트가 타설 및 양생되어 CAP 마감부가 형성되며, 상기 인장파이프는 상기 CAP 마감부 상에서 인장홀이 노출되도록 배치되고, 상기 강선은 상기 인장파이프를 통과하여 상기 CAP 마감부 상에서 상기 지압판으로 긴장된 후 고정될 수 있다.In this case, the reinforcing bar assembly is laid out so as to be exposed to the pile, and CAP concrete is laid and cured on the plurality of piles to connect the plurality of files, and a CAP finishing portion is formed, The tension line is arranged to be exposed on the finishing portion, and the steel wire may be fixed after being passed through the tension pipe and tensed to the platen on the CAP finish.

한편, 상기 앵커-천공홀은 상기 파일-천공홀의 배면에서 지중으로 형성되고, 상기 인장파이프는 상기 파일-천공홀의 상단에서 측방향으로 관통되게 배치되며, 상기 강선은 상기 인장파이프를 통과하여 콘크리트가 양생되어 생성된 파일의 측면에서 상기 지압판으로 긴장된 후 고정될 수 있다.In the meantime, the anchor-perforation hole is formed in the ground at the back of the pile-perforation hole, and the tensile pipe is arranged to penetrate laterally from the upper end of the pile-perforation hole, And can be fixed after being tensed by the above-mentioned pressure plate in terms of the cured and generated file.

이 경우에, 상기 철근조립체는 상기 파일 상으로 노출되게 배근되고, 상기 복수개의 파일 간을 연결하도록 상기 복수개의 파일 상으로 CAP 콘크리트가 타설 및 양생되어 CAP 마감부가 형성되며, 상기 인장파이프는 상기 CAP 마감부 측부에서 인장홀이 노출되도록 배치되고, 상기 강선은 상기 인장파이프를 통과하여 상기 CAP 마감부 측부에서 상기 지압판으로 긴장된 후 고정될 수 있다.In this case, the reinforcing bar assembly is laid out so as to be exposed to the pile, and CAP concrete is laid and cured on the plurality of piles to connect the plurality of files, and a CAP finishing portion is formed, And the tensile pipe is passed through the tensile pipe to be tightened to the platen at the side of the CAP finish part and then fixed.

또한 상기 철근조립체에는 상기 파일-천공홀의 내주연에 대응하는 접합철판부가 결합되고, 양생된 흙막이벽으로 둘러싸여진 토양을 굴토하면서 노출되는 상기 접합철판부에 철골띠장을 결합하여 상기 접합철판부 간을 결속할 수 있다.In addition, a steel plate assembly corresponding to the inner circumferential edge of the pile-hole is coupled to the steel reinforcing assembly, and a steel wale is coupled to the steel plate assembly exposed while the soil surrounded by the cured earth retaining wall is excavated, It can bind.

한편, 상기와 같은 목적을 달성하기 위한 본 발명은, 흙막이벽의 설치 위치에 따라 지반을 천공하여 파일-천공홀을 형성하는 단계; 상기 파일-천공홀의 깊이보다 깊게 앵커-천공홀을 형성하는 단계; 상기 앵커-천공홀에 어스앵커를 삽입하고 상기 어스앵커에 연결된 강선을 지상으로 노출시키는 단계; 길이방향으로 관통공이 형성된 PHC 파일에 상기 강선을 상기 관통공에 통과시킨 상태로 상기 파일을 상기 파일-천공홀에 삽입하는 단계; 및 상기 강선을 상기 파일 상에서 지압판으로 긴장시킨 후 고정하는 단계;를 포함하여 구성될 수도 있다.According to another aspect of the present invention, there is provided a method of constructing a pile-hole, Forming an anchor-perforation hole deeper than the depth of the pile-perforation hole; Inserting an earth anchor into the anchor-perforation hole and exposing a steel wire connected to the earth anchor to the ground; Inserting the file into the file-perforation hole with the steel wire passed through the through hole in a PHC file having a through hole in the longitudinal direction; And fixing the steel wire after tensioning the steel wire with the platen on the file.

이때 상기 복수개의 파일 간을 연결하도록 상기 복수개의 파일 상으로 CAP 마감부를 장착하고, 상기 강선은 상기 CAP 마감부 상에서 지압판으로 긴장된 후 고정될 수 있다.At this time, a CAP finishing unit is mounted on the plurality of files so as to connect the plurality of files, and the steel wire can be fixed after being tensed by the platen on the CAP finishing unit.

그리고 상기 CAP 마감부는, 상기 복수개의 파일의 측면 일부에 대응되는 원호형의 삽입부와, 상기 삽입부의 상단에서 복수개의 삽입부를 연결하고 상기 파일의 관통공에 대응되는 인장홀이 형성되는 CAP 플레이트로 구성될 수 있다.The CAP finishing portion includes an arc-shaped insertion portion corresponding to a side portion of the plurality of files, and a CAP plate having a plurality of insertion portions connected at an upper end of the insertion portion and having tensile holes corresponding to the through- Lt; / RTI >

또한 상기 파일에는 길이방향으로 일정 간격을 두고 접합철판부가 결합되어 상기 파일-천공홀에 삽입되고, 양생된 흙막이벽으로 둘러싸여진 토양을 굴토하면서 노출되는 상기 접합철판부에 철골띠장을 결합하여 상기 접합철판부 간을 결속할 수 있다. In the above-mentioned file, a steel plate is joined to the joint steel plate at a predetermined interval in the longitudinal direction to be inserted into the file-perforation hole, and the steel steel can is welded to the joint steel plate part exposed while crawling the soil surrounded by the cured earth retaining wall, The steel plate portion can be bound.

이때 상기 노출된 접합철판부는 상기 인접한 접합철판부 간의 수평높이가 일치하도록 조정되어 볼트 조임으로 상기 파일에 고정될 수 있다.At this time, the exposed bonded steel plate portion may be adjusted to match the horizontal height between the adjacent bonded steel plate portions and fixed to the pile by bolting.

본 발명에 따른 지하 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법에 따르면, CIP 파일 또는 PHC 파일과 동축선상 또는 인접하여 수직방향으로 어스앵커를 매립하여 어스앵커의 매립시 요구되는 지하 수평 공간을 현저히 줄이면서도 파일의 내력을 유지할 수 있어 인접하여 지하 구조물이 구축되어 있는 공간에서도 어스앵커에 의한 파일의 내력을 증대시킬 수 있는 장점이 있다. According to the method of constructing the earth retaining wall of an underground structure having a narrow underground space, the earth anchor is vertically co-axial or adjacent to the CIP file or the PHC file, The internal strength of the file can be maintained while reducing the space considerably. Thus, it is possible to increase the history of the file by the earth anchor even in the space where the underground structure is constructed.

또한 본 발명에 따르면, CIP 파일의 단점인 차수 성능을 향상시키면서 어스앵커의 긴장상태를 보다 강력히 유지할 수 있어 파일의 토압에 대한 내력을 증대시킬 수 있는 효과가 있다. Also, according to the present invention, it is possible to maintain the tension of the earth anchor more strongly while improving the order performance, which is a disadvantage of the CIP file, and thus it is possible to increase the proof against the earth pressure of the file.

도 1은 종래기술에 따라 구축되는 지하 연속 흙막이벽을 도시한 평면도,
도 2는 본 발명의 제1실시예에 따른 흙막이벽 구축공법의 시공방법을 설명하는 도면,
도 3은 제1실시예에 따른 흙막이벽 구축공법의 시공순서를 설명하는 도면,
도 4는 제1실시예에 따른 흙막이벽에 철골띠장을 장착한 상태를 나타낸 도면,
도 5는 파일 배면에 대한 그라우팅 주입 상태를 도시한 도면,
도 6은 제1실시예에 따른 흙막이벽의 작용을 설명하는 단면도,
도 7은 제1실시예에 대한 변형예를 설명하는 도면,
도 8은 본 변형예에 따른 흙막이벽의 작용을 설명하는 단면도,
도 9 내지 도 12는 본 발명의 제2실시예에 따른 흙막이벽 구축공법을 설명하는 도면,
도 13은 제2실시예에 따른 흙막이벽에 철골띠장을 장착한 상태를 나타낸 도면이다.
1 is a plan view showing an underground continuous earth retaining wall constructed according to the prior art,
2 is a view for explaining a construction method of the earth retaining wall construction method according to the first embodiment of the present invention,
3 is a view for explaining a construction procedure of the earth retaining wall construction method according to the first embodiment,
4 is a view showing a state in which a steel wale band is mounted on a earth retaining wall according to the first embodiment,
5 is a view showing the grouting injection state with respect to the back surface of the file,
6 is a sectional view for explaining the operation of the earth retaining wall according to the first embodiment,
7 is a view for explaining a modification of the first embodiment,
8 is a cross-sectional view illustrating the operation of the earth retaining wall according to the present modification,
9 to 12 are views for explaining a method of constructing an earth retaining wall according to a second embodiment of the present invention,
13 is a view showing a state in which a steel wale band is mounted on a earth retaining wall according to the second embodiment.

이하에서는 본 발명에 따른 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법에 관하여 첨부된 도면과 함께 더불어 상세히 설명하기로 한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a method of constructing a retaining wall for an underground structure having a narrow margin space according to the present invention will be described in detail with reference to the accompanying drawings.

<제1실시예>&Lt; Embodiment 1 >

먼저 본 발명에 따른 흙막이벽 구축공법에 대한 제1실시예에 대해 설명한다.First, a first embodiment of the earth retaining wall construction method according to the present invention will be described.

도 2는 본 발명의 제1실시예에 따른 흙막이벽 구축공법의 시공방법을 설명하는 도면이고, 도 3은 제1실시예에 따른 흙막이벽 구축공법의 시공순서를 설명하는 도면이며, 도 4는 제1실시예에 따른 흙막이벽에 철골띠장을 장착한 상태를 나타낸 도면이며, 도 5는 파일 배면에 대한 그라우팅 주입 상태를 도시한 도면이다. 또한 도 6은 제1실시예에 따른 흙막이벽의 작용을 설명하는 단면도이다.FIG. 2 is a view for explaining a construction method of the earth retaining wall construction method according to the first embodiment of the present invention, FIG. 3 is a view for explaining a construction procedure of the earth retaining wall construction method according to the first embodiment, FIG. 5 is a view showing a state in which a steel wale band is mounted on an earth retaining wall according to the first embodiment, and FIG. 5 is a view showing a grouting injection state with respect to a file back surface. 6 is a cross-sectional view illustrating the operation of the earth retaining wall according to the first embodiment.

도시된 바와 같이, 제1실시예에 따른 흙막이벽(100)은 CIP 공법에 의해 구축되는 지하 연속식 벽체로서, 파일-천공홀(10)을 형성하는 단계로부터 개시된다. 보다 상세히 설명하면, 시공 위치에서 지하 공간을 형성할 위치를 결정하고 지하 터파기 전에 흙막이벽(100)의 설치 위치에 따라 지반을 천공하여 파일-천공홀(10)을 형성한다. 파일-천공홀(10)은 서로 밀착되게 형성되고, 하나의 파일-천공홀(10)을 형성하여 콘크리트 타설하여 양생한 후에 인접하게 파일-천공홀(10)을 형성할 수도 있고, 인접하게 파일-천공홀(10)들을 연속으로 형성할 수도 있으며, 파일-천공홀(10)을 이격되게 형성한 후 파일을 시공하고 그 파일-천공홀(10) 사이에 연속되게 파일-천공홀(10)을 형성할 수도 있다.As shown, the earth retaining wall 100 according to the first embodiment starts from the step of forming a punched-through hole 10 as an underground continuous wall constructed by the CIP method. More specifically, the location to form the underground space at the construction site is determined and the pile-hole 10 is formed by drilling the ground according to the installation location of the earth retaining wall 100 before disposal. The file-perforation hole 10 is formed to be in close contact with each other, and one pile-perforation hole 10 may be formed to pour concrete after curing to form a pile-perforation hole 10 adjacent thereto, The perforation holes 10 may be continuously formed and the pile holes 10 may be spaced apart and then the piles may be formed and the pile holes 10 may be successively formed between the pile- May be formed.

그리고 상기 파일-천공홀(10)의 깊이보다 깊게 앵커-천공홀(20)을 형성한다. 이때 파일-천공홀(10)의 형성과 앵커-천공홀(20)의 형성 순서는 특별히 정해진 것은 아니고 시공의 편의에 의해 결정될 수 있다. And the anchor-perforation hole 20 is formed deeper than the depth of the pile-hole 10. At this time, the formation of the file-perforation hole 10 and the formation of the anchor-perforation hole 20 are not specifically defined and can be determined by convenience of construction.

또한 앵커-천공홀(20)은 파일-천공홀(10)과 일대일 대응되는 개수로 형성될 수도 있지만, 일반적으로 1 : 3~6의 배율로 천공된다. The anchor-perforation hole 20 may be formed in a number corresponding to the one-to-one correspondence with the punched-through hole 10, but it is generally perforated at a magnification of 1: 3 to 6.

아울러, 본 실시예에서는 앵커-천공홀(20)이 파일-천공홀(10)의 배면에 인접하게 지중에 매설된다(도 3의 (a) 참조). In addition, in this embodiment, the anchor-perforation hole 20 is buried in the ground adjacent to the back surface of the punched-through hole 10 (see FIG.

한편, 파일-천공홀(10)에는 철근으로 이루어진 철근조립체(40)가 삽입되고 앵커-천공홀(20)에는 어스앵커(30)가 강선(31)에 매달린 상태로 삽입된다. 이때 상기 철근조립체(40)에는, 도 3의 (b)에 도시된 바와 같이, 상기 파일-천공홀(10)의 내주연에 대응하는 접합철판부(43)가 결합될 수 있다. 여기서 상기 철근조립체(40)의 외경은 파일-천공홀(10)의 내경보다 30~100㎜ 정도 작게 형성되고, 접합철판부(43)는 상기 파일-천공홀(10)의 내경에 일치되게 형성되므로, 상기 철근조립체(40)와 접합철판부(43) 간에는 이음철근에 의한 용접 또는 철사를 통한 결선으로 결합될 수 있다. In the meantime, the reinforcing bar assembly 40 made of reinforcing bars is inserted into the punched hole 10 and the earth anchor 30 is inserted into the anchor-punched hole 20 while being suspended from the steel wire 31. 3 (b), a bonding steel plate portion 43 corresponding to the inner periphery of the punched-through hole 10 may be coupled to the reinforcing bar assembly 40 at this time. The outer diameter of the reinforcing bar assembly 40 is about 30 to 100 mm smaller than the inner diameter of the punched hole 10 and the bonded steel plate 43 is formed to be coincident with the inner diameter of the punched hole 10 The reinforcing bar assembly 40 and the bonded steel plate 43 can be joined by welding with a reinforcing bar or by wire connection.

이러한 접합철판부(43)는 CIP 파일(50)이 지중에 매설되어 터파기시 노출될 때, 도 4에 도시된 바와 같이, 상기 접합철판부(43)를 이용하여 철골띠장(70)을 결합하는 브라켓 용도로 활용하기 위함이다. 따라서 본 실시예에서와 같이 접합철판부(43)를 사용하면, CIP 파일(50) 중간에 삽입하여 철골띠장(70)과의 결합을 위한 H형강을 사용하지 않아도 무방하다는 장점을 갖게 된다.4, when the CIP file 50 is buried in the ground and exposed at the time of terra cotta grounding, the joint steel plate part 43 is joined to the steel wire canopy 70 using the joint steel plate part 43 To be used for bracket applications. Therefore, when the bonded steel plate 43 is used as in the present embodiment, it is advantageous in that it is not required to use the H-shaped steel for coupling with the steel wristband 70 by inserting it in the middle of the CIP file 50.

또한 본 실시예에 따른 철근조립체(40)를 제작할 때, 도 3의 (b)에 도시된 바와 같이, 철근조립체(40)에는 일정간격으로 구멍(46)이 천공된 맨젯튜브(45)가 추가로 결합될 수 있다. 상기 맨젯튜브(45)는 L.W 공법(Labiles Water Glass)을 실시하기 위한 것으로, CIP 공법에 의해 제작된 파일 간의 차수를 위한 구성이다. 종래에는 L.W 공법을 시행하기 위해서 CIP 공법에 의해 제작된 파일 배면에 별도로 지반을 천공한 천공홀에 맨젯튜브(45)를 삽입하여 그라우팅 주입액을 지반에 주입하였었다. 그런데 본 실시예에서는 철근조립체(40)에 맨젯튜브(45)를 직접 결합하여 CIP 공법을 위하여 천공한 파일-천공홀(10)에 함께 주입하므로, L.W 공법을 위하여 추가로 천공할 필요가 없어진다.3 (b), when the rebar assembly 40 according to the present embodiment is manufactured, the rebar assembly 40 is provided with a Manhattan tube 45 in which holes 46 are perforated at regular intervals Lt; / RTI &gt; The Manhattan tube 45 is for performing the L.W method (Labiles Water Glass), and is a structure for the degree between files produced by the CIP method. Conventionally, in order to carry out the LW method, a manhattan tube (45) was inserted into a perforation hole where a ground was drilled separately on the back of a file produced by the CIP method, and the grouting injection solution was injected into the ground. However, in this embodiment, since the manhattan tube 45 is directly coupled to the reinforcing bar assembly 40 and is poured into the punched-through hole 10 for the CIP method, it is not necessary to drill further for the LW method.

또한 종래의 공법에서는 맨젯튜브(45)가 천공홀의 깊이만큼 완전히 삽입되었는지 외부에서 확인할 수 없었으나, 본 실시예에서는 맨젯튜브(45)가 외부에서 철근조립체(40)(20)에 확실하게 결합된 상태에서 파일-천공홀(10)에 삽입되므로, 그라우팅 주입액이 천공홀의 전체 깊이에 고르게 분출될 수 있고 차수 취약 지점에 정확하게 주입액이 분출될 수 있다.Also, in the conventional method, it is impossible to confirm from the outside whether the manhattan tube 45 is completely inserted by the depth of the hole, but in this embodiment, the manhattan tube 45 is securely coupled to the reinforcing assembly 40 The grouting injection liquid can be uniformly sprayed to the entire depth of the perforation hole and the injection liquid can be ejected precisely at the weak point.

아울러, 그라우팅 주입액의 분출범위는 어스앵커(30)가 연결된 강선(31)에도 전체적으로 미치게 되므로, 그라우팅 주입액이 강선(31)의 고착화에도 도움을 주게 된다.In addition, since the range of the grouting injection liquid is entirely extended to the steel wire 31 to which the earth anchor 30 is connected, the grouting injection fluid also helps secure the steel wire 31.

이러한 맨젯튜브(45)에 천공된 구멍(46)에 이물질의 유입을 차단하고 상기 맨젯튜브(45)를 철근조립체(40)에 결합함과 아울러, 그라우팅 주입액을 분사할 때 상기 구멍(46)으로 분출될 수 있도록 상기 구멍(46)은 비교적 쉽게 파손 가능한 밀폐수단(미도시)으로 밀폐되면서 철근조립체(40)에 결합된다. 이러한 밀폐수단으로 쉽게 구할 수 있는 것으로는 테이프 종류가 있고, 본 실시예에서는 청테이프가 사용되었다.The holes 46 in the manhattan tube 45 are blocked and foreign matter is prevented from flowing into the holes 46 when the grouting injection liquid is sprayed. The hole 46 is coupled to the rebar assembly 40 while being sealed with a relatively easily breakable sealing means (not shown). There are tape types that can be easily obtained by such sealing means, and in the present embodiment, blue tape is used.

또한 상기 철근조립체(40)에는 인장홀(51)을 형성하기 위한 인장파이프(41)가 설치된다. 이때 본 실시예에서는 파일-천공홀(10)의 배면에 앵커-천공홀(20)이 형성되고, 강선(31)은 앵커-천공홀(20)을 따라 수직방향으로 배치되다가 파일-천공홀(10)에 형성될 파일을 향하여 90도 절곡되어 파일을 관통하여 지압판(33)에 의해 고정되므로, 상기 인장파이프(41)는 상기 철근조립체(40)의 상단에 장착된다. Also, a tensile pipe 41 for forming a tensile hole 51 is installed in the reinforcing bar assembly 40. In this embodiment, the anchor-perforation hole 20 is formed on the back surface of the file-perforation hole 10, the steel wire 31 is arranged in the vertical direction along the anchor-perforation hole 20, The tensile pipe 41 is mounted on the upper end of the reinforcing bar assembly 40 because the reinforcing bar assembly 40 is bent by 90 degrees toward the file to be formed on the reinforcing bar assembly 10,

이때 철근조립체(40)가 파일-천공홀(10)에 삽입되기 전에 인장파이프(41)가 철근조립체(40)에 설치될 수도 있지만, 철근조립체(40)가 삽입된 후에 인장파이프(41)를 설치하여도 무방하다.The tensile pipe 41 may be installed in the rebar assembly 40 before the rebar assembly 40 is inserted into the pile-perforation hole 10, but the tensile pipe 41 may be removed after the rebar assembly 40 is inserted. It may be installed.

이렇게 제작된 철근조립체(40)를 파일-천공홀(10)에 삽입하고(도 3의 (c) 참조), 상기 파일-천공홀(10)에 콘크리트를 타설하여 양생한다. 3 (c)), concrete is poured into the pile-perforation hole 10 to cure it.

그리고 이러한 과정을 반복하면서 CIP 파일(50)을 연속적으로 시공하여 지하 연속벽을 완성한다. Then, the CIP file 50 is successively constructed by repeating this process to complete the underground continuous wall.

콘크리트가 양생되어 파일이 형성되면, 도 3의 (d)에 도시된 바와 같이, 파일 상에 노출된 철근 조립체에 CAP 마감부(60)를 형성한다. 보다 상세히 설명하면, CAP 마감부(60)는 상기 복수개의 파일 간을 연결하도록 복수개의 파일 상으로 CAP 콘크리트를 타설 및 양생하여 형성되되, 인장파이프(41)가 상기 CAP 마감부(60)를 횡단하여 인장홀(63a)을 형성하도록 배치된다. 이에 따라 상기 강선(31)이 상기 인장파이프(41)를 통과하여 상기 CAP 마감부(60)의 측부에서 상기 지압판(33)으로 긴장된 후 고정된다. 이러한 CAP 마감부(60)를 형성하면 개별적으로 제작되는 파일 상호간을 결속할 수 있어 보다 큰 횡방향 토압에 대응할 수 있게 된다.Once the concrete is cured and piles are formed, a CAP finish 60 is formed on the exposed reinforcing bar assembly, as shown in Figure 3 (d). In more detail, the CAP finishing unit 60 is formed by pouring and curing CAP concrete on a plurality of files so as to connect the plurality of files, and a tension pipe 41 is provided between the CAP finishing unit 60 and the cross- So as to form a tension hole 63a. The steel wire 31 passes through the tension pipe 41 and is tightened to the pressure plate 33 at the side of the CAP finishing portion 60 and then fixed. When the CAP finishing portion 60 is formed, the individual files can be bound together and can cope with a larger lateral earth pressure.

그리고 도 6에 도시된 바와 같이, 파일(50)이 지반에 매립된 상태에서 수직방향 하방으로 어스앵커(30)와 강선(31)에 의해 당겨지게 되므로 횡방향의 토압(흰 화살표 참조)에 견디는 내력이 증가하게 된다.As shown in Fig. 6, since the pile 50 is pulled by the earth anchor 30 and the steel wire 31 downward in the vertical direction with the pile 50 embedded in the ground, The strength is increased.

특히 본 실시예에서는, CAP 마감부(60)에 의해 파일(50) 간이 상호 결속되고, 접합철판부(43)에 의한 철골띠장(70)의 결합에 의해 파일(50) 간 추가적으로 결속되므로, 이러한 결속력이 어스앵커(30)와 강선(31)에 의한 인장력에 더해져 횡방향 토압에 대해 보다 견고하게 흙막이벽(100)을 지탱할 수 있게 된다.Particularly, in this embodiment, the files 50 are bound together by the CAP finishing section 60 and further joined together between the files 50 by the joining of the steel wales 70 by the joining iron plate section 43, The binding force is added to the tensile force by the earth anchor 30 and the steel wire 31, so that the earth retaining wall 100 can be supported more stably against the transverse earth pressure.

또한 본 실시예에서 인장파이프(41)가 CAP 마감부(60)에 형성되는 것이 예시되었지만, CAP 마감부(60) 없이 파일을 돌출되게 형성하여 인장파이프(41)를 설치하는 것도 가능하다. In this embodiment, the tension pipe 41 is formed in the CAP finishing portion 60. However, it is also possible to provide the tension pipe 41 by protruding the pile without the CAP finishing portion 60.

이와 같이, 강선(31)의 긴장을 완료하면, 도 5에 도시된 바와 같이, 상술한 맨젯튜브(45)로 그라우팅 주입액을 주입하여 상기 구멍(46)을 통해 분출되게 함으로써 파일 간 이격에 의한 누수를 차단할 수 있을 뿐만 아니라, 긴장된 강선(31)을 지중에 고착화시켜 어스앵커(30)의 파일에 대한 인장력을 증대시킬 수 있게 된다.5, the grouting injection liquid is injected into the above-described manhattan tube 45 and is ejected through the hole 46, whereby the distance between the grooves 46 It is possible not only to block the water leakage but also to fix the tensioned steel wire 31 to the ground so that the tensile force of the earth anchor 30 against the file can be increased.

다음으로 본 발명의 제1실시예에 대한 변형예를 설명한다.Next, a modification of the first embodiment of the present invention will be described.

도 7은 제1실시예에 대한 변형예를 설명하는 도면이고, 도 8은 본 변형예에 따른 흙막이벽의 작용을 설명하는 단면도이다.Fig. 7 is a view for explaining a modification of the first embodiment, and Fig. 8 is a sectional view for explaining the action of the earth retaining wall according to the present modification.

본 변형예에서는, 도시된 바와 같이, 앵커-천공홀(20)이 상기 파일-천공홀(10)의 배면에 위치되는 것이 아니라, 상기 파일-천공홀(10)의 하부에서 지중으로 연장되게 형성된다. 따라서 어스앵커(30)는 파일 하단에서 파일과 동축상에 배치되므로, 상기 어스앵커(30)에 연결되는 강선(31)도 상기 파일을 관통하여 지상으로 노출시켜야 한다. 이를 위해 인장파이프(41)는 상기 파일-천공홀(10)의 길이방향으로 관통되게 배치된다.In this modification, as shown in the drawing, the anchor-perforation hole 20 is not formed on the back face of the punched-through hole 10 but is formed to extend from the bottom of the punched-through hole 10 to the ground do. Therefore, since the earth anchor 30 is disposed coaxially with the file at the lower end of the file, the steel wire 31 connected to the earth anchor 30 must also be exposed to the ground through the file. For this purpose, the tension pipe 41 is arranged to penetrate in the longitudinal direction of the pile-hole 10.

또한 본 변형예에서도 CAP 마감부(60)가 파일 상에 형성될 수 있는데, 인장파이프(41)는 절곡되지 않고 수직방향으로 배치되고, 상기 CAP 마감부(60) 상에서 상기 인장파이프(41)를 통과한 강선(31)이 지압판(33)에 고정된다.Also in this variant, a CAP finish 60 can be formed on the pile, wherein the tension pipe 41 is arranged in a vertical direction without being bent, and the tension pipe 41 on the CAP finish 60 And the passed steel wire 31 is fixed to the pressure plate 33.

따라서 도 8에 도시된 바와 같이, 파일(50)이 지반에 매립된 상태에서 수직방향 하방으로 어스앵커(30)와 강선(31)에 의해 당겨지게 되므로 횡방향의 토압(흰 화살표 참조)에 견디는 내력이 증가하게 된다.Therefore, as shown in FIG. 8, since the pile 50 is pulled by the earth anchor 30 and the steel wire 31 downward in the vertical direction while being embedded in the ground, The strength is increased.

그 외의 구성 및 작용은 제1실시예에서와 실질적으로 동일하므로 그에 대한 상세한 설명은 생략한다.Other configurations and operations are substantially the same as those in the first embodiment, and a detailed description thereof will be omitted.

<제2실시예>&Lt; Embodiment 2 >

다음으로 본 발명에 따른 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법의 제2실시예에 대해 설명한다. 본 실시예에서는 제1실시예와 대응되는 구성요소에 대해 동일한 도면번호를 사용하기로 한다.Next, a second embodiment of the method for constructing the earth retaining wall of an underground structure having a narrow frame clearance space according to the present invention will be described. In the present embodiment, the same reference numerals are used for the components corresponding to the first embodiment.

도 9 내지 도 12는 본 발명의 제2실시예에 따른 흙막이벽 구축공법을 설명하는 도면이고, 도 13은 제2실시예에 따른 흙막이벽에 철골띠장을 장착한 상태를 나타낸 도면이다.FIGS. 9 to 12 are views for explaining a method of constructing the earth retaining wall according to the second embodiment of the present invention, and FIG. 13 is a view showing a state where a steel wale is installed on the earth retaining wall according to the second embodiment.

본 발명에 따른 제1실시예와 제2실시예에서는, 과제의 해결수단은 실질적으로 동일하지만, 제1실시예는 CIP 공법에 대한 것인데 반해, 제2실시예는 PHC 파일 공법에 대한 것으로 상이점을 갖는다. 즉, 도시된 바와 같이, 제2실시예에서는, 철근조립체(40) 대신에 PHC 파일(80)을 파일-천공홀(10)에 삽입하고, 상기 PHC 파일(80)에 형성된 관통공(81)으로 어스앵커(30)의 강선(31)을 지상으로 노출시킨다. 이후 지압판(33)으로 상기 강선(31)을 긴장시킨 후 고정하게 되는데, 이때 본 실시예에서도 제1실시예에서와 유사한 기능을 하는 CAP 마감부(60)가 사용될 수 있다.In the first embodiment and the second embodiment according to the present invention, the means for solving the problems are substantially the same, but the first embodiment is for the CIP method, whereas the second embodiment is for the PHC file method, . That is, as shown in the drawing, in the second embodiment, the PHC file 80 is inserted into the file-perforation hole 10 instead of the reinforcing bar assembly 40, and the through hole 81 formed in the PHC file 80, The steel wire 31 of the earth anchor 30 is exposed to the ground. After that, the steel wire 31 is tightened with the pressure plate 33 and then fixed. At this time, the CAP finishing portion 60 having a function similar to that of the first embodiment can also be used.

다만, 본 실시예에서는, 상기 CAP 마감부(60)가 콘크리트로 제작되지 않고 강판으로 제작된다. 보다 상세히 설명하면, 상기 CAP 마감부(60)는, 복수개의 파일의 측면 일부에 대응되는 원호형의 삽입부(61)와, 상기 삽입부(61)의 상단에서 복수개의 삽입부(61)를 연결하고 상기 파일의 관통공(81)에 대응되는 인장홀(63a)이 형성되는 CAP 플레이트(63)로 구성된다. 여기서 지압판(33)은 강선(31)을 긴장시키는 역할뿐만 아니라, CAP 마감부(60)를 PHC 파일(80)에 고정하는 역할도 수행한다.However, in this embodiment, the CAP finishing portion 60 is not made of concrete but is made of steel. More specifically, the CAP finishing portion 60 includes an arc-shaped insertion portion 61 corresponding to a side portion of a plurality of files, and a plurality of insertion portions 61 at the upper end of the insertion portion 61 And a CAP plate 63 having a tensile hole 63a corresponding to the through hole 81 of the file. Here, the pressure plate 33 serves not only to tense the steel wire 31 but also to fix the CAP finishing portion 60 to the PHC file 80. [

또한 상기 파일(80)에는 길이방향으로 일정 간격을 두고 접합철판부(43)가 결합되어 상기 파일-천공홀(10)에 삽입될 수 있다. 이렇게 되면, 도 13에 도시된 바와 같이, 양생된 흙막이벽(100)으로 둘러싸여진 토양을 굴토하면서 노출되는 상기 접합철판부(43)에 철골띠장(70)을 결합하여 상기 접합철판부(43) 간을 결속할 수 있다.In addition, the joining metal plate 43 may be coupled to the file 80 at regular intervals in the longitudinal direction to be inserted into the file-perforation hole 10. 13, the steel wale 70 is joined to the bonded steel plate 43 exposed while crawling the soil surrounded by the cured retaining wall 100 to form the bonded steel plate portion 43, You can bind the liver.

이때 상기 노출된 접합철판부(43)는 상기 인접한 접합철판부(43) 간의 수평높이가 일치하지 않을 수 있는데, 이러한 경우에는 그 위치를 조정하여 볼트 조임으로 상기 파일에 고정될 수 있다.At this time, the exposed bonded steel plate portion 43 may not have the same horizontal height between the adjacent bonded steel plate portions 43. In this case, the exposed bonded steel plate portion 43 may be fixed to the pile by bolt tightening.

또한 PHC 파일(80) 공법에서는 파일 간 누수를 차단하기 위한 차단하기 위한 구성이 이미 공지되어 있을 뿐만 아니라, 제1실시예에서와 같은 맨젯튜브(45)를 PHC 파일(80)에 장착하여 파일-천공홀(10)에 삽입하는 것이 곤란하기 때문에 맨젯튜브(45)는 생략되어 구성된다.In addition, in the PHC file (80) method, a configuration for blocking the leaking of the files is already known, and the MANHOT tube 45 as in the first embodiment is mounted on the PHC file 80, It is difficult to insert it into the perforation hole 10, so that the manifold tube 45 is omitted.

이상에서와 같이 본 발명의 권리는 위에서 설명된 실시예에 한정되지 않고 청구범위에 기재된 바에 의해 정의되며, 본 발명의 분야에서 통상의 지식을 가진 자가 청구범위에 기재된 권리범위 내에서 다양한 변형과 개작을 할 수 있다는 것은 자명하다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined by the appended claims. It is obvious that you can do it.

10 : 파일-천공홀 20 : 앵커-천공홀
30 : 어스앵커 31 :강선 33 : 지압판
40 : 철근조립체 41 : 인장파이프 43 : 접합철판부 45 : 맨젯튜브 46 : 구멍
50 : CIP 파일
60 : CAP 마감부 61 : 삽입부 63 : CAP 플레이트
70 : 철골띠장
80 : PHC 파일 81 :관통공
100 : 흙막이벽
10: file - perforation hole 20: anchor-perforation hole
30: Earth anchor 31: Steel wire 33:
40: Reinforcing assembly 41: Tension pipe 43: Bonded steel plate 45: Manhattan tube 46: Hole
50: CIP file
60: CAP finishing portion 61: inserting portion 63: CAP plate
70: Steel wale
80: PHC file 81: Through hole
100: earth retaining wall

Claims (11)

흙막이벽(100)의 설치 위치에 따라 지반을 천공하여 파일-천공홀(10)을 형성하는 단계;
상기 파일-천공홀(10)의 깊이보다 깊게 앵커-천공홀(20)을 형성하는 단계;
상기 앵커-천공홀(20)에 어스앵커(30)를 삽입하고 상기 어스앵커(30)에 연결된 강선(31)을 지상으로 노출시키는 단계;
상기 철근조립체(40)에 인장홀을 형성하기 위한 인장파이프(41)를 설치하는 단계;
상기 파일-천공홀(10)에 철근조립체(40)를 삽입하는 단계;
상기 파일-천공홀(10)에 콘크리트를 타설하여 양생하는 단계; 및
상기 강선(31)을 상기 인장파이프(41)에 통과시켜 지압판(33)으로 긴장시킨 후 고정하는 단계;를 포함하는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
Drilling the ground according to the installation position of the earth retaining wall 100 to form a punched hole 10;
Forming an anchor-perforation hole (20) deeper than the depth of the pierce hole (10);
Inserting an earth anchor (30) into the anchor-perforation hole (20) and exposing a steel wire (31) connected to the earth anchor (30) to the ground;
Providing a tension pipe (41) for forming a tension hole in the reinforcing bar assembly (40);
Inserting a rebar assembly (40) into the punched-through hole (10);
Pouring concrete into the pile-hole 10; And
And a step of passing the steel wire (31) through the tension pipe (41) and tightening the steel wire (31) with a support plate (33).
제1항에 있어서,
상기 앵커-천공홀(20)은 상기 파일-천공홀(10)의 하부에서 지중으로 연장되고,
상기 인장파이프(41)는 상기 파일-천공홀(10)의 길이방향으로 관통되게 배치되며,
상기 강선(31)은 상기 인장파이프(41)를 통과하여 콘크리트가 양생되어 생성된 파일 상에서 상기 지압판(33)으로 긴장된 후 고정되는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
The method according to claim 1,
The anchor-perforation hole 20 extends under the ground at the bottom of the punched-through hole 10,
The tension pipe (41) is arranged to penetrate in the longitudinal direction of the pile-hole (10)
The steel wire (31) is fixed after being tensed by the pressure plate (33) on a file formed by curing concrete through the tension pipe (41). The steel wire (31) Method.
제2항에 있어서,
상기 철근조립체(40)는 상기 파일 상으로 노출되게 배근되고,
상기 복수개의 파일 간을 연결하도록 상기 복수개의 파일 상으로 CAP 콘크리트가 타설 및 양생되어 CAP 마감부(60)가 형성되며,
상기 인장파이프(41)는 상기 CAP 마감부(60) 상에서 인장홀이 노출되도록 배치되고,
상기 강선(31)은 상기 인장파이프(41)를 통과하여 상기 CAP 마감부(60) 상에서 상기 지압판(33)으로 긴장된 후 고정되는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
3. The method of claim 2,
The reinforcing bar assembly 40 is laid so as to be exposed to the pile,
CAP concrete is laid and cured on the plurality of files to connect the plurality of files to form a CAP finishing portion 60,
The tension pipe 41 is arranged to expose a tensile hole on the CAP finish 60,
Wherein the steel wire (31) passes through the tension pipe (41) and is tightened on the CAP finishing portion (60) with the pressure plate (33) Method.
제1항에 있어서,
상기 앵커-천공홀(20)은 상기 파일-천공홀(10)의 배면에서 지중으로 형성되고,
상기 인장파이프(41)는 상기 파일-천공홀(10)의 상단에서 측방향으로 관통되게 배치되며,
상기 강선(31)은 상기 인장파이프(41)를 통과하여 콘크리트가 양생되어 생성된 파일의 측면에서 상기 지압판(33)으로 긴장된 후 고정되는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
The method according to claim 1,
The anchor-perforation hole 20 is formed in the ground at the back surface of the punched-through hole 10,
The tension pipe (41) is arranged to penetrate laterally from the upper end of the punched-through hole (10)
The steel wire (31) is fixed after being tensed by the pressure plate (33) on the side of the pile which is generated by passing concrete through the tension pipe (41), and is fixed to the pile of the underground structure having a narrow edge margin space Wall construction method.
제4항에 있어서,
상기 철근조립체(40)는 상기 파일 상으로 노출되게 배근되고,
상기 복수개의 파일 간을 연결하도록 상기 복수개의 파일 상으로 CAP 콘크리트가 타설 및 양생되어 CAP 마감부(60)가 형성되며,
상기 인장파이프(41)는 상기 CAP 마감부(60) 측부에서 인장홀이 노출되도록 배치되고,
상기 강선(31)은 상기 인장파이프(41)를 통과하여 상기 CAP 마감부(60) 측부에서 상기 지압판(33)으로 긴장된 후 고정되는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
5. The method of claim 4,
The reinforcing bar assembly 40 is laid so as to be exposed to the pile,
CAP concrete is laid and cured on the plurality of files to connect the plurality of files to form a CAP finishing portion 60,
The tension pipe 41 is disposed to expose a tensile hole at the side of the CAP finishing portion 60,
Wherein the steel wire (31) passes through the tension pipe (41) and is fixed to the side of the CAP finishing portion (60) after being tensed by the pressure plate (33) Construction method.
제1항에 있어서,
상기 철근조립체(40)에는 상기 파일-천공홀(10)의 내주연에 대응하는 접합철판부(43)가 결합되고,
양생된 흙막이벽(100)으로 둘러싸여진 토양을 굴토하면서 노출되는 상기 접합철판부(43)에 철골띠장(70)을 결합하여 상기 접합철판부(43) 간을 결속하는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
The method according to claim 1,
The reinforcing bar assembly 40 is coupled with a bonded steel plate portion 43 corresponding to the inner periphery of the punched hole 10,
Characterized in that the joining steel plate portions (43) are bound by joining a steel wale band (70) to the joining steel plate portion (43) exposed while the soil surrounded by the cured retaining wall (100) Construction Method of Retaining Wall for Underground Structures with Free Space.
흙막이벽(100)의 설치 위치에 따라 지반을 천공하여 파일-천공홀(10)을 형성하는 단계;
상기 파일-천공홀(10)의 깊이보다 깊게 앵커-천공홀(20)을 형성하는 단계;
상기 앵커-천공홀(20)에 어스앵커(30)를 삽입하고 상기 어스앵커(30)에 연결된 강선(31)을 지상으로 노출시키는 단계;
길이방향으로 관통공(81)이 형성된 PHC 파일(80)에 상기 강선(31)을 상기 관통공(81)에 통과시킨 상태로 상기 파일을 상기 파일-천공홀(10)에 삽입하는 단계; 및
상기 강선(31)을 상기 파일 상에서 지압판(33)으로 긴장시킨 후 고정하는 단계;를 포함하는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
Drilling the ground according to the installation position of the earth retaining wall 100 to form a punched hole 10;
Forming an anchor-perforation hole (20) deeper than the depth of the pierce hole (10);
Inserting an earth anchor (30) into the anchor-perforation hole (20) and exposing a steel wire (31) connected to the earth anchor (30) to the ground;
Inserting the file into the file-perforation hole (10) with the steel wire (31) passed through the through hole (81) in the PHC file (80) having the through hole (81) in the longitudinal direction; And
And fixing the steel wire (31) by tilting the steel wire (31) with the support plate (33) on the file, and fixing the steel wire (31).
제7항에 있어서,
상기 복수개의 파일 간을 연결하도록 상기 복수개의 파일 상으로 CAP 마감부(60)를 장착하고,
상기 강선(31)은 상기 CAP 마감부(60) 상에서 지압판(33)으로 긴장된 후 고정되는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
8. The method of claim 7,
Mounting a CAP closure part (60) on the plurality of files to connect the plurality of files,
Wherein the steel wire (31) is fixed on the CAP finishing part (60) after being tensed by the support plate (33), and then the steel wire (31) is fixed on the CAP finishing part (60).
제8항에 있어서,
상기 CAP 마감부(60)는, 상기 복수개의 파일의 측면 일부에 대응되는 원호형의 삽입부(61)와, 상기 삽입부(61)의 상단에서 복수개의 삽입부(61)를 연결하고 상기 파일의 관통공(81)에 대응되는 인장홀이 형성되는 CAP 플레이트(63)로 구성되는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
9. The method of claim 8,
The CAP finisher 60 includes an arc-shaped insertion portion 61 corresponding to a side portion of the plurality of files and a plurality of insertion portions 61 at the upper end of the insertion portion 61, And a CAP plate (63) formed with a tensile hole corresponding to the through hole (81) of the bottom wall.
제7항에 있어서,
상기 파일에는 길이방향으로 일정 간격을 두고 접합철판부(43)가 결합되어 상기 파일-천공홀(10)에 삽입되고,
양생된 흙막이벽(100)으로 둘러싸여진 토양을 굴토하면서 노출되는 상기 접합철판부(43)에 철골띠장(70)을 결합하여 상기 접합철판부(43) 간을 결속하는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
8. The method of claim 7,
In the file, a bonded steel plate 43 is inserted at a predetermined interval in the longitudinal direction to be inserted into the punched-through hole 10,
Characterized in that the joining steel plate portions (43) are bound by joining a steel wale band (70) to the joining steel plate portion (43) exposed while the soil surrounded by the cured retaining wall (100) Construction Method of Retaining Wall for Underground Structures with Free Space.
제10항에 있어서,
상기 노출된 접합철판부(43)는 상기 인접한 접합철판부(43) 간의 수평높이가 일치하도록 조정되어 볼트 조임으로 상기 파일에 고정되는 것을 특징으로 하는 협소한 테두리 여유공간을 갖는 지하 구조물의 흙막이벽 구축공법.
11. The method of claim 10,
Wherein the exposed bonded steel plate part (43) is adjusted to match the horizontal height between the adjacent bonded steel plate parts (43), and is fixed to the pile by bolting. The floor panel of an underground structure having a narrow frame clearance space Construction method.
KR1020160160845A 2016-11-29 2016-11-29 Construction method of retaining wall for underground structures with narrow edge space KR101928054B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160160845A KR101928054B1 (en) 2016-11-29 2016-11-29 Construction method of retaining wall for underground structures with narrow edge space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160160845A KR101928054B1 (en) 2016-11-29 2016-11-29 Construction method of retaining wall for underground structures with narrow edge space

Publications (2)

Publication Number Publication Date
KR20180060852A true KR20180060852A (en) 2018-06-07
KR101928054B1 KR101928054B1 (en) 2018-12-11

Family

ID=62621257

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160160845A KR101928054B1 (en) 2016-11-29 2016-11-29 Construction method of retaining wall for underground structures with narrow edge space

Country Status (1)

Country Link
KR (1) KR101928054B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968245A (en) * 2017-05-18 2017-07-21 重庆科技学院 The uplift pile of prestress anchorage cable manually digging hole and its construction method
CN111411630A (en) * 2020-03-31 2020-07-14 上海二十冶建设有限公司 Supporting method for local deepened area in deep foundation pit
CN115299275A (en) * 2022-07-11 2022-11-08 北京市政路桥股份有限公司 Funnel type ancient tree protection structure construction method for upper part of slope terrain tunnel
WO2024039010A1 (en) * 2022-08-19 2024-02-22 오용환 H-pile using guide bracket and ground anchor and method for constructing temporary earth retaining structure using same

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102514988B1 (en) 2021-04-01 2023-03-29 (주)신명건설기술공사 Pile construction device and method using earth anchor
KR102626432B1 (en) * 2022-12-09 2024-01-16 오용환 Temporary retaining facility using guide bracket and ground anchor for step-by-step support of deep excavation and its construction method
KR102626433B1 (en) * 2023-01-11 2024-01-16 오용환 Temporary earth retaining facility using guide bracket and ground anchor and its construction method
KR102610817B1 (en) * 2023-01-11 2023-12-05 오용환 Temporary earth retaining facility using guide bracket and ground anchor and its construction method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4235661B2 (en) * 2006-09-29 2009-03-11 黒沢建設株式会社 Ground anchor and ground anchor method
KR101302743B1 (en) * 2012-12-06 2013-08-30 김인종 Phc pile and its using the same soil cement wall construction methode
KR101494132B1 (en) * 2014-03-28 2015-02-16 최정주 Self reliance type sheathing structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968245A (en) * 2017-05-18 2017-07-21 重庆科技学院 The uplift pile of prestress anchorage cable manually digging hole and its construction method
CN111411630A (en) * 2020-03-31 2020-07-14 上海二十冶建设有限公司 Supporting method for local deepened area in deep foundation pit
CN115299275A (en) * 2022-07-11 2022-11-08 北京市政路桥股份有限公司 Funnel type ancient tree protection structure construction method for upper part of slope terrain tunnel
CN115299275B (en) * 2022-07-11 2024-05-10 北京市政路桥股份有限公司 Construction method of funnel type ancient tree protection structure for upper part of slope terrain tunnel
WO2024039010A1 (en) * 2022-08-19 2024-02-22 오용환 H-pile using guide bracket and ground anchor and method for constructing temporary earth retaining structure using same

Also Published As

Publication number Publication date
KR101928054B1 (en) 2018-12-11

Similar Documents

Publication Publication Date Title
KR101928054B1 (en) Construction method of retaining wall for underground structures with narrow edge space
KR100910576B1 (en) Embed anchor and construction method of composite basement wall using the same
KR101973565B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate
KR20100068597A (en) A shoring method using arch plate pile and h-pile
JP3071402B2 (en) Lifting method of structure, jack engaging structure and bracket used in the method
KR100415809B1 (en) precast pile for braced wall and the method using the same
KR100914158B1 (en) Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut
KR101842208B1 (en) Construction method of retaining wall
KR20200124949A (en) Anchor Tension way sheathing structure and sheathing method of construction
US20060179730A1 (en) Wall structural member and method for constructing a wall structure
KR101065017B1 (en) A shoring method using arch plate pile and H-Pile
KR20070081633A (en) Construction method for underground watertight wall and subsidiary casing used in the same
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
JP2007162266A (en) Two-step earth retaining wall and its construction method
JP2007009505A (en) Foundation reinforcing method
KR20150039409A (en) The wall members and underground wall, underground wall construction method using the same
KR101078080B1 (en) Earth retaining wall and it&#39;s construction method using the precast pile and ground reinforcement
KR100924794B1 (en) Inflow reduction method for transition zone btween cut and coer bored tunnel
KR20170017199A (en) Retaining Wal1 Construction Method Using PHC Pile
JP2000352296A (en) Method o constructing passage just under underground structure
KR101807366B1 (en) A Foundation Method Of Continuous and Cut Off wall By Overlap Casing
KR101973566B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by bolting cutoff plate to phc pile with longitudinal plate
KR100313721B1 (en) Method for designing synthetic underground retaining wall by temporary soil protection structure and working process of underground retaining wall of structure
KR20190012368A (en) Smallcaliber composite pile wall using small drilling rig at adjacent building proximity section and construction method of the same
KR20190084633A (en) Top-down construction method for concrete building structure using steel pile underground wall and shear support plate

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant